PROJECT_DESCRIPTION.pdf
PDF 39 KB Posted
- Solicitation number
- 69056719B000009
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_MT_DAR_2019(1)_&_MT_Teton_144(1).pdf | ||
| Q&A_05-10-19.pdf | ||
| Plan_Request_Form.pdf | ||
| IFB_DAR.pdf | ||
| 01_mt-d201901_DAR2019(1)_PLANS_SIGNOFF.pdf | ||
| mt-d201901_DAR2019(1)_HydraulicsMemo_Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT DAR 2019(1), Defense Access Roads FY 2019 MT TETON 144(1), North Fork Project Teton, Cascade and Chouteau Counties, MT.
The work consists of roadway reconditioning, aggregate surfacing, aggregate stabilization, drainage improvements, and cattle guard replacement and other small items of work.
Project length: 44.39 Miles Tentative Fixed Completion Date: Fall 2020 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $5,000,000 to $7,000,000
Location: 10 Miles N of Great Falls, Mt.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
On e S ch ed ul e
Sc h
Na m e
A_
Ad di tio na l S ch
Sc h Na m e
_B tio na
Na m e
_C
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes Yes Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes Yes Yes 154 Contractor Sampling & Testing (yes/no) Yes Yes Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes 157 Soil Erosion & Sediment Control (erosion control devices) Fiber Roll 850 LNFT
Fiber Roll 2880
LNFT
Fiber Roll 2940
LNFT
158 Watering for Dust Control 4248 MGAL 4,873 MGAL 6032 MGAL
DIVISION 200 – Earthwork 203 Removal of Structures & Obstructions (structures, demolition)
Pipe
1 EACH
Pipe
1 EACH
Pipe
1 EACH
204 Excavation & Embankment Unclassified Borrow
97 TON
Ditch Excavation 275
LNFT
Unclassified Borrow
97 TON
Ditch Excavation
575 LNFT
Unclassified Borrow
97 TON
Ditch Excavation
575 LNFT
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap
Riprap Class 2
45 CUYD
Riprap Class 2
45 CUYD
Riprap Class 3
59 CUYD
Riprap Class 2
45 CUYD
Riprap Class 3
59 CUYD
On e S ch ed ul e
Sc h
Na m e
A_ tio na
Na m e
_B tio na
Na m e
_C
302 Minor Crushed Aggregate Roadway Aggregate
2155TON
Roadway Aggregate
2,640 TON
Roadway Aggregate
3385 TON
303 Road Reconditioning 199,800 LNFT 234,400 LNFT 291,500 LNFT 311 Stabilized Aggregate Surface Course Imported Aggregate
107,707 TON
Calcium Chloride
1,933 TON
In-place Aggregate 2,360
Imported Aggregate
121,317 TON
Calcium Chloride
2,224 TON
In-place Aggregate 2,360
Imported Aggregate
149,373 TON
Calcium Chloride
2,724 TON
DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both)
24-Inch Pipe
42 LNFT
24-Inch Pipe
118 LNFT
78-Inch Pipe
50 LNFT
24-Inch Pipe
118 LNFT
78-Inch Pipe
50 LNFT
607 Cleaning, Relaying, & Repairing Existing Drainage Structures
Cleaning Culvert
2 EACH
Repairing Culver
23 EACH
Cleaning Culvert
24 EACH
Repairing Culver
27 EACH
Cleaning Culvert
25 EACH
Repairing Culver
33 EACH
619 Fences, Gates, Cattle Guards & Bollard Posts Cattleguard
1 Each
Cattleguard 1 Each Fence
70 LNFT
Cattleguard 1 Each Fence
70 LNFT
622 Rental Equipment (yes/no) Yes Yes Yes 623 General Labor (yes/no) Yes Yes Yes 624 Topsoil (landscaping & related items) Yes Yes Yes 625 Turf Establishment (indicate seeding or mulching separately) 1,735 SQYD 2,785 SQYD 3,055 SQYD 635 Temporary Traffic Control – Flagger 2,560 FXHR 3,080 FXHR 3,720 FXHR 635 Temporary Traffic Control – Pilot Car 635 Temporary Traffic Control LPSM LPSM LPSM
| DIVISION 200 – Earthwork |
| 251 Riprap |