Q&A_12-12-19.pdf
PDF 99 KB Posted
- Attached to
- OR DOT 204(1), Weston-Elgin Highway Resurfacing Federal contract opportunity
- Solicitation number
- 69056719B000029
About this file
This document contains questions and answers related to the federal contract opportunity for OR DOT 204(1), Weston-Elgin Highway Resurfacing. The 19.47-mile project includes milling and inlaying Oregon state highway 204 with hot asphalt concrete pavement, guardrail repairs and improving the surface of three Sno-Parks with a bituminous surface treatment. The estimated price range is between $5,000,000 and $10,000,000. This small business set-aside opportunity is offered by the Department of Transportation Federal Highway Administration. The tentative completion date is Fall 2020. The questions and answers provide clarification on measurements for sites near the project, preparing areas for geotextile installation, availability of surveying grade books, requirements for paving adjacent lanes in the same day, allowance of 24-hour work, and allowance and percentage of recycled asphalt pavement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary_Weston-Elgin.pdf | ||
| Amendment A003.pdf | ||
| Q&A_12-11-19.pdf | ||
| Amendment A002.pdf | ||
| Amendment A001.pdf | ||
| Plan Request.pdf | ||
| IFB_Weston Elgin.pdf | ||
| Brand Name Justification Request_Weston-Elgin.docx | DOCX document | |
| OR2041_100% Weston-Elgin_PAVEMENT FIELD REVIEW MEMO.pdf | ||
| Revised_Plans_OR2041 100% Weston Elgin.pdf | ||
| OR204 32V-073_AC.pdf | ||
| OR204 - 17V-237.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No. OR DOT 204(1) Project Weston‐Elgin Highway Resurfacing
# General Technical Question Answer Date
1 X
Regarding adjacent or virtually adjacent sites within ½ mile of the project (§ 108.01A Labor);
is that measurement of ½ mile aerial (as the crow fly’s) or measured along the access road to the site? My assumption is that its an aerial measurement but I need to verify.
Your assumption is correct. The actual distance from the project measured to the site is correct.
12/5/19
2 X
Plans Sheet C.3 shows full depth pavement widening. The section has geotextile, with roadway aggregate method 2, topped with asphalt. My question has to do with preparing this area to subgrade before installing the geotextile. I would assume this area needs some sort of excavation of material to get the section down to bottom of the fabric layer.
How would this be paid for?
See Subsection 109.05(b) of FP‐14. 12/11/19
3 X Is there any surveying grade books that will be made available for construction of this project?
No. 12/11/19
Check General or Technical
4 X
Sheet E‐36 of the specifications 156.07(n) requires adjacent lanes be paved to the same elevation by the end of each day. Does this mean that one should expect to pave a few hours, stop, back the paving operation up, let the mat cool to facilitate traffic and then begin paving again in the opposite lane until the lanes are squared up? Or is it within 24 hours the lanes need to be squared up? This would make a massive difference when determining asphalt production, cost, and time along with potential smoothness issues on the overlay section of the roadway.
This will be addressed under a forthcoming amendment.
12/11/19
5 X Is 24 hour/day work allowed on this project? No. See Subsections 156.07 and 156.08. 12/11/19
6 X
On this project, can the contractor incorporate recycled asphalt pavement into the HMA? If so, what is the percent of recycled asphalt pavement allowed?
Yes. See Subsection 401.03(a) of FP‐14. 12/12/19