Q&A_10-07-19.pdf
PDF 54 KB Posted
- Solicitation number
- 69056719B000025
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Summary_Darrington.pdf | ||
| Amendment_A001.pdf | ||
| Darrington_Physical_Data.zip | ZIP file | |
| plans_wa-ef1612005_9.11.2019.pdf | ||
| IFB_Darrington.pdf | ||
| Plan_Request.pdf | ||
| PROJECT_DESCRIPTION_Darrington.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA FS ERFO 2016(1)‐20(5)
Darrington Emergency Repairs 2016, Phase II
# General Technical Question Answer Date
1 X I wanted to clarify the project length. The Project Description doc says that it's 0.17 miles long, but the IFB and Plans say 0.099 miles.
0.099 miles according to the IFB is correct.
The project description posted on 8/1/19 was preliminary information to alert bidders to the future solicitation, which was posted on 9/25/19.
10/7/19
Check General or Technical
File details come from the government source that posted it.