STATE PROJECT SHEET
NUMBER
ID FS SAW T
2017(1)
B.1
C D E F G H I J K
Typical Sections Plan
Parking Area
Erosion Control
Retaining Walls Drainage
Trail Features
Staging Areas
Permanent Traffic Control Allowance
A0020 A0010
15101-0000 MOBILIZATION LPSM
A0040 A0020
15201-0000 CONSTRUCTION SURVEY AND
STAKING
LPSM All
A0060 A0030
15301-0000 CONTRACTOR QUALITY CONTROL LPSM All
A0080 A0040
15401-0000 CONTRACTOR TESTING LPSM All
A0100 A0050
15501-0000 CONSTRUCTION SCHEDULE LPSM All
A0120 A0060
15701-0000 SOIL EROSION CONTROL
(Temporary soil stabilization)
LPSM All
A0140 A0070
15702-2000 SOIL EROSION CONTROL,
TURBIDITY MONITORING
LPSM All
A0160 15704-1000 SOIL EROSION CONTROL, PLASTIC LINING SQYD 2000
A0180 15715-1300 SOIL ERISION CONTROL, TEMPORARY
DIVERSION CHANNEL
LFT 100
A0200 A0080
15705-1400 SOIL EROSION CONTROL, FIBER
ROLL
LNFT 4650
A0220 A0090
15802-0000 WATERING FOR DUST CONTROL LPSM All
A0240 A0100
20101-0000 CLEARING AND GRUBBING ACRE 9.0
0.5
0.2
A0260 20220-1000 RMOVAL, INDIVIDUAL TREE, HAZARD EACH 20.0
A0280 20302-1000 REMOVAL OF FENCE, RAIL, STACKED LOG LNFT 520.0
A0300 21101-2000 ROADWAY OBLITERATION, METHOD 2,
SERVICE ROAD
SQYD 3950.0
A0320 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2,
ROCK SPILLWAY
CUYD
4.0
A0340 A0110
25126-0000 REMOVE AND RESET BOULDER EACH 8 14
A0360 A0120
25210-0000 ROCKERY SQFT 4800
A0380 25701-0800 CONTRACTOR FURNISHED ROCKERY
DESIGN
LPSM ALL
A0400 60201-0800 24-INCH PIPE CULVERT, GALVANIZED
STEEL
LNFT 20
A0420 60201-1000 36-INCH PIPE CULVERT, GALVANIZED
STEEL
LNFT 10
A0440 A0130
60405-0000 MANHOLE ADJUSTMENT (sewer) EACH 3
A0460 A0140
60915-1000 WHEELSTOP, CONCRETE (precast colored)
EACH 5
A0480 A0150
61901-0000 FENCE (Stacked Log Rail) LNFT 1,675
A0500 A0160
61901-0550 FENCE, BARB-LESS WIRE LNFT 50
A0520 A0170
61902-0000 GATE (Metal, self-closing swing gate, 8-feet wide)
EACH 3
A0540 A0180
61902-0000 GATE (Metal, swing gate, 12-feet wide) EACH 1
A0560 A0190
61903-0000 CATTLE GUARD (Raised, 5 feet wide) EACH 3
A0580 62017-0500 DRY STACKE STONE MANSONRY
HEADWALL FOR 24 INCH PIPE CULVERT
EACH 4.0
A0600 62017-0700 DRY STACKE STONE MANSONRY
HEADWALL FOR 36 INCH PIPE CULVERT
EACH 2
Remarks and/or Determination of
Estimated Quantity Bid Schedule
ALL
ALL
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Sheet and Description Estimated Quantities
ALL
ALL
ALL
ALL
ALL
ALL
9.2 0.5
4.0
1,675
MileStone:
Date Completed: In Progress Report Date: 05/09/22
20.0
520.0
3950.0
4.0
ALL
ID FS SAW T
2017(1)
B.2
C D E F G H I J K
Typical Sections Plan
Parking Area
Erosion Control
Retaining Walls Drainage
Trail Features
Staging Areas
Permanent Traffic Control Allowance
A003 A0620 A0200
62201-0300 DUMP TRUCK, 12 CUBIC YARD
MINIMUM CAPACITY HOUR
A003 A0640 A0210
62201-0600 BACKHOE LOADER, 8 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 30-INCH WIDTH HOUR
A003 A0660 A0220
62301-0000 GENERAL LABOR HOUR 40
A0680 A0230
62501-0000 TURF ESTABLISHMENT ACRE 4.0
A0700 A0240
63301-0000 SIGN SYSTEM (Kiosk sign) EACH 2 1
A0720 A0250
63301-1000 SIGN SYSTEM, GOVERNMENT
FURNISHED SIGN
EACH 12
A0740 A0260
63302-0000 SIGN SYSTEM SQFT 46 3
A0760 A0270
63308-2000 OBJECT MARKER, TYPE 2 EACH 22
A0780 A0280
63308-3000 OBJECT MARKER, TYPE 3 EACH 8
A0800 A0290
63316-1000 REMOVE AND RESET SIGN EACH 1
A0820 A0300
63403-0200 PAVEMENT MARKINGS, TYPE B
(white) SQFT 480
A0840 A0310
63502-0400 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 1 (4 feet wide) EACH 5
A0860 A0320
63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 (8 feet wide) EACH 5
A0880 A0330
63502-1500 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE A EACH 10
A0900 A0340
63502-3900 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN (Road Closed) EACH 2
A0920 A0350
63502-3900 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN (Trail Closed) EACH 4
A0940 A0360
63704-0000 VEHICLE (Utility Terrain) EACH 1
A0960 A0370
64631-0000 ROADSIDE DEVELOPMENT
(Trailway construction) LNFT
24,500
A0980 64631-0000 ROADSIDE DEVELOPMENT, EXISTING
TRAIL RESTORATION
LNFT 225
A1000 64631-0000 ROADSIDE DEVELOPMENT, ROCK
RETAINER
LNFT 1,200
A1020 A0380
64632-0000 ROADSIDE DEVELOPMENT
(Trailhead parking construction) SQYD 800
A1040 A0390
64632-0000 ROADSIDE DEVELOPMENT
(Aggregate surface course 6-Inch Depth) SQYD
18,500
A1060 64633-0000 ROADSIDE DEVELOPMENT
(Granular Backfill)
CUYD 164
A0180 A0400
64633-0000 ROADSIDE DEVELOPMENT,
UNCLASSIFIED BORROW
CUYD 11000
100 950
A1100 64706-1000 MITIGATION, WETLANDS MITIGATION,
PROTECTION MAT
SQYD 565
Pay Item Number Pay Item Description Unit
Sheet and Description Estimated Quantities Remarks and/or Determination of
Estimated Quantity Bid Schedule
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
24,500
MileStone:
Date Completed: In Progress Report Date: 05/09/22
1,200
11950
Revised by Amanedment A003
Revised by Amanedment A003
19,300
Revised by Amanedment A003
4.0
ID FS SAW T
2017(1)
B.3
C D E F G H I J K
Typical Sections Plan
Parking Area
Erosion Control
Retaining Walls Drainage
Trail Features
Staging Areas
Permanent Traffic Control Allowance
X0010 15101-0000 MOBILIZATION
LPSM All
X0020 64632-0000 ROADSIDE DEVELOPMENT
(Aggregate surface course 6-Inch Depth) SQYD 8,950
SUMMARY OF QUANTITIES - Option X A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Sheet and Description
MileStone:
Date Completed: In Progress Report Date: 05/09/22
Estimated Quantities Remarks and/or Determination of
Estimated Quantity
Bid Schedule
ALL
8,950
ID FS SAW T
2017(1)
B.4 SUMMARY OF QUANTITIES - Option Y
C D E F G H I J K Typical Sections Plan
Parking Area
Erosion Control
Retaining Walls Drainage
Trail Features
Staging Areas
Permanent Traffic Control Allowance
Y0010 15101-0000 MOBILIZATION LPSM
All
Y0020 64632-0000 ROADSIDE DEVELOPMENT
(Aggregate surface course 6-Inch Depth)
SQYD
8,950 800
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Sheet and Description
MileStone:
Date Completed: In Progress Report Date: 05/09/22
Estimated Quantities Remarks and/or Determination of
Estimated Quantity
Bid Schedule
ALL
9,750