Hines_Logging_Road_Overlay_Pre-Ad_plans.pdf
PDF 4 MB Posted
- Attached to
- OR HARNEY 127(1), Hines Logging Road Overlay Federal contract opportunity
- Solicitation number
- 69056719B000021
About this file
This document provides details for a federal contract opportunity to overlay Hines Logging Road in Harney County, Oregon. The solicitation number is 69056719B000021 and is being offered as a small business set-aside by the Department of Transportation Federal Highway Administration. The project consists of hot mix asphalt paving, striping, shoulder rock and other small items of work along 8 miles of road. The estimated price range for the work is between $1 million to $2 million and preliminary completion is scheduled for Summer 2020. Interested vendors should register on FBO.gov to receive notification when solicitation documents including plans and specifications are posted. Additional project information is available in an electronic preliminary plan file.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum.pdf | ||
| Amendment A001.pdf | ||
| Q&A_10-31-19.pdf | ||
| Plan_Request_for_Internet.pdf | ||
| IFB.pdf | ||
| Hines_Logging_Road_Plans_Stamped.pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| Preliminary_Letter_for_Hines_Logging_Road_Overlay.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
z w I u
.0
"O u
<LI
.c u a:
w w I z
:s ci
.0
"O
<LI
C:
Cl "iii
<LI
N
CALIFORNIA 1- - - - NEVADA -
OREGON KEY MAP
TYPE OF CONSTRUCTION:
Asphalt Pavement Milling, Asphalt Concrete Pavement, Shoulder Aggregate, Pavement Marking
DESIGN DESIGNATION:
ADT(2034)
V e (max)
58 (13% TRUCKS)
45MPH
Match Existing
SPECIFICATION:
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 US Customary Units
DJ
&a
ENGINEERS
PLANNERS
SURVEYORS
PLANS PREPARED FOR
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FE D ER AL LANDS HI GHWAY D IVISI ON
VANC OUVER, WASHIN GT ON
i 1--P-R-OJ- E-CT_M_ A_N_A _G-ER�
;:'. C. SANDERS
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
Project Location
PLANS FOR PROPOSED PROJECT
OR HARNEY 127(1)
HINES LOGGING ROAD OVERLAY
HARNEY COUNTY
MALHEUR
NATIONAL
FOREST
OREGON
LENGTH 8.0 MILES
r__) END PRO ECT
MP 8.00
fJ)]
.-1
\ BEGIN PROJECT
( MP 0.00
Scale in miles
1 0.5 0 1 2 3
STATE PROJECT SHEET
NUMBER
OR HARNEY 127(1)
INDEX TO SHEETS
A. GENERAL INFORMATION
A.1 TITLE SHEET
A.2 PLAN SYMBOLS AND ABBREVIATIONS
B. SUMMARIES
B.1 SUMMARY OF QUANTITIES
C. TYPICAL SECTION(S)
C.1 TABULATION OF TYPICAL SECTION QUANTITIES
C.2 TYPICAL SECTION
C.3 TRANSITION DETAILS
D. APPROACH ROADS AND PARKING AREAS
D.1 TABULATION OF APPROACH ROAD QUANTITIES
D.2 APPROACH ROAD DETAILS
E. TEMPORARY TRAFFIC CONTROL
E.1 TABULATION OF TEMPORARY TRAFFIC CONTROL
QUANTITIES
E.2 TEMPORARY TRAFFIC CONTROL PLAN
PROJECT LIMIT SIGNING
E.3 TEMPORARY TRAFFIC CONTROL
ADVANCE SIGNING
E.4 DELINEATION AND SIGNING FOR
UNMARKED PAVEMENTS
E.S TEMPORARY TRAFFIC CONTROL
SINGLE LANE CLOSURE LAYOUT
(WITH FLAGGERS)
E.6 TEMPORARY TRAFFIC CONTROL
SIGN INSTALLATION WOOD POSTS
F. PERMANENT TRAFFIC CONTROL
F.1 TABULATION OF PERMANENT TRAFFIC CONTROL
QUANTITIES
F.2 LINEAR PAVEMENT MARKINGS
APPROVED:
DATE _ _ _ __
Chief of Engineering, Western Federal Lands Highway Division
A.1
PRELIMINARY
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material A
M
A p r il
U
S C
F W
F L
H D H in e s L o g g in g R o a d d g n o r h a r o r a a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2HARNEY 127(1)OR
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
N
Fiber Roll or Wattle
C.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft
D
W
F L
H D H in e s L o g g in g R o a d d g n o r h a r o r a c a .d g n
OR HARNEY 127(1)
P
J u ly
C h e c k e d b y A
C O
H E
N D e s ig n e d b y D
L A
U T
Z E
N H
E I S
E R
QUANTITIES
TABULATION OF TYPICAL SECTION
See note 1 shoulder max to 3.0'
2.1' min shoulder max to 3.0'
2.1' min
TYPICAL SECTION
Match existing
LC
slope varies existing ground
Approximate slope varies existing ground
Approximate
SAFETY EDGE DETAIL
O slope varies existing ground
Approximate
See detail this sheet
Safety Edge (Typ), Method 1
Roadway Aggregate, VariesVaries
Varies
TYPICAL SECTION
NOTES:
MP 0.01 TO 8.00
surface
Existing roadway Tack coat
1. Existing pavement width varies, match existing
Match existing
Varies:12' Traveled way12' Traveled wayVaries:
2" min. compacted depth
0.3 to <3 million ESAL, nominal maximum size aggregate, gyratory mix, 1/2-inch or 3/4-inch
Asphalt concrete pavement, 2" min. compacted depth
0.3 to <3 million ESAL, nominal maximum size aggregate, gyratory mix, 1/2-inch or 3/4-inch
Asphalt concrete pavement, Varies: 28.2' min. to 30.0' max
C.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft
W
F L
H D H in e s L o g g in g R o a d d g n o r h a r o r a c b .d g n
OR HARNEY 127(1)
u ly
C h e c k e d b y A
C O
H E
N D e s ig n e d b y D
L A
U T
Z E
N H
E I S
E R
Varies: 28.7' min. to 30.5' max
Existing pavement existing pavement
Match edge of pavement (Typ)
Edge of existing
TRANSITION DETAILS
Existing cattle guard
30' Transition
SECTION TO CATTLE GUARD
LONGITUDINAL TRANSITION - TYPICAL
guard
Match cattle
Existing roadway surface
30' Transition
Existing roadway surface in c h d e p th p a v e m e n t m illin g
B e g in a s p h a lt in c h d e p th p a v e m e n t m illin g
E n d a s p h a lt in c h d e p th p a v e m e n t m illin g
B e g in a s p h a lt in c h d e p th p a v e m e n t m illin g
E n d a s p h a lt
MP 6.88
MP 4.15
MP 0.89
MP 0.34
million ESAL maximum size aggregate, 0.3 to <3 mix, 1/2-inch or 3/4-inch nominal
Asphalt concrete pavement, gyratory
30' Transition
Existing roadway surface in c h d e p th p a v e m e n t m illin g
B e g in a s p h a lt in c h d e p th p a v e m e n t m illin g
E n d a s p h a lt
30' Transition
Existing roadway surface
SECTION TO EXISTING ASPHALT
LONGITUDINAL TRANSITION - TYPICAL
SECTION TO EXISTING ASPHALT
LONGITUDINAL TRANSITION - TYPICAL
MP 0.01 MP 8.00
pavement
Match existing million ESAL size aggregate, 0.3 to <3
3/4-inch nominal maximum gyratory mix, 1/2-inch or
Asphalt concrete pavement, million ESAL maximum size aggregate, 0.3 to <3 mix, 1/2-inch or 3/4-inch nominal
Asphalt concrete pavement, gyratory pavement
Match existing million ESAL size aggregate, 0.3 to <3
3/4-inch nominal maximum gyratory mix, 1/2-inch or
Asphalt concrete pavement, C.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft
W
F L
H D H in e s L o g g in g R o a d d g n o r h a r o r a c c .d g n
OR HARNEY 127(1)
M a y
C h e c k e d b y A
C O
H E
N D e s ig n e d b y D
L A
U T
Z E
N H
E I S
E R in c h d e p th p a v e m e n t m illin g
B e g in a s p h a lt in c h d e p th p a v e m e n t m illin g
E n d a s p h a lt
0 to 2-inch depth
Asphalt Pavement Milling, 0 to 2-inch depth
Asphalt Pavement Milling, 0 to 2-inch depth
Asphalt Pavement Milling, 0 to 2-inch depth
Asphalt Pavement Milling, D.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft
W
F L
H D H in e s L o g g in g R o a d d g n o r h a r o r a ia .d g n
OR HARNEY 127(1)
M a y
C h e c k e d b y A
C O
H E
N D e s ig n e d b y D
L A
U T
Z E
N H
E I S
E R
QUANTITIES
TABULATION OF APPROACH ROAD
NO SCALE
C L o f a p p r o a c h
E d g e o f s h o u ld e r
See Note 1
End pavement R
Edge of shoulder
C L o f a p p r o a c h
W
R Edge of shoulder
E d g e o f s h o u ld e r
W
Match existing surfacing
Match existing surfacing
P
E n d p a v e m e n t
M a tc h e x is ti n g
E n d a g g r e g a te approach
Existing aggregate
Existing asphalt approach
Typ
Typ
See Note 1
End pavement
CL of Road
CL of Road
TYPE 3
material varies
Existing approach, TYPE 1
C L o f a p p r o a c h
See Note 1
End pavement R
Edge of shoulder
W
Match existing surfacing
Typ
CL of Road
TYPE 2
depth varies, 0"-2"
Roadway Aggregate, Method 1
Existing road section
Existing road section
Existing road section
TYPE 1 APPROACH
TYPE 2 APPROACH
TYPE 3 APPROACH
Match approach radius 'R' of the existing approach1.
10'
10'
Tack coat
M il li n g in c h d e p th
E n d A s p h a lt P a v e m e n t
M il li n g in c h d e p th
B e g in A s p h a lt P a v e m e n t
E d g e o f s h o u ld e r
E n d p a v e m e n t
M il li n g in c h d e p th
E n d A s p h a lt P a v e m e n t in c h d e p th
P a v e m e n t
M il li n g
B e g in A s p h a lt depth
Milling, 0 to 2-inch
Asphalt Pavement depth
Milling, 0 to 2-inch
Asphalt Pavement of approaches only)
Tack coat (paved portion
APPROACH ROAD DETAILS
STATE PROJECT
NUMBER
SHEET
D.2
STATE PROJECT
NUMBER
SHEET
U
S C
W
F L
H D H in e s L o g g in g R o a d d g n o r h a r o r a ib .d g n
OR HARNEY 127(1)
u ly
C h e c k e d b y A
C O
H E
N D e s ig n e d b y D
L A
U T
Z E
N H
E I S
E R
NOTE:
10'
0.3 to <3 million ESAL nominal maximum size aggregate, gyratory mix, 1/2-inch or 3/4-inch Asphalt concrete pavement,
0.3 to <3 million ESAL nominal maximum size aggregate, gyratory mix, 1/2-inch or 3/4-inch Asphalt concrete pavement,
0.3 to <3 million ESAL nominal maximum size aggregate, gyratory mix, 1/2-inch or 3/4-inch Asphalt concrete pavement, 10' of flared radius P=Dimension to end
File details come from the government source that posted it. Updated .