This document appears to be a Project Description for the MT FLAP VALLEY 20(1), Duck Creek Road contract opportunity. The project consists of roadway reconditioning, aggregate surfacing, aggregate stabilization, asphalt surfacing, subexcavation, and drainage improvements on 4.85 miles of road located 16 miles southeast of Glasgow, Montana. The work is divided into three discrete segments with varying scopes of work. The estimated price range for the contract is between $5 and $10 million, with a tentative fixed completion date in Fall 2025. The project will be solicited as a Full and Open competition, with the solicitation expected to be issued in Summer 2024. The document provides a detailed breakdown of the anticipated work items and quantities across the three segments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA_07-30-2024.pdf | ||
| Project Description MT FLAP VALLEY 20(1) Updated.pdf | ||
| Project Description MT FLAP VALLEY 20(1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT FLAP VALLEY 20(1), Duck Creek Road
This work consists of: Roadway reconditioning, aggregate surfacing, aggregate stabilization, asphalt surfacing, subexcavation, and drainage improvements.
Project Location: 16 Miles SE of Glasgow, Montana
Project Length: 4.85 Miles
Estimated Price Range: Between $5 and $10 Million
Tentative Fixed Completion Date: Fall 2025
(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
O n e
S ch ed u le
S ch
N am e
A
A d d it io n al
N am e
_B d d it io n al
N am e
_C
DIVISION 150 – Project Requirements
152 Construction Survey & Staking (yes/no) Yes Yes Yes
153 Contractor Quality Control and Assurance (yes/no) Yes Yes Yes
154 Contractor Sampling & Testing (yes/no) Yes Yes Yes
155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes
157 Soil Erosion & Sediment Control (erosion control devices)
Fiber Roll 2200
LNFT
Fiber Roll 2700
LNFT
Fiber Rolls 2700
LNFT
158 Watering for Dust Control 1 LPSM 1 LPSM 1 LPSM
DIVISION 200 – Earthwork
201 Clearing and Grubbing 4.7 ACRE 10.6 ACRE 10.6 ACRE
203 Removal of Structures and Obstructions n/a Pipe Culverts
1 EACH
Pipe Culverts
1 EACH
204 Excavation & Embankment Roadway Excavation
5800 CUYD
Unclassified Borrow
3500 CUYD
Roadway
11900 CUYD
9900 CUYD
Roadway
11900 CUYD
9900 CUYD
207 Separation-Stabilization Geotextile 23500
SQYD
Geotextile 53000
SQYD
Geotextile 53000
SQYD
e S ch ed
N
A d d it io n al
N am e
_B d it io n al
N am e
_C
DIVISION 300 – Aggregate and Base Courses
302 Roadway Aggregate, Method 2 2300 CUYD 2300 CUYD 2300 CUYD
303 Road Reconditioning n/a n/a 2.176 MILE
308 Recycled Aggregate Base 1900 CUYD 1900 CUYD 1900 CUYD
311 Stabilized Aggregate Surface Course n/a
Aggregate
7000 TON
Calcium Chloride
120 TON
Aggregate
7000 TON
Calcium Chloride
120 TON
DIVISION 400 – Asphalt Pavements and Surface Treatments
403 Asphalt Concrete Pavement 4600 TON 4600 TON 4600 TON
412 Tack Coat 8.5 TON 8.5 TON 8.5 TON
413 Asphalt Pavement Milling, 4-inch Depth 17800 SQYD 17800 SQYD 17800 SQYD
DIVISION 600 – Incidental Construction
602 Culverts & Drains (indicate one or both) End Section for 30-inch Culvert
3 EACH
24-inch Culvert
120 LNFT
End Section for 18-inch Culvert
3 EACH
End Section for 24-
2 EACH
End Section for 30-
3 EACH
24-inch Culvert
120 LNFT
End Section for 18-
3 EACH
End Section for 24-
2 EACH
End Section for 30-
3 EACH
607 Cleaning, Relaying, & Repairing Existing Drainage Structures
Cleaning 6 EACH Cleaning 12 EACH Cleaning 12 EACH
622 Rental Equipment (yes/no) Yes Yes Yes
624 Topsoil (landscaping & related items) 4-inch depth
5.0 ACRE
4-inch depth
12.0 ACRE
4-inch depth
12.0 ACRE
625 Turf Establishment (indicate seeding or mulching separately) 5.0 ACRE 12.0 ACRE 12.0 ACRE e S ch ed
N
A d d it io n al
N am e
_B d it io n al
N am e
_C
633 Permanent Traffic Control Sign System
6.0 SQFT
Remove and Reset Sign (Wood Post)
26 EACH
Delineator
8 EACH
Sign System
40 EACH
8 EACH
Sign System
40 EACH
8 EACH
634 Permanent Pavement Markings Type B Solid (White)
24500 LNFT
Type B Soild (Yellow)
22700 LNFT
Type B Broken
720 LNFT
Type B Solid (White)
720 LNFT
Type B Solid (White)
720 LNFT
635 Temporary Traffic Control – Barricade Type 3 6 EACH 6 EACH 6 EACH
635 Temporary Traffic Control – Drum 130 EACH 130 EACH 130 EACH
635 Temporary Traffic Control – Portable Changeable Message Sign 4 EACH 4 EACH 4 EACH
635 Temporary Traffic Control – Pavement Markings 12500 LNFT 12500 LNFT 12500 LNFT
635 Temporary Traffic Control – Construction Sign 250 SQFT 250 SQFT 250 SQFT
635 Temporary Traffic Control – Flagger 1300 HOUR 2400 HOUR 2600 HOUR
635 Temporary Traffic Control – Pilot Car 650 HOUR 1200 HOUR 1300 HOUR
635 Temporary Traffic Control – Traffic Control Supervisor 65 DAY 120 DAY 130 DAY