This bid opening summary documents the bids received for Oregon Department of Transportation contract number 69056719B000029 to resurface 19.47 miles of Oregon State Highway 204 between Weston and Elgin. High Desert Aggregate and Paving provided the lowest bid of $3,893,870.70 for Schedule A and $4,126,264.70 for Schedule B. The work includes milling and repaving the highway with asphalt concrete, guardrail repairs, and improving three Sno-Parks with a bituminous surface treatment. The project completion date is fall 2020. Bids were opened on December 19, 2019 with six contractors attending. The engineer's estimate was $6,815,955.50 for Schedule A and $7,191,201.10 for Schedule B.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q&A_12-12-19.pdf | ||
| Amendment A003.pdf | ||
| Q&A_12-11-19.pdf | ||
| Amendment A002.pdf | ||
| Amendment A001.pdf | ||
| Brand Name Justification Request_Weston-Elgin.docx | DOCX document | |
| OR2041_100% Weston-Elgin_PAVEMENT FIELD REVIEW MEMO.pdf | ||
| Revised_Plans_OR2041 100% Weston Elgin.pdf | ||
| OR204 32V-073_AC.pdf | ||
| Plan Request.pdf | ||
| IFB_Weston Elgin.pdf | ||
| OR204 - 17V-237.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID OPENING SUMMARY Solicitation No. 69056719B000029 Bid Opening Date 12/19/19 Time: 1400
Project Name/No: OR DOT 204(1), Weston-Elgin Highway Resurfacing
LOW BIDDER’S PHONE NUMBER Schedule A: 541-504-8566 LOW BIDDER’S PHONE NUMBER Schedule B: 541-504-8566 Attendance: 6
Bid Opening Officer: Dean Umathum Assistants: Sean Molina
OFFER RECEIVED REC'D
BY
CONTRACTOR SCHEDULE A SCHEDULE B
DATE TIME
1.
12/19/19 1251 DU High Desert Aggregate and
Paving $3,893,870.70 $4,126,264.70
2.
12/19/19 1138 DU Rocky Mountain Construction
$6,288,418.50 $6,589,913.50
3.
12/19/19 1051 DU Tidewater Contractors
$5,596,473.80 $5,858,427.60
4.
12/19/19 1324 DU Central Washington Asphalt
$4,145,774.70 $4,362,583.10
5.
12/19/19 1324 DU Valley Paving & Aggregate
$4,370,574.80 $4,587,283.86
6.
7.
8.
Engineer’s Estimate $6,815,955.50 $7,191,201.10