Amendment A002.pdf
PDF 163 KB Posted
- Solicitation number
- 69056723B000002
About this file
This document is an Amendment to Solicitation 69056723B000002 for the MT NP LIBI 10(2), Little Bighorn Battlefield National Monument project.
Amendment A002 revises the following:
Contract Clauses: Adds physical data files to FAR Clause 52.236-4 Physical Data.
Special Contract Requirements: Revises language in Sub-Section 636.03 General to require the relocation of electrical lines for the automatic gates at the entrance station affected by cattle guard installation.
The solicitation is for the Department of Transportation Federal Highway Administration to provide construction services for the Little Bighorn Battlefield National Monument project. Key details include the solicitation number, 69056723B000002, and the project name, MT NP LIBI 10(2), Little Bighorn Battlefield National Monument. The amendment provides updated information on physical data files and electrical system requirements.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A002 10/10/2024 N/A
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056723B000002
9B. DATED (SEE ITEM 11)
09/19/2024
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
MT NP LIBI 10(2), Little Bighorn Battlefield National Monument Amendment A002 is issued to revise the following:
CONTRACT CLAUSES
Page C-93. Adds physical data files to FAR Clauses 52.236-4 Physical Data (Apr 1984)
SPECIAL CONTRACT REQUIREMENTS
Page F-27. Revised language in Sub-Section 636.03 General. Add the following.
ENCLOSURES: Pages C-93 and F-27
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
C-93
Contract Clauses Project: MT NP LIBI 10(2), Little Bighorn Battlefield National Monument power, and roads; (3) uncertainties of weather, river stages, tides, or similar physical conditions at the site; (4) the conformation and conditions of the ground; and (5) the character of equipment and facilities needed preliminary to and during work performance. The Contractor also acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the Government, as well as from the drawings and specifications made a part of this contract. Any failure of the Contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the Government.
(b) The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.
52.236-4 Physical Data (Apr 1984)
Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by: N/A..
(b) Weather conditions: N/A.
(c) Transportation facilities: N/A.
(d) Geotechnical data, design data, and environmental information consisting of the following, will be posted with the solicitation.
1) libi01002_LittleBighornParkRoad_FinalGeotech_PavementReport
GR56-20.pdf
2) libi01002_LittleBighornParkRoad_FinalGeotechAddendum GM40-23.pdf
3) libi10-2_LittleBighorn_COR_CemeteryRoad-3D.dxf;
4) libi10-2_LittleBighorn_COR_Main01-3D.dxf
5) libi10-2_LittleBighorn_COR_StoneHouseLot-3D.dxf
6) libi10-2_LittleBighorn_COR_StoneHouseRoad-3D.dxf
7) libi10-2_LittleBighorn_COR_VisitorCenter-3D.dxf
8) libi10-2_LittleBighorn_ALI_APPR_CemeteryRoad.xml
9) libi10-2_LittleBighorn_ALI_APPR_StoneHouseRoad.xml
10) libi10-2_LittleBighorn_ALI_MAIN_Main01.xml
11) libi10-2_LittleBighorn_SUR_controlsheet.xlsx
12) libi10-2_LittleBighorn_TER_ExistingGround.xml
13) libi10-2_LittleBighorn_TER_FINSURF_CemeteryRoad.xml
14) libi10-2_LittleBighorn_TER_FINSURF_Main01.xml
15) libi10-2_LittleBighorn_TER_FINSURF_StoneHouse.xml
16) libi10-2_LittleBighorn_TER_FINSURF_VisitorCenter.xml
17) libi10-2_LittleBighorn_XS.pdf
18) libi10-2_LittleBighorn_AlignmentData.pdf
19) libi10-2_LittleBighorn_EW.pdf
20) LIBI entrance gate electrical drawing.pdf
21) as-maintained electrical drawing.pdf
52.236-5 Material and Workmanship (Apr 1984) Revised by Amendment A002
F-27 DIVISION 600
Special Contract Requirements Project: MT NP LIBI 10(2), Little Bighorn Battlefield National Monument
Section 636. — TRAFFIC SIGNAL, TRAFFIC COUNTER, LIGHTING, AND ELECTRICAL SYSTEMS
08/01/14–FP14
Construction Requirements
636.03 General. Add the following:
Relocate electrical lines for the automatic gates at the entrance station affected by cattle guard installation as directed by the CO. Run new conductors matching the existing conductors to the current termination points. Do not splice conductors between termination points. Refer to As-Built-Drawings LIBI entrance gate electrical drawing.pdf and as-maintained electrical drawing.pdf located in the FAR Clause 52.236-4 – Physical Data.
Payment
636.14 Delete the second paragraph and substitute the following:
Payment for lump sum pay items will be prorated based on the certified cost breakdown and the work completed.
Revised by Amendment A001
Revised by Amendment A002
File details come from the government source that posted it. Updated .