QA_10-10-2024.pdf
PDF 76 KB Posted
- Solicitation number
- 69056723B000002
About this file
This document contains a series of questions and answers related to a federal contract opportunity for a road project at the Little Bighorn Battlefield National Monument. The contract opportunity, identified as MT NP LIBI 10(2), is being solicited by the Federal Highway Administration, a civilian agency within the Department of Transportation.
The key details gathered from the Q&A are:
- The procurement intends to pave either concrete or asphalt, but specific details will be provided in the solicitation.
- There are questions about the relocation of an electrical line, including its current location, power source, and required materials. These details will be addressed in future amendments to the solicitation.
- Addenda #1 did not provide enough information to accurately price the electrical line relocation, and additional details will be provided in Amendment A002.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT NP LIBI 10(2)
Little Bighorn Battlefield Road
# General Technical Question Answer Date
1 X We are very interested in the sources sought notice posted on SAM for Little Bighorn Battlefield. Can you please advise if the intention is to pave concrete or asphalt?
The sources sought posting provides a very brief summary of a future project the Government intends to advertise. Please submit bidder questions after the solicitation of this project is posted.
6/21/2022
2 X I have question on Pay Item Number 63640-0700-Relocate Electrical Line. Is there a detail of what this is or a drawing? No
10/8/2024
3 X is the electrical line for a Utility? No 10/8/2024
4 X On Sheet Number D.4, Says relocate electrical line. Where is this line being relocated too?
This will be addressed under Amendment A001 10/8/2024
5 X where is the Detector Wire Loop on Sheet H.2 getting power from?
Power will be hooked up by others 10/8/2024
6 X
On the Addenda #1, Do you have a drawing of how much demo of existing conductors and a footage of the new conductors along with the size of the conductors needed?
Addenda #1 does not give enough information or details to accurately price this line item number .
will be addressed under Amendment A002 10/10/2024