Bid Tabulation-MT DAR MALM 2025(1).pdf

PDF 649 KB Posted

Attached to
MT DAR MALM 2025(1), Defense Access Roads FY 2025
Solicitation number
69056725B000007
Issued by

About this file

This document is a Tabulation of Bids for the Defense Access Roads FY 2025 project (Solicitation No. 69056725B000007) issued by the Federal Highway Administration's Western Federal Lands division. The bid tabulation covers five alternate schedules (A, B, C, D, and E) for a road construction project in Fergus County, Montana, with multiple contractors submitting bids. Bidders include KH Civil Contractors, McKenzie Construction and Site Development, Shumaker Trucking & Excavating Contractors, and Century Companies, with total bid amounts ranging from approximately $3.5 million to $13.2 million across different schedules.

The bid includes detailed line items for various construction activities such as mobilization, construction survey and staking, quality control, testing, soil erosion control, roadway aggregate work, calcium chloride application, traffic control, and equipment usage. Each schedule contains comprehensive pricing for specific road improvement tasks, with the engineer's estimate serving as a baseline for comparison. The bids were opened on 06/11/25 at the FHWA Vancouver, WA Office by Marino Chea, with the lowest bidder varying by schedule - for example, McKenzie Construction had the lowest bid for Schedule A at $3,530,163.19, while KH Civil Contractors had the lowest for Schedule B at $5,489,531.24.

View the file

Other files

File Type Posted
BidSum_MT DAR MALM 2025(1).pdf PDF
Amendment A001.pdf PDF
QA_06-05-2025.pdf PDF
QA_06-04-2025.pdf PDF
QA_06-03-2025.pdf PDF
mtd-malm2025-1_DAR2025(1)_plans.pdf PDF
DAR Grizzly Bear Sightings Log.docx DOCX document
IFB_69056725B000007_MT DAR MALM 2025(1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 06/12/25

1 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Contractor Responsive?

Engineer's Estimate

Century Companies, Inc.

KH Civil Contractors, Inc.

McKenzie Construction and Site Development, LLC

Shumaker Trucking & Excavating Contractors, Inc.

Alternate Schedule A

$3,143,842.50

$4,661,390.00

$3,628,194.87

$3,530,163.19

$3,703,784.15

Alternate Schedule B

$5,427,107.50

$7,240,745.00

$5,489,531.24

$5,791,352.14

$5,866,268.33

Alternate Schedule C

$7,716,040.00

$9,737,240.00

$7,137,926.45

$7,927,642.76

$7,969,365.72

Contractor Responsive?

Engineer's Estimate

Century Companies, Inc.

KH Civil Contractors, Inc.

McKenzie Construction and Site Development, LLC

Shumaker Trucking & Excavating Contractors, Inc.

Alternate Schedule D

$9,374,482.50

$11,539,165.00

$8,203,595.31

$9,451,266.78

$9,356,462.05

Alternate Schedule E

$10,604,717.50

$13,241,770.00

$9,236,240.99

$10,799,766.21

$10,474,766.40

2 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: A

Schedule Type: Alternate

Solcitation No: 69056725B000007

Division: Western Federal Lands

State: MT County: Fergus

Federal Land: Opened at: FHWA Vancouver, WA Office

Opened by: Marino Chea

Date: 06/11/25

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

McKenzie Construction and Site Development, LLC $3,530,163.19 2301 Calvert Street NW Washington, DC 20008

KH Civil Contractors, Inc. $3,628,194.87 280 Robinson Way Lewistown, MT 59457

Shumaker Trucking & Excavating Contractors, Inc. $3,703,784.15

PO BOX 1279

Great Falls, MT 59403

Century Companies, Inc. $4,661,390.00 510 1st Ave. N.

Lewistown, MT 59457

Engineer's Estimate $3,143,842.50

Contracting Officer 06/12/2025

3 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: A

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1000 15101-0000 MOBILIZATION

McKenzie Construction and Site Development, LLC Lump Sum $402,491.62 KH Civil Contractors, Inc. Lump Sum $480,200.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $554,094.00 Century Companies, Inc. Lump Sum $620,000.00 Engineer's Estimate ALL LPSM Lump Sum $400,000.00

A1002 15201-0000 CONSTRUCTION SURVEY AND STAKING

McKenzie Construction and Site Development, LLC Lump Sum $74,610.05 KH Civil Contractors, Inc. Lump Sum $12,600.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $119,571.00 Century Companies, Inc. Lump Sum $248,000.00 Engineer's Estimate ALL LPSM Lump Sum $115,000.00

A1004 15301-0000 CONTRACTOR QUALITY CONTROL

McKenzie Construction and Site Development, LLC Lump Sum $112,489.01 KH Civil Contractors, Inc. Lump Sum $85,400.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $213,438.00 Century Companies, Inc. Lump Sum $300,000.00 Engineer's Estimate ALL LPSM Lump Sum $225,000.00

A1006 15401-0000 CONTRACTOR TESTING

McKenzie Construction and Site Development, LLC Lump Sum $56,244.50 KH Civil Contractors, Inc. Lump Sum $119,000.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $252,849.00 Century Companies, Inc. Lump Sum $230,000.00 Engineer's Estimate ALL LPSM Lump Sum $180,000.00

A1008 15501-0000 CONSTRUCTION SCHEDULE

McKenzie Construction and Site Development, LLC Lump Sum $22,956.94 KH Civil Contractors, Inc. Lump Sum $14,000.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $163,328.00 Century Companies, Inc. Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $32,000.00

A1010 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

McKenzie Construction and Site Development, LLC $52.40 $24,104.00 KH Civil Contractors, Inc. $7.00 $3,220.00 Shumaker Trucking & Excavating Contractors, Inc. $5.20 $2,392.00 Century Companies, Inc. $12.00 $5,520.00 Engineer's Estimate 460 LNFT $7.00 $3,220.00

4 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: A

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1012 15802-0000 WATERING FOR DUST CONTROL

McKenzie Construction and Site Development, LLC Lump Sum $148,072.27 KH Civil Contractors, Inc. Lump Sum $9,100.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $16,967.00 Century Companies, Inc. Lump Sum $75,000.00 Engineer's Estimate ALL LPSM Lump Sum $8,000.00

A1014 25101-0200 PLACED RIPRAP, CLASS 2 (RIPRAP HEADWALL)

McKenzie Construction and Site Development, LLC $430.44 $3,873.96 KH Civil Contractors, Inc. $280.00 $2,520.00 Shumaker Trucking & Excavating Contractors, Inc. $191.00 $1,719.00 Century Companies, Inc. $500.00 $4,500.00 Engineer's Estimate 9 CUYD $550.00 $4,950.00

A1016 30202-2000 ROADWAY AGGREGATE, METHOD 2 (E ROADS)

McKenzie Construction and Site Development, LLC $62.82 $65,018.70 KH Civil Contractors, Inc. $52.71 $54,554.85 Shumaker Trucking & Excavating Contractors, Inc. $52.70 $54,544.50 Century Companies, Inc. $56.00 $57,960.00 Engineer's Estimate 1,035 TON $50.00 $51,750.00

A1018 30301-6000 ROADWAY RECONDITIONING

McKenzie Construction and Site Development, LLC $58,540.20 $752,241.57 KH Civil Contractors, Inc. $5,544.00 $71,240.40 Shumaker Trucking & Excavating Contractors, Inc. $9,510.00 $122,203.50 Century Companies, Inc. $12,000.00 $154,200.00 Engineer's Estimate 12.85 MILE $12,000.00 $154,200.00

A1020 31103-3000 STABILIZED AGGREGATE SURFACE COURSE, CALCIUM CHLORIDE (E ROADS)

McKenzie Construction and Site Development, LLC $36.73 $1,111,229.42 KH Civil Contractors, Inc. $52.71 $1,594,688.34 Shumaker Trucking & Excavating Contractors, Inc. $41.60 $1,258,566.40 Century Companies, Inc. $55.00 $1,663,970.00 Engineer's Estimate 30,254 TON $35.00 $1,058,890.00

A1022 31103-3000 STABILIZED AGGREGATE SURFACE COURSE, CALCIUM CHLORIDE (IN-PLACE STABILIZATION)

McKenzie Construction and Site Development, LLC $43.43 $196,477.32 KH Civil Contractors, Inc. $61.12 $276,506.88 Shumaker Trucking & Excavating Contractors, Inc. $51.00 $230,724.00 Century Companies, Inc. $65.00 $294,060.00 Engineer's Estimate 4,524 TON $40.00 $180,960.00

5 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: A

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1024 31110-0000 CALCIUM CHLORIDE

McKenzie Construction and Site Development, LLC $459.13 $313,126.66 KH Civil Contractors, Inc. $1,012.20 $690,320.40 Shumaker Trucking & Excavating Contractors, Inc. $704.00 $480,128.00 Century Companies, Inc. $830.00 $566,060.00 Engineer's Estimate 682 TON $750.00 $511,500.00

A1026 60705-0000 REPAIRING DRAINAGE STRUCTURE

McKenzie Construction and Site Development, LLC $4,017.46 $4,017.46 KH Civil Contractors, Inc. $2,800.00 $2,800.00 Shumaker Trucking & Excavating Contractors, Inc. $2,830.00 $2,830.00 Century Companies, Inc. $7,500.00 $7,500.00 Engineer's Estimate 1 EACH $4,000.00 $4,000.00

A1028 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY

McKenzie Construction and Site Development, LLC $183.65 $14,692.00 KH Civil Contractors, Inc. $183.40 $14,672.00 Shumaker Trucking & Excavating Contractors, Inc. $184.00 $14,720.00 Century Companies, Inc. $185.00 $14,800.00 Engineer's Estimate 80 HOUR $250.00 $20,000.00

A1030 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH

McKenzie Construction and Site Development, LLC $241.04 $19,283.20 KH Civil Contractors, Inc. $183.40 $14,672.00 Shumaker Trucking & Excavating Contractors, Inc. $132.00 $10,560.00 Century Companies, Inc. $215.00 $17,200.00 Engineer's Estimate 80 HOUR $200.00 $16,000.00

A1032 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

McKenzie Construction and Site Development, LLC $292.70 $11,708.00 KH Civil Contractors, Inc. $239.40 $9,576.00 Shumaker Trucking & Excavating Contractors, Inc. $145.00 $5,800.00 Century Companies, Inc. $250.00 $10,000.00 Engineer's Estimate 40 HOUR $250.00 $10,000.00

A1034 62301-0000 GENERAL LABOR

McKenzie Construction and Site Development, LLC $123.96 $4,958.40 KH Civil Contractors, Inc. $92.40 $3,696.00 Shumaker Trucking & Excavating Contractors, Inc. $92.70 $3,708.00 Century Companies, Inc. $80.00 $3,200.00 Engineer's Estimate 40 HOUR $100.00 $4,000.00

6 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: A

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1036 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

McKenzie Construction and Site Development, LLC $20.66 $929.70 KH Civil Contractors, Inc. $14.00 $630.00 Shumaker Trucking & Excavating Contractors, Inc. $0.65 $29.25 Century Companies, Inc. $11.00 $495.00 Engineer's Estimate 45 SQYD $4.50 $202.50

A1038 62502-0000 TURF ESTABLISHMENT (DRY METHOD)

McKenzie Construction and Site Development, LLC $10.33 $464.85 KH Civil Contractors, Inc. $14.00 $630.00 Shumaker Trucking & Excavating Contractors, Inc. $1.30 $58.50 Century Companies, Inc. $5.00 $225.00 Engineer's Estimate 45 SQYD $6.00 $270.00

A1040 63501-0000 TEMPORARY TRAFFIC CONTROL

McKenzie Construction and Site Development, LLC Lump Sum $114,784.70 KH Civil Contractors, Inc. Lump Sum $85,400.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $70,715.00 Century Companies, Inc. Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $22,000.00

A1042 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

McKenzie Construction and Site Development, LLC $74.61 $56,703.60 KH Civil Contractors, Inc. $72.80 $55,328.00 Shumaker Trucking & Excavating Contractors, Inc. $67.10 $50,996.00 Century Companies, Inc. $80.00 $60,800.00 Engineer's Estimate 760 HOUR $90.00 $68,400.00

A1044 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

McKenzie Construction and Site Development, LLC $401.74 $19,685.26 KH Civil Contractors, Inc. $560.00 $27,440.00 Shumaker Trucking & Excavating Contractors, Inc. $1,507.00 $73,843.00 Century Companies, Inc. $2,100.00 $102,900.00 Engineer's Estimate 49 DAY $1,500.00 $73,500.00

Total Schedule - All Items

McKenzie Construction and Site Development, LLC $3,530,163.19 KH Civil Contractors, Inc. $3,628,194.87 Shumaker Trucking & Excavating Contractors, Inc. $3,703,784.15 Century Companies, Inc. $4,661,390.00 Engineer's Estimate $3,143,842.50

7 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: B

Schedule Type: Alternate

Solcitation No: 69056725B000007

Division: Western Federal Lands

State: MT County: Fergus

Federal Land: Opened at: FHWA Vancouver, WA Office

Opened by: Marino Chea

Date: 06/11/25

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

KH Civil Contractors, Inc. $5,489,531.24 280 Robinson Way Lewistown, MT 59457

McKenzie Construction and Site Development, LLC $5,791,352.14 2301 Calvert Street NW Washington, DC 20008

Shumaker Trucking & Excavating Contractors, Inc. $5,866,268.33

PO BOX 1279

Great Falls, MT 59403

Century Companies, Inc. $7,240,745.00 510 1st Ave. N.

Lewistown, MT 59457

Engineer's Estimate $5,427,107.50

8 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1000 15101-0000 MOBILIZATION

KH Civil Contractors, Inc. Lump Sum $544,050.00 McKenzie Construction and Site Development, LLC Lump Sum $548,898.49 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $808,080.00 Century Companies, Inc. Lump Sum $850,000.00 Engineer's Estimate ALL LPSM Lump Sum $700,000.00

B1002 15201-0000 CONSTRUCTION SURVEY AND STAKING

KH Civil Contractors, Inc. Lump Sum $21,600.00 McKenzie Construction and Site Development, LLC Lump Sum $137,535.16 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $190,109.00 Century Companies, Inc. Lump Sum $350,000.00 Engineer's Estimate ALL LPSM Lump Sum $210,000.00

B1004 15301-0000 CONTRACTOR QUALITY CONTROL

KH Civil Contractors, Inc. Lump Sum $97,200.00 McKenzie Construction and Site Development, LLC Lump Sum $155,873.18 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $337,182.00 Century Companies, Inc. Lump Sum $350,000.00 Engineer's Estimate ALL LPSM Lump Sum $410,000.00

B1006 15401-0000 CONTRACTOR TESTING

KH Civil Contractors, Inc. Lump Sum $122,850.00 McKenzie Construction and Site Development, LLC Lump Sum $77,936.59 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $379,840.00 Century Companies, Inc. Lump Sum $300,000.00 Engineer's Estimate ALL LPSM Lump Sum $330,000.00

B1008 15501-0000 CONSTRUCTION SCHEDULE

KH Civil Contractors, Inc. Lump Sum $13,500.00 McKenzie Construction and Site Development, LLC Lump Sum $25,214.78 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $249,251.00 Century Companies, Inc. Lump Sum $218,000.00 Engineer's Estimate ALL LPSM Lump Sum $60,000.00

B1010 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

KH Civil Contractors, Inc. $6.75 $6,075.00 McKenzie Construction and Site Development, LLC $28.01 $25,209.00 Shumaker Trucking & Excavating Contractors, Inc. $5.20 $4,680.00 Century Companies, Inc. $12.00 $10,800.00 Engineer's Estimate 900 LNFT $7.00 $6,300.00

9 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1012 15802-0000 WATERING FOR DUST CONTROL

KH Civil Contractors, Inc. Lump Sum $16,200.00 McKenzie Construction and Site Development, LLC Lump Sum $183,380.22 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $27,530.00 Century Companies, Inc. Lump Sum $150,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00

B1014 25101-0200 PLACED RIPRAP, CLASS 2 (RIPRAP HEADWALL)

KH Civil Contractors, Inc. $270.00 $2,430.00 McKenzie Construction and Site Development, LLC $429.79 $3,868.11 Shumaker Trucking & Excavating Contractors, Inc. $191.00 $1,719.00 Century Companies, Inc. $500.00 $4,500.00 Engineer's Estimate 9 CUYD $550.00 $4,950.00

B1016 30202-2000 ROADWAY AGGREGATE, METHOD 2 (E ROADS)

KH Civil Contractors, Inc. $51.25 $91,225.00 McKenzie Construction and Site Development, LLC $62.72 $111,641.60 Shumaker Trucking & Excavating Contractors, Inc. $51.40 $91,492.00 Century Companies, Inc. $56.00 $99,680.00 Engineer's Estimate 1,780 TON $50.00 $89,000.00

B1018 30301-6000 ROADWAY RECONDITIONING

KH Civil Contractors, Inc. $5,346.00 $124,989.48 McKenzie Construction and Site Development, LLC $58,452.44 $1,366,618.05 Shumaker Trucking & Excavating Contractors, Inc. $9,241.00 $216,054.58 Century Companies, Inc. $12,000.00 $280,560.00 Engineer's Estimate 23.38 MILE $12,000.00 $280,560.00

B1020 31103-3000 STABILIZED AGGREGATE SURFACE COURSE, CALCIUM CHLORIDE (E ROADS)

KH Civil Contractors, Inc. $51.25 $2,273,450.00 McKenzie Construction and Site Development, LLC $36.67 $1,626,681.20 Shumaker Trucking & Excavating Contractors, Inc. $40.20 $1,783,272.00 Century Companies, Inc. $55.00 $2,439,800.00 Engineer's Estimate 44,360 TON $35.00 $1,552,600.00

B1022 31103-3000 STABILIZED AGGREGATE SURFACE COURSE, CALCIUM CHLORIDE (IN-PLACE STABILIZATION)

KH Civil Contractors, Inc. $54.16 $679,762.16 McKenzie Construction and Site Development, LLC $43.55 $546,596.05 Shumaker Trucking & Excavating Contractors, Inc. $46.50 $583,621.50 Century Companies, Inc. $65.00 $815,815.00 Engineer's Estimate 12,551 TON $40.00 $502,040.00

10 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1024 31110-0000 CALCIUM CHLORIDE

KH Civil Contractors, Inc. $976.05 $1,178,092.35 McKenzie Construction and Site Development, LLC $458.45 $553,349.15 Shumaker Trucking & Excavating Contractors, Inc. $698.00 $842,486.00 Century Companies, Inc. $800.00 $965,600.00 Engineer's Estimate 1,207 TON $750.00 $905,250.00

B1026 60201-0800 24-INCH PIPE CULVERT

KH Civil Contractors, Inc. $283.50 $14,175.00 McKenzie Construction and Site Development, LLC $146.70 $7,335.00 Shumaker Trucking & Excavating Contractors, Inc. $215.00 $10,750.00 Century Companies, Inc. $205.00 $10,250.00 Engineer's Estimate 50 LNFT $350.00 $17,500.00

B1028 60705-0000 REPAIRING DRAINAGE STRUCTURE

KH Civil Contractors, Inc. $2,700.00 $13,500.00 McKenzie Construction and Site Development, LLC $4,011.44 $20,057.20 Shumaker Trucking & Excavating Contractors, Inc. $2,998.00 $14,990.00 Century Companies, Inc. $7,500.00 $37,500.00 Engineer's Estimate 5 EACH $4,000.00 $20,000.00

B1030 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY

KH Civil Contractors, Inc. $176.85 $14,148.00 McKenzie Construction and Site Development, LLC $183.38 $14,670.40 Shumaker Trucking & Excavating Contractors, Inc. $184.00 $14,720.00 Century Companies, Inc. $185.00 $14,800.00 Engineer's Estimate 80 HOUR $250.00 $20,000.00

B1032 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH

KH Civil Contractors, Inc. $176.85 $14,148.00 McKenzie Construction and Site Development, LLC $240.68 $19,254.40 Shumaker Trucking & Excavating Contractors, Inc. $132.00 $10,560.00 Century Companies, Inc. $215.00 $17,200.00 Engineer's Estimate 80 HOUR $200.00 $16,000.00

B1034 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

KH Civil Contractors, Inc. $230.85 $9,234.00 McKenzie Construction and Site Development, LLC $292.26 $11,690.40 Shumaker Trucking & Excavating Contractors, Inc. $145.00 $5,800.00 Century Companies, Inc. $250.00 $10,000.00 Engineer's Estimate 40 HOUR $250.00 $10,000.00

11 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1036 62301-0000 GENERAL LABOR

KH Civil Contractors, Inc. $89.10 $3,564.00 McKenzie Construction and Site Development, LLC $123.78 $4,951.20 Shumaker Trucking & Excavating Contractors, Inc. $92.70 $3,708.00 Century Companies, Inc. $80.00 $3,200.00 Engineer's Estimate 40 HOUR $100.00 $4,000.00

B1038 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

KH Civil Contractors, Inc. $14.85 $4,677.75 McKenzie Construction and Site Development, LLC $20.63 $6,498.45 Shumaker Trucking & Excavating Contractors, Inc. $0.65 $204.75 Century Companies, Inc. $11.00 $3,465.00 Engineer's Estimate 315 SQYD $4.50 $1,417.50

B1040 62502-0000 TURF ESTABLISHMENT (DRY METHOD)

KH Civil Contractors, Inc. $13.50 $4,252.50 McKenzie Construction and Site Development, LLC $10.31 $3,247.65 Shumaker Trucking & Excavating Contractors, Inc. $1.30 $409.50 Century Companies, Inc. $5.00 $1,575.00 Engineer's Estimate 315 SQYD $6.00 $1,890.00

B1042 63501-0000 TEMPORARY TRAFFIC CONTROL

KH Civil Contractors, Inc. Lump Sum $102,600.00 McKenzie Construction and Site Development, LLC Lump Sum $206,302.74 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $98,485.00 Century Companies, Inc. Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $39,000.00

B1044 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

KH Civil Contractors, Inc. $70.20 $101,088.00 McKenzie Construction and Site Development, LLC $74.49 $107,265.60 Shumaker Trucking & Excavating Contractors, Inc. $61.70 $88,848.00 Century Companies, Inc. $80.00 $115,200.00 Engineer's Estimate 1,440 HOUR $90.00 $129,600.00

B1046 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

KH Civil Contractors, Inc. $540.00 $36,720.00 McKenzie Construction and Site Development, LLC $401.14 $27,277.52 Shumaker Trucking & Excavating Contractors, Inc. $1,507.00 $102,476.00 Century Companies, Inc. $2,100.00 $142,800.00 Engineer's Estimate 68 DAY $1,500.00 $102,000.00

12 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Total Schedule - All Items

KH Civil Contractors, Inc. $5,489,531.24 McKenzie Construction and Site Development, LLC $5,791,352.14 Shumaker Trucking & Excavating Contractors, Inc. $5,866,268.33 Century Companies, Inc. $7,240,745.00 Engineer's Estimate $5,427,107.50

13 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: C

Schedule Type: Alternate

Solcitation No: 69056725B000007

Division: Western Federal Lands

State: MT County: Fergus

Federal Land: Opened at: FHWA Vancouver, WA Office

Opened by: Marino Chea

Date: 06/11/25

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

KH Civil Contractors, Inc. $7,137,926.45 280 Robinson Way Lewistown, MT 59457

McKenzie Construction and Site Development, LLC $7,927,642.76 2301 Calvert Street NW Washington, DC 20008

Shumaker Trucking & Excavating Contractors, Inc. $7,969,365.72

PO BOX 1279

Great Falls, MT 59403

Century Companies, Inc. $9,737,240.00 510 1st Ave. N.

Engineer's Estimate $7,716,040.00

14 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: C

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C1000 15101-0000 MOBILIZATION

KH Civil Contractors, Inc. Lump Sum $604,500.00 McKenzie Construction and Site Development, LLC Lump Sum $703,730.55 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $1,065,673.00 Century Companies, Inc. Lump Sum $1,004,000.00 Engineer's Estimate ALL LPSM Lump Sum $1,000,000.00

C1002 15201-0000 CONSTRUCTION SURVEY AND STAKING

KH Civil Contractors, Inc. Lump Sum $31,200.00 McKenzie Construction and Site Development, LLC Lump Sum $206,242.87 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $259,412.00 Century Companies, Inc. Lump Sum $450,000.00 Engineer's Estimate ALL LPSM Lump Sum $320,000.00

C1004 15301-0000 CONTRACTOR QUALITY CONTROL

KH Civil Contractors, Inc. Lump Sum $111,800.00 McKenzie Construction and Site Development, LLC Lump Sum $187,910.17 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $463,650.00 Century Companies, Inc. Lump Sum $450,000.00 Engineer's Estimate ALL LPSM Lump Sum $615,000.00

C1006 15401-0000 CONTRACTOR TESTING

KH Civil Contractors, Inc. Lump Sum $144,950.00 McKenzie Construction and Site Development, LLC Lump Sum $93,955.08 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $502,063.00 Century Companies, Inc. Lump Sum $400,000.00 Engineer's Estimate ALL LPSM Lump Sum $495,000.00

C1008 15501-0000 CONSTRUCTION SCHEDULE

KH Civil Contractors, Inc. Lump Sum $13,000.00 McKenzie Construction and Site Development, LLC Lump Sum $28,644.84 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $332,712.00 Century Companies, Inc. Lump Sum $260,000.00 Engineer's Estimate ALL LPSM Lump Sum $90,000.00

C1010 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

KH Civil Contractors, Inc. $6.50 $9,100.00 McKenzie Construction and Site Development, LLC $23.21 $32,494.00 Shumaker Trucking & Excavating Contractors, Inc. $5.20 $7,280.00 Century Companies, Inc. $12.00 $16,800.00 Engineer's Estimate 1,400 LNFT $7.00 $9,800.00

15 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: C

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C1012 15802-0000 WATERING FOR DUST CONTROL

KH Civil Contractors, Inc. Lump Sum $23,400.00 McKenzie Construction and Site Development, LLC Lump Sum $183,326.99 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $38,047.00 Century Companies, Inc. Lump Sum $170,000.00 Engineer's Estimate ALL LPSM Lump Sum $22,000.00

C1014 25101-0200 PLACED RIPRAP, CLASS 2 (RIPRAP HEADWALL)

KH Civil Contractors, Inc. $260.00 $2,340.00 McKenzie Construction and Site Development, LLC $429.67 $3,867.03 Shumaker Trucking & Excavating Contractors, Inc. $191.00 $1,719.00 Century Companies, Inc. $500.00 $4,500.00 Engineer's Estimate 9 CUYD $550.00 $4,950.00

C1016 30202-2000 ROADWAY AGGREGATE, METHOD 2 (E ROADS)

KH Civil Contractors, Inc. $48.87 $98,228.70 McKenzie Construction and Site Development, LLC $64.16 $128,961.60 Shumaker Trucking & Excavating Contractors, Inc. $49.80 $100,098.00 Century Companies, Inc. $65.00 $130,650.00 Engineer's Estimate 2,010 TON $50.00 $100,500.00

C1018 30301-6000 ROADWAY RECONDITIONING

KH Civil Contractors, Inc. $5,148.00 $181,518.48 McKenzie Construction and Site Development, LLC $58,435.48 $2,060,435.02 Shumaker Trucking & Excavating Contractors, Inc. $9,067.00 $319,702.42 Century Companies, Inc. $12,000.00 $423,120.00 Engineer's Estimate 35.26 MILE $12,000.00 $423,120.00

C1020 31103-3000 STABILIZED AGGREGATE SURFACE COURSE, CALCIUM CHLORIDE (E ROADS)

KH Civil Contractors, Inc. $48.87 $2,737,453.05 McKenzie Construction and Site Development, LLC $36.66 $2,053,509.90 Shumaker Trucking & Excavating Contractors, Inc. $40.00 $2,240,600.00 Century Companies, Inc. $55.00 $3,080,825.00 Engineer's Estimate 56,015 TON $35.00 $1,960,525.00

C1022 31103-3000 STABILIZED AGGREGATE SURFACE COURSE, CALCIUM CHLORIDE (IN-PLACE STABILIZATION)

KH Civil Contractors, Inc. $51.34 $1,128,607.22 McKenzie Construction and Site Development, LLC $43.54 $957,139.82 Shumaker Trucking & Excavating Contractors, Inc. $44.60 $980,441.80 Century Companies, Inc. $65.00 $1,428,895.00 Engineer's Estimate 21,983 TON $40.00 $879,320.00

16 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: C

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C1024 31110-0000 CALCIUM CHLORIDE

KH Civil Contractors, Inc. $939.90 $1,635,426.00 McKenzie Construction and Site Development, LLC $401.02 $697,774.80 Shumaker Trucking & Excavating Contractors, Inc. $695.00 $1,209,300.00 Century Companies, Inc. $800.00 $1,392,000.00 Engineer's Estimate 1,740 TON $750.00 $1,305,000.00

C1026 60201-0800 24-INCH PIPE CULVERT

KH Civil Contractors, Inc. $273.00 $13,650.00 McKenzie Construction and Site Development, LLC $146.66 $7,333.00 Shumaker Trucking & Excavating Contractors, Inc. $215.00 $10,750.00 Century Companies, Inc. $205.00 $10,250.00 Engineer's Estimate 50 LNFT $350.00 $17,500.00

C1028 60201-1000 36-INCH PIPE CULVERT

KH Civil Contractors, Inc. $374.40 $29,952.00 McKenzie Construction and Site Development, LLC $277.28 $22,182.40 Shumaker Trucking & Excavating Contractors, Inc. $173.00 $13,840.00 Century Companies, Inc. $230.00 $18,400.00 Engineer's Estimate 80 LNFT $350.00 $28,000.00

C1030 60705-0000 REPAIRING DRAINAGE STRUCTURE

KH Civil Contractors, Inc. $2,600.00 $15,600.00 McKenzie Construction and Site Development, LLC $4,010.27 $24,061.62 Shumaker Trucking & Excavating Contractors, Inc. $2,970.00 $17,820.00 Century Companies, Inc. $7,500.00 $45,000.00 Engineer's Estimate 6 EACH $4,000.00 $24,000.00

C1032 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY

KH Civil Contractors, Inc. $170.30 $13,624.00 McKenzie Construction and Site Development, LLC $183.32 $14,665.60 Shumaker Trucking & Excavating Contractors, Inc. $184.00 $14,720.00 Century Companies, Inc. $185.00 $14,800.00 Engineer's Estimate 80 HOUR $250.00 $20,000.00

C1034 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH

KH Civil Contractors, Inc. $170.30 $13,624.00 McKenzie Construction and Site Development, LLC $240.61 $19,248.80 Shumaker Trucking & Excavating Contractors, Inc. $132.00 $10,560.00 Century Companies, Inc. $215.00 $17,200.00 Engineer's Estimate 80 HOUR $200.00 $16,000.00

17 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: C

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C1036 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

KH Civil Contractors, Inc. $222.30 $8,892.00 McKenzie Construction and Site Development, LLC $292.17 $11,686.80 Shumaker Trucking & Excavating Contractors, Inc. $145.00 $5,800.00 Century Companies, Inc. $250.00 $10,000.00 Engineer's Estimate 40 HOUR $250.00 $10,000.00

C1038 62301-0000 GENERAL LABOR

KH Civil Contractors, Inc. $85.80 $3,432.00 McKenzie Construction and Site Development, LLC $123.74 $4,949.60 Shumaker Trucking & Excavating Contractors, Inc. $92.70 $3,708.00 Century Companies, Inc. $80.00 $3,200.00 Engineer's Estimate 40 HOUR $100.00 $4,000.00

C1040 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

KH Civil Contractors, Inc. $14.30 $6,435.00 McKenzie Construction and Site Development, LLC $20.62 $9,279.00 Shumaker Trucking & Excavating Contractors, Inc. $0.65 $292.50 Century Companies, Inc. $11.00 $4,950.00 Engineer's Estimate 450 SQYD $4.50 $2,025.00

C1042 62502-0000 TURF ESTABLISHMENT (DRY METHOD)

KH Civil Contractors, Inc. $13.00 $5,850.00 McKenzie Construction and Site Development, LLC $10.31 $4,639.50 Shumaker Trucking & Excavating Contractors, Inc. $1.30 $585.00 Century Companies, Inc. $5.00 $2,250.00 Engineer's Estimate 450 SQYD $6.00 $2,700.00

C1044 63501-0000 TEMPORARY TRAFFIC CONTROL

KH Civil Contractors, Inc. Lump Sum $124,800.00 McKenzie Construction and Site Development, LLC Lump Sum $286,801.33 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $125,434.00 Century Companies, Inc. Lump Sum $65,000.00 Engineer's Estimate ALL LPSM Lump Sum $60,000.00

C1046 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

KH Civil Contractors, Inc. $67.60 $137,904.00 McKenzie Construction and Site Development, LLC $74.47 $151,918.80 Shumaker Trucking & Excavating Contractors, Inc. $59.60 $121,584.00 Century Companies, Inc. $80.00 $163,200.00 Engineer's Estimate 2,040 HOUR $90.00 $183,600.00

18 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: C

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C1048 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

KH Civil Contractors, Inc. $520.00 $42,640.00 McKenzie Construction and Site Development, LLC $401.02 $32,883.64 Shumaker Trucking & Excavating Contractors, Inc. $1,507.00 $123,574.00 Century Companies, Inc. $2,100.00 $172,200.00 Engineer's Estimate 82 DAY $1,500.00 $123,000.00

Total Schedule - All Items

KH Civil Contractors, Inc. $7,137,926.45 McKenzie Construction and Site Development, LLC $7,927,642.76 Shumaker Trucking & Excavating Contractors, Inc. $7,969,365.72 Century Companies, Inc. $9,737,240.00 Engineer's Estimate $7,716,040.00

19 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: D

Schedule Type: Alternate

Solcitation No: 69056725B000007

Division: Western Federal Lands

State: MT County: Fergus

Federal Land: Opened at: FHWA Vancouver, WA Office

Opened by: Marino Chea

Date: 06/11/25

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

KH Civil Contractors, Inc. $8,203,595.31 280 Robinson Way Lewistown, MT 59457

Shumaker Trucking & Excavating Contractors, Inc. $9,356,462.05

PO BOX 1279

Great Falls, MT 59403

McKenzie Construction and Site Development, LLC $9,451,266.78 2301 Calvert Street NW Washington, DC 20008

Century Companies, Inc. $11,539,165.00 510 1st Ave. N.

Engineer's Estimate $9,374,482.50

20 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: D

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

D1000 15101-0000 MOBILIZATION

KH Civil Contractors, Inc. Lump Sum $631,150.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $1,267,205.00 McKenzie Construction and Site Development, LLC Lump Sum $820,960.91 Century Companies, Inc. Lump Sum $1,200,000.00 Engineer's Estimate ALL LPSM Lump Sum $1,220,000.00

D1002 15201-0000 CONSTRUCTION SURVEY AND STAKING

KH Civil Contractors, Inc. Lump Sum $39,000.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $303,024.00 McKenzie Construction and Site Development, LLC Lump Sum $252,070.19 Century Companies, Inc. Lump Sum $500,000.00 Engineer's Estimate ALL LPSM Lump Sum $395,000.00

D1004 15301-0000 CONTRACTOR QUALITY CONTROL

KH Civil Contractors, Inc. Lump Sum $130,000.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $548,564.00 McKenzie Construction and Site Development, LLC Lump Sum $229,154.72 Century Companies, Inc. Lump Sum $500,000.00 Engineer's Estimate ALL LPSM Lump Sum $770,000.00

D1006 15401-0000 CONTRACTOR TESTING

KH Civil Contractors, Inc. Lump Sum $150,800.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $578,981.00 McKenzie Construction and Site Development, LLC Lump Sum $114,577.36 Century Companies, Inc. Lump Sum $450,000.00 Engineer's Estimate ALL LPSM Lump Sum $615,000.00

D1008 15501-0000 CONSTRUCTION SCHEDULE

KH Civil Contractors, Inc. Lump Sum $13,000.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $385,409.00 McKenzie Construction and Site Development, LLC Lump Sum $34,373.20 Century Companies, Inc. Lump Sum $300,000.00 Engineer's Estimate ALL LPSM Lump Sum $110,000.00

D1010 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

KH Civil Contractors, Inc. $6.50 $10,270.00 Shumaker Trucking & Excavating Contractors, Inc. $5.20 $8,216.00 McKenzie Construction and Site Development, LLC $23.21 $36,671.80 Century Companies, Inc. $12.00 $18,960.00 Engineer's Estimate 1,580 LNFT $7.00 $11,060.00

21 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: D

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

D1012 15802-0000 WATERING FOR DUST CONTROL

KH Civil Contractors, Inc. Lump Sum $28,600.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $44,649.00 McKenzie Construction and Site Development, LLC Lump Sum $197,073.05 Century Companies, Inc. Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $27,000.00

D1014 25101-0200 PLACED RIPRAP, CLASS 2 (SLOPE ARMOR)

KH Civil Contractors, Inc. $200.20 $18,018.00 Shumaker Trucking & Excavating Contractors, Inc. $194.00 $17,460.00 McKenzie Construction and Site Development, LLC $315.08 $28,357.20 Century Companies, Inc. $500.00 $45,000.00 Engineer's Estimate 90 CUYD $450.00 $40,500.00

D1016 25101-0200 PLACED RIPRAP, CLASS 2 (RIPRAP HEADWALL)

KH Civil Contractors, Inc. $260.00 $2,340.00 Shumaker Trucking & Excavating Contractors, Inc. $191.00 $1,719.00 McKenzie Construction and Site Development, LLC $429.66 $3,866.94 Century Companies, Inc. $500.00 $4,500.00 Engineer's Estimate 9 CUYD $550.00 $4,950.00

D1018 25101-0300 PLACED RIPRAP, CLASS 3 (RIPRAP HEADWALL)

KH Civil Contractors, Inc. $260.00 $5,200.00 Shumaker Trucking & Excavating Contractors, Inc. $173.00 $3,460.00 McKenzie Construction and Site Development, LLC $315.08 $6,301.60 Century Companies, Inc. $500.00 $10,000.00 Engineer's Estimate 20 CUYD $500.00 $10,000.00

D1020 30202-2000 ROADWAY AGGREGATE, METHOD 2 (E ROADS)

KH Civil Contractors, Inc. $48.87 $98,228.70 Shumaker Trucking & Excavating Contractors, Inc. $49.40 $99,294.00 McKenzie Construction and Site Development, LLC $25.20 $50,652.00 Century Companies, Inc. $56.00 $112,560.00 Engineer's Estimate 2,010 TON $50.00 $100,500.00

D1022 30301-6000 ROADWAY RECONDITIONING

KH Civil Contractors, Inc. $5,148.00 $226,460.52 Shumaker Trucking & Excavating Contractors, Inc. $8,905.00 $391,730.95 McKenzie Construction and Site Development, LLC $58,434.45 $2,570,531.46 Century Companies, Inc. $12,000.00 $527,880.00 Engineer's Estimate 43.99 MILE $12,000.00 $527,880.00

22 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: D

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

D1024 31103-3000 STABILIZED AGGREGATE SURFACE COURSE, CALCIUM CHLORIDE (E ROADS)

KH Civil Contractors, Inc. $48.87 $2,737,453.05 Shumaker Trucking & Excavating Contractors, Inc. $39.80 $2,229,397.00 McKenzie Construction and Site Development, LLC $36.66 $2,053,509.90 Century Companies, Inc. $55.00 $3,080,825.00 Engineer's Estimate 56,015 TON $35.00 $1,960,525.00

D1026 31103-3000 STABILIZED AGGREGATE SURFACE COURSE, CALCIUM CHLORIDE (IN-PLACE STABILIZATION)

KH Civil Contractors, Inc. $50.53 $1,733,077.94 Shumaker Trucking & Excavating Contractors, Inc. $42.20 $1,447,375.60 McKenzie Construction and Site Development, LLC $43.53 $1,492,991.94 Century Companies, Inc. $65.00 $2,229,370.00 Engineer's Estimate 34,298 TON $40.00 $1,371,920.00

D1028 31110-0000 CALCIUM CHLORIDE

KH Civil Contractors, Inc. $867.60 $1,883,559.60 Shumaker Trucking & Excavating Contractors, Inc. $694.00 $1,506,674.00 McKenzie Construction and Site Development, LLC $401.02 $870,614.42 Century Companies, Inc. $800.00 $1,736,800.00 Engineer's Estimate 2,171 TON $750.00 $1,628,250.00

D1030 60201-0800 24-INCH PIPE CULVERT

KH Civil Contractors, Inc. $273.00 $13,650.00 Shumaker Trucking & Excavating Contractors, Inc. $213.00 $10,650.00 McKenzie Construction and Site Development, LLC $146.65 $7,332.50 Century Companies, Inc. $205.00 $10,250.00 Engineer's Estimate 50 LNFT $350.00 $17,500.00

D1032 60201-1000 36-INCH PIPE CULVERT

KH Civil Contractors, Inc. $374.40 $29,952.00 Shumaker Trucking & Excavating Contractors, Inc. $173.00 $13,840.00 McKenzie Construction and Site Development, LLC $277.27 $22,181.60 Century Companies, Inc. $230.00 $18,400.00 Engineer's Estimate 80 LNFT $350.00 $28,000.00

D1034 60704-0000 CLEANING CULVERT IN PLACE

KH Civil Contractors, Inc. $3,250.00 $3,250.00 Shumaker Trucking & Excavating Contractors, Inc. $2,520.00 $2,520.00 McKenzie Construction and Site Development, LLC $3,666.47 $3,666.47 Century Companies, Inc. $4,000.00 $4,000.00 Engineer's Estimate 1 EACH $3,200.00 $3,200.00

23 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: D

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

D1036 60705-0000 REPAIRING DRAINAGE STRUCTURE

KH Civil Contractors, Inc. $2,600.00 $18,200.00 Shumaker Trucking & Excavating Contractors, Inc. $2,950.00 $20,650.00 McKenzie Construction and Site Development, LLC $4,010.20 $28,071.40 Century Companies, Inc. $7,500.00 $52,500.00 Engineer's Estimate 7 EACH $4,000.00 $28,000.00

D1038 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY

KH Civil Contractors, Inc. $170.30 $13,624.00 Shumaker Trucking & Excavating Contractors, Inc. $184.00 $14,720.00 McKenzie Construction and Site Development, LLC $183.32 $14,665.60 Century Companies, Inc. $185.00 $14,800.00 Engineer's Estimate 80 HOUR $250.00 $20,000.00

D1040 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH

KH Civil Contractors, Inc. $170.30 $13,624.00 Shumaker Trucking & Excavating Contractors, Inc. $132.00 $10,560.00 McKenzie Construction and Site Development, LLC $240.61 $19,248.80 Century Companies, Inc. $215.00 $17,200.00 Engineer's Estimate 80 HOUR $200.00 $16,000.00

D1042 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

KH Civil Contractors, Inc. $222.30 $8,892.00 Shumaker Trucking & Excavating Contractors, Inc. $145.00 $5,800.00 McKenzie Construction and Site Development, LLC $292.17 $11,686.80 Century Companies, Inc. $250.00 $10,000.00 Engineer's Estimate 40 HOUR $250.00 $10,000.00

D1044 62301-0000 GENERAL LABOR

KH Civil Contractors, Inc. $85.80 $3,432.00 Shumaker Trucking & Excavating Contractors, Inc. $92.70 $3,708.00 McKenzie Construction and Site Development, LLC $123.74 $4,949.60 Century Companies, Inc. $80.00 $3,200.00 Engineer's Estimate 40 HOUR $100.00 $4,000.00

D1046 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

KH Civil Contractors, Inc. $14.30 $7,078.50 Shumaker Trucking & Excavating Contractors, Inc. $0.60 $297.00 McKenzie Construction and Site Development, LLC $20.62 $10,206.90 Century Companies, Inc. $11.00 $5,445.00 Engineer's Estimate 495 SQYD $4.50 $2,227.50

24 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: D

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

D1048 62502-0000 TURF ESTABLISHMENT (DRY METHOD)

KH Civil Contractors, Inc. $13.00 $6,435.00 Shumaker Trucking & Excavating Contractors, Inc. $1.10 $544.50 McKenzie Construction and Site Development, LLC $10.31 $5,103.45 Century Companies, Inc. $5.00 $2,475.00 Engineer's Estimate 495 SQYD $6.00 $2,970.00

D1050 63501-0000 TEMPORARY TRAFFIC CONTROL

KH Civil Contractors, Inc. Lump Sum $157,300.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $142,564.00 McKenzie Construction and Site Development, LLC Lump Sum $336,169.97 Century Companies, Inc. Lump Sum $75,000.00 Engineer's Estimate ALL LPSM Lump Sum $75,000.00

D1052 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

KH Civil Contractors, Inc. $67.60 $169,000.00 Shumaker Trucking & Excavating Contractors, Inc. $58.70 $146,750.00 McKenzie Construction and Site Development, LLC $74.47 $186,175.00 Century Companies, Inc. $80.00 $200,000.00 Engineer's Estimate 2,500 HOUR $90.00 $225,000.00

D1054 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

KH Civil Contractors, Inc. $520.00 $52,000.00 Shumaker Trucking & Excavating Contractors, Inc. $1,507.00 $150,700.00 McKenzie Construction and Site Development, LLC $401.02 $40,102.00 Century Companies, Inc. $2,100.00 $210,000.00 Engineer's Estimate 100 DAY $1,500.00 $150,000.00

Total Schedule - All Items

KH Civil Contractors, Inc. $8,203,595.31 Shumaker Trucking & Excavating Contractors, Inc. $9,356,462.05 McKenzie Construction and Site Development, LLC $9,451,266.78 Century Companies, Inc. $11,539,165.00 Engineer's Estimate $9,374,482.50

25 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: E

Schedule Type: Alternate

Solcitation No: 69056725B000007

Division: Western Federal Lands

State: MT County: Fergus

Federal Land: Opened at: FHWA Vancouver, WA Office

Opened by: Marino Chea

Date: 06/11/25

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

KH Civil Contractors, Inc. $9,236,240.99 280 Robinson Way Lewistown, MT 59457

Shumaker Trucking & Excavating Contractors, Inc. $10,474,766.40

PO BOX 1279

Great Falls, MT 59403

McKenzie Construction and Site Development, LLC $10,799,766.21 2301 Calvert Street NW Washington, DC 20008

Century Companies, Inc. $13,241,770.00 510 1st Ave. N.

Engineer's Estimate $10,604,717.50

26 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: E

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

E1000 15101-0000 MOBILIZATION

KH Civil Contractors, Inc. Lump Sum $687,700.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $1,388,483.00 McKenzie Construction and Site Development, LLC Lump Sum $919,659.62 Century Companies, Inc. Lump Sum $1,450,000.00 Engineer's Estimate ALL LPSM Lump Sum $1,380,000.00

E1002 15201-0000 CONSTRUCTION SURVEY AND STAKING

KH Civil Contractors, Inc. Lump Sum $43,550.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $338,565.00 McKenzie Construction and Site Development, LLC Lump Sum $286,421.24 Century Companies, Inc. Lump Sum $593,000.00 Engineer's Estimate ALL LPSM Lump Sum $440,000.00

E1004 15301-0000 CONTRACTOR QUALITY CONTROL

KH Civil Contractors, Inc. Lump Sum $136,500.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $610,685.00 McKenzie Construction and Site Development, LLC Lump Sum $252,050.69 Century Companies, Inc. Lump Sum $600,000.00 Engineer's Estimate ALL LPSM Lump Sum $855,000.00

E1006 15401-0000 CONTRACTOR TESTING

KH Civil Contractors, Inc. Lump Sum $156,000.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $650,301.00 McKenzie Construction and Site Development, LLC Lump Sum $126,025.34 Century Companies, Inc. Lump Sum $450,000.00 Engineer's Estimate ALL LPSM Lump Sum $685,000.00

E1008 15501-0000 CONSTRUCTION SCHEDULE

KH Civil Contractors, Inc. Lump Sum $13,000.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $429,983.00 McKenzie Construction and Site Development, LLC Lump Sum $45,827.39 Century Companies, Inc. Lump Sum $350,000.00 Engineer's Estimate ALL LPSM Lump Sum $120,000.00

E1010 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

KH Civil Contractors, Inc. $6.50 $11,440.00 Shumaker Trucking & Excavating Contractors, Inc. $5.20 $9,152.00 McKenzie Construction and Site Development, LLC $26.06 $45,865.60 Century Companies, Inc. $12.00 $21,120.00 Engineer's Estimate 1,760 LNFT $7.00 $12,320.00

27 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: E

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

E1012 15802-0000 WATERING FOR DUST CONTROL

KH Civil Contractors, Inc. Lump Sum $32,500.00 Shumaker Trucking & Excavating Contractors, Inc. Lump Sum $50,281.00 McKenzie Construction and Site Development, LLC Lump Sum $197,057.81 Century Companies, Inc. Lump Sum $225,000.00 Engineer's Estimate ALL LPSM Lump Sum $30,000.00

E1014 25101-0200 PLACED RIPRAP, CLASS 2 (SLOPE ARMOR)

KH Civil Contractors, Inc. $200.20 $18,018.00 Shumaker Trucking & Excavating Contractors, Inc. $194.00 $17,460.00 McKenzie Construction and Site Development, LLC $315.06 $28,355.40 Century Companies, Inc. $500.00 $45,000.00 Engineer's Estimate 90 CUYD $450.00 $40,500.00

E1016 25101-0200 PLACED RIPRAP, CLASS 2 (RIPRAP HEADWALL)

KH Civil Contractors, Inc. $260.00 $2,340.00 Shumaker Trucking & Excavating Contractors, Inc. $191.00 $1,719.00 McKenzie Construction and Site Development, LLC $429.63 $3,866.67 Century Companies, Inc. $500.00 $4,500.00 Engineer's Estimate 9 CUYD $550.00 $4,950.00

E1018 25101-0300 PLACED RIPRAP, CLASS 3 (RIPRAP HEADWALL)

KH Civil Contractors, Inc. $260.00 $5,200.00 Shumaker Trucking & Excavating Contractors, Inc. $173.00 $3,460.00 McKenzie Construction and Site Development, LLC $315.06 $6,301.20 Century Companies, Inc. $500.00 $10,000.00 Engineer's Estimate 20 CUYD $500.00 $10,000.00

E1020 30202-2000 ROADWAY AGGREGATE, METHOD 2 (E ROADS)

KH Civil Contractors, Inc. $47.35 $113,403.25 Shumaker Trucking & Excavating Contractors, Inc. $48.40 $115,918.00 McKenzie Construction and Site Development, LLC $62.70 $150,166.50 Century Companies, Inc. $56.00 $134,120.00 Engineer's Estimate 2,395 TON $50.00 $119,750.00

E1022 30301-6000 ROADWAY RECONDITIONING

KH Civil Contractors, Inc. $5,148.00 $251,737.20 Shumaker Trucking & Excavating Contractors, Inc. $8,925.00 $436,432.50 McKenzie Construction and Site Development, LLC $58,429.93 $2,857,223.58 Century Companies, Inc. $12,000.00 $586,800.00 Engineer's Estimate 48.90 MILE $12,000.00 $586,800.00

28 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: E

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

E1024 31103-3000 STABILIZED AGGREGATE SURFACE COURSE, CALCIUM CHLORIDE (E ROADS)

KH Civil Contractors, Inc. $47.35 $3,368,384.30 Shumaker Trucking & Excavating Contractors, Inc. $38.20 $2,717,471.60 McKenzie Construction and Site Development, LLC $36.66 $2,607,919.08 Century Companies, Inc. $55.00 $3,912,590.00 Engineer's Estimate 71,138 TON $35.00 $2,489,830.00

E1026 31103-3000 STABILIZED AGGREGATE SURFACE COURSE, CALCIUM CHLORIDE (IN-PLACE STABILIZATION)

KH Civil Contractors, Inc. $50.53 $1,733,077.94 Shumaker Trucking & Excavating Contractors, Inc. $42.10 $1,443,945.80 McKenzie Construction and Site Development, LLC $43.67 $1,497,793.66 Century Companies, Inc. $65.00 $2,229,370.00 Engineer's Estimate 34,298 TON $40.00 $1,371,920.00

E1028 31110-0000 CALCIUM CHLORIDE

KH Civil Contractors, Inc. $867.60 $2,110,870.80 Shumaker Trucking & Excavating Contractors, Inc. $694.00 $1,688,502.00 McKenzie Construction and Site Development, LLC $400.98 $975,584.34 Century Companies, Inc. $800.00 $1,946,400.00 Engineer's Estimate 2,433 TON $750.00 $1,824,750.00

E1030 60201-0800 24-INCH PIPE CULVERT

KH Civil Contractors, Inc. $273.00 $13,650.00 Shumaker Trucking & Excavating Contractors, Inc. $213.00 $10,650.00 McKenzie Construction and Site Development, LLC $146.64 $7,332.00 Century Companies, Inc. $205.00 $10,250.00 Engineer's Estimate 50 LNFT $350.00 $17,500.00

E1032 60201-1000 36-INCH PIPE CULVERT

KH Civil Contractors, Inc. $374.40 $29,952.00 Shumaker Trucking & Excavating Contractors, Inc. $173.00 $13,840.00 McKenzie Construction and Site Development, LLC $277.25 $22,180.00 Century Companies, Inc. $230.00 $18,400.00 Engineer's Estimate 80 LNFT $350.00 $28,000.00

E1034 60704-0000 CLEANING CULVERT IN PLACE

KH Civil Contractors, Inc. $3,250.00 $6,500.00 Shumaker Trucking & Excavating Contractors, Inc. $2,520.00 $5,040.00 McKenzie Construction and Site Development, LLC $4,869.16 $9,738.32 Century Companies, Inc. $4,000.00 $8,000.00 Engineer's Estimate 2 EACH $3,200.00 $6,400.00

29 out of 30

Project No: MT DAR MALM 2025(1)

Project Name: Defense Access Roads FY 2025

Schedule: E

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

E1036 60705-0000 REPAIRING DRAINAGE STRUCTURE

KH Civil Contractors, Inc. $2,600.00 $18,200.00 Shumaker Trucking & Excavating Contractors, Inc. $2,950.00 $20,650.00 McKenzie Construction and Site Development, LLC $4,009.89 $28,069.23 Century Companies, Inc. $7,500.00 $52,500.00 Engineer's Estimate 7 EACH $4,000.00 $28,000.00

E1038 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY