AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A002 05/07/2020 N/A See Box 14.

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056719R000015

9B. DATED (SEE ITEM 11)

04/13/2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WA NPS PP MORA 2019(1), Pavement Preservation Mt Rainier

See Page 2.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A002, dated 05-07-2020 WA NPS PP MORA 2019(1) Solicitation No. 69056719R000015 Pavement Preservation Mt Rainier

REVISIONS ARE AS FOLLOWS:

SPECIAL CONTRACT REQUIREMENTS

Page E-17, Subsection 107.10(d), Other Requirements. Revises paragraphs (19) & (20).

Page E-19, Subsection 108.01, Commencement, Prosecution, and Completion of Work.

Revises Table 108-0 construction dates for Ohana Campground Areas.

Pages F-3 through F-3f, Section 409, Micro Surfacing. Revises entire Section 409.

ENCLOSURES

Pages:

E-17 E-19 F-3 through F-3f

E-17 DIVISION 100

Special Contract Requirements Project: WA NPS PP MORA 2019(1) Pavement Preservation Mt Rainier

(10) In the event that human remains, funerary objects, sacred objects, or objects of cultural patrimony are discovered during construction, follow Subsection 107.02 requirements for archeological or paleontological remains or specimens and ensure steps are taken to comply with the provisions outlined in the Native American Graves Protection and Repatriation Act.

(11) If any wildlife species (i.e. reptiles, migratory birds, raptors, or bats) is found nesting, hibernating, estivating, or otherwise living in, or immediately nearby, worksites; do not disturb the wildlife species encountered, suspend operations, and notify the CO.

(12) Confine staging and parking for vehicles, equipment and materials to paved overlooks and parking areas as directed by CO.

(13) Limit use of air horns within the Park to emergencies only.

(14) Use of un-muffled engine brakes is prohibited in the Park, except when required for safety. Vehicles equipped with engine braking systems must have engine braking mufflers conforming to original manufacturer’s specifications and be in good working order.

(15) Suspend construction operations where water (including water puddles) is on project area surfaces, and notify the CO.

(16) Do not disturb rock walls or culvert inlet headwalls.

(17) Do not feed or approach wildlife. Notify the CO if bear, cougar or fox loiter in the project area. Suspend operations and notify the CO where there is a potential conflict with these animals.

(18) Do not side cast any material. Remove all construction debris and excess material not incorporated into the project according to Subsection 203.05 (a) and (d).

(19) Do not perform construction activities during night time hours between April May 1 and September 15 (dates inclusive), unless otherwise directed by the CO.

(20) Staging and storing or stockpiling of materials that require dumping and loading (gravel, rock, etc.), is only allowed at the Sunrise Parking Lot between March from May 1, 2020 through July 1, 2020; and from May 1, 2021 through July 1, 2021 31 (dates inclusive). Do not use sites unless approved by the CO.

(21) Clean all pavement preservation equipment according to Subsection 107.10(c), and repair leaks, prior to entering the park. Remove external oil and grease, along with dirt and mud prior to construction, and inspect daily thereafter. Fix any identified problems and leaks immediately.

Revised by Amendment A002

E-19 DIVISION 100

Project: WA NPS PP MORA 2019(1) Pavement Preservation Mt Rainier

Table 108-0 Route Construction Restrictions

Route Name/Area Notes Work days

Time of year for allowable construction

0206AZ

0206BZ

0206CAZ

0206CZ

0206DZ

0206EZ

0206FZ

0206GZ

0206HZ

Ohana Campground Loop A Ohana Campground Loop B Ohana Campground Loop C Ohana Campground Loop C Bisector Ohana Campground Loop D Ohana Campground Loop E Ohana Campground Loop F Ohana Campground Loop G Ohana Campground Loop H

Up to 3 loops may be closed concurrently.

Mon - Thurs

April 15May 1 – May 21 (Thursday prior to Memorial Day Weekend); and after Labor Day.

0200AZ

0200BZ

0200CZ

0200DZ

White River Campground Loop A White River Campground Loop B White River Campground Loop C White River Campground Loop D

Only 1 loop may be closed at a time. Do not work in campground loops while working on parking lot and vice versa.

Mon – Fri before 3rd weekend of June OR Mon- Thurs after Labor Day

Work is not allowed from the 3rd weekend of June through Labor Day.

0934 Sunrise Parking Lot Up to 1/3 of the parking lot may be closed at a time.

Mon - Fri

Complete any work prior to July 1, 2020 & July 1, 2021

(public opening) Note: Provide two weeks’ notice prior to work at all locations.

108.01A Labor. (Added Subsection).

Follow the requirements of FAR Clause 52.222-6 Construction Wage Rate Requirements.

Adjacent or virtually adjacent work sites, as used in FAR Clause 52.222-6, are defined to be work sites within ½ mile of the project. Application of Construction Wage Rate Requirements (Davis- Bacon Act) for work sites beyond ½ mile of the project will be determined by the CO.

108.02 Subcontracting Amend as follows:

Delete the text of the first paragraph and substitute the following:

Follow the requirements of FAR Clause 52.222-11 Subcontracts (Labor Standards) and FAR Clause 52.236-1 Performance of Work by the Contractor.

Delete the last paragraph and substitute the following:

In FAR Clause 52.236-1 Performance of Work, the percentage of work performed by the Contractor will be computed as the cost of the contract work performed on-site by the Contractor’s employees divided by the total cost of the contract.

Revised by Amendment A001

F-3 DIVISION 400

Project: WA NPS PP MORA 2019(1) Pavement Preservation Mt Rainier

Section 409. — MICRO SURFACING

08/01/14–FP14

Delete the text of this Section and substitute the following:

Description

409.01 This work consists of applying a polymer-modified micro surfacing mix on an existing pavement surface.

Material

409.02 Conform to the following Subsections:

Micro surfacing aggregate 703.10(b) Mineral filler 725.05 Polymer-modified emulsified asphalt for micro-surfacing 702.02(b) Water 725.01(a)

Construction Requirements

409.03 Qualifications. Provide a superintendent and foreman with experience in placing micro surfacing. Submit the following for approval at least 14 days before starting micro surfacing work:

(a) Names of personnel; and

(b) A résumé for each individual describing their experience on at least five micro surfacing projects of similar complexity.

409.04 Composition of Mix (JMF). Delete paragraphs (c), (d), (e), and (f) and substitute the following:(c) Water. Use potable water for micro surfacing according to Subsection 725.01(c).

Submit a written JMF for micro surfacing which conforms to ISSA A143, Recommended Performance Guideline for Micro Surfacing for approval at least 14 days before production.

Include the following:

(a) Aggregate gradation values. Percent passing for each sieve size for the aggregate blend;

(b) Emulsified asphalt content. Residual asphalt content, as a percent by mass of dry aggregate; and

(c) Polymer-modifier. Type and quantity of polymer-modifier solids based on the residual asphalt content.

F-3a DIVISION 400

Project: WA NPS PP MORA 2019(1), Pavement Preservation Mt Rainier

409.05 Equipment.

(a) Mixing equipment. Conform to ISSA A143.

(b) Spreading equipment. Conform to ISSA A143.

(c) Sweeper. Furnish a vacuum sweeper with the following capabilities:

(1) Self-propelled;

(2) Equipped with a built-in water spray system to reduce the dust generated during the sweeping process;

(3) Capable of vertical broom pressure control; and

(4) Picking up and removing excess aggregate by vacuum capability.

(d) Pneumatic-tire rollers.

(1) Self-propelled;

(2) 10-ton (9-metric ton) gross mass with a tire pressure of 50 pounds per square inch (350 kilopascals). A smaller pneumatic tire roller with additional coverages may be approved for use by the CO where site limitations prohibit the use of 10-ton roller; and

(3) Water-spray system.

(e) Auxiliary equipment. Furnish hand squeegees, shovels, and other equipment necessary to perform the work. Provide power brooms, air compressors, water flushing equipment, and hand brooms to clean the pavement surface.

Other equipment of proven performance may be used in addition to or instead of this equipment when approved by the CO.

409.06 Surface Preparation. Delete paragraphs and substitute the following:

Clean the existing surface of all loose material, dirt and other deleterious material. Clean all vegetation, roots and dirt to a depth of 2 inches from all joints and other spaces between the asphalt surface adjacent curb or gutter. Dispose of material according to Subsections 203.05(a) and (d).

Remove or protect painted pavement markings, reflectorized tape, and other material that interferes with the work (There are no existing raised pavement markers or thermoplastic markings). Protect service entrances (such as manholes, valve boxes, drop inlets, snow pole holders, etc.)., Protect all concrete work, walls, curbs, gutters, historic features, rumble strips, wheel stops, vegetation to remain. and all other objects adjacent to the micro surfacing work being performed according to CO-approved methods.

F-3b DIVISION 400

Project: WA NPS PP MORA 2019(1), Pavement Preservation Mt Rainier

409.07 Weather Limitations. Apply only when the following apply:

(a) Ambient air temperature is above 45 °F (7 °C);

(b) Surface temperature in the shade is above 45 °F (7 °C);

(c) Weather is not foggy, rainy, or overcast; and

(d) Temperatures below 32 °F (0 °C) are not anticipated for at least 24 hours after application.

409.08 Calibration. Calibrate mixing equipment according to ISSA A143.

409.09 Production Start-Up Procedures. Conduct a pre-surfacing preparatory phase meeting according to Subsection 153.04(a).

On the first day of placement, construct one 300-foot (100-meter) long control strip, one lane wide.

Coordinate location of the control strip with the CO. Construct the control strip using material, lay-down, and rolling procedures intended for the entire project.

Cease production after construction of the control strip until the material and the control strip are evaluated and accepted by the CO. Repeat the control strip process until an acceptable control strip is produced.

Acceptable control strips may remain in place and will be accepted as a part of the completed surface treatment. Correct unacceptable control strips.

Use these start-up procedures when changing construction procedures, when resuming production after a termination of production due to unsatisfactory quality according to Subsection 106.04, or the beginning of a new construction season.

409.10 Application. Substitute the following in place of the ninth paragraph:

Roll the parking areas and turnouts within 2 hours from the curing of the surface. Roll the parking areas and turnouts with at least two full-coverage passes with the roller. Rolling the mainline is not required. Provide a micro surfacing mixture of the proper consistency at all times so as to provide the application rate required by the surface condition. Place with an application rate conforming to Table 409-1.

Table 409-1 Application Rate for Micro Surfacing

Aggregate Type(1)

Application Rate (lb/yd2)

Type II 17 - 22 Type III 25 - 30

(1) See Table 703-8 for aggregate gradations.

F-3c DIVISION 400

Project: WA NPS PP MORA 2019(1), Pavement Preservation Mt Rainier

Application rates are based upon the weight of dry aggregate in the mixture. Application rates are affected by the unit weight and gradation of the aggregate and the demand of the surface to which the micro surfacing is being applied.

Fog the surface with water in front of the spreader.

Provide the CO with a split certified shipping ticket for each separate emulsified asphalt shipment load prior to mixing and application.

Prior to starting application of micro surfacing, calibrate each mixing unit to be used on the project in accordance with ISSA A143 and in the presence of the CO or designated representative. Clean the spreader box prior to start of each work shift.

Blend the additives with the aggregate. Pre-wet the aggregate in the pugmill before mixing with the polymer-modified emulsified asphalt.

Mix the surfacing material a maximum of 4 minutes. Ensure the mix is of uniform consistency as it leaves the mixer and conforms to the approved JMF. Adjust mineral filler and polymer-modified emulsified asphalt content during construction when approved by the CO to adjust for variations in field conditions.

Carry sufficient mix in the spreader to completely cover the surface. Spread the mix with a spreader box. In areas not accessible to the spreader use hand squeegees to work the mix.

Maintain quality control documentation and make available to the CO upon request and at completion of daily work. At a minimum of 4 times daily calculate the percent emulsion content, aggregate spread rate, and yield of the mixture from the equipment computer display readings and report to the CO. Maintain a daily report and log sheet containing the following information:

(a) Micro surfacing emulsion used, tons;

(b) Aggregate used, tons;

(c) Water used in the mixture, gallons;

(d) Mineral filler used, lbs;

(e) Set control agent used, gallons;

(f) Other additives used, lbs;

(g) Surface area application rate (dry lbs per square yard); and

(h) Percent of emulsion (by dry aggregate weight).

Provide copies of the daily log to the CO before the start of the next day’s production, or as directed by the CO.

Provide straight lines along curbs and shoulders and do not allow runoff onto these areas. Provide straight and neat starting and ending joints by masking surfaces at the start, end, and other locations as directed by the CO.

F-3d DIVISION 400

Project: WA NPS PP MORA 2019(1), Pavement Preservation Mt Rainier

For transverse joints, use a butt joint. Use building paper placed over previously placed micro surfacing or other suitable method to avoid double placement of micro surfacing. Remove ridges or bumps in the finished surface.

For longitudinal joints, place joints on lane lines. Use half passes and odd-width passes only in turnouts and parking areas. Do not use half passes for the last pass in paved areas. Overlap longitudinal joints no more than 3 inches (75 millimeters). Limit the elevation difference at joints to less than ¼ inch (6 millimeters).

Begin rolling after the mixture has cured to the point where it will not pick up on the roller tires.

Unless otherwise stated, do not open an area to traffic until rolling in that area is completed. Roll all areas with at least two full-coverage passes with the roller unless otherwise approved by the

CO.

Allow treated areas to cure completely before opening to traffic. Cure is complete when clear water can be pressed out of the placed mix with a piece of paper without discoloring the paper.

Remove streaks and transverse ripples as defined by ISSA A143 from the finished surface. Ensure the finished micro surfacing has a uniform texture free of scratches, tear, and other surface irregularities. Repair areas with surface irregularities or where the micro surfacing does not conform to the job-mix-formula at the direction of the CO.

Remove and dispose of material spills and associated debris at the end of each shift according to Subsections 203.05(a) and (d).

Perform an initial vacuum sweep of the micro surfacing one to two days after the micro surfacing application. Remove loose or shedding material from the treated surface areas. Salvage aggregate material from vacuum sweeping according to Subsection 203.03 and stockpile at the Park maintenance yard as directed by the CO.

Two weeks to one month after completion of micro surfacing application, before second application of paint, sweep the entire treated surface. Salvage aggregate material from vacuum sweeping according to Subsection 203.03 and stockpile at the Park maintenance yard as directed by the CO.

409.11 Acceptance. See Table 409-2 for sampling, testing, and acceptance requirements.

Polymer-modified emulsified asphalt will be evaluated under Subsections 106.03 and 106.04.

Furnish a production certification with each load of polymer-modified emulsified asphalt.

Micro surfacing aggregate will be evaluated under Subsections 106.02 and 106.04.

Mineral filler will be evaluated under Subsections 106.02 and 106.03.

Construction of the micro surfacing will be evaluated under Subsections 106.02 and 106.04.

F-3e DIVISION 400

Project: WA NPS PP MORA 2019(1), Pavement Preservation Mt Rainier

Measurement

409.12 Measure the Section 409 pay items listed in the bid schedule according to Subsection 109.02 for each day’s production.

Payment

409.13 The accepted quantities will be paid at the contract price per unit of measurement for the Section 409 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

F-3f DIVISION 400

Project: WA NPS PP MORA 2019(1), Pavement Preservation Mt Rainier

T ab le

-2

S am p li n g, T es ti n g an d A cc ep ta n ce R eq u ir em en ts

R em ar k s

S ou rc e

N ot r eq ui re d w he n us in g a pr e-cr us he d co m m er ci al so ur ce

P ro du ct io n es te d by

G ov er nm en t

R ep or ti ng im e

B ef or e pr od uc in g h ou rs

B ef or e in co rp or at in g in to w or k h ou rs

B ef or e in co rp or at in g in to w or k

(1 ) A pp li es to e ac h ag gr eg at e gr ad e fu rn is he d.

(2

) A pp li es to e ac h as ph al t m at er ia l f ur ni sh ed

S p lit le

Y o

Y

, 2

1-qu ar t sa m pl

, 2

1-qu ar t sa m o

P oi n t of p lin g

S ou rc m at er ia l

C ru sh er b el t (d ur in g pr od uc tio n) oi nt o f sh ip m en t o r de liv er y

S to ck pi oi nt o f sh ip m en t o r de liv er y

D is tr ib ut or tr uc k

S am p lin g F re q u en cy pe r m at er ia l ty r da y pe r st oc kp ile r m at er ia l

D et er m in ed by th e

C O r da y

M in im um r di st ri bu to r tr uc k

T es t M et ho ds ec if ic at io n s

S ub se ct io n

3.

A

S H

T

S ub se ct io n

2.

(b

A A

S H

T

S ub se ct io n

2.

(b eg or y ha ra ct er is ti c

Q ua li ra da tio n

Q ua ra da tio n (S ee le

-8 f ap ic si ev es

Q ua la ce m en t te m pe ra tu re yp cc ep ta n u bs ec ti on

M ea su re d an d te st ed co nf or m an

(1

.0

5) ss nt ro l (1

.0

3)

M ea su re d an d te st ed or m

4) ea su re d an d te st ed or m

4) ro ss nt ro l (1

3) er ia l o r

P ro du ct u bs ec ti on

M ic su rf ac in g ag gr eg at e fo r su rf ac e m ix tu re

(1

P ol ym er od if ie d em ul si fi as ph al t(2

M ic su rf ac in g ag gr eg at e fo r su rf ac e m ix tu re

(1

P ol ym er od if ie d em ul si fi as ph al t(2