Bid Opening Summary_Weston-Elgin.pdf

PDF 217 KB Posted

Attached to
OR DOT 204(1), Weston-Elgin Highway Resurfacing Federal contract opportunity
Solicitation number
69056719B000029
Issued by
Department of Transportation Federal Highway Administration

About this file

This bid opening summary documents the bids received for Oregon Department of Transportation contract number 69056719B000029 to resurface 19.47 miles of Oregon State Highway 204 between Weston and Elgin. High Desert Aggregate and Paving provided the lowest bid of $3,893,870.70 for Schedule A and $4,126,264.70 for Schedule B. The work includes milling and repaving the highway with asphalt concrete, guardrail repairs, and improving three Sno-Parks with a bituminous surface treatment. The project completion date is fall 2020. Bids were opened on December 19, 2019 with six contractors attending. The engineer's estimate was $6,815,955.50 for Schedule A and $7,191,201.10 for Schedule B.

View the file

Other files for this federal contract opportunity

Other files attached to OR DOT 204(1), Weston-Elgin Highway Resurfacing, newest first.
File Type Posted
Q&A_12-12-19.pdf PDF
Amendment A003.pdf PDF
Q&A_12-11-19.pdf PDF
Amendment A002.pdf PDF
Amendment A001.pdf PDF
Brand Name Justification Request_Weston-Elgin.docx DOCX document
OR2041_100% Weston-Elgin_PAVEMENT FIELD REVIEW MEMO.pdf PDF
Revised_Plans_OR2041 100% Weston Elgin.pdf PDF
OR204 32V-073_AC.pdf PDF
Plan Request.pdf PDF
IFB_Weston Elgin.pdf PDF
OR204 - 17V-237.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID OPENING SUMMARY Solicitation No. 69056719B000029 Bid Opening Date 12/19/19 Time: 1400

Project Name/No: OR DOT 204(1), Weston-Elgin Highway Resurfacing

LOW BIDDER’S PHONE NUMBER Schedule A: 541-504-8566 LOW BIDDER’S PHONE NUMBER Schedule B: 541-504-8566 Attendance: 6

Bid Opening Officer: Dean Umathum Assistants: Sean Molina

OFFER RECEIVED REC'D

BY

CONTRACTOR SCHEDULE A SCHEDULE B

DATE TIME

1.

12/19/19 1251 DU High Desert Aggregate and

Paving $3,893,870.70 $4,126,264.70

2.

12/19/19 1138 DU Rocky Mountain Construction

$6,288,418.50 $6,589,913.50

3.

12/19/19 1051 DU Tidewater Contractors

$5,596,473.80 $5,858,427.60

4.

12/19/19 1324 DU Central Washington Asphalt

$4,145,774.70 $4,362,583.10

5.

12/19/19 1324 DU Valley Paving & Aggregate

$4,370,574.80 $4,587,283.86

6.

7.

8.

Engineer’s Estimate $6,815,955.50 $7,191,201.10