PROJECT_DESCRIPTION_-_Upper_Hoh_Clearing.pdf
PDF 83 KB Posted
- Solicitation number
- 69056719Q000012
About this file
Project Description - Upper Hoh Clearing on Spruce Trail
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 69056719Q000012_A0004.pdf | ||
| 69056719Q000012_A0003.pdf | ||
| 19Q000012_Offeror_Q-A.pdf | ||
| 69056719Q000012_A0002.pdf | ||
| 69056719Q000012_A0001.pdf | ||
| 69056719Q000012.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT: WA JEFF 91420(3), Upper Hoh Clearing on Spruce Trail, Olympic National Park, Clallam County, Washington
WORK: The work consists of road pioneering, removal of trees/root wads and erosion/sediment control within the defined construction limits on Spruce Railroad Trail. The road pioneering will follow the proposed alignment, the tree/root wad removal will include removing trees and root wads and stockpiling at the North Winfield Pit and other small items of work.
The intent of the project is to pioneer a route that is wide enough to allow appropriate equipment to remove trees (Diameter Breast Height (DBH>10 inches) along the route and to provide a running surface for the future completion of construction.
PROJECT LENGTH: Approximately 1.55 miles
TENTATIVE COMPLETION DATE: Spring 2019
ESTIMATED PRICE RANGE: Between $100,000 and $250,000
LOCATION: Approximately 20 miles southwest of Port Angeles, Clallam County, WA
To view the INTERESTED VENDORS LIST you must register as an FBO user. Go to https://www.fbo.gov/. Scroll down to the "Vendors/Citizens" box. Click on "Register Now" and follow the directions.
THIS SOLICITATION IS OFFERED AS A TOTAL SMALL BUSINESS SET-ASIDE
https://www.fbo.gov/
File details come from the government source that posted it.