This document is an amendment to a solicitation for improvements to Skilak Lake Road in Alaska. The amendment revises requirements for soil erosion control, stream diversions, and facilities. For soil erosion control, it requires design of temporary fish passage culverts and submission of field design cross sections. For stream diversions, it increases the submittal deadline to 14 days prior to in-water work and adds required information to the submittal. For facilities, it limits furnished residential housing to within 35 miles of the project limits and requires providing one four-wheel drive pickup truck for exclusive government use, to be delivered by the notice to proceed date and maintained with insurance by the contractor. The solicitation number is 69056724B000002 and is issued by the Department of Transportation Federal Highway Administration for improvements to AK FWS KNA 1192(1) Skilak Lake Road.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A003 11/21/2023 N/A See Box 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056724B000002
9B. DATED (SEE ITEM 11)
11/09/2023
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AK FWS KNA 1192(1), Skilak Lake Road AOP Improvements
See Page 2.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A003, dated 11-21-2023 AK FWS KNA 1192(1)
Solicitation No. 69056724B000002 Skilak Lake Road AOP Improvements
REVISIONS ARE AS FOLLOWS:
SPECIAL CONTRACT REQUIREMENTS
Page E-47, Subsection 157.04, General. Revises fifth paragraph.
Page E-49, Subsection 157.10(a), Submittals. Revises first paragraph.
Page F-15, Subsection 637.03, Facilities. Adds maximum commuting distance requirements for residential housing under Subsection (b), and revises outline for Subsection (c)..
ENCLOSURES
Pages:
E-47 / E-49
F-15
E-47 DIVISION 150
Special Contract Requirements
Project: AK FWS KNA 1192(1), Skilak Lake Road AOP Improvements
Section 157. — SOIL EROSION AND SEDIMENT CONTROL
01/06/23(2)– FP-14
Material
157.02 Add the following to the material list:
Filter Rock 705.08
Construction Requirements
157.03 Qualifications. Delete this Subsection and substitute the following:
Provide an Erosion Control Supervisor (ECS) meeting one of the following criteria:
(a) Alaska Certified Erosion and Sediment Control Lead (AK-CESCL)
(b) Certified Professional in Erosion and Sediment Control (CPESC);
(c) Certified Professional in Storm Water Quality (CPSWQ);
(d) Certified Erosion, Sediment and Storm Water Inspector (CESSWI); or
(e) Certified Inspector of Sediment and Erosion Control (CISEC).
157.04 General. Delete the text of this Subsection and substitute the following:
Provide and install permanent and temporary measures to control erosion, sedimentation, and discharge of pollutants, according to the Alaska Pollutant Discharge Elimination System (APDES)
Construction General Permit (CGP), the project Storm Water Pollution Prevention Plan (SWPPP) of record, and this contract.
Immediately report to the CO any incident of non-compliance with the CGP that may endanger health or the environment. Provide copies of any correspondence or reports required by either the
CGP or the SWPPP.
Provide an ECS to manage installation, maintenance, inspection, and reporting for erosion and sediment control measures, maintain and update the SWPPP of record, and prepare any documentation required by the CGP or the SWPPP. Furnish the ECS’s name, project office address, 24-hour telephone number(s), and qualifications at the preconstruction conference.
If wood chips are used, do not import without approval from the CO.
Design temporary fish passage culverts that meet the requirements of Subsections 157.10(e) and
602.03, and submit plotted field-design cross-sections according to Subsection 104.03 152.05(g).
Revised by Amendment A003
E-49 DIVISION 150
Project: AK FWS KNA 1192(1), Skilak Lake Road AOP Improvements expected within the next 7 days in areas with a mean annual precipitation of 40 inches or greater; or within 14 days for those areas with a mean annual precipitation less than 40 inches.
Complete installation of temporary soil stabilization measures to disturbed sites or stockpiles within 14 days and installation of permanent soil stabilization measures within 7 days of last disturbance. Provide for temporary stabilization of all exposed soil prior to winter construction shut down.
(g) Construct and maintain perimeter protection and locate erodible stockpiles away from storm drain inlets, waterways, and drainage channels.
(h) Handle and dispose of all pollutants, including construction materials, waste materials, and construction debris, in a manner that does not cause contamination of storm water.
(i) Apply fertilizers and other chemicals in a manner and at application rates that will not result in loss of chemicals to storm water runoff. Follow manufacturers label requirements except as otherwise required by the contract
(j) Do not discharge concrete wastewater near or into waterways or wetlands. Submit proposed washout areas to the CO for approval. Do not allow untreated wastewater and water removed from within the work area to enter surface waters.
157.10 Diversions. Add the following:
Dewater according to Subsection 208.07, in observance with the laws referenced in Subsection 107.01.
(a) Submittals. At least 10 working 14 days prior to commencement of in-water work, submit detailed stream diversion plan drawings to the CO for review and approval according to Subsection 153.03 (b) 104.03.
Include the following information:
(1) Drawings and written narrative showing the type, size, location, elevation, and method of installation and removal for the stream diversion, and means of access to waterways;
(2) The sequence and schedule for installing and removing the diversion;
(3) Best management practices used to ensure minimization of erosion or turbidity occurs to a stream channel;
(4) Discuss all construction stages;
(5) A list of on-site backup materials and equipment;
(6) If gravity system is used, provide capacity calculations and profile in HEC-RAS or other hydraulic modeling software approved by the CO.
This project is not required to maintain fish passage during construction.
F-15 DIVISION 600
Project: AK FWS KNA 1192(1), Skilak Lake Road AOP Improvements
Section 637. — FACILITIES AND SERVICES
08/01/14– FP14
Description
637.01 Add the following:
This work also includes furnishing vehicles for the exclusive use of Government personnel.
Construction Requirements
637.03 Facilities. Amend as follows:
Add the following to paragraph (b):
Unless otherwise allowed by the CO, furnish residential housing that is no more than 35 miles from the project limits.
Add the following:
(c)(b) Vehicle. Provide two one ½ ton, 4x4 wheel drive, two-door pickup trucks, manufactured within 5-years of the Award date. Deliver the vehicle to Wasilla RPO, 2901 East Bogard Road, Wasilla, AK 99654, on the day of the Notice to Proceed date in FAR Clause 52.211-10 Commencement, Prosecution, and Completion of Work. Furnish a vehicle with no visible Contractor’s company name or logo. Equip the vehicle with a Citizen Band (CB) radio.
Maintain the vehicle in such a manner to provide safety and reasonable comfort for the operator with all factory equipment in working order. Provide all fuels, maintenance, and collision and comprehensive insurance. Insurance is for the Contractor’s protection. The Government will be responsible for all Government caused damage to the vehicle beyond normal wear and tear.
The Government will not indemnify the Contractor for Government caused damage to third parties. Damage due to no fault of the Government will be the responsibility of the Contractor.
Secure vehicle insurance according the standards established by the state in which the vehicle is owned/operated.
Revised by Amendments A001 and A003