UPDATED_OR FLAP GRANT 24(2)_PROJECT DESCRIPTION.pdf

PDF 149 KB Posted

Attached to
OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II
Solicitation number
69056723B000021
Issued by

About this file

This document contains a detailed project description for the OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II project located in the Wallowa-Whitman National Forest in Grant County, Oregon.

The project involves installing 3 precast concrete box culverts, 2 bridges, and other roadway work including paving, excavation, and erosion control. The work is divided into two bid schedules, Schedule A and Schedule B, which will be separately awarded. The estimated price range for the project is $5 million to $10 million, with a tentative solicitation date in Winter 2024/2025 and a tentative fixed completion date of Winter 2025. The project is being offered as a small business set-aside. The federal agency involved is the Department of Transportation Federal Highway Administration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UPDATED July 2024

OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II

Wallowa-Whitman National Forest

Grant County, Oregon

All project work is located along Granite Hill Road and Bull Run to Baker Road located in Grant County, Oregon. Work items include installing 3 precast concrete box culverts and 2 bridges. The 3 box culverts are AOP structures ranging in length from 34-feet to 66-feet and span 13-feet to 22-feet. One bridge is a single span, 54-foot long simply supported, prestressed concrete voided slab beam. The second bridge is a single span, 105-foot long simply supported, prestressed concrete deck bulb tee girder structure. Both bridges are founded on steel H-piles.

Construction of the bridges will require temporary bridges and traffic control.

This project has two schedules; only one schedule will be awarded.

Project length: NA

Tentative Fixed Completion Date: Winter 2025

Estimated Price Range: $5 million to $10 million

Tentative Solicitation Date: Winter 2024/2025

Location: 32 Miles NW of Baker City, Oregon

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

S ch ed u le A ed u

B

DIVISION 150 – Project Requirements

151 Mobilization LPSM LPSM

152 Construction Survey & Staking (yes/no) Yes Yes

153 Contractor Quality Control and Assurance (yes/no)

Yes Yes

154 Contractor Sampling & Testing (yes/no) Yes Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no)

Yes Yes ed u ed u

157 Soil Erosion & Sediment Control (erosion control devices) Temporary Stream Diversions (Bull Run 01) (boundary Creek) (Bull Run 02) Silt Fence Fiber Rolls Check Dams

N/A

LPSM

N/A

700 LNFT

1400 LNFT

10 Each

LPSM

3000 LNFT

1400 LNFT

20 Each

DIVISION 200 – Earthwork

201 Clearing & Grubbing 2.6 ACRES 3.2 ACRES

203 Removal of Structures & Obstructions (structures, demolition) Removal of culverts 3 Each 5 Each

204 Excavation & Embankment Roadway Excavation Unclassified Borrow

1000 CUYD

2700 CUYD

1500 CUYD

2400 CUYD

208 Structure Excavation Structural Backfill 190 CUYD 190 CUYD

DIVISION 250 – Slope Reinforcement and Retaining Walls

251 Riprap Method A Riprap Ditch Method A Class 3 Riprap Ditch Method B Class 4 Boulder

4 CUYD

70 CUYD

2200 CUYD

4 Each

4 CUYD

210 CUYD

2200 CUYD

4 Each

DIVISION 300 – Aggregate and Base Courses

302 Minor Crushed Aggregate Roadway Aggregate Method 2 2700 CUYD 3800 CUYD

DIVISION 400 – Asphalt Pavements & Surface Treatments

403 Asphalt Concrete Asphalt Concrete Pavement, Type 1 1000 TONS 1500 TONS

412 Asphalt Tack Coat (asphalt surface treatment) 2 Tons 3 Tons

DIVISION 550 – Bridge Construction

551 Driven Piles Steel H-Pile, 12x74, In Place 14x117, In Place Untreated Timber Pile, In place Dynamic Pile Load Test

37 LNFT

327 LNFT

28 Each 4 Each

37 LNFT

327 LNFT

4 Each ed u ed u

552 Structural Concrete (concrete – major structures) Structural Concrete Class A (AE) Structural Concrete, Class D (AE), For approach slabs, type 2 Expansion Joints

96 CUYD

30 SQYDs

129 LNFT

96 CUYD

30 SQYDs

129 LNFT

553 Prestressed Concrete Precast, prestressed concrete slabs, 48-inch voided Precast, prestressed concrete decked bulb tee girder (47 Inch)

378 LNFT

517 LNFT

378 LNFT

517 LNFT

554 Reinforcing Steel Reinforcing steel Reinforcing steel, epoxy coated

16400 LBS

11440 LBS

16400 LBS

11440 LBS

556 Bridge Railing 341 LNFT 341 LNFT

564 Bearing Devices Elastomeric (Bull Run Creek Crossing #3) Elastomeric (Bull Run Creek Crossing #4)

575 Minor Bridge Work Temporary Bridge (44’x14’) Temporary Bridge (75’x14’)

585 Ultra High Performance Concrete (Joints) 13 CUYD 13 CUYD

DIVISION 600 – Incidental Construction

602 Culverts & Drains (indicate one or both) Reinforced Concrete Box Culvert

(15 FEET SPAN, 9 FEET RISE)

(22 FEET SPAN, 9 FEET RISE)

(13 FEET SPAN, 12 FEET RISE)

34 LNFT

66 LNFT

56 LNFT

34 LNFT

617 Guardrail Guardrail Terminal Section Structure transition Railing

952 LNFT

8 Each

167 LNFT

952 LNFT

8 Each

167 LNFT

625 Turf Establishment (indicate seeding or mulching separately) 2.6 Acre 3.2 Acre

626 Plants, Trees, Shrubs, Vines & Groundcovers Cuttings, Cottonwood Pole (Cottonwood Bole) Cuttings, Willow Pole (Willow Pole Tripod) Cuttings, Willow Pole Remove and Replant Tree & Shrub (Conserved Willow Bush)

12 Each 38 Each

1500 Each 30 Each

12 Each 38 Each

1500 Each 30 Each

634 Permanent Pavement Markings (traffic pavement markings) Type B, Solid (4-Inch, Yellow) Type B, Solid (4-Inch, White)

9800 LNFT

9800 LNFT

13700 LNFT

13700 LNFT

635 Temporary Traffic Control – Flagger 1400 HRS 2200 HRS ed u ed u

635 Temporary Traffic Control Detours (2) (Bull Run 03) (Bull Run 04) Traffic Signal Systems (2) (Bull Run 03) (Bull Run 04) Barricade Type 3 Tubular Markers Portable Changeable Message Signs Construction Signs Traffic Control Supervisor

12 Each 90 Each 2 Each 4 Each

146 DAY

20 Each 150 Each

2 Each 4 Each

146 DAY

647 Environmental Mitigation (use pay item description) Root Wad Fish Passage Boulders Stream Bed Material

22 Each 106 Each

94 CUYD

22 Each 318 Each

393 CUYD

File details come from the government source that posted it. Updated .