Amendment 0001.pdf
PDF 809 KB Posted
- Solicitation number
- 69056725Q000038
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a VTC (Video Teleconference) System Procurement with Ancillary Installation, issued by the Federal Highway Administration (FHWA) Western Lands Division in Vancouver, WA. Amendment 0001, effective 08/28/2025, revises Page B-8 of Section B and adds Attachment 0001 with photos and a floor plan, which includes detailed drawings of office and conference room layouts (Conference Rooms A and B).
The amendment includes critical contract provisions such as government-furnished information access, authority to obligate the government, payment restrictions for unauthorized work, and contract closeout procedures. The attachment provides visual documentation of the project space, with Figure 1 showing a floor plan highlighting the conference rooms, and Figures 2 and 3 depicting the interior views of Conference Rooms B and A, respectively, which appear to be equipped with conference tables, chairs, and audiovisual equipment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QandA 08-28-2025.pdf | ||
| Attachment 0001_photos and Plan.pdf | ||
| QandA 08-22-2025-2.pdf | ||
| QandA 08-22-2025.pdf | ||
| Brand Name Justification_PolyCom-signed.pdf | ||
| 69056725Q000038_RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
69056725Q000038 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
690567
Vancouver WA 98661
610 E FIFTH STREET
FHWA WESTERN FED LANDS DIVISION
Federal Highway Administration
08/28/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.
Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, x
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/18/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
VTC System Procurement with Ancillary Installation
By way of this amendment, amendment 0001, amend to:
1. Revise Page B-8 of Section B.
2. Add Attachment _0001 Photos and Plan.
All changes are indicated by red and/or lined-through text on the attached pages.
All other stipulations remain unchanged.
15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
haydar.mohammad Highlight haydar.mohammad Highlight haydar.mohammad Highlight
B-8 Amendment 0001
16. GOVERNMENT FURNISHED INFORMATION
The FHWA will provide to the Contractor access to any information under its purview necessary to complete any requirements under this Order that is not publicly available.
17. AUTHORITY TO OBLIGATE THE GOVERNMENT
The Contracting Officer is the only individual who can legally commit or obligate the Government to the expenditure of public funds. No cost chargeable to the proposed task order can be incurred before receipt of a fully executed task order or specific authorization from the Contracting Officer.
18. PAYMENT FOR UNAUTHORIZED WORK
No payments will be made for any unauthorized supplies and/or services or for any unauthorized changes to the work specified herein. This includes any services performed by the Contractor of their own volition or at the request of an individual other than a duly appointed Contracting Officer.
Only a duly appointed Contracting Officer is authorized to change the specifications, terms, and conditions under this effort.
19. CLOSEOUT OF CONTRACT FILES
The Government will initiate the administrative closeout of the Delivery Order after receiving evidence that all technical requirements have been completed. The Contractor shall furnish all required documents in support of the closeout of this contract.
The Government anticipates the timeframe to complete the administrative close out of this contract will not exceed 30 days. The costs incurred in the administrative closeout of task orders and contract files are unallowable direct costs under the contract and, therefore, cannot be charged as direct costs to the Government. Contractors are to handle such costs in accordance with their disclosure statements/cost accounting systems.
10. ATTACHMENTS
Attachment 0001_Photos and Plan (3 pages)
Attachment 0001 Project name: VTC System Procurement with Ancillary Installation
1 Amendment 0001
Figure 1: Drawing of the office and conference rooms
2 Amendment 0001
Figure 2: Conference Room B
3 Amendment 0001
Figure 3: Conference Room A
File details come from the government source that posted it. Updated .