plans_wa-ef1612005_9.11.2019.pdf
PDF 13 MB Posted
- Solicitation number
- 69056719B000025
About this file
Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Summary_Darrington.pdf | ||
| Amendment_A001.pdf | ||
| Q&A_10-07-19.pdf | ||
| Darrington_Physical_Data.zip | ZIP file | |
| IFB_Darrington.pdf | ||
| Plan_Request.pdf | ||
| PROJECT_DESCRIPTION_Darrington.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EDWARD S
HAMMONTREE
Digitally signed by EDWARD S
HAMMONTREE
Date: 2019.09.16 14:45:30 -06'00'
CP GPS
JH
BH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
P
M
N o v e m b e r
U
S C c p w w o r k d w a e f1 a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2FS ERFO 2016(1)-20(5)WA
DI
T
NO SCALE
- no symbol -wall face
N
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
FSR 4036 MP 0.1
F-
M a ll a rd y C rk dR
F
N y dr all a
M
~7 m iles
To Verlot
48.070701, -121.650641
Latitude, Longitude
FN
Scale in miles
VICINITY MAPS
A.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D p w w o r k d w a e f1 a c .d g n
WA FS ERFO 2016(1)-20(5)
A u g u s t
K
H a r r is o n
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
N
Campground
River Bar
Campground
Red Bridge
N F 4037
NF 4039
MP 0.1
FSR 4036
~ 4 mil esTo S ilve rton
Moun tain Loo p Hwy
SHEET 1 OF 2
NF 4037
NATIONAL FOREST
- SNOQUALMIE
MT. BAKER
FSR 4065 MP 1.2
Bedal ni at n u o M y w
H
Bedal Creek Trailhead kr C l ad e
B
R
DF
N
C h o cw ich C re k p o
L
NATIONAL FOREST
MT. BAKER - SNOQUALMIE
FSR 20 MP 35.4
m ile s
T o D a rrin g to n
48.072951, -121.399366
Latitude, Longitude
48.034962, -121.478972
Latitude, Longitude
NF-49
N
N
Scale in miles
Scale in miles
VICINITY MAPS
A.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d w a e f1 a d .d g n
WA FS ERFO 2016(1)-20(5)
A
A u g u s t
H a r r is
A le x a n d
C h e c k e d b y
D e s ig n e d b y
Chocwich Campground
S o u th
Fork n o g u a lm is h R iv e r
NF-
Monte Cristo Lake Myrtle Lake
Lost Lake
Gothic Basin Trailhead
Barlow Pass & Trailhead
S o u th
F o r k
S a u k
R iv e r niat n u o
M p o o L y w H m il e s
4.8 m iles ni at n uo
M po oL ywH
To S ilverton
T o B e d a l
FSR 4065 MP 1.2
South Fork Sauk River
.5 m il e s
T o S il v e rt o n
FSR 20 MP 35.4
SHEET 2 OF 2
B u c k C re e k
P a lm e r C re k
POINT
NUMBER NORTH EAST ELEVATION DESCRIPTION
20351.000 2000.000 3000.000 1000.000 5/8" IR w/fhwa alum cap
20352.000 1863.996 2843.545 1004.652 5/8" IR w/fhwa alum cap
16101.000 1000.000 2000.000 1000.000 5/8" IR w/fhwa alum cap
16102.000 934.556 2262.480 1000.254 5/8" IR w/fhwa alum cap
40651.000 2000.000 4000.000 2000.000 5/8" IR W/FHWA ALUM CAP
40652.000 1644.455 3930.889 1994.393 5/8" IR W/FHWA ALUM CAP
FSR 4065 MP 1.2
FSR 4036 MP 0.1
PROJECT :Darrington District Emergency Repairs, Phase II DATE OF FIELD WORK : Multiple entries
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : Assumed
VERTICAL DATUM : Assumed
PROJECT COORDINATES
FSR 20 MP 35.4
c:
\p w -w or k\ d0 w a-ef
5a e.
xl sx ]S he et
-A ug -2
5:
W
FL
H
D S ur ve y
W
FL
H
D S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
A.5
SHEET
NUMBER
FS ERFO 2016(1)-20(5)WA
SURVEY CONTROL
Sheet and Description
SECTION C SECTION D SECTION E SECTION H -
FSR 20 MP
35.4
FSR 4036 MP
0.1
FSR 4065 MP
1.2
TEMP
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL (FSR 4036 MP 0.1) LPSM All ALL
A0140 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL (FSR 20 MP 35.4) LPSM All ALL
A0160 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL (FSR 4065 MP 1.2) LPSM All ALL
A0180 15702-2000 SOIL EROSION CONTROL, TURBIDITY MONITORING (FSR 4065 MP 1.2) LPSM All ALL
A0200 15702-2000 SOIL EROSION CONTROL, TURBIDITY MONITORING (FSR 20 MP 35.4) LPSM All ALL
A0220 15702-2000 SOIL EROSION CONTROL, TURBIDITY MONITORING (FSR 4036 MP 0.1) LPSM All ALL
A0240 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 223 12 235
A0260 20302-1200 REMOVAL OF GUARDRAIL LNFT 13 2 15
A0280 20304-9000 REMOVAL OF STREAM DEBRIS (FSR 20 MP 35.4) LPSM All ALL
A0300 20401-0000 ROADWAY EXCAVATION CUYD 186 41 23 250
A0320 20403-0000 UNCLASSIFIED BORROW CUYD 15 179 6 200
A0340 25101-0500 PLACED RIPRAP, METHOD A, CLASS 5 CUYD 586 29 615
A0360 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4 CUYD 155 15 170
A0380 25126-0000 REMOVE AND RESET BOULDER EACH 6 4 10
A0400 30202-1000 ROADWAY AGGREGATE, METHOD 1 TON 35 124 6 165 ESTIMATED AT 1.97 TON/CUYD
A0420 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 217 23 240 ESTIMATED AT 1.97 TON/CUYD
A0440 30303-1000 ROADBED RECONDITIONING SQYD 107 18 125
A0460 40301-0200 ASPHALT CONCRETE PAVEMENT, TYPE 2 TON 97 13 110 ESTIMATED AT 1.94 TON/CUYD
A0480 60101-0000 CONCRETE (LARGE CULVERT REINFORCED CONCRETE COLLAR) CUYD 18 2 20
A0500 60301-0300 180-INCH STRUCTURAL PLATE PIPE LNFT 75 5 80
A0520 60704-0000 CLEANING CULVERT IN PLACE EACH 1 1
A0540 61702-0800 TERMINAL SECTION TYPE TANGENT EACH 1 1 TL-2
A0560 61920-2000 REMOVE AND RESET GATE EACH 1 1
A0580 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 20
A0600 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 30-INCH WIDTH HOUR 20
A0620 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 20
A0640 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT HOUR 20 20
A0660 62301-0000 GENERAL LABOR HOUR 20
A0680 62401-0500 FURNISHING AND PLACING TOPSOIL, 8-INCH DEPTH SQYD 69 11 80
A0700 62502-0000 TURF ESTABLISHMENT SQYD 361 301 38 700
A0720 62635-3000 CUTTINGS, WILLOW POLE EACH 150 10 160
A0740 63302-0000 SIGN SYSTEM SQFT 6 6
A0760 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID LNFT 120 10 130
A0780 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 8 2 10
A0800 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 20 20
MileStone: 100% Date Completed: 09/11/19 Report Date: 09/11/19
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
-S ep
-2
:5
A M
Remarks and/or Determination of Estimated QuantityPay Item Description Unit
Estimated Quantities c:
\p w -w or k\ d0
B S he et s.
xl sm ]S he et
STATE PROJECT
B.1FS ERFO 2016(1)-20(5)WA
SHEET
NUMBER
Sheet and Description
SECTION C SECTION D SECTION E SECTION H -
FSR 20 MP
35.4
FSR 4036 MP
0.1
FSR 4065 MP
1.2
TEMP
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0820 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 182 8 190
A0840 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 25 25
A0860 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 160 160
A0880 64702-2000 MITIGATION, LOG BARRIER LNFT 145 5 150
A0900 64703-3010 MITIGATION, ROCK WEIR EACH 7 7
A0920 64703-5000 MITIGATION, ROOT WAD EACH 29 1 30
A0940 64703-6000 MITIGATION, FISH PASSAGE BOULDER EACH 15 5 20
A0960 64704-1000 MITIGATION, STREAMBED MATERIAL CUYD 450 25 475
A0980 64704-1600 MITIGATION, STREAMBED CHANNEL RECONSTRUCTION CUYD 1,543 57 1,600
-S ep -2
:5
A M
MileStone: 100% Date Completed: 09/11/19 Report Date: 09/11/19 c:
\p w -w or k\ d0
B S he et s.
xl sm ]S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B.2FS ERFO 2016(1)-20(5)WA
20351
CP
20352
CP
Chock wich C reek
El = 1001.99
E = 2942.54
N = 1937.83
El = 1000.92
E = 2989.57
N = 1975.12
20 40020
SCALE IN FEET
N
PLAN
FSR 20 MP 35.4
1. Match existing horizontal alignment. Adjust to fit field conditions.
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d w a e f1 c a .d g n
WA FS ERFO 2016(1)-20(5)
M a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
NOTE:
LEGEND:
Edge of road
60' method 1, 6-inch compacted depth
Roadbed reconditioning and Roadway aggregate, CONSTRUCTION
BEGIN
CONSTRUCTION
END
debris (~311 CUYD)
Removal of stream
104+35 LT
debris (~194 CUYD)
Removal of stream
102+44 RT
debris (~292 CUYD)
Removal of stream
102+50 LT
debris (~1244 CUYD)
Removal of stream
105+55 LT
See C.2 for details channel reconstruction
Streambed
Limits of construction
1.5
Existing ground from channel excavation
Place suitable streambed material
BERM DETAIL
4'
Top of berm elevation 1004.0 FT
Berm (10 LNFT)
(FSR 20)
Mountain Loop Highway
Not to Scale
Roadbed reconditioning
(approximate 10-foot diameter) to finish channel grade
Clean culvert in place
Limits of construction
CP
20351
,0
.0
,0
.4
+1.2%
.0
.5
.1
.9
,0
.1
+18.8
+27.
6%
+17.5%
+10.8%
POINT NORTHING EASTING ELEV.
C.2
STATE PROJECT
NUMBER
SHEET
WA FS ERFO 2016(1)-20(5)
FOOTNOTE:
[1] [1]
H a r r is
J
N e ig h o r n
C h e c k e d b y
D e s ig n e d b y
0+00
1+00 2+00
1827.26
1879.23
1839.03
1850.83
1876.82
1875.36
1842.15
1883.71
1851.63
1853.12
1855.07
1867.38
1892.69
1919.39
1935.61
1980.42
2006.88
2020.74
2961.79
2929.42
2960.00
2971.03
2941.54
2954.61
2974.24
2948.22
3046.96
3034.44
2998.83
2976.21
2971.47
2978.53
2978.28
2964.94
2969.61
2979.92
1021.51
1017.61
1015.73
1013.85
1010.86
1010.55
1012.00
1007.00
1020.00
1017.38
1010.95
1006.41
1001.93
996.95
994.82
992.53
992.20
992.00
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
[1]GRADING CONTROL POINTS
SCALE IN FEET
10 2010 construction of groin and cut-off berm.
Excavated material from channel reconstruction to be used in
FSR 20 MP 35.4
CHANNEL GRADING PLAN
CUYD
EMB.
CUYD
EXC.
U
S s u r v ft p w w o r k d w a e f1 c b .d g n
A
A
S e p te m b e r
Flo w
TYPICAL FLOODPLAIN GROIN DETAIL
A
L
B
C D E
F G H
I
J
K
M
N
Q
R
1.5
4'
.5
(6' to 20') Varies
1.5
4'
9.5'
16.5'
Ch oc w ic h
Cr ee k
6'
16.5'
6'
' R
' R
'R
100' R
R
F S
R
M o u n ta in L o o p H ig h w a y channel reconstruction
Mitigation, streambed
Existing ground
O
P
Channel profile grade
OHW
Existing ground
Existing ground stream channel
Centerline of proposed
Existing contour (typ.)
Finish grade contour (typ.)
channel bottom
Proposed ege of
10-foot diameter arch culvert
Cleaning culvert in place, 6' profile channel grade, 10-foot diameter
Cleaning culvert in place to
Begin channel reconstruction End channel reconstruction
1.5
Cut-off berm LC
1 1.5 from channel excavation
Place suitable streambed material
(for information only, 70 LNFT)
Cut-off berm
Not to Scale
Not to Scale
TYPICAL CHANNEL DETAIL
SECTION A-A
[1]listed per the grading control points
Excavate channel to the elevations
[1]grading control points the elevation listed per the
Construct floodplain groin to groin (typ.)
Floodplain
NO SCALE
TYPICAL SECTION
FSR 4036 MP 0.1
SAFETY EDGE DETAIL
PAVEMENT TRANSITION
BEGINNING AND ENDING
FSR 4036 MP 0.1
TYPICAL SECTION
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d w a e f1 fa .d g n
WA FS ERFO 2016(1)-20(5)
M a r c h
K
H a r r is o n
K
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
Turf establishment and topsoil.[3]
Construct slopes as shown in the Staking Report Data Listing.[2]
Listing.
Superelevate roadway as indicated in the Staking Report Data [1]
[1]Slope
1:4
C o n s tr u c ti o n L im it s
C o n s tr u c ti o n L im it s
[2]
[2]
Red top
Point available in survey notes
Pull aggregate base to cover safety edge
Asphalt concrete pavement
1:4
C le a r in g L im it s
L im it s
C le a r in g
Existing surface elevation and cross slope
Match existing pavement for structure dimensions
Profile, see Typical Section
Matchline
LC
Roadway aggregate
6" compacted depth
Roadway aggregate, method 2, Profile grade
Existing ground
See Typical Sections
Safety Edge Detail (typ.)
Variable
Travel way
10'
Travel way
10'
Variable
[3] [3]
Saw cut and tack coat
Embankment
Place tack coat between lifts
3" compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 2, 5 1000
.2
+1.517 1%
.9
+0.7316%
6.
,0
.5
SSD = 1399'
K = 64
50' VC
K = 20
119' VC
CP
16102
T
W A R N I
G
B U R I E
U T I L I T Y
P O
T
.0
P C
.2
PT
4+
.29
POT 5
+36
.64
D
Curve= PR1
R= 90.00'
T= 59.41'
N e = 0.04
L= 105.02'
2+65.00
5+00.00
CONSTRUCTION
END
LEGEND:
El.= 994.23
E= 2051.423
N= 839.680
El.= 1000.51
E= 2245.282
N= 942.383
NOTE:
PLAN AND PROFILE
FSR 4036 MP 0.1
20 40020
SCALE IN FEET
CONSTRUCTION
BEGIN
unique to this site.
1. Coordinates are assumed and
STOP
CUYD
EXC.
CUYD
EMB.
6+00 5+00 4+00 3+00 2+00 1+00
988 988
990 990
992 992
994 994
996 996
998 998
1000 1000
1002 1002
1004 1004
D.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d w a e f1 fb .d g n
WA FS ERFO 2016(1)-20(5)
A u g u s t
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
Profile grade
Existing ground
Line to be constructed
R
Preserve tree
Edge of pavement
Edge of pavement
Slope stake limits R
30'
(FSR 2000)
Mountain Loop Highway
FSR 4036
See Sheet D.3 for details
Bank stabilization, Limits of construction
5+00 solid, white (120 LNFT)
Pavement markings, type B, 4+96 RT
R1-1, 30" x 30"
(6 SQFT)
Sign system
4+85 RT
outside of slope stake limits)
(Remove existing pavement
Turf Establishment
Roadway Excavation and
Remove and reset gate (1 EACH)
4+58
Terminal section type tangent (1 EACH)
Removal of guardrail (13 LNFT)
4+90 LT
CO guidance (6 EACH) approximate same location per
Remove and reset boulder in
Flow
5 1000
FOOTNOTE:
N
NO SCALE
between logs.
Pole Planting: Willow live cutting bundles, random spacing 1 per SQYD[2] flow of a maximum of 8.5-feet total length from bank line.
Embed trunk completely, allowing the rootwad end to project into[1]
D.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d w a e f1 fc .d g n
WA FS ERFO 2016(1)-20(5)
M a r c h
H a r r is
N e ig h o
C h e c k e d b y
D e s ig n e d b y
DETAIL
BANK STABILIZATION
FSR 4036 MP 0.1
A
El. 985.4
1.5H :1V
El. 991.9
El. 995.4
1H:1V
6'
8.5' (max.)
Existing ground
LC
Water table
Backfill with conserved streambed material
Riprap toe
Existing contour (typ.)
logs to elevation 991.9 streambed material above
Backfill with conserved
A
Line to be constructed
22.9' Rt
3+71.0
28.9' Rt
4+35.8
(29 EACH)
12" to 18" dia. logs spaced at 5'
Mitigation, root wad [1]
34.7' Rt
4+42.7
42.3' Rt
4+48.3
38.0' Rt
3+12.1
26.6' Rt
3+51.2
(145 LNFT)
12" to 18" dia.
Mitigation, log barrier
[2](150 EACH)
Cuttings, willow pole
[2]
(150 EACH)
Cuttings, willow pole
(29 EACH)
12" to 18" dia. logs spaced at 5'
Mitigation, root wad typical section details
See D.1 for roadway
10 200
SCALE IN FEET
SECTION A-A
12" to 18" dia. (145 LNFT)
Mitigation, log barrier
0 4
PLAN
Station and offset point
Edge of active channel
22' to 26' Log Lengths
(517 SQYD)
geotextile, class 2, type E
Separation-stabilization
Class 5 (586 CUYD)
Placed riprap, Method A, Class 5 (586 CUYD)
Placed riprap, Method A, place turf establishment
8-inch depth (69 SQYD) and
Furnishing and placing topsoil, FSR 4036
TYPICAL SECTION
FSR 4065 MP 1.2
FSR 4065 MP 1.2
TYPICAL SECTION
Turf establishment limits.[3]
Construct slopes as shown in the Staking Report Data Listing.[2]
Listing.
Superelevate roadway as indicated in the Staking Report Data [1]
E.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d w a e f1 g a .d g n
WA FS ERFO 2016(1)-20(5)
M a r c h
K
H a r r is o n
K
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
[1]Slope
C o n s tr u c ti o n L im it s
C o n s tr u c ti o n L im it s
[2] 1:4
1:4 [2]
C le a r in g L im it s
C le a r in g L im it s
VariableVariable
LC
grade Profile
Existing ground
6" compacted depth method 1, Roadway aggregate, [3] [3]
12'
Travel Way
Embankment
CP
40652
,9
.6
,9
.7
-0.5000%
+3.8
0%
,9
.6
K = 20
86' VC
P C
.1
PT 306+
53.44
PO
T
7+ .0
P O
T
.0
5 1 0 1
95 1995
N
NOTE:
PLAN AND PROFILE
FSR 4065 MP 1.2
20 40020
SCALE IN FEET
Curve= C1004
D
R= 90.00'
T= 68.64' e= 0.05
L= 117.28' this site.
Coordinates are assumed and unique to 1.
CUYD
EXC.
CUYD
EMB.
308+00307+00306+00305+00304+00
1986 1992
1988 1994
1990 1996
1992 1998
1994 2000
1996 2002
1998 2004
2000 2006
2002 2008
E.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d w a e f1 g b .d g n
WA FS ERFO 2016(1)-20(5)
M a r c h
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
Profile grade
Line to be constructed
Slope stake limits
304+70
307+00
Existing ground fiber roll (138 LNFT)
Soil erosion control, 305+64 to 306+80 LT fiber roll (85 LNFT)
Soil erosion control, 305+21 to 306+19 RT
El = 1995.64
E = 3944.90
N = 1724.04
CONSTRUCTION
BEGIN
CONSTRUCTION
END
Limits of construction
El = 1996.68
E = 3792.64
N = 1595.69
See E.3-7 for details
305+63
50 30 2040 10 0 10 20 30 40 5060 60
N
PIPE INLET OUTLETHYDRAULIC INFORMATION
100 100
BEVEL: 1V:2HFLOWLINE SLOPE: 0.157 ft/ft
PLAN AND PROFILE
CULVERT
FSR 4065 MP 1.2
Q : 225
Q : 80 OHW : 1.0 ft
HW : 2.4 ft
INSTREAM WORK WINDOW: 7/16-9/16
BANKFULL CHANNEL WIDTH: 10 ft
TYPE: Str. Plate Pipe Culvert
LENGTH: 75 ft
PIPE SLOPE: 0.122 ft/ft
INFILL TYPE: Corrugated Metal Pipe
SPAN: 15 ft RISE: 15 ft
WALL THICKNESS: N/A
TYPE: Corrugated Metal Pipe
INV N/E/EL: 1614.27/3932.72/1980.4'
BURIAL DEPTH: 8.8 ft
LOWER BEVEL HEIGHT: 3.75 ft
BEVEL: 1V:1.25H
HEADWALL: Riprap with concrete collar
INV N/E/EL: 1673.78/3888.01/1971.3'
BURIAL DEPTH: 6.3 ft
LOWER BEVEL HEIGHT: 3.75 ft
HEADWALL: Riprap with concrete collar
E.3
STATE PROJECT
NUMBER
SHEET
U
S S u r
D c p w w o r k d w a e f1 g c .d g n
WA FS ERFO 2016(1)-20(5
S e p te m b e r
C h e c k e d b y
D e s ig n e d b y
0 1
SCALE IN FEET
5 0 5 10 15 20
LC
m in
1234567
Existing edge of road
Proposed edge of roadstructural plate pipe
Proposed 180-inch
CMP & 36" CMP
existing 24"
Remove riprap end treatment method B, class 4
Placed riprap
Flow riprap end treatment method B, class 4
Place riprap
Existing ground100yr water surface
Proposed road grade
Proposed road centerline
Slope 15.7%
Slope 1 2.2%
(m in
Flow boulder per detail Sheet E.5 material and fish passage
Backfill with streambed per detail Sheet E.6
Rock weir, typ.
per detail Sheet E.6
Rock weir, (typ.)
at inlet elev. 1989.2'
Prop. channel at outlet elev. 1977.59'
Prop. channel boulder, (typ.) embed into bank
Large salvaged on-site per detail Sheet E.7 riprap end treatment method B, class 4
Place riprap Invert elev. 1971.3' per detail Sheet E.4
Concrete Collar
Invert elev. 1980.4' into existing grades embed into bank to help transition
Large salvaged on-site boulder, (typ.)
See Sheet E.4 for details
Concrete collar, (typ.)
See Sheet E.7 for details riprap end treatment method B, class 4
Placed riprap per detail Sheet E.4
Concrete Collar
SECTION VIEW
TYPICAL SECTION
THRU COLLAR
INLET COLLAR
ISOMETRIC VIEW
ANCHOR BOLT DETAIL
3'-0"
LC
COLLAR DETAILS
REINFORCED CONCRETE
LARGE CULVERT
6" (min.)
m in
18" O.C. See detail
" Anchor bolt @4
" Ø galvanized4 3Structural plate pipe
#4
E.4
STATE PROJECT
NUMBER
SHEET
U
S S u r
D c p w w o r k d w a e f1 g d .d g n
WA FS ERFO 2016(1)-20(5)
M a r c h
C h e c k e d b y
D e s ig n e d b y
3'-0"
3'
Sp an
3'
Culvert crown
Culvert invert
To bedrock or 3' (max.)
To bedrock or 3' (max.)
2' (min.) lap splice
#4 Reinf (6 total)
2' (min.) lap splice
#4 Reinf (6 total)
#4 stirrups bolt design - 4" hook
Acceptable anchor
PLAN
Flow
A
A
NOTE:
FOOTNOTE:
B B
3.
2.
1.
channel conditions.
Arrange streambed cobbles and gravels to generally mimic natural
Stagger in-channel fish passage boulders within the culvert span.
streambed cobble, and bank stone gradations.
See special contract requirements for streambed sediment, Mix streambed cobbles evenly throughout streambed sediment.
Material.
Quantities included in Item 64704-1000 Mitigation, Streambed[5] at the top of bank elevation.
Embed boulders within bank material. Top of boulder should be[4] dimension.
smallest4 3 Embed fish passage boulders within active channel [3] streambed sediment.
Construct well defined banks with bank stone and[2] parabolic shape.
Slope streambed aggregate towards flowline to ensure[1]
LOCATION (FT)
(FT)
(IN)
GRADATION
COBBLE
STREAMBED
(CUYD)
COBBLE
STREAMBED
(CUYD)
SEDIMENT
STREAMBED
10 Class E 15
(CUYD)
STONE
BANK
15 27
(IN +/- 4)
BOULDER DIAMETER
FISH PASSAGE
ITEM DESCRIPTION UNIT
QUANTITY
MITIGATION QUANTITIES
FS 4065 MP 1.2 15290 145
TREATMENT
CULVERT INTERIOR
SIMULATED STREAM
(EACH)
BOULDER
FISH PASSAGE
E.5
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c p w w o r k d w a e f1 g e .d g n
WA FS ERFO 2016(1-20(5)
M a r c h
C h e c k e d b y
D e s ig n e d b y
INFORMATIONAL QUANTITIES
64704-1000
64703-6000
64703-3010
Mitigation, streambed material
Mitigation, fish passage boulder
Mitigation, rock weir
CUYD
EACH
EACH
SECTION A-A
Flow
SECTION B-B
LC
D
D (typ.)
(typ.)
W
Streambed sediment
Streambed cobble
Round pipe culvert wall
Streambed top
Streambed cobble
LC
Culvert wall
D (typ.)
D (typ.)
[2]large boulders and bank stones
Construct banks fromed with
[1]Channel flowline b u r ia l d e p th
[3]boulder in channel
Fish passage
Culvert inlet
[4]boulder in bank, (typ.)
Fish passage
[3]channel, typ.
boulder in
Fish passage
[5]
2 3 4 5 6
D (typ.)2
[4]anchor boulder in bank boulder or rock weir
Fish passage[2] rock weir anchor boulders fish passage boulders and
Use bank stones between sediment cobble, and large boulders with streambed
Streambed material between bank stones, See Sheet E.6 for details
Rock weir, (typ.)
See Sheet E.6 for details
Rock weir anchor boulder in bank, (typ.)
[5] [5]
DETAIL
ROCK WEIR
E.6
STATE PROJECT
NUMBER
SHEET
I n t_ ft p w w o r k d w a e f1 g f.
d g n
WA FS REFO 2016(1)-20(5)
M a r c h
C h e c k e d b y
D e s ig n e d b y
6"
Z
D o w n s tr e a m f r o m c o n tr l)
6" h
(FT)
h
NO SCALE
channel
Bottom of
Flow 2-7%
Top cener rock, Control Point streambed material elevation or top of
Original streambed Top of bank b b h
[2]W 2
[2]Top rock
[4]boulder, (typ.)
Anchor
Top of bank
Control point
20°-30°
20°-30° bb
F lo w
Control point
Bottom of channel
Bottom of channel
SECTION A-A SECTION B-B
PLAN
ELEVATION
FOOTNOTE:
[4]Anchor boulder, (typ.)
Top of bank
Footer rock, (typ.)
[2][1]
[3][2]Footer rock
[2] [2] [2]
[4]Anchor boulder, (typ.)
[1] [1]
[2][1] [2][1]
[1] [1]
[2][1]
[2][1]
[3][2]Top rock
[4][3]Footer rock, (typ.)
B
W4 1 [2] W 2
1 W4
ROCK WEIR INFORMATION
(TYP)
WEIR
ROCK
(FT)
W
(FT)
b
(FT)
Z
(IN)
DIAMETER
FOOTER ROCK
TOP ROCK AND
ANCHOR BOULDER CONTROL POINT
Easting Northing Elevation
(NO.)
QUANTITY
(IN)
DIAMETER
(NO.)
QUANTITY
4065 No.1
4065 No.2
4065 No.3
4065 No.4
4065 No.5
4065 No.6
4065 No.7
10 2.5
2.5
2.5
2.5
2.5
2.5
2.5 15
15 1.25
1.25
1.25
1.25
1.25
1.25
1.25
2 3940.6487
3931.3546
3922.7320
3913.5378
3904.6821
3895.4894
3886.6576 1675.5764
1663.8211
1651.5854
1639.7984
1627.5607
1616.0839
1603.7134 1991.2'
1988.9'
1986.5'
1984.2'
1981.9'
1979.5'
1977.2'
[2]Footer rock should be at the top of bank elevation.
Embed anchor boulder within streambed material. Top of boulder[4] streambed material.
Fill voids in top rock and footer rock with specified[3] top rocks. Space top rocks in center half as shown on plan view.
together to create a tightly packed and stable foundation for the
Place top rocks outside of the center half and all footer rocks close [2]
Orient top rocks to deflect water towards center of stream.[1]
DETAILS
RIPRAP HEADWALL
E.7
STATE PROJECT
NUMBER
SHEET
I n t_ ft p w w o r k d w a e f1 g g .d g n
WA FS ERFO 2016(1)-20(5)
M a r c h
L e
N e ig h o
C h e c k e d b y
D e s ig n e d b y
NOTE:
FOOTNOTE:
shown on site specific details, whichever is greater.
Construct riprap end treatment to a thickness of 36-inches or as[3]
Riprap end treatment slope to match roadway embankment slope.[2]
Bevel to match roadway embankment.[1]
Sl op e
PIPE BEVEL DETAIL
Sl op e
SKEW ANGLE DIAGRAM
c e n te r li n e
R o a d w a y
Cu lv er t ce nt er lin e
BOP
EOP
(DIAMETER OR SPAN GREATER OR EQUAL TO 48-INCHES)
(DIAMETER OR SPAN LESS THAN 48-INCHES)
.2
D o r R
.2
D o r R o r R is e
R
D ia m e te r
D o r R is e
R
D ia m e te r
D
W
RIPRAP END TREATMENT
Sl op e
FRONT VIEW
SIDE VIEW
shown in the plans
Streambed material where shown in the plans
Streambed material where
V a r ia b le R is e
W2
Variable W2
Placed riprap, class 4
[3
" m in
[1]
[1]
Manufacturer's standards
0.25 D or R or per the
Optional
Skew geotextile filter, class 1, type C
Separation and stabilization
V a r ia b le R is e
Concrete Collar
Placed riprap, class 4
24"
24" beneath and at all sides of placed riprap.
Place earthwork geotextile between riprap and existing ground, Contractor to field verify all invert elevations, prior to installation.
2.
1.
SWPPP ALUMINUM SIGN PANEL
[1]
Sheet I.3 for mounting instructions.
See SCR Subsection 107.01A(d) for installation location and [1]
SWPPP SIGN
F.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d w a e fl d a .d g n
WA FS ERFO 2016(1)-20(5)
S e p te m b e r
H a r r is
M il le
C h e c k e d b y
D e s ig n e d b y
(adjust text as needed for specific project information)
White Background
Black Foreground
3"
4"C
3"
2"C
2"
2"C
14"
"2
"B2
3'-6"
"8
3IN =
"8
5TH =
"8 1R = 1
BORDER
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FIBER ROLL
(FT)
(FT)
W157-21
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
F.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-20(5) WA
U S
C c p w w o r k d w a e fl d b .d g n
A u g u s t
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
NOTE:
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVERSPAN x RISE
PIPE ARCH
SIZE
PIPE ARCH
SIZE
SPAN x RISE
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVER
MINIMUM
COVERDIAMETER
PIPE
SIZE
PIPE
SIZE
DIAMETER
MINIMUM
COVER
ALUMINUMSTEEL
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
602-1
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
METAL PIPE CULVERT
Fill heights exceeding 100 feet require
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES
INCHES
INCHES
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
INCHES
3.5
INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS
0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.109/120.138/10 0.168/8
INCHES INCHES INCHES
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
3.5
" CORRUGATIONS2
1" x 3
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS
0.135/100.105/120.075/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.060/160.135/100.105/120.075/140.060/16
STATE PROJECT
NUMBER
SHEET
G.1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-20(5) WA
U S
C c p w w o r k d w a e f1 e a .d g n
A u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
3.
4.
special analysis by the CO.
The fill heights in the table are for helical lockseam and welded seam pipe only.
Fill heights for culvert pipe with annular corrugations are more restrictive than those of helical lockseam and welded seam pipe.
Obtain approval before furnishing annular corrugation pipe.
Measure minimum cover from the top of the pipe culvert to the subgrade for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.
ROUND PIPE
DIAMETER
PIPE ARCH
SPAN × RISE
CORRUGATION
[1] Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as
[2] For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the dimension of the end corrugation in the pipe.
COUPLING BANDS FOR METAL PIPE CULVERT [1]
[3] Use annular corrugated bands with pipes having annular corrugations or with helical pipe the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
ANNULAR
CORRUGATED
HELICALLY
CORRUGATED
BANDS [4]
SEMI-
CORRUGATEDSIZE [2]
BANDS [3] BANDS [5]
602-2
MINIMUM BAND WIDTH (INCHES)
1 × 2
1 × 3
3 × 1
5 × 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 × 64 to 142 × 91
60 × 46 to 81 × 59
87 × 64 to 142 × 91
60 × 46 to 81 × 59
49 × 33 to 83 × 57
17 × 13 to 42 × 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
COUPLING BAND
METAL PIPE CULVERT
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" × 3
2pipe ends rerolled with 2 corrugations on rerolled pipe ends.
STATE PROJECT
NUMBER
SHEET
G.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-20(5) WA
U S
C c p w w o r k d w a e f1 e b .d g n
A u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Smoother sleeve with center stop.
Stab type joint
W
Band Band
Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge
Watertight pipe joints are not required unless specified in the Special Contract Requirements.
Other types of coupling bands or fastening devices that comply with the joint performance criteria of AASHTO Standard specifications for
Highway Bridges, Division II Section 26 may be used.
of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
W
BoltsBand
WW
rerolled with 3" × 1" pipe corrugations.
having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.
"2 1" × 3
2The minimum band widths shown for 3" × 1" and 5" × 1" corrugated sizes apply to 2 diameter, required above 42" diameter
Second angle connection optional to 42" diameter, required above 42" diameter
Second angle connection optional to 42"
NOTE:
underdrain [6]
[4] Use helical corrugated bands with pipes having helically corrugated ends.
[5]
[6]
" for 18" round culvert (21" × 15" pipe arch) or less8
" for 21" round culvert (24" × 18" pipe arch) or more2
LEGEND:
BEDDING DEPTH
MINIMUM SPACING
SPACING
DIAMETER
or SPAN
PIPE SIZE (H) DEPTH
602-3
STANDARD APPROVED FOR USE 12/1993
DRAFT: 10/2014
REVISED: 4/1994 6/2005
> 54"
12" to 54"
6"
4"
UP to 48"
48" and UP
24" span or 36", PIPE CULVERT BEDDING
METAL AND PLASTIC
STATE PROJECT
NUMBER
SHEET
G.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-20(5) WA
U S
C c p w w o r k d w a e f1 e c .d g n
A u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.
See Section 704 for bedding and backfill requirements.
1.
2.
3.
Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
MULTIPLE PIPE INSTALLATION
PIPING PLUG
BELOW NATURAL GROUND OR
TRENCH EXCAVATION IN EMBANKMENT
ON UNSTABLE MATERIAL
ABOVE AND BELOW
NATURAL GROUND
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
Bedding material (uncompacted)
Impermeable backfill material.
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
H
Width
H H
H H
H H
H H
H
H
H
H
Finished subgrade Finished subgrade
Natural ground
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Roadway embankment
Finished subgrade trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
depth table
See bedding excavation in trench
HH
compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding
H
Half diameter or whichever is less
(see table)
Minimum spacing or Span
Diameter or Span
Diameter section
Metal endMetal end section or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth. Or lean concrete
18" (min.)
6" in uncompacted depth.
* Reduce to 18" for
2'-0" ±
1'-0" ±
18" ±
18" ±18"±
(min.)
6"
(min.)
6"
12" (min.), 24" (max.)
"/foot of cover,2 minimum
1'-0"
NOTE:
2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.)
2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.)
PIPE SIZE (D) WIDENING
DITCH WIDENING
602-6
TREATMENT IN CUT SLOPES
PIPE CULVERT INLET 30"
24"
18"
7'
6'
5'
STATE PROJECT
NUMBER
SHEET
G.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-20(5) WA
U S
C c p w w o r k d w a e f1 e d .d g n
A u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
dimension of all pipe arch culverts.
D equals the diameter of all round pipe or the rise 1.
TYPE II
TYPE I
SECTION B-B
SECTION A-A
N o r m a l d it c h l in e
S u b g r a d e s h o u ld e r
Pipe culvert
E n d o f p ip e
FLOW
Flat b ottom di tch a t culv ert in let
FLOW
Tape r at 1
0:1 r atio
Taper a t 10:1 ratio
FLOW
2D or
FLOW
Taper at 10
:1 rat io
2D or
N o r m a l d it c h l in e subgrade elevation
Maximum 2D or
S u b g r a d e s h o u ld e r o r e n d s e c ti o n
E n d o f p ip e b e v e l
Flat b ottom ditc h at c ulvert inlet
A
A
B
B section
End
PLAN PLAN
Original ground in mountainous terrain flat terrain. Taper at 5:1
Taper at 10:1 in rolling or 5:1 in mountainous terrain.
or flat terrain. Taper at
Taper at 10:1 in rolling
Normal ditch line
Pipe culvert
Original ground cut slope
Normal
(See table)
Ditch widening
Subgrade shoulder Normal ditch lineSubgrade shoulder
Pavement surface
Berm
Pavement surface
Subgrade
End section
Berm pipe as staked
Slope at ditch at end section
Flow line of pipe as staked
Slope at cut slope
Normal
D in lieu of 45° pipe elbow
30° pipe elbows may be required
At skewed pipe locations, 22.5° or
Standard 45° pipe elbow.
slope
1:3 max ditch line
Normal maximum slope
1:1.5
Cut Slope slope
1:3 max maximum slope
1:1.5
Cut Slope
D ditch line
Normal
Subgrade
1'
1'
NOTE:
B e r m
D
B e r m
D
(min.)
4' d ip a t c e n te r
(Min.)
4'
POLYVINYL CHLORIDE (PVC) PLASTIC ROUND PIPE CULVERT
PIPE
SIZE
FILL HEIGHT TABLE AND MINIMUM CELL CLASSIFICATION NUMBER PER ASTM D 1784
SMOOTH WALL (SOLID WALL) RIBBED
PIPE
SIZE
MINIMUM
COVER
CELL CLASS.
NO. 12454
CELL CLASS.
NO. 12364
MINIMUM
COVER CELL CLASS.
NO. 12454C
CELL CLASS.
NO. 12364C
A B C D
END SECTION DIMENSIONS
FILL HEIGHT TABLE AND MINIMUM CELL CLASSIFICATION NUMBER PER ASTM D 3350
SMOOTH WALL (SOLID WALL) CORRUGATED RIBBED
PIPE
SIZE
PIPE
SIZE
PIPE
SIZE
CELL CLASSIFICATION
NUMBER 335434C
CELL CLASS.
NO. 435400C CELL CLASS.
NO. 335434C
MINIMUM
COVER CELL CLASS.
NO. 334433C
MINIMUM
COVER
MINIMUM
COVER
POLYETHYLENE (PE) PLASTIC ROUND PIPE CULVERT
PIPE SIZE
602-5
STANDARD APPROVED FOR USE 12/1993
DRAFT: 2/2009
REVISED: 4/1994 6/2005
PLASTIC PIPE CULVERT
12 57
INCHES
DIAMETER
INCHES MAXIMUM FILL HEIGHT (FEET)HEIGHT (FEET)
MAXIMUM FILL
INCHESINCHES
DIAMETER
MAXIMUM FILL HEIGHT (FEET)INCHESINCHES
DIAMETER 1.4771.2921.3851.1540.9230.8570.607
MINIMUM WALL THICKNESS (INCHES)
INCHES
DIAMETER
INCHES MAXIMUM FILL HEIGHT (FEET) INCHES
DIAMETER
INCHES MAXIMUM FILL HEIGHT (FEET)
MINIMUM WALL THICKNESS (INCHES)
0.358 0.438 0.358 0.438
66.5
63.5
45.5
24.5
14.5
INCHES
DIMENSIONS
INCHES
DIAMETER
STATE PROJECT
NUMBER
SHEET
G.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-20(5)WA
U S
C c p w w o r k d w a e f1 e e .d g n
A u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
PLASTIC PIPE END SECTION
SIDE
TOP
FRONT
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve.
If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
Measure minimum cover from the top of the pipe culvert to the subgrade for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.
A
D
C
CONCRETE ROUND PIPE CULVERT
FILL HEIGHT AND PIPE CLASS TABLE
BEDDING DEPTH
SIZE
PIPE
MINIMUM SPACING
EMBANKMENT TRENCHDIAMETER
DEPTHPIPE SIZE (H)
CLASS VCLASS IVCLASS IIICLASS II
TRENCH
CLASS VCLASS IVCLASS IIICLASS II
EMBANKMENT
602-7
STANDARD APPROVED FOR USE 12/1993
DRAFT: 6/2008
REVISED: 4/1994 6/2005
CULVERT INSTALLATION
CONCRETE PIPE
INCHES
DIAMETER
INCHES
COVER
MINIMUM
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE IN FEET
> 54"
12" TO 54"
6"
4"
OVER 96"
36"-96"
12"-36"
48"
0.5H
15"
72"
72"
2H
STATE PROJECT
NUMBER
SHEET
G.6
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-20(5)WA
U S
C c p w w o r k d w a e f1 e f.
d g n
A u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
6.
5.
4.
3.
2.
1.
MULTIPLE ROUND PIPE INSTALLATION SUPPLEMENTAL CONCRETE PIPE TIE
PIPING PLUG
TRENCH INSTALLATIONEMBANKMENT INSTALLATION
LEGEND:
Bedding material (uncompacted).
Embankment material placed in layers
Impermeable backfill material.
adjusted to tie into impervious material.
material is used for backfill. Width may be material at the pipe inlet where granular
Construct a piping plug of impermeable backfill
Roadway embankment
Limits of pipe compaction
SECTION A-A
install the pipe culvert according to the limits of pipe
Where unyielding or unstable material is encountered, the compaction limits shall be the walls of the trench.
in an embankment. For pipe installation in a trench, Pipe compaction limits shown are for pipe installation and rigid pavements.
pipe to the top of the pavement for both flexible
Measure maximum fill height from the top of the to the top of the pavement for rigid pavements.
culvert to the subgrade for flexible pavements, and
Measure minimum cover from the top of the pipe of camber or increase the pipe culvert gradient.
the elevation of the inlet invert, reduce the amount elevation on the parabolic curve as designed exceeds
Develop camber on a parabolic curve. If the midpoint ordinate amount equal to 1% of the pipe length.
a chord through the inlet and outlet inverts an
When directed, camber pipe culverts upwards from in the contract documents.
Use Supplemental Concrete Pipe Tie when specified
AASHTO Standard Specifications for Highway Bridges.
structural pipe designs meeting the criteria of may be increased on approval of site-specific
Maximum fill heights for pipe culvert installations
A
A lean concrete backfill in accordance with Section 614
Compacted backfill material placed in layers
Bedding (See table)Bedding (See table)
H
Width
° 60°
H
H
H
H
(See table)
Minimum spacing
H
Finished subgrade before trench excavation embankment height
Finished subgrade or to springline backfill
Compacted
Piping plug end treatment
Culvert
Embankment slope
High water elevation
Pipe culvert holes (typ.)
Concrete pipe tie when precast
Tapered holes permitted over pipe joint
Do not install fastener
O Ring if required
2H2H compaction shown on Standard 602-3.
" min.2 12'-6 not exceeding 6" compacted depth.
not exceeding 6" compacted depth, or
1'-0" (min.)
" dia. hole for4
" max.2 12'-9 ty p ic a l m a x
1'-0"±
1'-3" min.
1'-5" max.
1" dia. Joint tie
NOTE:
H H
H H
QUANTITIES
TEMPORARY TRAFFIC CONTROL
TABULATION OF
H.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d w a e f1 n a .d g n
WA FS ERFO 2016(1)-20(5)
S e p te m b e r
H a r r is
A le x a n d e r
C h e c k e d b y
D e s ig n e d b y
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
Expressway / Freeway
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
W13-1P
(optional)
W13-1P
(optional) xx
MPH
xx
MPH
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
635-1
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
H.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-20(5) WA
U S
C c p w w o r k d w a e f1 n b .d g n
A u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
G20-2
G20-2
G20-2
G20-1
See Note 11
G20-1
See Note 11
M in o r R o a d
M a jo r R o a d
W20-1
See Note 10
W20-1
See Note 10
W20-1 over
W16-8P
See Note 9
W20-1 over
W16-8P
See Note 9
W20-1
Ro ad N am e
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
W20-1
See Note 10
W20-1
See Note 10
G20-2
Erect all project advance warning signs before starting construction work.
Not all details shown on the temporary traffic control sheets may be applicable to this project. The Contractor may add or delete information and details in this traffic control plan as necessary to accommodate actual operations.
Where advance warning signs, placed as shown, interfere with permanent signs, locate the warning signs as determined by the CO for best results. Vary messages as required.
Additional or different message signs may be required to fit the actual construction conditions.
Install advisory speed plates under the W20 series warning signs as needed to indicate a maximum recommended speed through the construction area.
Ensure all sign supports exposed to impact by traffic meet the requirements of
NCHRP-350 or MASH for crashworthiness.
Maintain two-way traffic during all non-work hours except as approved by the CO.
Do not store traffic control devices along the roadway when not in use. Cover post-mounted signs when not applicable.
If W20-1 is placed on a roadway other than that on which the actual construction work occurs, include a supplementary plaque indicating the name of the road on which the construction does occur (applies to major roads only).
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify the distance to the work area in feet or in miles. Install an additional W20-1 each end of the project. Show the distance on the G20-1 sign to the nearest whole mile.
If signing on a roadway under a jurisdiction other than the client agency, verify that an encroachment permit has been obtained.
State standards may be used as an alternative if approved by the CO.
Refer to the Section 635 of the Special Contract Requirements for allowable retroreflective sheeting types.
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
Pr oj ec t L im its
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
A
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1 limit or 85 percentile speed prior
Shoulder taper formula:
Where:
L =
L =
Minimum length of taper
* Approach speed based on the regulatory posted speed, not the advisory speed.
**Lengthen taper as needed to provide minimum of three channelizing devices in taper at required spacing.
L =
W =
S =
LENGTH AND SPACING TABLE
APPROACH
SPEED* TAPER
AREA
BUFFER
SPACE
WORK
SPACE
CHANNELIZING DEVICE
WS
WS²
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
MINIMUM TAPER LENGTH**
BUFFER SPACE
LENGTH
Expressway / Freeway
SHOULDER
WORK
xx
MPH
635-10
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
MPH
FEET
for S ≤ 40 MPH for S ≥ 45 MPH
Width of offset in feet
Numerical value of posted speed to work in miles per hour
FEET
SPACING IN FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
SHOULDER CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
H.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-20(5)WA
U S
C c p w w o r k d w a e f1 n c .d g n
A u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
Traffic flow
Traffic flow
NOTE:
See Note 2
10' min.
W21-5W20-1
See Note 3
G20-2
See Note 3
W20-1
See Note 3
G20-2
See Note 3
(See Length and
Spacing Table)
(optional) TERMINATION AREA
W13-1P
(optional)
1.
2.
3.
4.
Final location and spacing of signs and devices may be changed to fit field conditions as approved by the CO.
For project specific minimum width, refer to Special
Contract Requirements, Section 156.
If shoulder closure is completely within the project limits, eliminate the "ROAD WORK AHEAD" (W20-1) and "END
ROAD WORK" (G20-2) signs.
Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.
Channelizing devices
W
A Device spacing
AVARIABLE WORK SPACEBUFFER SPACETAPER AREAAB
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table)
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.