This document is a pre-solicitation notice for the OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II project in Wallowa-Whitman National Forest, Grant County, Oregon. The project consists of paving, AOP culverts, bridge construction, and roadway excavation, with an estimated price range between $5 million to $7 million. The work is set aside for small businesses, with a tentative completion date of Winter 2024. The Federal Highway Administration is the responsible agency. Interested vendors must be registered in SAM.gov and have the Contract Opportunities Administrator role to view the list of interested vendors. The solicitation documents, including the Invitation for Bids with specifications and plans, will be posted at a later date. Vendors are encouraged to follow the opportunity to receive notification when the solicitation is issued.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
APPROVED:
DATE
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SPECIFICATION:
S. HAYTER
PROJECT MANAGER
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED BY
Western Federal Lands Highway Division
Chief of Engineering, R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for
P A
C F
I C
I O
E C
A N
COLUMBIA R
IV
ER
S N
A K E
R
IV
E R
Lake
Malheur Lake
Harney
Lake
Summer
D
ES
C H
U T
E S
R I V
E R
Lake
Klamath
Upper
Abert
Lake
WASHINGTON
I D
A H
O
CALIFORNIA
OREGON KEY MAP
LAKE N.P.
CRATER
REFUGE
WILDLIFE
NATIONAL
MALHEUR
RANGE
ANTELOPE
NATIONAL
HART MT.
Grants Pass
MEDFORD
Ashland
Roseburg
EUGENE
Bend
Corvallis
Newport
SALEM
PORTLAND
Astoria
Pendleton
La Grande
Ontario
Burns
Falls
Klamath
Bend
North
City
Baker
Dalles
The
395101
20 20
NEVADA
Project Location
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
e (max)
V
ADT (2043)
ADT (2023)
Match Existing
35 MPH and 55 MPH
AOP culverts, Roadway Excavation
Paving, Bridge Construction, PLANS FOR PROPOSED PROJECT
OR FLAP GRANT 24(2)
LENGTH - 5 SITES
ROAD RECONSTRUCTION, PHASE II
GRANITE HILL
OREGON
GRANT COUNTY
WALLOWA WHITMAN NATIONAL FOREST
PROJECT LOCATION
N
Phillips Lake
CITY
BAKER
NATIONAL FOREST
WHITMAN
WALLOWA
INTERSTATE
SUMPTER
Unity Reservoir
FOREST
NATIONAL
WHITMAN
WALLOWA
Springs Hwy
Medical
SCALE IN MILES
Scale in miles
5 10 155
BRIDGEPORT
WHITNEY
AUSTIN
GRANITE
BOURNE
HAINES
KEATING
N.
Fo rk
Jo hn
Day River
Granite C r.
C le ar
C r.
B e a v e r
Sutton Cr.
C r.
Burnt Rive r
Pow der
River
INTERSTATE
See Sheet A.3 for vicinity map
:1
P
M
J u ly
T it le
S h e e t c p w w o r k
\d
\O R a g r a n t2
P
L N g e n
.d g n
PROJECT
NUMBER
SHEET
A.1
OR FLAP GRANT 24(2)
PRELIMINARY - N
OT FOR CONSTRUCTION
N
SCALE IN MILES
Scale in miles
1 1
G ra n ite
B u ll
Run
C re e k
GRANITE
Spring
Corrigal h Gulc yt BosLo
S n u m p
C r e e k
BEGIN SCHEDULE B
BEGIN PROJECT
"MAIN 01" 242+00
OR FLAP GRANT 24(2)
END SCHEDULE A & B
END PROJECT
"MAIN 01" 498+75
OR FLAP GRANT 24(2)
S2S3S4 S5
S6S1S2 S3
S4S1
S12
S9 S10 S11 S12
S7 S8 S9 S10
S11
S14S15 S16
S17S18 S13
S14
S15
S16
S13
S24
S21 S22 S23 S24
S25
S19
S20
S21
S30 S29 S28
S22 S23
S26 S27
S35
S34S33 S32S31
S36
S26S27
S34 S35
S25
S28
S36
S33
GRANT CO.
BAKER CO.
T S
R
E
T
S
R
/2 E
T
S
R
/2 E
T S
R
E
C u tr id g e
C h a n n e l
Beagle
C re e k
Bul l
Run
C r e e k
T
S
R
/2 E
T S
R
E
T
S
R
/2 E
T S
R
E
RESUME CONSTRUCTION
SUSPEND CONSTRUCTION
RESUME CONSTRUCTION
SUSPEND CONSTRUCTION
SUSPEND CONSTRUCTION
SUSPEND CONSTRUCTION
RESUME CONSTRUCTION
BEGIN SCHEDULE A
RESUME CONSTRUCTION
32 m iles
To Baker City m il e s
T o L a G ra n d e
"MAIN 01" 489+65
"MAIN 01" 383+55
"MAIN 01" 376+50
"MAIN 01" 347+00
"MAIN 01" 339+00
"MAIN 01" 268+40
"MAIN 01" 273+00
"MAIN 01" 247+00
:5
A
J u n e
V ic in it y M a p p w w o r k
\d
\O R a g r a n t2
P
L N g e n
.d g n
VICINITY MAP
PROJECT
A.3
Profile grade tack coat between lifts
3-inch compacted depth, placed in two equal lifts with
Asphalt concrete pavement, type 1, 12-inch compacted depth
Roadway Aggregate, Method 2, LC
Existing ground Existing ground
D
C o n s tr u c ti o n l im it
0.25 D
Edge of pavement
Aggregate base course
First lift of asphalt
Second lift of asphalt
Existing ground C o n s tr u c ti o n l im it
See Fill Slope Rounding
Existing groundC o n s tr u c ti o n l im it
See Fill Slope Rounding
See Fill Slope Rounding
C o n s tr u c ti o n l im it Tur f es tabl ishment limi ts
See Safety Edge
1:3 1:3
See Fill Slope Rounding
C o n s tr u c ti o n l im it
Turf establishment limits
SAFETY EDGE
376+98 to 379+32, RT
379+87 to 381+32, RT
492+16 to 494+35, RT
495+39 to 496+47, RT
Varies (0' to 2')
1'
Varies (1:20 to 1:2)
377+61 to 379+20, LT
379+73 to 383+07, LT
493+54 to 494+48, LT
495+53 to 497+75, LT
Varies (0' to 2')
1'
Va rie s
(1 :2 to :2
2% Crown
242+00 to 247+00
268+40 to 273+00
339+00 to 347+00
376+50 to 379+26
379+80 to 383+55
489+65 to 494+41
495+46 to 498+75
"MAIN 01"
2% Crown
Existing ground
5'5'
FILL SLOPE ROUNDING
Turf establishment limits
Turf establishment limits
Slope stake limit
:2
J u n e
T y p ic a l
S e c ti o n p w w o r k
\d
\o r a g r a n t2 p ln ty p
.d g n
TYPICAL SECTION
PROJECT
C.1
Var iabl e (1 :20 to
1:3
Shoulder
1'
Traveled lane
11'
Traveled lane
11'
Shoulder
1'
Variable (1:20 to 1:3)
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
19101 411063.041 8762239.436 4952.423 44°46'25.225932"N 118°20'33.708639"W 4896.8887 0.999684269 5/8 IR W/FHWA ALUM CAP 1.
19102 411427.357 8761980.811 4934.568 44°46'28.890400"N 118°20'37.157964"W 4879.0313 0.999685 5/8 IR W/FHWA ALUM CAP
19103 411664.235 8761854.422 4924.350 44°46'31.262013"N 118°20'38.821915"W 4868.8122 0.99968541 5/8 IR W/FHWA ALUM CAP
19201 413263.290 8760343.866 4844.977 44°46'47.444361"N 118°20'59.166408"W 4789.4094 0.999688671 5/8 IR W/FHWA ALUM CAP
19202 413483.832 8760168.182 4840.029 44°46'49.667576"N 118°21'01.520015"W 4784.4588 0.999688835 5/8 IR W/FHWA ALUM CAP
19203 413641.076 8760054.654 4838.528 44°46'51.249614"N 118°21'03.035524"W 4782.9561 0.999688855 5/8 IR W/FHWA ALUM CAP
19301 415807.651 8754202.579 4724.178 44°47'14.165889"N 118°22'23.355795"W 4668.502 0.999693581 5/8" IR W/FHWA ALUM CAP
19302 415778.314 8753947.999 4721.096 44°47'13.942448"N 118°22'26.895422"W 4665.4158 0.999693736 5/8" IR W/FHWA ALUM CAP
19303 415851.373 8753652.755 4717.564 44°47'14.740334"N 118°22'30.961377"W 4661.8787 0.999693879 5/8" IR W/FHWA ALUM CAP
19401 416393.798 8750845.151 4689.957 44°47'20.822079"N 118°23'09.683142"W 4634.2222 0.999695006 5/8" IR W/FHWA ALUM CAP
19402 416392.851 8750554.396 4677.940 44°47'20.887829"N 118°23'13.714005"W 4622.2011 0.999695578 FND RPC
19403 416423.079 8750266.282 4674.242 44°47'21.260602"N 118°23'17.696960"W 4618.4989 0.999695743 5/8" IR W/FHWA ALUM CAP
19501 422748.097 8741413.566 4578.468 44°48'25.964984"N 118°25'18.161147"W 4522.545 0.999698312 5/8" IR W/FHWA ALUM CAP
19502 423080.469 8741099.233 4572.923 44°48'29.325844"N 118°25'22.401410"W 4516.9931 0.999698475 5/8" IR W/FHWA ALUM CAP
19503 423303.976 8740933.418 4572.497 44°48'31.574302"N 118°25'24.621089"W 4516.5632 0.999698428 5/8" IR W/FHWA ALUM CAP
PROJECT :Granite Hill Phase 2 DATE OF FIELD WORK : August 2019
PROJECT UNITS : International foot COORDINATE SYSTEM : Orgeon North SPCS NAD83 2011
EPOCH DATE : 2010.0000
VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID12b
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
Pr oj ec ts
_2
3\ O re go n\ G ra ni te _H ill
G ra ni te
_H ill
_2
9_ co nt ro ls he et .x ls x]
Sh ee t 2-
Fe b-
:4
PM
W
FL
H D
S ur ve y
W
FL
H D
_S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.1
SHEET
NUMBER
FLAP GRANT 24(2)OR
SURVEY CONTROLPRELIMINARY - N
N39°15'56"W
PI 243+51.78
Δ = 05°00'00" (LT)
R = 2,000.00' T = 87.32' L = 174.53' e = 2.8%
P C
.4
P T
.9
P C
.7
Y T I L I T
U D
E I R
U B G
N I N
R A W
N
BEGIN SCHEDULE B
BEGIN CONSTRUCTION
BEGIN PROJECT
SUSPEND CONSTRUCTION
to be Constructed "MAIN 01" Line
Construction limit
Slope stake limit
See Section H for details type B, solid (4-inch, yellow) Pavement markings, See Section H for details type B, solid (4-inch, white) Pavement markings, Profile grade
See Section F for details reinforced concrete box culvert 15 feet span, 9 feet rise, precast 244+66.4
Existing Ground
Crossing #1 Bull Run Creek
N34°15'57"W
241+50 242+00 242+50 243+00 243+50 244+00 244+50 245+00 245+50 246+00 246+50
4,918 4,918
4,920 4,920
4,922 4,922
4,924 4,924
4,926 4,926
4,928 4,928
4,930 4,930
4,932 4,932
4,934 4,934
241+50 242+00 242+50 243+00 243+50 244+00 244+50 245+00 245+50 246+00 246+50
4,918 4,918
4,920 4,920
4,922 4,922
4,924 4,924
4,926 4,926
4,928 4,928
4,930 4,930
4,932 4,932
4,934 4,934
-3.49%
-3.11%
-3.60%
-4.01%
.9
.0
.4
.4
.0
.2
246+40.42 4917.94
SSD = 2218'
K = 152
75' VC
SSD = 2644'
K = 121
50' VC
HLSD = INF'
K = 194
75' VC
HLSD = INF'
K = 132
100' VC
,9
.7
247+00
4,908 4,908
4,910 4,910
4,912 4,912
4,914 4,914
4,916 4,916
4,918 4,918
4,920 4,920
4,922 4,922
4,924 4,924
247+00
4,908 4,908
4,910 4,910
4,912 4,912
4,914 4,914
4,916 4,916
4,918 4,918
4,920 4,920
4,922 4,922
4,924 4,924
-3.25%
"MAIN 01" 242+00
E= 540105.0424
N= 938002.4670 "MAIN 01" 247+00
:1
J u ly
B u ll R u n
S h e t] p w
-w o rk \d
\o ra -g ra n t2
-2 p ln p p -r e d o n e .d g n
PROJECT
D.4
N29°37'18"W
N40°01'14"W
PI 268+96.85
Δ = 47°52'28" (RT)
R = 430.00' T = 190.88' L = 359.29' e = 6.0%
PI 272+28.51
Δ = 10°23'56" (LT)
R = 850.00' T = 77.35' L = 154.27' e = 4.6%
P C
.1
P T
.4
P T
.2
2 2
N
RESUME CONSTRUCTION
See Section H for details type B, solid (4-inch, white) Pavement markings, to be Constructed "MAIN 01" Line
See Section H for details type B, solid (4-inch, yellow) Pavement markings, CONSTRUCTION
SUSPEND
Slope stake limit
Construction limit
Profile grade
Existing Ground
See Section F for details reinforced concrete box culvert 22 feet span, 9 feet rise, precast 270+08.8
Crossing #2 Bull Run Creek
268+00 268+50 269+00 269+50 270+00 270+50 271+00 271+50 272+00 272+50 273+00 273+50
4,834 4,834
4,836 4,836
4,838 4,838
4,840 4,840
4,842 4,842
4,844 4,844
4,846 4,846
4,848 4,848
4,850 4,850
268+00 268+50 269+00 269+50 270+00 270+50 271+00 271+50 272+00 272+50 273+00 273+50
4,834 4,834
4,836 4,836
4,838 4,838
4,840 4,840
4,842 4,842
4,844 4,844
4,846 4,846
4,848 4,848
4,850 4,850
-2.16%
-1.50%
-0.73%
.0
.7
.2
.4
HLSD = INF'
K = 114
75' VC
HLSD = INF'
K = 257
200' VC
,8
.6
"MAIN 01" 268+40
"MAIN 01" 273+00
:1
J u ly
B u ll R u n
S h e p w
-w o rk \d
\o ra -g ra n t2
-2 p ln p p -r e d o n e .d g n
PROJECT
D.5
S6 8°0
7'0 6"W
N75°22'37"W e = 6.0%
'267.59L =
'138.51T =
'420.00R =
(RT)36°30'16"Δ =
340+67.68PI
.1
C
C 3
.7
T
1 3
N
BEGIN SCHEDULE A
RESUME CONSTRUCTION
See Section H for details type B, solid (4-inch, white) Pavement markings, See Section H for details type B, solid (4-inch, yellow) Pavement markings, Slope stake limit
Construction limit to be Constructed "MAIN 01" Line
Profile grade
Existing Ground
See Section F for details reinforced concrete box culvert 13 feet span, 12 feet rise, precast 343+55.3
Culvert Crossing Boundary Creek
337+00 337+50 338+00 338+50 339+00 339+50 340+00 340+50 341+00 341+50 342+00 342+50 343+00 343+50 344+00 344+50
4,712 4,712
4,714 4,714
4,716 4,716
4,718 4,718
4,720 4,720
4,722 4,722
4,724 4,724
4,726 4,726
4,728 4,728
337+00 337+50 338+00 338+50 339+00 339+50 340+00 340+50 341+00 341+50 342+00 342+50 343+00 343+50 344+00 344+50
4,712 4,712
4,714 4,714
4,716 4,716
4,718 4,718
4,720 4,720
4,722 4,722
4,724 4,724
4,726 4,726
4,728 4,728
-1.34%
-0.31% 3
.9
.2
.0
.5
SSD = 597'
K = 73
150' VC
HLSD = INF'
K = 146
150' VC
,7
.8
"MAIN 01" 339+00
:5
J u ly
B o u n d a ry
C re e k
S h e p w
-w o rk \d
\o ra -g ra n t2
-2 p ln p p -r e d o n e .d g n
PROJECT
D.6
S84°33'39"W e = 5.4%
'192.58L =
'97.29T =
'550.00R =
(LT)20°03'43"Δ =
345+14.43PI
.7
.3
P
O E
5 3
9 N
See Section H for details type B, solid (4-inch, white) Pavement markings, See Section H for details type B, solid (4-inch, yellow) Pavement markings, Slope stake limit
Construction limit to be Constructed "MAIN 01" Line
CONSTRUCTION
SUSPEND
Profile grade
Existing Ground
345+00 345+50 346+00 346+50 347+00 347+50 348+00 348+50 349+00
4,708 4,708
4,710 4,710
4,712 4,712
4,714 4,714
4,716 4,716
4,718 4,718
4,720 4,720
4,722 4,722
4,724 4,724
4,726 4,726
4,728 4,728
345+00 345+50 346+00 346+50 347+00 347+50 348+00 348+50 349+00
4,708 4,708
4,710 4,710
4,712 4,712
4,714 4,714
4,716 4,716
4,718 4,718
4,720 4,720
4,722 4,722
4,724 4,724
4,726 4,726
4,728 4,728
-2.38%
-1.43%
.3
.4
HLSD = INF'
K = 132
125' VC
"MAIN 01" 347+00
:1
J u ly
B o u n d a ry
C re e k S h e e t2 p w
-w o rk \d
\o ra -g ra n t2
-2 p ln p p -r e d o n e .d g n
PROJECT
D.7
N87°0 1'38"
W
N55°29'06"W e = 5.4%
L = 319.30'
T = 163.81'
R = 580.00'
Δ = 31°32'32" (RT)
PI 381+45.76
e = ___ L = 309.94' T = 156.22' R = 1,000.00'
Δ = 17°45'29" (LT)
PI 375+58.03
P T
.7
P C
.9
P T
.2
1 3
Y T I L I
U
D
I R
B
G
I N R A
W
N
RESUME CONSTRUCTION CONSTRUCTION
SUSPEND
to be Constructed "MAIN 01" Line
Slope stake limit
Construction limit
See Section H for details type B, solid (4-inch, yellow) Pavement markings, See Section H for details type B, solid (4-inch, white) Pavement markings, Profile grade
Existing Ground
G
T
S
T
G
S
T G S
T G S
TGS
376+50 377+00 377+50 378+00 378+50 379+00 379+50 380+00 380+50 381+00 381+50 382+00 382+50 383+00 383+50
4,668 4,668
4,670 4,670
4,672 4,672
4,674 4,674
4,676 4,676
4,678 4,678
4,680 4,680
4,682 4,682
4,684 4,684
4,686 4,686
4,688 4,688
376+50 377+00 377+50 378+00 378+50 379+00 379+50 380+00 380+50 381+00 381+50 382+00 382+50 383+00 383+50
4,668 4,668
4,670 4,670
4,672 4,672
4,674 4,674
4,676 4,676
4,678 4,678
4,680 4,680
4,682 4,682
4,684 4,684
4,686 4,686
4,688 4,688
-4.49%
-1.00%
-2.45%
-1.13%
.4
.2
.6
.5
.0
.0
SSD = 797'
K = 69
100' VC
HLSD = 265'
K = 43
150' VC
HLSD = INF'
K = 114
150' VC
,6
.7
"MAIN 01" 376+50 "MAIN 01" 383+55
LEGEND:
Guardrail System MGS, Type 2, Class A Wood Posts
Terminal Section, Type MGS Tangent
Structure Railing Transition Section
4377+50 to 379+13 RT
378+13 to 379+01 LT
380+04 to 380+79 RT
379+92 to 382+55 LT
:1
J u ly
B u ll R u n
S h e p w
-w o rk \d
\o ra -g ra n t2
-2 p ln p p -r e d o n e .d g n
PROJECT
D.8
N56°18'17"W
N64°1 1'33
"W
N37°47'11"W e = 6.0%
'299.57L =
'152.49T =
'650.00R =
(RT)26°24'22"Δ =
492+82.87PI
e = ___ '137.67L = '68.94T = '1,000.00R =
(LT)07°53'16"Δ =
488+59.47PI
.5
.2
.3
.9
T4
.2
P
3 4
N
RESUME CONSTRUCTION
to be Constructed "MAIN 01" Line
Slope stake limit
Construction limit
See Section H for details type B, solid (4-inch, yellow) Pavement markings, See Section H for details type B, solid (4-inch, white) Pavement markings, Profile grade
Existing Ground
G
T
S
T G S
T G S
S G T
S G
496+44
Bull Run Creek Crossing #4
488+00 488+50 489+00 489+50 490+00 490+50 491+00 491+50 492+00 492+50 493+00 493+50 494+00 494+50 495+00 495+50 496+00 496+50
4,566 4,566
4,568 4,568
4,570 4,570
4,572 4,572
4,574 4,574
4,576 4,576
4,578 4,578
4,580 4,580
4,582 4,582
4,584 4,584
4,586 4,586
4,588 4,588
4,590 4,590
488+00 488+50 489+00 489+50 490+00 490+50 491+00 491+50 492+00 492+50 493+00 493+50 494+00 494+50 495+00 495+50 496+00 496+50
4,566 4,566
4,568 4,568
4,570 4,570
4,572 4,572
4,574 4,574
4,576 4,576
4,578 4,578
4,580 4,580
4,582 4,582
4,584 4,584
4,586 4,586
4,588 4,588
4,590 4,590
-0.43% -0.10%
-1.00%
.8
.5
.9
.0
.0
.7
SSD = 1243'
K = 111
100' VC
SSD = 798'
K = 53
75' VC
HLSD = INF'
K = 297
100' VC
,5
.4
"MAIN 01" 489+65LEGEND:
Guardrail System MGS, Type 2, Class A Wood Posts
Terminal Section, Type MGS Tangent
Structure Railing Transition Section
7492+66 to 494+16 RT
494+31 LT
494+06 to
495+94 RT
495+56 to
497+22 LT
495+72 to
:3
J u ly
B u ll R u n
B u ll R u n
S h e p w
-w o rk \d
\o ra -g ra n t2
-2 p ln p p -r e d o n e .d g n
PROJECT
D.9
N37° 47'
11" W
N10°57'43"W e = ___
'196.63L =
'100.15T =
'420.00R =
(RT)26°49'28"Δ =
499+38.64PI
.4
.6
P
0 N
END SCHEDULE A & B
END CONSTRUCTION
END PROJECT
to be Constructed "MAIN 01" Line
Slope stake limit
Construction limit
See Section H for details type B, solid (4-inch, yellow) Pavement markings, See Section H for details type B, solid (4-inch, white) Pavement markings, Profile grade
Existing Ground
TG
G
T
S
497+00 497+50 498+00 498+50 499+00 499+50 500+00 500+50
4,562 4,562
4,564 4,564
4,566 4,566
4,568 4,568
4,570 4,570
4,572 4,572
4,574 4,574
4,576 4,576
4,578 4,578
4,580 4,580
4,582 4,582
4,584 4,584
4,586 4,586
497+00 497+50 498+00 498+50 499+00 499+50 500+00 500+50
4,562 4,562
4,564 4,564
4,566 4,566
4,568 4,568
4,570 4,570
4,572 4,572
4,574 4,574
4,576 4,576
4,578 4,578
4,580 4,580
4,582 4,582
4,584 4,584
4,586 4,586
-2.42%
+0.73%
.0
.2
L P
.9
HLSD = 340'
K = 56
175' VC
"MAIN 01" 498+75
Structure Railing Transition Section
Terminal Section, Type MGS Tangent
Guardrail System MGS, Type 2, Class A Wood Posts
LEGEND:
:5
J u ly
B u ll R u n
B u ll R u n
S h e p w
-w o rk \d
\o ra -g ra n t2
-2 p ln p p -r e d o n e .d g n
PROJECT
D.10
NO SCALE
5.
4.
3.
2.
1.
Case 1: Overlying material Case 2: Overlying material between drilled holes Excavate area between drilled holes Excavate area
Overlying material Overlying material
Rock material Rock material backfill or overlying material Crushed coarse aggregate backfill or overlying material
Crushed coarse aggregate aggregate backfill Crushed coarse aggregate backfill Crushed coarse
Finished gradeFinished grade depth (A) is 18" or less depth (A) is greater than 18"
NOTE:
the base metal with two coats of zinc-oxide paint.
Treat field cut galvanized steel post surfaces that expose requirements in Section 617.
Place crushed coarse aggregate according to the post underdrain pipe with geotextile" in Section 703.
"coarse aggregate for concrete" or "granular backfill for Use crushed coarse aggregate backfill that conforms to oblong hole configuration for Case 1 conditions.
Unless otherwise specified, use either the circular or the
Use this standard when posts cannot be embedded to the
ELEVATION
PLAN VIEWPLAN VIEW
ELEVATION
Steel Post
Wood Post
Wood Post
Steel Post
POST EMBEDMENT DIMENSIONS
B A
E m b e d m e n t D e p th
B A
E m b e d m e n t D e p th
23"
23"
21"
21"
12"
8"
617-31 or 617-32.
minimum depth shown on Standard 617-10, 617-11, fo r M
G S fo r G fo r M
G S fo r G
21" or 23" 8" or 12"
DEPTH
EMBEDMENT
Case 1
Case 2
DEPTH (B)
DRILLING
MATERIAL (A)
OVERLYING
TYPE
HOLE
42”
30" to 42”
24" to 42”
> 30”
> 18" to 30”
0 to 18”
42" - A
12”
24”
6/2022 STANDARD APPROVED FOR USE
REVISED: 617-13
INSTALLATION IN ROCK
W-BEAM GUARDRAIL
MGS AND G4
:4
A u g u s t
S td
-1 p w
-w o rk \d
\S td
-1 d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
D.11
6.
5.
4.
3.
2.
1.
embankment Edge of widened post section. See Note 4 face of the rail in the standard Tangent line projected from the embankment Edge of widened post section. See Note 4 face of the rail in the standard Tangent line projected from the
Varies by manufacturer end of terminal not shown.
Terminal posts and
Varies by manufacturer end of terminal not shown.
Terminal posts and
NOTE:
terminal grading extents where practical.
Construct a 1V:4H slope outside of the guardrail terminal.
Install a reflectorized object marker on the end of the according to the manufacturer's recommendations.
end farther from the edge of shoulder, or use a taper Install terminal at a 1:25 taper or flatter to position the the manufacturer's recommendations.
necessary to install the tangent terminal according to manufacturer for a specific product. Adjust grading as begin at post 3. Verify the length of need with the For design purposes, the length of need is assumed to of site limitations, use the alternative grading layout.
as practical within site constraints. If necessary because are provided, use the preferred grading layout as much staking notes or model. If no staking notes or model Construct the terminal grading layout as shown in the other details.
recommendations. See manufacturer's drawings for Install tangent terminal according to the manufacturer's
See Note 6 Guardrail terminal grading o r fl a tt e r
V
:1
H
Front of rail face
PLAN
PREFERRED GRADING
Post section
Standard
L
See Note 6 Guardrail terminal grading o r fl a tt e r
V
:1
H
Hinge point line
See Note 3
Length of Need
Guardrail system
Pay limits
Pay limits terminal section type tangent or type MGS tangent
Back of post
Back of post
Front of rail face
Hinge point line
PLAN
ALTERNATIVE GRADING
post section
Standard
Guardrail system
Pay limits
Pay limits terminal section type tangent or type MGS tangent
See Note 3
Length of Need
12'-6"
(min.)
10'-0"
(m in
(m in
(m in
12'-6"
(m in
TEST LEVEL
L
50 (for MGS)
37.5 or 50 (for G4)
(FT)
3 (> 45 mph)
2 (≤ 45 mph)
6/2022 REVISED: 617-20
AND GRADING
TYPE TANGENT TERMINAL
W-BEAM GUARDRAIL
MGS AND G4
6/2005 STANDARD APPROVED FOR USE
:3
J u n e
S td
-2 p w
-w o rk \d
\S td
-2 d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
D.12
4.
3.
2.
1.
on terminal sections All posts except those guardrail bolt guardrail post bolt
NOTE:
OMITTED POST DETAIL
PLAN VIEW
See Note 1
TYPICAL GUARDRAIL CROSS SECTION
TYPICAL GUARDRAIL ELEVATION
POST BOLT ASSEMBLY GUARDRAIL MOUNT
FLEXIBLE DELINEATOR
POST AND BLOCK
of traffic Lap in direction splice Mid-span of rail as applicable ground line at face Edge of pavement or
1V:10H or flatter slope 1V:10H or flatter slope fill slope
Variable
Hinge point steeper than fill slope Variable slope but not departure terminal sections required for approach and Subgrade shoulder. Widening on each side of block 16d galvanized nail Toenail with one groundline at face of rail Edge of pavement or groundline at face of rail Edge of pavement or on each side of block 16d galvanized nail Toenail with one shown on Typical Section Aggregate base or as shown on Typical Section Aggregate base or as
See Note 4 sheeting Retroreflective
W beam rail
Post and block block (typ.)
Post and
Hinge point departure terminal sections required for approach and Subgrade shoulder. Widening
1V:2H or flatter slope
TYPICAL GUARDRAIL CROSS SECTION
P o s t le n g th recommendations.
or mechanical means according to the manufacturer's delineator to the top of the wood post using either an adhesive Install a flexible hinged delineator every fourth post. Fasten including its appearance, and accepted manufacturing practices.
those consistent with the proper functioning of the part, Dimensional tolerances not shown or implied are intended to be block rotation.
the adjacent blocks with two 16d galvanized nails to prevent with anti-rotation nails. If combination blocks are used, toenail or combination of blocks (no more than two) to achieve the Size of block shown elsewhere on the plans. Use a single block and the hinge point. For all other locations, see Section 617 omitted in locations where the typical guardrail cross section When encountering impenetrable material, one post may be
See Note 2
(one omitted post) unsupported span
(max.)
See Note 2
Traffic
(t y p
(ty p.)
6" See Note 2
8" or 12"
(ty p.)
6" (typ.)
8"
" Ø hole (typ.)4
See Note 2 8" or 12"
8"
" Ø hole4
" recess nut8
5" (max.)
3" x 4" (min.)
actual 8-inch or 12-inch offset. Secure wood blocks to the posts and Standard 617-13 or 617-37.
includes 2-feet (min.) between the back of the guardrail post
6' post
(typ.)
2'-0"
6' post
6' POST CENTERED ON HINGE, 8" OR 12" BLOCK
12'-6"
43'-9" (min.)
56'-3" (min.) distance between omitted posts
"2 13'-1 6'-3" Post spacing
6' POST, 8" OR 12" BLOCK
bolts and nuts (8 per splice)
" guardrail splice4 1" x 18
8" or 12" block
" x 18" or 22"8
" plain round washer.4
8" or 12" block
" x 18" or 22"8
(t y p
REVISED: 617-31
WOOD POSTS
MGS W-BEAM GUARDRAIL
7/2022 STANDARD APPROVED FOR USE
:2
A u g u s t
S td
-3 p w
-w o rk \d
\S td
-3 d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
D.13
NOTE:
SPAN WITH HEADWALL DETAIL
WOOD POST DETAIL STEEL POST DETAIL CRT POST DETAIL
PLAN
ELEVATION
Finished grade
PLAN VIEW
See Note 1
POST AND
BURIED OBSTRUCTION
BURIED OBSTRUCTION
See Note 3 See Note 3
Hinge point line
Rail splice (typ.)
(no nesting required) Single W-beam rail element
Slope varies
Slope varies
Slope varies the face of the headwall flush (zero offset) with Back of post may be See Note 4
Headwall the face of the headwall flush (zero offset) with Back of post may be
Hinge point line
CRT WOOD POST
FRONT SIDE
TOP
the maximum height of the culvert headwall above the the finished grade to act as a vertical roadway curb, In locations where the culvert headwall extends above upstream and downstream of posts 2 and 7 is The minimum length of guardrail, including the end terminals, Use wood posts for CRT posts.
Posts 1 and 8 may be wood or steel.
5.
4.
3.
2.
1.
See Note 1
POST AND
See Note 2
POST AND
12" (min.)12" (min.)
8" or 12"
8"
24"
8" or 12"
6"
24"
12"
8"
24" hole (typ.)
" dia.2
8"
" dia.4
6"
6"
See Standard 617-31 or 617-32 for other assembly details.
finished grade is 2-inches.
62.5-feet.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
2 3 4 5 6 7 8
8 1 8 2 7 or 25'-0" (3 omitted posts)
18'-9" (2 omitted posts)
6'-3"
REVISED: 617-37
LONG-SPAN SYSTEM
MGS W-BEAM GUARDRAIL
STANDARD APPROVED FOR USE 7/2022
:4
A u g u s t
S td
-3 p w
-w o rk \d
\S td
-3 d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
D.14
N
Erosion Control - Bull Run 01-1
BEGIN CONSTRUCTION
BEGIN PROJECT
SOIL EROSION CONTROL, SILT FENCE
"MAIN 01" 242+00
:2
M a y
E r o s io n C o n tr o l B u ll
R u n
S h e p w w o r k \d
\o r a g r a n t2 p ln e c .d g n
CONTROL
SOIL EROSION AND SEDIMENT
PROJECT
E.2
Y T I L I T
U D
E I R
U B G
N I N
R A
W
N
Erosion Control - Bull Run 01-2
SUSPEND CONSTRUCTION
SOIL EROSION CONTROL, SILT FENCE
"MAIN 01" 247+00
:4
M a y
E r o s io n C o n tr o l B u ll
R u n
S h e p w w o r k \d
\o r a g r a n t2 p ln e c .d g n
CONTROL
SOIL EROSION AND SEDIMENT
PROJECT
E.3
N
Erosion Control - Bull Run 02-1
RESUME CONSTRUCTION
SOIL EROSION CONTROL, SILT FENCE
"MAIN 01" 268+40
:3
M a y
E r o s io n C o n tr o l B u ll
R u n
S h e p w w o r k \d
\o r a g r a n t2 p ln e c .d g n
CONTROL
SOIL EROSION AND SEDIMENT
PROJECT
E.4
1 2
N
Erosion Control - Bull Run 02-2
SUSPEND CONSTRUCTION
"MAIN 01" 273+00
:3
M a y
E r o s io n C o n tr o l B u ll
R u n
S h e p w w o r k \d
\o r a g r a n t2 p ln e c .d g n
CONTROL
SOIL EROSION AND SEDIMENT
PROJECT
E.5
1 3
N
RESUME CONSTRUCTION
SOIL EROSION CONTROL, SILT FENCE
"MAIN 01" 339+00
:3
M a y
E r o s io n C o n tr o l B o u n d a r y
C r e e k
S h e p w w o r k \d
\o r a g r a n t2 p ln e c .d g n
CONTROL
SOIL EROSION AND SEDIMENT
PROJECT
E.6
N
SUSPEND CONSTRUCTION
SOIL EROSION CONTROL, SILT FENCE
"MAIN 01" 347+00
:3
M a y
E r o s io n C o n tr o l B o u n d a r y
C r e e k
S h e p w w o r k \d
\o r a g r a n t2 p ln e c .d g n
CONTROL
SOIL EROSION AND SEDIMENT
PROJECT
E.7
5 3
0 3
Y T I L I
I R
I N R A W
N
RESUME CONSTRUCTION
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, FIBER ROLL
"MAIN 01" 376+50
:4
M a y
E r o s io n C o n tr o l B u ll
R u n
S h e p w w o r k \d
\o r a g r a n t2 p ln e c .d g n
CONTROL
SOIL EROSION AND SEDIMENT
PROJECT
E.8
3 3 4 3
N
SUSPEND CONSTRUCTION
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, FIBER ROLL
"MAIN 01" 383+55
:4
M a y
E r o s io n C o n tr o l B u ll
R u n
S h e p w w o r k \d
\o r a g r a n t2 p ln e c .d g n
CONTROL
SOIL EROSION AND SEDIMENT
PROJECT
E.9
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Fil l s lop e
T o e o f s lo p e
PLAN
ELEVATION
4.
3.
2.
1.
T o e o f s lo p e
Fil l s lop e
ELEVATION
PLAN
PLAN
PLAN
END DETAIL
END POSTS DETAIL
POSTS AT JOINTS
Varies
Geotextile
Steel or wood post
Backfilled and compacted soil fo r s p a c in g
S e e N o te
Limits of clearing
(undisturbed) Existing ground
Silt fence reinforcement
NOTE:
Staple or tie
Section B Geotextile fabric, Tie top of posts together driven tightly together.
Steel or wood posts
Steel or wood post
Staple or tie
Geotextile fabric
Fasten fabric to posts around each post one full turn.
Fold geotextile fabric
See Note 3
End Posts Detail End posts, see
End Posts Detail End posts, see
See Note 3 fabric, Section A Geotextile
Flow
Flow
Flow running around the ends.
Curve ends of silt fence upgrade to prevent water from as possible.
Install silt fence to follow the ground contours as closely does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow Alternate preassembled silt fence options will be allowed m in m in m in
6-foot (max.) spacing without silt fence reinforcement.
10-foot (max.) spacing with silt fence reinforcement.
4" min.
6" min. trench
DETAIL APPROVED FOR USE --/----
10/2016REVISED: 157-1W
WFLHD DETAIL
SILT FENCE
:4
J u n e
D e t W p w
-w o rk \d
\W
-1
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
E.12
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction o f runoff from disturbe d areas sp ac in g ch ar t
Se e
Fi be r Ro ll
Fiber roll ff o n ur f o no it ce ri
D along contours Install fiber rolls
Fiber roll
Slope
Fil l s lop e
Direction of runoff ground Existing soil to match ground level Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
FIBER ROLL
(FT)
(FT)
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
to
(m in
(m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent Overlap fiber rolls 12-inch minimum. Drive stakes at
NOTE:
DETAIL APPROVED FOR USE 10/2014
7/2016 REVISED: 157-21W
:0
J u n e
D e t W p w
-w o rk \d
\W
-2
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
E.13
See Note
6%
5%
4%
3%
2%
NO SCALE
6%
5%
4%
3%
2%
5%
4%
3%
2%
7.
6.
5.
4.
3.
2.
1.
Adjust check dam spacing based on site-specific conditions.
around the ends of the fiber roll.
Provide sufficient length to prevent water from flowing
Drive stakes into undisturbed soil of trench bottom.
stakes. Drive stakes at each end of the fiber roll and at
Install check dams in ditches perpendicular to the flowline.
installation.
Repair all rills or gullies and properly compact prior to functional requirements of the check dam device.
gravel bags as approved by the CO, to meet the Construct check dams from fiber rolls, filter rock, or
MODERATE GRADES
CHECK DAM
CROSS SECTION
V-DITCH
CROSS SECTION
FLAT-BOTTOM DTICH
CROSS SECTION
CROSS SECTION
STAKING DETAIL
FIBER ROLL
PLAN
are similar for flat-bottom ditches Check dam installation details V-ditch design shown.
Flow line
GRADE
DITCH
(See Note 7)
CHECK DAM SPACING*
GRAVEL BAG
Gravel bag the ends. See Note 6 to prevent flow around Curve ends upstream
Filter rock
Filter rock
FIBER ROLL CHECK DAM
GRAVEL BAG CHECK DAM
SPACING (max.)
CHECK DAM
See Note 5
NOTE:
GRADE
DITCH
SPACING (max.)
CHECK DAM
(See Note 7)
CHECK DAM SPACING
FILTER ROCK
GRADE
DITCH
(See Note 7)
CHECK DAM SPACING*
FIBER ROLL
SPACING (max.)
CHECK DAM
FILTER ROCK CHECK DAM
uphill side of fiber roll trench material on Place excavated
Flow
F lo w on ditch grades steeper than 5%.
Do not use fiber roll check dams
* Spacing calculated based on on ditch grades steeper than 6%.
* Do not use gravel bag check dams
(FT)
(FT)
(FT)
Trench 2" (min.)
m in
Fiber roll 9" Ø (min.)
Trench 2" (min.)
-inch wood 8
1-inch x 18 1Stake fiber rolls in place with 1
Expose stakes 2-inches (min.) above top of fiber roll.
2-foot (max.) spacing.
m in
"6 m in m in .6
9" Ø minimum fiber roll.
DETAIL APPROVED FOR USE 7/2016
REVISED: 157-15W
:2
S e p te m b e r
D e t W p w
-w o rk \d
\W
-1
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
E.14 with plastic liner or riprap Temporary diversion channel
NO SCALE
temporary barrier Use sandbags to construct
A
A
Flow
PLASTIC LINED DIVERSION CHANNEL
SECTION B-B
SECTION A-A
W
B
W
B
SandbagsPlastic liner
SSSS D D SSSS
Flow
Plastic liner when scheduled) Silt fence (typ.
and secure with sandbags (typ.)
5.
4.
3.
2.
1.
Flow using one of the methods listed in Subsection 204.11(a).
temporary culvert. Compact temporary culvert backfill channel through the roadway embankment with When specified replace the portion of the diversion liner. Bury the upstream edge of the liner a minimum of Do not construct with longitudinal joints if using a plastic
Construct channel at a minimum grade of 0.5 percent.
width of the temporary diversion channel.
Use plastic liner or riprap along the entire length and diameter, riprap class, channel dimensions and quantities.
See Erosion Control Section for temporary culvert
NOTE:
Permanent culvert
Roadway centerline
BB
See Note 5 when scheduled) Silt fence (typ.
backflow into natural channel Use sandbags to prevent
Permanent natural channel
Earthwork limits
DIVERSION CHANNEL
PLAN
TEMPORARY CULVERT
SECTION B-B
Ø embankment
Roadway embankment Roadway
Temporary culvert backfill
Subgrade
Bedding
Natural ground
RIPRAP LINED DIVERSION CHANNEL
SECTION A-A SECTION B-B
W
B B
W
T T when scheduled) Silt fence (typ.
Sandbags
Riprap lining Riprap lining
SS SS
D DSS SS
FlowFlow
GeotextileGeotextile
6" deep and secure with riprap or sandbags.
Bury plastic liner 6" deep
2' 2'2'2'
6/2005 STANDARD APPROVED FOR USE
7/2022 6/2007 REVISED:
CHANNELS
TEMPORARY DIVERSION
157-5
:5
J u n e
S td
-5 p w
-w o rk
\d \S td -5
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
E.15
SCALE IN FEET
0 1010 20 25
N
Proposed road grade
Proposed roadLC
Flowline
(L-66')
(15 feet span, 9 feet rise)
Precast reinforced concrete box culvert
Mitigation, streambed material
Match existing stream bottom
100-yr WS profile
Existing stream bottom locate as directed by CO
Temporary flow barrier, locate as directed by CO
Temporary flow barrier, Placed riprap, method A, class 3
Existing channel edge
244+66.4
Station
Existing channel edge
LC
LCExisting road locate as directed by CO
Temporary flow barrier, locate as directed by CO emporary flow barrier, T
New precast wingwall (L-12')
(L-66')
(15 feet span, 9 feet rise)
Precast reinforced concrete box culvert
New channel bottom edge
LC
Existing stream bottom
New precast wingwall (L-12') wingwall (L-12') New precast
0.033 Ft/Ft
New channel (L-20')
New channel (L-10')LC
New channel (L-20')LC
New channel (L-10')LC
Remove boulder weir
F.2
STATE PROJECT
NUMBER
SHEET
In t_ ft p w w o r k \d
\B u ll
R u n C r e e k N o C u lv e r t_
L O
F
I n t_ f t2
D .d g n
OR FLAP GRANT 24(2)
:5 e c e m b e r
C h e c k e d b y
D e s ig n e d b y
PLAN & PROFILE
AOP CULVERT
BULL RUN CREEK NO. 1
PIPE INLET OUTLET
ACTIVE CHANNEL WIDTH: 10 feet
LENGTH: 66 feet
INFILL TYPE: SBM
SPAN: 15'-0"
TYPE: Conserved
HYDRAULIC INFORMATION
100 100
OHW : 1.0 feet
HW : 2.5 feetQ : 184 cfs
TYPE: Concrete Box Culvert
WALL THICKNESS: 12 in
HEADWALL: Precast Concrete HEADWALL: Precast Concrete
BURIAL DEPTH: 3.0 feet BURIAL DEPTH: 3.0 feet
FLOWLINE SLOPE: 0.033 ft/ftINSTREAM WORK WINDOW: 7/15- 8/15
INV N/E/EL: INV N/E/EL: Q : 51 cfs RISE: 9'-0"
PIPE SLOPE: 0.033 ft/ft BEVEL: 2(h):1(v) BEVEL: 2(h):1(v)
LOWER BEVEL HEIGHT: 8.0 feet LOWER BEVEL HEIGHT: 8.0 feetFISH SPECIES: Bull trout, Steelhead, Chinook
60 50 40 30 20 10 07090 80100110120130140 605040302010 70 9080 100 110 120 130 140
Flow
5°
135°
5°
135° existing 60"x90" CMP arch
Removal of pipe culvert, Proposed road
New culvertLC
0.033 Ft/Ft
0.033 Ft/Ft
.9 °8
.1
Cast-in-place cutoff wall Cast-in-place cutoff wall
(t yp
33'-1 8"
G P S
Construction limits Existing edge of pavement
Proposed edge of pavement
411715.26/8761817.23/4911.7'411650.03/8761807.13/4914.0'
Grade to match existing terrain '-0
" (typ
Proposed terrain
32'-10 8"
CULVERT OUTLET
CULVERT INLET
TYPICAL INFILL CHANNEL
TOW, elev 4925.0'
100-yr WS
2-yr WS
Elev 4923.0'
Placed riprap, method A, class 3
Existing grade road LC
(15 feet span, 9 feet rise)
Precast reinforced concrete box culvert
Channel bank top
Flowline
Existing grade, upstream
Floor elev 4914.0'
See Notes 1 & 2 Cast-in-place cutoff wall
Mitigation, streambed material
New precast wingwall (L-12')
Elev 4919.0'
New channel bottom edge
New channel bottom edge
F.3
STATE PROJECT
NUMBER
SHEET
In t_ ft p w w o r k \d
\B u ll
R u n C r e e k N o C u lv e r t_
L O
F
I n t_ f t2
D .d g n
OR FLAP GRANT 24(1)
:5 e c e m b e r
C h e c k e d b y
D e s ig n e d b y
S v e n L e o n
ELEVATIONS
AOP CULVERT
BULL RUN CREEK NO. 1
Proposed grade road existing 60"x90" CMP arch culvert
Removal of pipe culvert, TOW, elev 4922.7' 100-yr WS
2-yr WS
Elev 4920.7'
Existing grade road LC (15 feet span, 9 feet rise)
Precast reinforced concrete box culvert
Channel bank top
New channel bottom edge
Proposed grade road
Flowline
Placed riprap, method A, class 3
Floor elev 4911.7' existing 60"x90" CMP arch culvert
Removal of pipe culvert, See Notes 1 & 2
Cast-in-place cutoff wall
Mitigation, streambed material
New precast wingwall (L-12')
Elev 4916.7'
Existing grade, downstream
10'-0"12" 18" 18" 12"
M a x
M a x and could be higher or lower. See Geotechnical Memo GM14-23 for more information.
3. Potential rock surface elevation of 4911 ft. based on boring. Actual surface will undulate
2. Place cutoff wall flush with inside edges of wingwall footers.
1. Extend cast-in-place cutoff wall 3'. If bedrock is encountered before 3', embed the wall 6" into bedrock.
NOTES:
5'-0" 5'-0"
5'-0"5'0"
Match new channel bottom elevation
Separation-stabilization geotextile, class 1, type C
Separation-stabilization geotextile, class 1, type C
Match new channel bottom elevation
Concrete, headwall
Concrete, headwall
Elev 4919.0'
Elev 4916.7'
Not to scale.
Not to scale.
SCALE IN FEET
0 1010 20 25
N
Proposed road grade
Proposed roadLC
Flowline
(L-56')
(22 feet span, 9 feet rise)
Precast reinforced concrete box culvert Mitigation, streambed material
Match existing stream bottom
100-yr WS profile
Existing stream bottom locate as directed by CO
Temporary flow barrier, locate as directed by CO
Temporary flow barrier, method A, class 3 Placed riprap, Existing channel edge
LCNew culvert
Station 270+08.8
Existing channel edge
Proposed road LC
LCExisting road locate as directed by CO
Temporary flow barrier, locate as directed by CO
Temporary flow barrier, PIPE INLET OUTLET
ACTIVE CHANNEL WIDTH: 15 feet
LENGTH: 56 feet
INFILL TYPE: SBM
SPAN: 22'-0"
TYPE: Conserved
HYDRAULIC INFORMATION
100 100
OHW : 1.0 feet
HW : 2.5 feetQ : 283 cfs
TYPE: Concrete Box Culvert
WALL THICKNESS: 12 in
HEADWALL: Precast Concrete HEADWALL: Precast Concrete
BURIAL DEPTH: 3.0 feet BURIAL DEPTH: 3.0 feet
FLOWLINE SLOPE: 0.021 ft/ftINSTREAM WORK WINDOW: 7/15- 8/15
INV N/E/EL: INV N/E/EL: Q : 91 cfs RISE: 9'-0"
PIPE SLOPE: 0.021 ft/ft BEVEL: 2(h):1(v) BEVEL: 2(h):1(v)
LOWER BEVEL HEIGHT: 8.0 feet LOWER BEVEL HEIGHT: 8.0 feet
New precast wingwall (L-12')
(L-56')
(22 feet span, 9 feet rise)
Precast reinforced concrete box culvert
New channel bottom edge
Flow
FISH SPECIES: Bull trout, Steelhead, Chinook
LC
Existing stream bottom
PLAN & PROFILE
AOP CULVERT
BULL RUN CREEK NO. 2
60 50 40 30 20 10 07090 80100110120130140 605040302010 70 9080 100 110 120 130 140
New precast wingwall (L-12') wingwall (L-12') New precast
0.040 Ft/Ft
0.021 Ft/Ft
0.023 Ft/Ft
New channel (L-45')
New channel (L-60')LC
5°
135°
135°
5°
New channel (L-45')LC
New channel (L-60')LC existing 84"x120" CMP arch culvert
Removal of pipe culvert, .2
.8
F.4
STATE PROJECT
NUMBER
SHEET
In t_ ft p w w o r k \d
\B u ll
R u n C r e e k N o C u lv e r t_
L O
F
I n t_ f t2
D .d g n
OR FLAP GRANT 24(2)
:4 e c e m b e r
C h e c k e d b y
D e s ig n e d b y
Remove boulder weir
24'-10 8"
31'-1 8"
Construction Limit
(t yp
Existing edge of pavement
Proposed edge of pavement
413376.72/8760274.68/4830.8' 413375.83/8760219.85/4829.7'
'-0
" (typ
Grade to match existing
Grade to match existing e = ___ '359.29L = '190.88T = '430.00R = (RT)47°52'28"Δ = 268+96.8505PI
TYPICAL INFILL CHANNEL
F.5
STATE PROJECT
NUMBER
SHEET
In t_ ft p w w o r k \d
\B u ll
R u n C r e e k N o C u lv e r t_
L O
F
I n t_ f t2
D .d g n
OR FLAP GRANT 24(2)
:4 e c e m b e r
C h e c k e d b y
D e s ig n e d b y
S v e n L e o n
ELEVATIONS
AOP CULVERT
BULL RUN CREEK NO. 2
TOW, elev 4841.8'
100-yr WS
2-yr WS
Elev 4839.8'
Placed riprap, method A, class 3
Existing grade road LC (22 feet span, 9 feet rise)
Precast reinforced concrete box culvert
Channel bank top
Flowline
Existing grade, upstream
Elev 4826.8'
Floor elev 4830.8' Precast cutoff wall
Mitigation, streambed material
New precast wingwall (L-12')
Elev 4840.0' existing 84"x120" CMP arch culvert
Removal of pipe culvert, TOW, elev 4840.7' 100-yr WS
2-yr WS
Elev 4838.7' Existing grade road LC
(22 feet span, 9 feet rise)
Precast reinforced concrete box culvert
Channel bank top
Placed riprap, method A, class 3
Existing grade, downstream
Elev 4825.7'
Floor elev 4829.7' existing 84"x120" CMP arch culvert
Removal of pipe culvert, Precast cutoff wall
Mitigation, streambed material
New precast wingwall (L-12')
Elev 4834.7'
Flowline
5'-0"
15'-0"2'-0" 18" 18" 2'-0"
" New channel bottom edge
New channel bottom edge
New channel bottom edge
5'-0" 5'-0"
5'-0"
Match new channel bottom elevation
Separation-stabilization geotextile, class 1, Type C
New channel bottom edge
Separation-stabilization geotextile, class 1, Type C
Match new channel bottom elevation
Profile grade
Profile grade
Concrete, headwall
Concrete, headwall
Elev 4835.8'
Elev 4834.7'
Not to scale.
Not to scale.
SCALE IN FEET
0 1010 20 25
N
0.049 Ft/Ft
New precast wingwall (L-12')
Proposed road grade
Proposed roadLCFlowline
(L-34')
(13 feet span, 12 feet rise)
Precast reinforced concrete box culvert
Mitigation, streambed material
Match existing stream bottom
100-yr WS profile
Existing stream bottom locate as directed by CO
Temporary flow barrier, locate as directed by CO
Temporary flow barrier, method A, class 3 Placed riprap, Existing channel edge
LC
Station 343+55.3
Existing channel edge
New channel bank top
Proposed road LC LCExisting road locate as directed by CO
Temporary flow barrier, locate as directed by CO
Temporary flow barrier, F.6
STATE PROJECT
NUMBER
SHEET
In t_ ft p w w o r k \d
\B o u n d a r y C r e e k C u lv e r t_
L O
F
I n t_ f t2
D .d g n
OR FLAP GRANT 24(2)
:5
N o v e m b e r
C h e c k e d b y
D e s ig n e d b y
PIPE INLET OUTLET
ACTIVE CHANNEL WIDTH: 8 feet
LENGTH: 34 feet
INFILL TYPE: SBM
SPAN: 13'-0"
TYPE: Conserved
HYDRAULIC INFORMATION
100 100
OHW : 1.0 feet
HW : 2.5 feetQ : 141 cfs
TYPE: Concrete Box Culvert
WALL THICKNESS: 12 in
HEADWALL: Precast Concrete HEADWALL: Precast Concrete
BURIAL DEPTH: 4.8 feet BURIAL DEPTH: 4.0 feet
FLOWLINE SLOPE: 0.049 ft/ftINSTREAM WORK WINDOW: 7/15- 8/15
INV N/E/EL: INV N/E/EL: Q : 41 cfs
PLAN & PROFILE
AOP CULVERT
BOUNDARY CREEK
PIPE SLOPE: 0.019 ft/ft BEVEL: 2(h):1(v) BEVEL: 2(h):1(v)
LOWER BEVEL HEIGHT: 8.0 feet LOWER BEVEL HEIGHT: 8.0 feet
New precast wingwall (L-12')
36x60" CMP arch
Remove existing
New channel bottom edge
New channel (L-117')LC
F lo w
Flow
FISH SPECIES: Bull trout, Steelhead, Chinook
0.049 Ft/Ft
0.045 Ft/Ft
wingwall (L-12') New precast
New channel (L-117')LC
(final grading by others)
Existing mine tailing surface
Existing stream bottom
10 20 30 40 50 60 70
80 90 100 110 120 130 140 150
060 50 40 30 20 1070 160 170 180 190 200 210
28' straight
L 28', R 25'
L 45', R 0'L 16', R 25'
LCNew channel (L-38')
New channel (L-38')LC
RISE: 12'-0"
(L-34')
(13 feet span, 12 feet rise)
Precast reinforced concrete box culvert
"8
19'-11 14'-1"
.7
New culvert elev 4707.5'
Daylight flowline, new bank toe, see channel wood details F.17
New channel wood structures, 2 locations locate as needed for dividing flow embed 6' minimum, 6' above final ground surface, 12, 12" dia., Untreated timber pile, in place, place tight against log piles
Boulder, 4, 36" min. dia., station 690, elev 4707' at new stream channel flowline, Daylight outlet channel flowline
New channel bank edge
New channel (by others)LC
New channel bank top
New channel (by others)LC elev 4707'
New channel flowline, as directed by CO
6, locate randomly, Mitigation, root wad, 7'-6"
7'-6"
(t yp
'-0
" (typ
Construction limits
(conserved willow bush)
Remove and replant tree and shrub, Cuttings, willow pole (willow pole tripod)
Cuttings, willow pole
Willow plantings, see details F.14, F.15, F.16
Proposed edge of pavement
Existing edge of pavement
135°
135°
415857.63/8753774.08/4709.5' 415824.79/8753765.31/4708.8'
5°
Grade to match existing terrain e = ___ '192.58L = '97.29T = '550.00R = (LT)20°03'43"Δ = 345+14.4346PI
TYPICAL INFILL CHANNEL
Placed riprap, method A, class 3
(13 feet span, 12 feet rise)
Precast reinforced concrete box culvert
Mitigation, streambed material
2-yr WS
100-yr WS
Profile grade
New precast wingwall (L-12')
Precast cutoff wall
Channel bank top
Flowline
TOW, elev 4722.8'
Elev 4720.8'
Floor elev 4708.8' Elev 4704.8'
Elev 4716.8'
36x60" CMP arch culvert
Culvert removal, Existing grade, downstream
ELEVATIONS
AOP CULVERT
BOUNDARY CREEK
Elev 4717.5'
Mitigation, streambed material
Precast cutoff wall existing 36x60" CMP arch culvert
Culvert removal, Floor elev 4709.5 Elev 4705.5'
New precast wingwall (L-12')
Placed riprap, method A, class 3
Profile grade
TOW, elev 4723.5'
100-yr WS
2-yr WS
Elev 4721.5'
(13 feet span, 12 feet rise)
Precast reinforced concrete box culvert
Channel bank top
Flowline
Existing grade, upstream
Existing grade road LC
Existing grade road LC
F.7
STATE PROJECT
NUMBER
SHEET
In t_ ft p w w o r k \d
\B o u n d a r y C r e e k C u lv e r t_
L O
F
I n t_ f t2
D .d g n
OR FLAP GRANT 24(2)
:5
N o v e m b e r
C h e c k e d b y
D e s ig n e d b y
S v e n L e o n
5'-0" 5'-0"
5'-0"5'-0"
Separation-stabilization geotextile, class 1, type C
Separation-stabilization geotextile, class 1, type C
Match new channel bottom elevation
Match new channel bottom elevation
8'18"12" 18" 12"
Concrete, headwall
Concrete, headwall
Elev 4717.5'
Elev 4716.8'
Not to scale.
Not to scale.
Existing road
Proposed road LC
LC
LC
existing 120" x 84" CMP
Removal of pipe culvert, Existing channel edge bottom edges
Proposed channel
LC
B
B
New channel endpoint
LCNew channel endpoint
N
10 20010
SCALE IN FEET
Flow
Erosion control pad, 6' x 8' x 1'
Placed riprap, method A, class 1, Placed riprap, method B, class 4
Proposed bridge, see S. Sheets
F.8
STATE PROJECT
NUMBER
SHEET
In t_ ft p w w o r k
\d
\B u ll
R u n
C r e e k
N o
R ip r a p
F
L O
I n t_ f t2
D .d g n
OR FLAP GRANT 24(2)
:4
N o v e m b e r
C h e c k e d b y
D e s ig n e d b y
RIPRAP PLAN
BULL RUN CREEK CROSSING #3
'-0
'-0
.3
21'-0"
21'-0"
10' radius
Elev 4668.8
375+54.85
Proposed channel __ bottom edges
Proposed channel
7'
7' A
A locate as directed by CO diversion, Temporary flow locate as directed by CO
Temporary flow diversion, GPS
19403
19402
GPS
Construction limits
Proposed edge of pavement
Existing edge of pavement
1V:4H
BOUNDARY MARKER
BOUNDARY MARKER
WARNING BURIED UTILITY
ELEVATION
Low chord 4676.68'
NO SCALE
Placed riprap, method B, class 4 geotextile, class 1, type C
Separation-stabilization existing 120" x 84" CMP
Removal of pipe culvert, elev 4668.8' channel bottom, Proposed stream
See Note 1
Conserved streambed material
Elev. = 4678.97
Sta. = 379+25.85
Begin Bridge
Elev. = 4678.43
Sta. = 379+79.85
End Bridge
F.9
STATE PROJECT
NUMBER
SHEET
In t_ ft p w w o r k
\d
\B u ll
R u n
C r e e k
N o
R ip r a p
F
L O
I n t_ f t2
D .d g n
OR FLAP GRANT 24(2)
:4
N o v e m b e r
C h e c k e d b y
D e s ig n e d b y
20'-0"
SECTION A-A
SECTION B-B
Elev 4674.0'
8'-0" 18'-0"
Elev 4665.0'
'-0
Excavation limit
Final road grade material streambed
Conserved
4'-0"
100-year W.S. Elev 4672.0' Elev 4671.0'OHW
Bridge abutment
4,660
4,665
4,670
4,675
4,680
4,685
-1.00
RIPRAP ELEVATIONS
BULL RUN CREEK CROSSING #3
Existing road grade
Proposed road grade
36 to 40" dia., 24 randomly placed as directed by CO
Mitigation, fish passage boulder, Placed riprap, method B, class 4 geotextile, class 1, type C
Separation-stabilization
Conserved streambed material
Bridge abutment
Elev 4674.0'
18'-0"Variable18'-0"
Elev 4665.0'
Placed riprap, method B, class 4 geotextile, class 1, type C
Separation-stabilization
'-0
Elev 4674.0' to Place riprap, method B, class 4
1. Placement of conserved streambed material is incidental
NOTES:
m in
1V:4H max. 1V:20H
Flow
Existing road
Proposed roadLC
LC
LC
Placed riprap, method B, class 4
Existing channel edge
LC
New channel endpoint
LC
endpoint
New channel
Elev 4564.5
494+94.0
Proposed channel
N
10 20010
SCALE IN FEET
B
B
Erosion control pad, 6' x 8' x 1'
Placed riprap, method A, class 1, See S. Sheets
Proposed bridge
F.10
STATE PROJECT
NUMBER
SHEET
In t_ ft p w
-w o rk \d
\B u ll
R u n
C re e k
N o -4 ft
W W
R ip ra p
F L
O
In t_ ft
D .d g n
OR FLAP GRANT 24(2)
:1
S e p te m b e r
C h e c k e d b y
D e s ig n e d b y
RIPRAP PLAN
BULL RUN CREEK CROSSING #4
10' radius existing 120" x 84" CMP
Removal of pipe culvert, '-0
'-0
8' -0
0"
0"
8' -0
0"
0"
A
A
8' -0
0"
8' -0
0"
'25
.9
87'
72' locate as directed by CO
Channel wood structure, locate as directed by CO
Channel wood structure, 52'
20' bottom edge
Proposed channel bottom edge
Proposed channel
156°
155°
'-0
'-0
(ty p
'-0
'-0
(ty p locate as directed by CO diversion, Temporary flow locate as directed by CO
Temporary flow diversion, Construction limits
Proposed edge of pavement
Existing edge of pavement
ELEVATION
Existing ground
Elev. = 4578.84
Sta. = 494+42.92
Begin Bridge
F.11
STATE PROJECT
NUMBER
SHEET
In t_ ft p w
-w o rk \d
\B u ll
R u n
C re e k
N o -4 ft
W W
R ip ra p
F L
O
In t_ ft
D .d g n
OR FLAP GRANT 24(2)
:1
S e p te m b e r
C h e c k e d b y
D e s ig n e d b y
RIPRAP ELEVATIONS
BULL RUN CREEK CROSSING #4
SECTION B-B
Elev 4572.5'
8'-0" 18'-0"
Elev 4563.5'
'-0
Excavation limit
Final road grade material streambed
Conserved
4'-0"
4,580
4,585
4,575
4,570
4,565
4,560 elev 4564.5' channel bottom, Proposed stream
26'-0"
Elev 4569.2'OHW
100-year W.S. Elev 4570.5' existing 120" x 84" CMP
Removal of pipe culvert, Elev 4572.5'
Elev 4563.5' method B, class 4
Placed riprap, geotextile, class 1, type C
Separation-stabilization
Elev 4563.5'
Excavation limit
See Note 1
Conserved streambed material
Low chord 4573.56' -1.00
Elev. = 4577.79
Sta. = 495+44.92
End Bridge
Proposed road grade
Elev 4572.5'
24 randomly placed as directed by CO
36 to 40" dia., Mitigation, fish passage boulders, ' m in
Elev 4572.5'
8'-0"18'-0"
Elev 4563.5'
Excavation limit
Bridge abutment material streambed
Conserved
SECTION A-A
geotextile, class 1, type C
Separation-stabilization method B, class 4
Placed riprap, to Place riprap, method B, class 4
1. Placement of conserved streambed material is incidental
NOTES:PRELIMINARY - N
SECTION A-A
Flow sediment
Streambed
D2
SECTION B-B
PLAN
LC
F lo w
Culvert wall
A A
B
B
NOTE:
FOOTNOTE:
Streambed cobble
D
(typ.)
(typ.)
Streambed sediment
36" min.
3.
2.
1.
LOCATION
(ft)
D
(ft)
W
INFILL INFORMATIONAL QUANTITIES
(cuyd)
COBBLE
STREAMBED
(cuyd)
SEDIMENT
STREAMBED
Culvert outlet
Culvert inlet
8 58
W
(cuyd)
STONE
BANK
CULVERT INTERIOR TREATMENT
SIMULATED STREAM
Streambed sediment
Streambed cobble
Channel flowline
Pipe arch culvert wall
Box culvert wall
13 36 boulder
Fish passage boulder
Fish passage
(in +/- 4)
BOULDER DIAMETER
FISH PASSAGE
Stagger in-channel fish passage boulder within the culvert span.
streambed sediment, streambed cobble, and bank stone gradations.
See special contract requirements Section 703 for
Mix streambed cobbles evenly throughout streambed sediment.
[3]Fish passage boulder
[2]Bank stone
[2]Bank stone
[1]
[5] d e p th b u r ia l b u r ia l d e p th
Round pipe culvert wall
(each)
BOULDER
FP
top
Streambed
55Boundary Creek
15 10 30 90 36 16
22 15 Class E 40 36 94 13
Bull Run Creek No. 1
Bull Run Creek No. 2
Class E
Class E
F.12
STATE PROJECT
NUMBER
SHEET
OR FLAP GRANT 24(2)
/1
/2
G r a n it e H il l_
R o a d A
O P
S tr e a m
C u lv
I n te r io r T r e a t_
B a n k B o u ld e r S to n e s .d g n
U
S I n t2
D
X /X
X X h e c k e d b y
X /X
X s ig n e d b y
S v e n L e o n
GRADATION
COBBLE
STREAMBED
Material.
Quantities included in Item 64704-1000 Mitigation, Streambed[5]
18-inches or as specified on plan sheet.[4] dimension.
smallest4 3 Embed fish passage boulders within active channel [3] stone, and streambed sediment.
Construct well defined banks with fish…