Project Description MT FLAP VALLEY 20(1) Updated.pdf

PDF 160 KB Posted

Attached to
MT FLAP VALLEY 20(1), Duck Creek Road
Solicitation number
69056724B000013
Issued by

About this file

This document appears to be a project description for the federal contract opportunity MT FLAP VALLEY 20(1), Duck Creek Road. The project consists of roadway reconditioning, aggregate surfacing, aggregate stabilization, asphalt surfacing, subexcavation, and drainage improvements on 4.85 miles of gravel road in Valley County, Montana. The project is divided into three segments with varying work scopes, such as reconstructing and widening the roadway, resurfacing with gravel and dust palliative, and surface reconditioning and aggregate surfacing. The estimated price range is between $2 and $5 million, with a tentative fixed completion date in Fall 2025. The federal agency involved is the Department of Transportation Federal Highway Administration, and the solicitation is expected to be issued in the Summer of 2024.

View the file

Other files

File Type Posted
QA_07-30-2024.pdf PDF
Project Description MT FLAP VALLEY 20(1).pdf PDF
Project Description MT FLAP VALLEY 20(1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT FLAP VALLEY 20(1), Duck Creek Road

This work consists of: Roadway reconditioning, aggregate surfacing, aggregate stabilization, asphalt surfacing, subexcavation, and drainage improvements.

Project Location: 16 Miles SE of Glasgow, Montana

Project Length: 4.85 Miles

Estimated Price Range: Between $2 and $5 Million

Tentative Fixed Completion Date: Fall 2025

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

O n e

S ch ed u le

S ch

N am e

A

A d d it io n al

N am e

_B d d it io n al

N am e

_C

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) Yes Yes Yes

153 Contractor Quality Control and Assurance (yes/no) Yes Yes Yes

154 Contractor Sampling & Testing (yes/no) Yes Yes Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes

157 Soil Erosion & Sediment Control (erosion control devices)

Fiber Roll 2200

LNFT

Fiber Roll 2700

LNFT

Fiber Rolls 2700

LNFT

158 Watering for Dust Control 1 LPSM 1 LPSM 1 LPSM

DIVISION 200 – Earthwork

201 Clearing and Grubbing 4.7 ACRE 10.6 ACRE 10.6 ACRE

203 Removal of Structures and Obstructions n/a Pipe Culverts

1 EACH

Pipe Culverts

1 EACH

204 Excavation & Embankment Roadway Excavation

5800 CUYD

Unclassified Borrow

3500 CUYD

Roadway

11900 CUYD

9900 CUYD

Roadway

11900 CUYD

9900 CUYD

207 Separation-Stabilization Geotextile 23500

SQYD

Geotextile 53000

SQYD

Geotextile 53000

SQYD

e S ch ed

N

A d d it io n al

N am e

_B d it io n al

N am e

_C

DIVISION 300 – Aggregate and Base Courses

302 Roadway Aggregate, Method 2 2300 CUYD 2300 CUYD 2300 CUYD

303 Road Reconditioning n/a n/a 2.176 MILE

308 Recycled Aggregate Base 1900 CUYD 1900 CUYD 1900 CUYD

311 Stabilized Aggregate Surface Course n/a

Aggregate

7000 TON

Calcium Chloride

120 TON

Aggregate

7000 TON

Calcium Chloride

120 TON

DIVISION 400 – Asphalt Pavements and Surface Treatments

403 Asphalt Concrete Pavement 4600 TON 4600 TON 4600 TON

412 Tack Coat 8.5 TON 8.5 TON 8.5 TON

413 Asphalt Pavement Milling, 4-inch Depth 17800 SQYD 17800 SQYD 17800 SQYD

DIVISION 600 – Incidental Construction

602 Culverts & Drains (indicate one or both) End Section for 30-inch Culvert

3 EACH

24-inch Culvert

120 LNFT

End Section for 18-inch Culvert

3 EACH

End Section for 24-

2 EACH

End Section for 30-

3 EACH

24-inch Culvert

120 LNFT

End Section for 18-

3 EACH

End Section for 24-

2 EACH

End Section for 30-

3 EACH

607 Cleaning, Relaying, & Repairing Existing Drainage Structures

Cleaning 6 EACH Cleaning 12 EACH Cleaning 12 EACH

622 Rental Equipment (yes/no) Yes Yes Yes

624 Topsoil (landscaping & related items) 4-inch depth

5.0 ACRE

4-inch depth

12.0 ACRE

4-inch depth

12.0 ACRE

625 Turf Establishment (indicate seeding or mulching separately) 5.0 ACRE 12.0 ACRE 12.0 ACRE e S ch ed

N

A d d it io n al

N am e

_B d it io n al

N am e

_C

633 Permanent Traffic Control Sign System

6.0 SQFT

Remove and Reset Sign (Wood Post)

26 EACH

Delineator

8 EACH

Sign System

40 EACH

8 EACH

Sign System

40 EACH

8 EACH

634 Permanent Pavement Markings Type B Solid (White)

24500 LNFT

Type B Soild (Yellow)

22700 LNFT

Type B Broken

720 LNFT

Type B Solid (White)

720 LNFT

Type B Solid (White)

720 LNFT

635 Temporary Traffic Control – Barricade Type 3 6 EACH 6 EACH 6 EACH

635 Temporary Traffic Control – Drum 130 EACH 130 EACH 130 EACH

635 Temporary Traffic Control – Portable Changeable Message Sign 4 EACH 4 EACH 4 EACH

635 Temporary Traffic Control – Pavement Markings 12500 LNFT 12500 LNFT 12500 LNFT

635 Temporary Traffic Control – Construction Sign 250 SQFT 250 SQFT 250 SQFT

635 Temporary Traffic Control – Flagger 1300 HOUR 2400 HOUR 2600 HOUR

635 Temporary Traffic Control – Pilot Car 650 HOUR 1200 HOUR 1300 HOUR

635 Temporary Traffic Control – Traffic Control Supervisor 65 DAY 120 DAY 130 DAY