1-9-2019Q&A.pdf
PDF 91 KB Posted
- Solicitation number
- 69056718B000025
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No. BONVIL 2016(1) Project Snake River Road and Bear Creek Road
# General Technical Question Answer Date 1 x Is the stockpile of this material, approximately
1,140 tons, to be stockpiled at the contractors gavel source or another location?
An amendment will be issued to address the stockpile location.
1/4/19
2 x
Specification section 305.01 and 304.04 states this work includes pulverizing existing in‐place base and to add crushed aggregate if required.
Are we to assume that there is sufficient existing road base in place to preform a full depth reclamation of 12”?
There is sufficient road base in place for a full depth reclamation of 12”
1/4/19
3 x
On the drawings you show Bonneville County Pit (Irwin, ID) and Bureau of Reclamation Pit. What is the intent of showing the pits? Are the pits to be used as a material source?
The pits are referenced in the Notice to Bidders, Page A‐2a. There are no Government-provided sources for this project.
1/7/19
4 x
Do we stockpile the 1,140 Tons of aggregate at the pits and if so which pit do you want the stockpile at?
An amendment will be issued to address the stockpile location.
1/7/19
5 x Are my subcontractors required to be Small Business or can I use whoever I want?
Subcontractors are not required to be small businesses; however, see FAR clause 52.219‐ 14, Limitations on Subcontracting. 1/9/19
Check General or Technical
File details come from the government source that posted it.