QA_05-05-2020.pdf
PDF 100 KB Posted
- Solicitation number
- 69056719R000015
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA_05-07-2020.pdf | ||
| Amendment A002.pdf | ||
| Amendment A001.pdf | ||
| QA_05-04-2020.pdf | ||
| QA_04-30-2020.pdf | ||
| MORA_C6_Final_Report.pdf | ||
| RFP Pavement Preservation MT. Rainier.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA NPS PP MORA 2019(1)
Pavement Preservation Mt Rainier
# General Technical Question Answer Date
1 X Is the park allowing visitors for site visits or is COVID‐19 restrictions in place?
No. Snow and COVID‐19 are both contributing to the Pavement Preservation limits being inaccessible, but snow is the critical factor.
4/30/2020
2 X Is there a contact to reach out to for access to the park?
No. See https://www.nps.gov/mora/index.htm to determine the Park's operating status.
4/30/2020
3 X
Page E‐12 list locations of stockpiles that will “not” be approved for staging or storing and stockpiling materials. Is it correct that these locations will not be allowed.
Correct. The locations shown in Subsections 105.04(a) and (b) will not be approved for staging or storing and stockpiling of materials.
4/30/2020
4 X
On Checklist provided by your department, we don’t have “total for the schedule in the summary page” (see last page of bid schedule).
Just want to make sure that information that you have already provided will be considered for the checklist and no additional pages will be needed.
Page A‐9 is the last page of the bid schedule and has a space provided for the schedule total. Enter the information on the bid schedule pages provided and do not provide additional bid schedule pages with your bid.
5/4/2020
5 X
Table 108‐0 lists restrictions for Ohana Campground Loop A‐H that work can only be performed April 15th to May 21st. Based on this information and the NTP for the project is it anticipated that this work will need to be performed in 2021?
We have received your question and will be providing an appropriate response.
5/4/2020
Check General or Technical
6 X
Table 108‐0 lists restrictions for Ohana Campground Loop A‐H that work can only be performed April 15th to May 21st. Will Type 2 micro surfacing work on these routes be allowed after labor day?
We have received your question and will be providing an appropriate response.
5/4/2020
7 X
Table 108‐0 lists restrictions for Ohana Campground Loop A‐H that work can only be performed April 15th to May 21st. Will AC Patching be allowed to be performed outside of the listed restrictions and if so when?
We have received your question and will be providing an appropriate response.
5/4/2020
8 X
Section 409.05 Micro Surfacing Equipment allows for truck mounted and continuous machines for placement of Type 3 Micro Surfacing. With the project having over 40 miles of continuous roadways in an effort to mitigate the transverse joints which would be in excess of 400 if truck mounted units were allowed would it not be in the best interest of the FHWA to specify a continuous run machine for the Type 3 Micro Surfacing. Previous projects such as CA NPS YOSE 2018 (1) Pavement Preservation Yosemite required it on a similar project
At this time, we will not be modifying the requirements of Subsection 409.05. Bid accordingly.
5/4/2020
9 X
Section 105.04 lists locations that can not be used for staging or storing and stockpiling of material does the FHWA have a list of stockpile locations that can be used on this project?
All of the locations listed in Subsection
105.04 are not restricted. The list of restricted areas are shown in Subsections 105.04(a) and (b). See paragraphs 1 through 3 for additional information.
5/5/2020