| Bid_Opening_Summary_US_20_Lower_Sunken_Grade.pdf | ||
| Q&A_08-30-19.pdf | ||
| Amendment_A001.pdf | ||
| Q&A_08-28-19.pdf | ||
| Q&A_08-20-19.pdf | ||
| Phsycial_Data.zip | ZIP file | |
| Plans-OR_DOT_20(1)_Flat.pdf | ||
| Plan_Request_form.pdf | ||
| IFB_Lower_Sunken_Grade.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR DOT 20(1),US 20 Lower Sunken Grade Slide Repair MP 55.4, Linn County, OR
The work consists of Embankment, aggregate, riprap, drainage, temporary traffic control, horizontal drains and other small items of work.
Project length: 0.1 Miles
Tentative Fixed Completion Date: Winter 2020 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $2,000,000 to $3,000,000
Location: 25 Miles E of Sweet Home, OR.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
Sc he du le
A
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes
DIVISION 200 – Earthwork 201 Clearing & Grubbing 7,700 SQYD 203 Removal of Structures & Obstructions Removal of Inlet Plug, Existing Pipe
1 EACH
1 EACH
204 Excavation & Embankment Select Borrow Embankment Construction Conserve and Stockpile Topsoil
700 TON
12,800 CUYD
900 CUYD
207 Earthwork Geosynthetics Separation-Stabilization Geotextile, Class 1, Type C Geotextile Filter, Class1, Type C
1,300 SQYD
1,600 SQYD
Sc he du le
A
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Placed Riprap, Method A, Class 3 Placed Riprap, Method A, Class 4 Placed Riprap, Method A, Class 5 Boulder
1,900 CUYD
45 CUYD
80 CUYD
5 EACH
DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 350 TON
DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 8 TON
DIVISION 600 – Incidental Construction 602 Culverts & Drains 18-Inch Pipe Culvert (Corrugated Polyethylene Pipe) 36-Inch Pipe Culvert 36-Inch Pipe Culvert (Down Drain) 48-Inch Pipe Culvert
260 LNFT
76 LNFT
31 LNFT
154 LNFT
606 Corrugated Metal Spillways Spillway Assembly (36-Inch) Pipe Anchor Assembly, 36-Inch
1 EACH
5 EACH
610 Horizontal Drains Horizontal Drain Pipe Horizontal Drain Casing and Collar (Steel Pipe) Construct and Remove Temporary Access and Drill Pads
19,000 LNFT
90 EACH
ALL
622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 624 Topsoil Placing Conserved Topsoil, 6-Inch Depth 5,500 SQYD 625 Turf Establishment Seeding, Hydraulic Method 5,500 SQYD 629 Rolled Erosion Control Products & Cellular Confinement Systems Rolled Erosion Control Product, Type 2.B 5,500 SQYD 635 Temporary Traffic Control Drum Warning Light Type A Warning Light Type B Warning Light Type C Construction Sign Traffic Control Supervisor Flagger
80 EACH
8 EACH
70 EACH
8 EACH
99 SQFT
32 DAY
500 FXHR
| DIVISION 200 – Earthwork |
| DIVISION 250 – Slope Reinforcement and Retaining Walls |
| DIVISION 300 – Aggregate and Base Courses |