01_mt-d201901_DAR2019(1)_PLANS_SIGNOFF.pdf

PDF 14 MB Posted

Attached to
MT DAR 2019(1), Defense Access Roads FY 2019 & MT TETON 144(1), North Fork Project
Solicitation number
69056719B000009
Issued by

About this file

Plans

View the file

Other files

File Type Posted
BidSum_MT_DAR_2019(1)_&_MT_Teton_144(1).pdf PDF
Q&A_05-10-19.pdf PDF
Plan_Request_Form.pdf PDF
IFB_DAR.pdf PDF
mt-d201901_DAR2019(1)_HydraulicsMemo_Final.pdf PDF
PROJECT_DESCRIPTION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

stephen Stamp

Sheet and Description

TCR H-02 H-06 J-01 J-03 J-04 J-05 J-06 J-07 J-08 J-09 J-11 Bid Schedule

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15201-0000 CONSTRUCTION SURVEY AND

STAKING LPSM ALL

A0060 15201-0000 CONSTRUCTION SURVEY AND

STAKING (TCR) LPSM ALL

A0080 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0100 15301-0000 CONTRACTOR QUALITY CONTROL

(TCR) LPSM ALL

A0120 15401-0000 CONTRACTOR TESTING LPSM ALL

A0140 15401-0000 CONTRACTOR TESTING (TCR) LPSM ALL

A0160 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0180 15501-0000 CONSTRUCTION SCHEDULE (TCR) LPSM ALL

A0200 15705-1400 SOIL EROSION CONTROL, FIBER

ROLL LNFT 120 120 100 210 150 700

A0220 15705-1400 SOIL EROSION CONTROL, FIBER

ROLL (TCR) LNFT 150 150

A0240 15801-0000 WATERING FOR DUST CONTROL MGAL 727 172 972 447 671 877 94 3,960

A0260 15801-0000 WATERING FOR DUST CONTROL

(TCR) MGAL 288 288

A0280 20310-1000 PLUG, EXISTING PIPE EACH 1 1

A0300 20404-0000 UNCLASSIFIED BORROW TON 97 97

A0320 20425-1000 DITCH, EXCAVATION LNFT 275 275

A0340 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 (ENERGY DISSIPATOR) CUYD 5 16 11 32

A0360 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 (RIPRAP HEADWALL) CUYD 6 7 13

A0380 30202-2000 ROADWAY AGGREGATE, METHOD 2

(J ROADS) TON 450 100 405 195 295 340 75 1,860

A0400 30202-2000 ROADWAY AGGREGATE, METHOD 2

(TCR) TON 295 295

A0420 30302-5000 AGGREGATE SURFACE Contract Quantity

RECONDITIONING (TCR) LNFT 14,414 14,414

A0440 30302-6000 ROADWAY RECONDITIONING LNFT 35,165 7,973 45,144 20,750 31,152 40,709 4,488 185,381 Contract Quantity

A0460 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (J ROADS) TON 17,922 4,371 24,751 11,377 17,079 22,319 2,352 100,171

A0500 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (APPROACH

ROADS) TON 110 84 469 663

MileStone: Signoff Date Completed: 03/18/19 Report Date: 03/18/19

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES - Schedule A

-M ar

-2

2:

P

M

Remarks and/or Determination of Estimated

Quantity Pay Item Description Unit

Estimated Quantities

F:

\h ig hw ay s\

FH

W

A\

_m t-d2

1_ D

A R

\E st im at e\

PS

E S ig no ff \S ec tio n B su m m ar y.

xl sm ]S he et

STATE PROJECT

B.1DAR 2019(1)

TETON 144 (1)

MT

MT

SHEET

NUMBER

TCR H-02 H-06 J-01 J-03 J-04 J-05 J-06 J-07 J-08 J-09 J-11 Bid Schedule

A0540 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (TCR) TON 6,873 6,873

A0580 31110-0000 CALCIUM CHLORIDE TON 320 82 444 203 321 398 42 1,810

A0600 31110-0000 CALCIUM CHLORIDE (TCR) TON 123 123

A0620 60201-0800 24-INCH PIPE CULVERT LNFT 42 42

A0640 60704-0000 CLEANING CULVERT IN PLACE EACH 4 2 4 2 4 1 17

A0660 60704-0000 CLEANING CULVERT IN PLACE

(TCR) EACH 2 2

A0680 60705-0000 REPAIRING DRAINAGE STRUCTURE EACH 4 7 4 3 5 23

A0700 61903-0700 CATTLE GUARD, 24 FEET (TCR) EACH 1 1

A0720 62201-0300 DUMP TRUCK, 12 CUBIC YARD

MINIMUM CAPACITY HOUR 49

A0740 62201-0300 DUMP TRUCK, 12 CUBIC YARD

MINIMUM CAPACITY (TCR) HOUR 10

A0760 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT

MINIMUM RATED CAPACITY

BUCKET, 24-INCH WIDTH HOUR 49

A0780 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT

MINIMUM RATED CAPACITY

BUCKET, 24-INCH WIDTH (TCR) HOUR 10

A0800 62201-2050 ROLLER HOUR 26

A0820 62201-2050 ROLLER (TCR) HOUR 10

A0840 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM

BLADE HOUR 57

A0860 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM

BLADE (TCR) HOUR 10

A0880 62301-0000 GENERAL LABOR HOUR 46

A0900 62301-0000 GENERAL LABOR (TCR) HOUR 10

A0920 62405-0300 PLACING CONSERVED TOPSOIL,

4-INCH DEPTH SQYD 180 315 180 775 285 1,735

A0940 62502-0000 TURF ESTABLISHMENT (DRY

METHOD) SQYD 180 315 180 775 285 1,735

A0960 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL

A0980 63501-0000 TEMPORARY TRAFFIC CONTROL

(TCR) LPSM ALL

A1000 63509-1000 TEMPORARY TRAFFIC CONTROL,

FLAGGER FXHR 420 100 620 280 380 540 60 2,400

A1020 63509-1000 TEMPORARY TRAFFIC CONTROL,

FLAGGER (TCR) FXHR 160 160

-M ar -2

2:

P M

MileStone: Signoff Date Completed: 03/18/19 Report Date: 03/18/19

F:

\h ig hw ay s\

FH

W

A\

_m t-d2

1_ D

A R

\E st im at e\

PS

E S ig no ff \S ec tio n B su m m ar y.

xl sm ]S he et

2)

SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

STATE PROJECT

B.2DAR 2019(1)

TETON 144 (1)

MT

MT

SHEET

NUMBER

TCR H-02 H-06 J-01 J-03 J-04 J-05 J-06 J-07 J-08 J-09 J-11 Bid Schedule

B0020 15101-0000 MOBILIZATION LPSM ALL

B0040 15201-0000 CONSTRUCTION SURVEY AND

STAKING LPSM ALL

B0060 15201-0000 CONSTRUCTION SURVEY AND

STAKING (TCR) LPSM ALL

B0080 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

B0100 15301-0000 CONTRACTOR QUALITY CONTROL

(TCR) LPSM ALL

B0120 15401-0000 CONTRACTOR TESTING LPSM ALL

B0140 15401-0000 CONTRACTOR TESTING (TCR) LPSM ALL

B0160 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

B0180 15501-0000 CONSTRUCTION SCHEDULE (TCR) LPSM ALL

B0200 15705-1400 SOIL EROSION CONTROL, FIBER

ROLL LNFT 230 1,800 120 120 100 210 150 2,730

B0220 15705-1400 SOIL EROSION CONTROL, FIBER

ROLL (TCR) LNFT 150 150

B0240 15801-0000 WATERING FOR DUST CONTROL MGAL 282 343 727 172 972 447 671 877 94 4,585

B0260 15801-0000 WATERING FOR DUST CONTROL

(TCR) MGAL 288 288

B0280 20310-1000 PLUG, EXISTING PIPE EACH 1 1

B0300 20404-0000 UNCLASSIFIED BORROW TON 97 97

B0320 20425-1000 DITCH, EXCAVATION LNFT 300 275 575

B0340 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 (ENERGY DISSIPATOR) CUYD 5 16 11 32

B0360 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 (RIPRAP HEADWALL) CUYD 6 7 13

B0380 25101-0300 PLACED RIPRAP, METHOD A,

CLASS 3 (RIPRAP HEADWALL) CUYD 63 63

B0400 30202-2000 ROADWAY AGGREGATE, METHOD 2

(H ROADS) TON 60 425 485

B0420 30202-2000 ROADWAY AGGREGATE, METHOD 2

(J ROADS) TON 450 100 405 195 295 340 75 1,860

B0440 30202-2000 ROADWAY AGGREGATE, METHOD 2

(TCR) TON 295 295

B0460 30302-5000 AGGREGATE SURFACE Contract Quantity

RECONDITIONING (TCR) LNFT 14,414 14,414

B0480 30302-6000 ROADWAY RECONDITIONING LNFT 17,741 16,843 35,165 7,973 45,144 20,750 31,152 40,709 4,488 219,965 Contract Quantity

B0500 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (H ROADS) TON 2,265 8,344 10,609

-M ar -2

2:

P M

MileStone: Signoff Date Completed: 03/18/19 Report Date: 03/18/19

F:

\h ig hw ay s\

FH

W

A\

_m t-d2

1_ D

A R

\E st im at e\

PS

E S ig no ff \S ec tio n B su m m ar y.

xl sm ]S he et

3)

SUMMARY OF QUANTITIES - Schedule B

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

STATE PROJECT

B.3DAR 2019(1)

TETON 144 (1)

MT

MT

TCR H-02 H-06 J-01 J-03 J-04 J-05 J-06 J-07 J-08 J-09 J-11 Bid Schedule

B0540 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (IN-PLACE

STABILIZATION, H-02 ROAD) TON 2,895 2,895

B0580 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (J ROADS) TON 17,922 4,371 24,751 11,377 17,079 22,319 2,352 100,171

B0620 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (APPROACH

ROADS) TON 106 110 84 469 769

B0660 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (TCR) TON 6,873 6,873

B0700 31110-0000 CALCIUM CHLORIDE TON 149 153 320 82 444 203 321 398 42 2,112

B0720 31110-0000 CALCIUM CHLORIDE (TCR) TON 123 123

B0740 60201-0800 24-INCH PIPE CULVERT LNFT 38 42 80

B0760 60202-0400 24-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 38 38

B0780 60202-1300 78-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 50 50

B0800 60704-0000 CLEANING CULVERT IN PLACE EACH 1 4 4 2 4 2 4 1 22

B0820 60704-0000 CLEANING CULVERT IN PLACE

(TCR) EACH 2 2

B0840 60705-0000 REPAIRING DRAINAGE STRUCTURE EACH 3 1 4 7 4 3 5 27

B0860 61903-0700 CATTLE GUARD, 24 FEET (TCR) EACH 1 1

B0880 61921-1000 REMOVE AND RESET FENCE LNFT 70 70

B0900 62201-0300 DUMP TRUCK, 12 CUBIC YARD

MINIMUM CAPACITY HOUR 52

B0920 62201-0300 DUMP TRUCK, 12 CUBIC YARD

MINIMUM CAPACITY (TCR) HOUR 10

B0940 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT

MINIMUM RATED CAPACITY

BUCKET, 24-INCH WIDTH HOUR 52

B0960 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT

MINIMUM RATED CAPACITY

BUCKET, 24-INCH WIDTH (TCR) HOUR 10

B0980 62201-2050 ROLLER HOUR 26

-M ar -2

2:

P M

MileStone: Signoff Date Completed: 03/18/19 Report Date: 03/18/19

F:

\h ig hw ay s\

FH

W

A\

_m t-d2

1_ D

A R

\E st im at e\

PS

E S ig no ff \S ec tio n B su m m ar y.

xl sm ]S he et

4)

SUMMARY OF QUANTITIES - Schedule B

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

STATE PROJECT

B.4DAR 2019(1)

TETON 144 (1)

MT

MT

TCR H-02 H-06 J-01 J-03 J-04 J-05 J-06 J-07 J-08 J-09 J-11 Bid Schedule

B1000 62201-2050 ROLLER (TCR) HOUR 10

B1020 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM

BLADE HOUR 57

B1040 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM

BLADE (TCR) HOUR 10

B1060 62301-0000 GENERAL LABOR HOUR 49

B1080 62301-0000 GENERAL LABOR (TCR) HOUR 10

B1100 62405-0300 PLACING CONSERVED TOPSOIL,

4-INCH DEPTH SQYD 135 915 180 315 180 775 285 2,785

B1120 62502-0000 TURF ESTABLISHMENT (DRY

METHOD) SQYD 135 915 180 315 180 775 285 2,785

B1140 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL

B1160 63501-0000 TEMPORARY TRAFFIC CONTROL

(TCR) LPSM ALL

B1180 63509-1000 TEMPORARY TRAFFIC CONTROL,

FLAGGER FXHR 200 320 420 100 620 280 380 540 60 2,920

B1200 63509-1000 TEMPORARY TRAFFIC CONTROL,

FLAGGER (TCR) FXHR 160 160

-M ar -2

2:

P M

MileStone: Signoff Date Completed: 03/18/19 Report Date: 03/18/19

F:

\h ig hw ay s\

FH

W

A\

_m t-d2

1_ D

A R

\E st im at e\

PS

E S ig no ff \S ec tio n B su m m ar y.

xl sm ]S he et

5)

SUMMARY OF QUANTITIES - Schedule B

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

STATE PROJECT

B.5DAR 2019(1)

TETON 144 (1)

MT

MT

SHEET

NUMBER

TCR H-02 H-06 J-01 J-03 J-04 J-05 J-06 J-07 J-08 J-09 J-11 Bid Schedule

C0020 15101-0000 MOBILIZATION LPSM ALL

C0040 15201-0000 CONSTRUCTION SURVEY AND

STAKING LPSM ALL

C0060 15201-0000 CONSTRUCTION SURVEY AND

STAKING (TCR) LPSM ALL

C0080 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

C0100 15301-0000 CONTRACTOR QUALITY CONTROL

(TCR) LPSM ALL

C0120 15401-0000 CONTRACTOR TESTING LPSM ALL

C0140 15401-0000 CONTRACTOR TESTING (TCR) LPSM ALL

C0160 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

C0180 15501-0000 CONSTRUCTION SCHEDULE (TCR) LPSM ALL

C0200 15705-1400 SOIL EROSION CONTROL, FIBER

ROLL LNFT 230 1,800 120 120 100 210 150 30 30 2,790

C0220 15705-1400 SOIL EROSION CONTROL, FIBER

ROLL (TCR) LNFT 150 150

C0240 15801-0000 WATERING FOR DUST CONTROL MGAL 282 343 727 172 972 447 671 877 876 283 94 5,744

C0260 15801-0000 WATERING FOR DUST CONTROL

(TCR) MGAL 288 288

C0280 20310-1000 PLUG, EXISTING PIPE EACH 1 1

C0300 20404-0000 UNCLASSIFIED BORROW TON 97 97

C0320 20425-1000 DITCH, EXCAVATION LNFT 300 275 575

C0340 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 (ENERGY DISSIPATOR) CUYD 5 16 11 32

C0360 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 (RIPRAP HEADWALL) CUYD 6 7 13

C0380 25101-0300 PLACED RIPRAP, METHOD A,

CLASS 3 (RIPRAP HEADWALL) CUYD 63 63

C0400 30202-2000 ROADWAY AGGREGATE, METHOD 2

(H ROADS) TON 60 425 485

C0420 30202-2000 ROADWAY AGGREGATE, METHOD 2

(J ROADS) TON 450 100 405 195 295 340 505 240 75 2,605

C0440 30202-2000 ROADWAY AGGREGATE, METHOD 2

(TCR) TON 295 295

C0460 30302-5000 AGGREGATE SURFACE Contract Quantity

RECONDITIONING (TCR) LNFT 14,414 14,414

C0480 30302-6000 ROADWAY RECONDITIONING LNFT 17,741 16,843 35,165 7,973 45,144 20,750 31,152 40,709 42,662 14,467 4,488 277,094 Contract Quantity

C0500 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (H ROADS) TON 2,265 8,344 10,609

-M ar -2

2:

P M

MileStone: Signoff Date Completed: 03/18/19 Report Date: 03/18/19

F:

\h ig hw ay s\

FH

W

A\

_m t-d2

1_ D

A R

\E st im at e\

PS

E S ig no ff \S ec tio n B su m m ar y.

xl sm ]S he et

6)

SUMMARY OF QUANTITIES - Schedule C

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

STATE PROJECT

B.6DAR 2019(1)

TETON 144 (1)

MT

MT

TCR H-02 H-06 J-01 J-03 J-04 J-05 J-06 J-07 J-08 J-09 J-11 Bid Schedule

C0540 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (IN-PLACE

STABILIZATION, H-02 ROAD) TON 2,895 2,895

C0580 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (J ROADS) TON 17,922 4,371 24,751 11,377 17,079 22,319 21,438 6,618 2,352 128,227

C0620 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (APPROACH

ROADS) TON 106 110 84 469 769

C0660 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (TCR) TON 6,873 6,873

C0700 31110-0000 CALCIUM CHLORIDE TON 149 153 320 82 444 203 321 398 382 118 42 2,612

C0720 31110-0000 CALCIUM CHLORIDE (TCR) TON 123 123

C0740 60201-0800 24-INCH PIPE CULVERT LNFT 38 42 80

C0760 60202-0400 24-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 38 38

C0780 60202-1300 78-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 50 50

C0800 60704-0000 CLEANING CULVERT IN PLACE EACH 1 4 4 2 4 2 4 1 1 23

C0820 60704-0000 CLEANING CULVERT IN PLACE

(TCR) EACH 2 2

C0840 60705-0000 REPAIRING DRAINAGE STRUCTURE EACH 3 1 4 7 4 3 5 6 33

C0860 61903-0700 CATTLE GUARD, 24 FEET (TCR) EACH 1 1

C0880 61921-1000 REMOVE AND RESET FENCE LNFT 70 70

C0900 62201-0300 DUMP TRUCK, 12 CUBIC YARD

MINIMUM CAPACITY HOUR 54

C0920 62201-0300 DUMP TRUCK, 12 CUBIC YARD

MINIMUM CAPACITY (TCR) HOUR 10

C0940 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT

MINIMUM RATED CAPACITY

BUCKET, 24-INCH WIDTH HOUR 54

C0960 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT

MINIMUM RATED CAPACITY

BUCKET, 24-INCH WIDTH (TCR) HOUR 10

C0980 62201-2050 ROLLER HOUR 26

-M ar -2

2:

P M

MileStone: Signoff Date Completed: 03/18/19 Report Date: 03/18/19

F:

\h ig hw ay s\

FH

W

A\

_m t-d2

1_ D

A R

\E st im at e\

PS

E S ig no ff \S ec tio n B su m m ar y.

xl sm ]S he et

7)

SUMMARY OF QUANTITIES - Schedule C

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

STATE PROJECT

B.7DAR 2019(1)

TETON 144 (1)

MT

MT

TCR H-02 H-06 J-01 J-03 J-04 J-05 J-06 J-07 J-08 J-09 J-11 Bid Schedule

C1000 62201-2050 ROLLER (TCR) HOUR 10

C1020 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM

BLADE HOUR 57

C1040 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM

BLADE (TCR) HOUR 10

C1060 62301-0000 GENERAL LABOR HOUR 51

C1080 62301-0000 GENERAL LABOR (TCR) HOUR 10

C1100 62405-0300 PLACING CONSERVED TOPSOIL,

4-INCH DEPTH SQYD 135 915 180 315 180 775 285 270 3,055

C1120 62502-0000 TURF ESTABLISHMENT (DRY

METHOD) SQYD 135 915 180 315 180 775 285 270 3,055

C1140 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL

C1160 63501-0000 TEMPORARY TRAFFIC CONTROL

(TCR) LPSM ALL

C1180 63509-1000 TEMPORARY TRAFFIC CONTROL,

FLAGGER FXHR 200 320 420 100 620 280 380 540 500 140 60 3,560

C1200 63509-1000 TEMPORARY TRAFFIC CONTROL,

FLAGGER (TCR) FXHR 160 160

-M ar -2

2:

P M

MileStone: Signoff Date Completed: 03/18/19 Report Date: 03/18/19

F:

\h ig hw ay s\

FH

W

A\

_m t-d2

1_ D

A R

\E st im at e\

PS

E S ig no ff \S ec tio n B su m m ar y.

xl sm ]S he et

8)

SUMMARY OF QUANTITIES - Schedule C

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

STATE PROJECT

B.8DAR 2019(1)

TETON 144 (1)

MT

MT

SHEET

NUMBER

mt-d201901cb-US_Int2D-000
mt-d201901lh_J-01-Int_ft2D-000
mt-d201901_DAR2019(1)_PLANS_SIGNOFF-2
B Sheets
DAR2019_Signoff

File details come from the government source that posted it.