PROJECT_DESCRIPTION.pdf
PDF 160 KB Posted
- Attached to
- OR HARNEY 127(1), Hines Logging Road Overlay Federal contract opportunity
- Solicitation number
- 69056719B000021
About this file
This document provides details for a federal highway construction project solicitation. The project consists of hot mix asphalt paving, striping, shoulder rock and other minor work items for 8 miles of the Hines Logging Road in Harney County, Oregon. The estimated price range for the work is between $1 million to $2 million. A tentative completion date of Summer 2020 is provided. This solicitation is designated as a small business set-aside and will be issued in Winter or Spring of 2020. Interested vendors must register on FBO.gov to view the vendor list and receive notification when solicitation documents, including specifications and plans, are posted. The federal agency responsible for this project is the Department of Transportation Federal Highway Administration.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum.pdf | ||
| Amendment A001.pdf | ||
| Q&A_10-31-19.pdf | ||
| Plan_Request_for_Internet.pdf | ||
| IFB.pdf | ||
| Hines_Logging_Road_Plans_Stamped.pdf | ||
| Preliminary_Letter_for_Hines_Logging_Road_Overlay.pdf | ||
| Hines_Logging_Road_Overlay_Pre-Ad_plans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR HARNEY 127(1), Hines Logging Road Overlay, Client: Harney County OR, Location: Harney County, Oregon
The work consists of hot mix asphalt paving, striping, shoulder rock and other small items of work.
Project length: 8 Miles
Tentative Fixed Completion Date: Summer 2020 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: between $1 million to $2 million
Location: Hines, Oregon
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
O ne
S ch ed ul e Sc he du le A
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) No 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Asphalt Concrete Pavement By Gyratory Mix Design Method 15,200 TONS 412 Asphalt Tack Coat (asphalt surface treatment) 64 TON 413 Asphalt Pavement Milling 300 SQYD DIVISION 600 – Incidental Construction 621 Monuments & Markers (construction survey & staking) (yes/no) No 622 Rental Equipment (yes/no) No 623 General Labor (yes/no) No 634 Permanent Pavement Markings (traffic pavement markings) 8 MILE 635 Temporary Traffic Control – Flagger 30 DAYS 635 Temporary Traffic Control – Pilot Car 30 DAYS 635 Temporary Traffic Control – Sign 151 SQFT