Project No. BONVIL 2016(1) Project Snake River Road and Bear Creek Road
# General Technical Question Answer Date 1 x Is the stockpile of this material, approximately
1,140 tons, to be stockpiled at the contractors gavel source or another location?
An amendment will be issued to address the stockpile location.
1/4/19
2 x
Specification section 305.01 and 304.04 states this work includes pulverizing existing in‐place base and to add crushed aggregate if required.
Are we to assume that there is sufficient existing road base in place to preform a full depth reclamation of 12”?
There is sufficient road base in place for a full depth reclamation of 12”
1/4/19