PROJECT_DESCRIPTION_Darrington.pdf
PDF 171 KB Posted
- Solicitation number
- 69056719B000025
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Summary_Darrington.pdf | ||
| Amendment_A001.pdf | ||
| Q&A_10-07-19.pdf | ||
| Darrington_Physical_Data.zip | ZIP file | |
| plans_wa-ef1612005_9.11.2019.pdf | ||
| IFB_Darrington.pdf | ||
| Plan_Request.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA FS ERFO 2016(1)-20(5) Darrington Emergency Repairs 2016, Phase II
The work consists of This work consists of Grading, aggregate, asphalt paving, drainage, temporary diversion, AOP culvert, turf establishment, log barrier mitigation for 3 intermittent damaged sites and other small items of work.
Project length: 0.17 Miles
Tentative Fixed Completion Date: Fall 2019 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $500,000 to $1,000,000
Location: 20 miles SE of Darrington, WA.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
On e S ch ed ul e
Sc h
Na m e
A_
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (Fiber Roll) 235 LNFT 157 Soil Erosion & Sediment Control (Temporary Diversion Channel) LPSM 157 Soil Erosion & Sediment Control (Turbidity Monitoring) LPSM
DIVISION 200 – Earthwork 20302-1200 Removal of Guardrail 15 LF 20304-9000 Removal of Stream Debris LPSM 20401-0000 Roadway Excavation 250 CUYD 20403-0000 Unclassified Borrow 200 CUYD
DIVISION 250 – Slope Reinforcement and Retaining Walls 25101-0500 Placed Riprap, Method A, Class 5 615 CUYD 25101-2400 Placed Riprap, Method B, Class 4 170 CUYD
On e S ch ed ul e
Sc h
Na m e
A_
25201-1000 Remove and Reset Boulder 6 EACH
DIVISION 300 – Aggregate and Base Courses 30202-1000 Roadway Aggregate, Method 1 165 TON 30202-2000 Roadway Aggregate, Method 2 240 TON 30303-1000 Roadbed Reconditioning 125 SQYD
DIVISION 400 – Asphalt Pavements & Surface Treatments 40301-0200 Asphalt Concrete Pavement, Type 2 110 TON
DIVISION 600 – Incidental Construction 60101-0000 Concrete (concrete collar) 20 CUYD 60301-0300 180-inch Structural Plate Pipe 78 LNFT 60704-0000 Cleaning Culvert in Place 1 EACH 61702-0800 Terminal Section Type Tangent 1 EACH 61920-2000 Remove and Reset Gate 1 EACH 62401-0500 Furnishing and Placing Topsoil, 8 inch depth 755 SQYD 62502-0000 Turf Establishment 700 SQYD 62635-3000 Cuttings, Willow Pole 160 EACH 63401-0300 Pavement Markings, Type B, Solid 125 LF 63502-0600 Temporary Traffic Control, Barricade Type 3 8 EACH 63502-1300 Temporary Traffic Control, Drum 45 EACH 63504-1000 Temporary Traffic Control, Construction Sign 190 FQFT 63507-0700 Temporary Traffic Control, Traffic Control Supervisor 80 Day 63509-1000 Temporary Traffic Control, Flagger 500 FXHR 64703-2000 Mitigation, Log Barrier 150 LF 64703-5000 Mitigation, Root Wad 30 EACH 64703-6000 Mitigation, Fish Passage Boulder 1,610 CUYD 64704-1000 Mitigation, Streambed Material 475 CUYD 64703-6000 Mitigation, Streambed Channel Reconstructionl 1,600 CUYD
| DIVISION 200 – Earthwork |
| DIVISION 250 – Slope Reinforcement and Retaining Walls |
| DIVISION 300 – Aggregate and Base Courses |
| DIVISION 400 – Asphalt Pavements & Surface Treatments |
File details come from the government source that posted it.