This document provides details for the ID Boise 24(17) Banks Lowman Road federal construction contract opportunity. The opportunity involves asphalt pavement milling and asphalt concrete work along 4.2 miles of roadway located 4 miles west of Lowman, Idaho. The project description specifies items including construction surveying and staking, contractor quality control, soil erosion control devices, asphalt concrete, asphalt tack coat, asphalt pavement milling, asphalt crack sealing and filling, asphalt patching, and permanent and temporary traffic markings. The estimated price range for the work is between $1 million to $2 million. The tentative completion date is Summer 2020. The solicitation is anticipated to be released in Winter/Spring 2020 and is offered as a small business set-aside. The opportunity is issued by the Department of Transportation Federal Highway Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum.pdf | ||
| Q&A_11-26-19.pdf | ||
| Q&A_11-25-19.pdf | ||
| IFB.pdf | ||
| plans_id-a1502417_Rotated.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ID Boise 24(17) Banks Lowman Road, Client: Boise County, Boise County, Idaho
The work consists of asphalt pavement millings and asphalt concrete pavement and other small items of work.
Project length: 4.2 Miles
Tentative Fixed Completion Date: Summer 2020 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: Between $1 million to $2 million
Location: 4 miles West of Lowman Idaho
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
O ne
S ch ed ul e Sc he du le A
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) Inlet Protection 7 each
DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 7000 TONS 412 Asphalt Tack Coat (asphalt surface treatment) 35 TONS 413 Asphalt Pavement Milling 61454 SQ YDS 414 Asphalt Pavement Crack Sealing & Filling 4.2 Miles 418 Asphalt Concrete Pavement Patching 40 SQ YDS DIVISION 600 – Incidental Construction 634 Permanent Pavement Markings (traffic pavement markings)
TYPE B SOLID
TYPE B BROKEN
TYPE B STOP MESSAGE
161198 LN FT
1172 LN FT
2 EACH
635 Temporary Traffic Control – Flagger 1020 HOURS 635 Temporary Traffic Control – Pilot Car 340 HOURS
O ne
S ch ed ul e Sc he du le A
635 Temporary Traffic Control
CONE, TYPE 28-INCH
DRUM
PAVEMNT PARKINGS
CONSTRUCTION SIGN
736 EACH
40 EACH
22,124 LN FT
170 SQ FT
File details come from the government source that posted it. Updated .