Amendment_A001.pdf
PDF 438 KB Posted
- Solicitation number
- 69056719B000020
About this file
Amendment A001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_US_20_Lower_Sunken_Grade.pdf | ||
| Q&A_08-30-19.pdf | ||
| Q&A_08-28-19.pdf | ||
| Q&A_08-20-19.pdf | ||
| Phsycial_Data.zip | ZIP file | |
| Plans-OR_DOT_20(1)_Flat.pdf | ||
| Plan_Request_form.pdf | ||
| IFB_Lower_Sunken_Grade.pdf | ||
| PROJECT_DESCRIPTION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 08/28/2019 N/A See Block 10
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056719B000020
9B. DATED (SEE ITEM 11)
08/01/2019
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
OR DOT 20(1), US 20 Lower Sunken Grade Slide Repair MP 55.4
See Page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, dated 08/28/2019 OR DOT 20(1) Solicitation No. 69056719B000020 US 20 Lower Sunken Grade Slide Repair MP 55.4
REVISIONS ARE AS FOLLOWS:
SPECIAL CONTRACT REQUIREMENTS
Page F-14, Subsection 625.03, General. Revises requirements.
PLANS
Plan Sheet C.7 Revises riprap callout
ENCLOSURES
Pages:
F-14
Plan Sheets:
C.7
F-14 DIVISION 600
Special Contract Requirements Project: OR DOT 20(1), US 20 Lower Sunken Grade Slide Repair MP 55.4
Section 625. — TURF ESTABLISHMENT
Materials
625.02 Amend as follows:
Delete the following from the material list:
Tackifiers 713.11
Add the following to the material list:
Tackifiers 713.11(a)(1)
Construction Requirements
625.03 General. Delete the text of this Subsection and substitute the following:
Perform the work required under Sections 624 and 629; and Apply apply turf establishment to finished slopes and ditches between September 1 and by November 30, 2019. Do not apply turf establishment during windy weather or when the ground is excessively wet, frozen, snow covered, extremely dry, cloddy, hard pan, or not friable.
625.07 Seeding. Add the following to paragraph (b):
Apply the seed at the rate of 65 pounds (kilograms) of live seed per acre.
Submit tackifiers manufacturer’s recommendations for installations, and add tackifiers according to the manufacturer’s written recommendations.
Revised by Amendment A001
DRAIN OUTLET ASSEMBLY
HORIZONTAL DRAIN COLLECTION SYSTEM
NO SCALE
Sch. 80 PVC clean out end cap
Stainless steel hose clamp watertight connections
1.5" Ø sch. 80 PVC tee solvent-welded horizontal drain pipe
1.5" Ø sch. 80 PVC
Ball valves
Sch. 80 PVC clean out end cap
2" Ø flexible polyethylene outlet hose
Horizontal drain pipe
Horizontal drain casing and collar (steel pipe)
Clean out cap, 1.5" Ø
Geotextile filter, class 1, type C (nonwoven)
Placed riprap, method A, class 3, 4' minimum thickness to collection pipe (maintain a 2% minimum slope)
2" Ø flexible polyethylene outlet hose to carry horizontal drain water
Frictional watertight connection
Gasket for plastic pipe
Backfill material
1:1.5
(maintain a minimum 2% slope)
Header collection pipe 12" Ø smooth wall polyethylene drain pipe
1' min.
NOTE:
collection pipe.
Independently attach each outlet hose directly to the header 4.
See Subsection 610.13.
Install cleanout fittings on the header collection pipe.3.
create a relatively flat surface prior to placing geotextile.
Choke riprap, in the area of the backfill material, to2.
against the exposed face of the geotextile.
geotextile on top of the backfill material. Place riprap end of the riprap buttress. Securely fasten the wrapped
Wrap geotextile up and over backfill material at each 1.
to collection pipe (maintain a 2% minimum slope)
2" Ø flexible polyethylene outlet hose to carry horizontal drain water
Horizontal drain casing and collar (steel pipe)
Clean out cap, 1.5" Ø
1' min.
2' min.
1 Revised by Amendment A001
STATE PROJECT
NUMBER
SHEET
OR DOT 20(1) C.7
:4
A
M
A u g u s t
H o r iz o n ta l D r a in
C o ll e c ti o n S y s te m D e ta il s c p w w o r k
\d
\C S h e e ts
.d g n
SYSTEM DETAILS
HORIZONTAL DRAIN COLLECTION