PROJECT_DESCRIPTION.pdf

PDF 39 KB Posted

Attached to
MT DAR 2019(1), Defense Access Roads FY 2019 & MT TETON 144(1), North Fork Project
Solicitation number
69056719B000009
Issued by

View the file

Other files

File Type Posted
BidSum_MT_DAR_2019(1)_&_MT_Teton_144(1).pdf PDF
Q&A_05-10-19.pdf PDF
Plan_Request_Form.pdf PDF
IFB_DAR.pdf PDF
01_mt-d201901_DAR2019(1)_PLANS_SIGNOFF.pdf PDF
mt-d201901_DAR2019(1)_HydraulicsMemo_Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT DAR 2019(1), Defense Access Roads FY 2019 MT TETON 144(1), North Fork Project Teton, Cascade and Chouteau Counties, MT.

The work consists of roadway reconditioning, aggregate surfacing, aggregate stabilization, drainage improvements, and cattle guard replacement and other small items of work.

Project length: 44.39 Miles Tentative Fixed Completion Date: Fall 2020 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $5,000,000 to $7,000,000

Location: 10 Miles N of Great Falls, Mt.

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

On e S ch ed ul e

Sc h

Na m e

A_

Ad di tio na l S ch

Sc h Na m e

_B tio na

Na m e

_C

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes Yes Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes Yes Yes 154 Contractor Sampling & Testing (yes/no) Yes Yes Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes 157 Soil Erosion & Sediment Control (erosion control devices) Fiber Roll 850 LNFT

Fiber Roll 2880

LNFT

Fiber Roll 2940

LNFT

158 Watering for Dust Control 4248 MGAL 4,873 MGAL 6032 MGAL

DIVISION 200 – Earthwork 203 Removal of Structures & Obstructions (structures, demolition)

Pipe

1 EACH

Pipe

1 EACH

Pipe

1 EACH

204 Excavation & Embankment Unclassified Borrow

97 TON

Ditch Excavation 275

LNFT

Unclassified Borrow

97 TON

Ditch Excavation

575 LNFT

Unclassified Borrow

97 TON

Ditch Excavation

575 LNFT

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap

Riprap Class 2

45 CUYD

Riprap Class 2

45 CUYD

Riprap Class 3

59 CUYD

Riprap Class 2

45 CUYD

Riprap Class 3

59 CUYD

On e S ch ed ul e

Sc h

Na m e

A_ tio na

Na m e

_B tio na

Na m e

_C

302 Minor Crushed Aggregate Roadway Aggregate

2155TON

Roadway Aggregate

2,640 TON

Roadway Aggregate

3385 TON

303 Road Reconditioning 199,800 LNFT 234,400 LNFT 291,500 LNFT 311 Stabilized Aggregate Surface Course Imported Aggregate

107,707 TON

Calcium Chloride

1,933 TON

In-place Aggregate 2,360

Imported Aggregate

121,317 TON

Calcium Chloride

2,224 TON

In-place Aggregate 2,360

Imported Aggregate

149,373 TON

Calcium Chloride

2,724 TON

DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both)

24-Inch Pipe

42 LNFT

24-Inch Pipe

118 LNFT

78-Inch Pipe

50 LNFT

24-Inch Pipe

118 LNFT

78-Inch Pipe

50 LNFT

607 Cleaning, Relaying, & Repairing Existing Drainage Structures

Cleaning Culvert

2 EACH

Repairing Culver

23 EACH

Cleaning Culvert

24 EACH

Repairing Culver

27 EACH

Cleaning Culvert

25 EACH

Repairing Culver

33 EACH

619 Fences, Gates, Cattle Guards & Bollard Posts Cattleguard

1 Each

Cattleguard 1 Each Fence

70 LNFT

Cattleguard 1 Each Fence

70 LNFT

622 Rental Equipment (yes/no) Yes Yes Yes 623 General Labor (yes/no) Yes Yes Yes 624 Topsoil (landscaping & related items) Yes Yes Yes 625 Turf Establishment (indicate seeding or mulching separately) 1,735 SQYD 2,785 SQYD 3,055 SQYD 635 Temporary Traffic Control – Flagger 2,560 FXHR 3,080 FXHR 3,720 FXHR 635 Temporary Traffic Control – Pilot Car 635 Temporary Traffic Control LPSM LPSM LPSM

DIVISION 200 – Earthwork
251 Riprap