This document appears to be a pre-solicitation for the WA USFS OKWEN 617 76(1) Icicle Creek Rockfall Mitigation Project. The work consists of rockfall mitigation measures on up to three slopes, including draped wire mesh installation, slope scaling, and gabion basket rockfall barriers. There are three bid schedules, with only one schedule to be awarded. The project length is 0.55 miles, and the tentative fixed completion date is Summer 2025. The estimated price range is $700,000 to $2,000,000. The location is 5 miles southwest of Leavenworth, Washington, in Chelan County. The key product and service requirements include construction survey and staking, contractor quality control and assurance, contractor sampling and testing, soil erosion and sediment control, removal of structures and obstructions, minor crushed aggregate, ditch reconditioning, asphalt concrete, concrete barriers and precast guardwalls, permanent pavement markings, temporary traffic control, draped rockfall protection, and roadside rockfall protection using gabion barriers.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA USFS OkWen617 76(1), Icicle Creek Road Rockfall Mitigation
The work consists of rockfall mitigation measures on up to three slopes which includes draped wire mesh installation, slope scaling, and gabion basket rockfall barriers. There are 3 bid schedules; only 1 will be awarded.
Project length: 0.55 miles
Tentative Fixed Completion Date: Summer 2025
(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $700,000 to $2,000,000
Location: 5 miles SW of Leavenworth, WA. Chelan County.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
S ch ed u le A ed u
B ed u
C
DIVISION 150 – Project Requirements
152 Construction Survey & Staking (yes/no) Yes Yes Yes
153 Contractor Quality Control and Assurance (yes/no) Yes Yes Yes
154 Contractor Sampling & Testing (yes/no) Yes Yes Yes
155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes
157 Soil Erosion & Sediment Control (erosion control devices) LPSM LPSM LPSM
DIVISION 200 – Earthwork
202 Additional Clearing & Grubbing (clearing & grubbing) Individual tree 30 EACH 30 EACH 30 EACH
203 Removal of Structures & Obstructions Removal of Pavement, Asphalt 331 SQFT 629 SQFT 1,245 SQFT
203 Removal of Structures & Obstructions Sawcutting Pavement 996 SQFT 1,577 LNFT 2,382 LNFT
DIVISION 300 – Aggregate and Base Courses
302 Minor Crushed Aggregate 40 TONS 170 TONS 220 TONS
303 Ditch Reconditioning 710 LNFT 1,120 LNFT 1,900 LNFT ed u
A ed u
B ed u
C
DIVISION 400 – Asphalt Pavements & Surface Treatments
403 Asphalt Concrete 15 TONS 65 TONS 85 TONS
DIVISION 600 – Incidental Construction
618 Concrete Barriers & Precast Guardwalls 510 LNFT 772 LNFT 1,374 LNFT
622 Rental Equipment (yes/no) Yes Yes Yes
623 General Labor (yes/no) Yes Yes Yes
634 Permanent Pavement Markings (traffic pavement markings) 6,000 LNFT 12,000 LNFT 23,000 LNFT
635 Temporary Traffic Control LPSM LPSM LPSM
651 Rockfall Protection, Draped Rockfall Protection, Cable Net 5,650 SQYD 5,650 SQYD 5,650 SQYD
651 Rockfall Protection, Temporary Rockfall Protection
LPSM LPSM LPSM
654 Roadside Rockfall Protection, Gabion Barrier
40 CUYD 420 CUYD