KEFJ1005_Plan_Set.pdf
PDF 26 MB Posted
- Solicitation number
- 69056718B000017
About this file
Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum.pdf | ||
| A003.pdf | ||
| A002.pdf | ||
| Q&A_06-13-18.pdf | ||
| Amendment_A001.pdf | ||
| Plan_Request_Form.pdf | ||
| IFB_Exit_Glacier_Rd.pdf | ||
| PROJECT_DESCRIPTION_Exit_Glacier.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CP GPS
JH
BH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS4
P
M
M a r c h
U
S C c m y fi le s p w p r o d u c ti o n d k e fj a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 NPS KEFJ 10(5) AK
DI
T
NO SCALE
- no symbol -wall face
N
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
NPS Drwg. No. 186/80043
NPS PMIS No. 204568A
SCALE IN MILES
VICINITY MAP
N
A.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D m y fi le s p w p r o d u c ti o n d k e fj a c .d g n
AK NPS KEFJ 10(5)
A p r il
C h e c k e d b y B
V I N
C E
N T
D e s ig n e d b y L
T O
W N
S E
N D
0.5 1.0 1.5 2.00.00.5
N A T I O N A L F O R E S T
C H U G A C H
SEWARD
noi tc err us e R re vi
R
CREEK
BEAR
PROJECT LOCATION
10+26.00 to 13+85.00
BRIDGE REHABILITATION
EXIT GLACIER ROAD
Exit Glacier Road
7 m iles
To Seward 3 miles
To Seward Highway
Hwy 9 (Seward Highway)
N A T I O N A L PARK
K E N A I F J O R D S
Sheet and Description
Section C Section D Section E Section E Section G Section H Section I Section F Section K Section G Section H Section I
Typical Section
Plan & Profile
Approach Roads
Erosion Control
Fences and Gates Drainage Walls &
Rockeries Safety
Features Miscellaneous Temporary
Traffic Control
Permanent Traffic Control
Bridge ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0060 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 93 60 153
A0080 20302-1200 REMOVAL OF GUARDRAIL LNFT 119 119
A0100 57501-0000 MINOR BRIDGE WORK (Thin Epoxy
Overlay) LPSM ALL ALL
A0120 61701-1200 GUARDRAIL SYSTEM G4, TYPE 2,
CLASS A STEEL POSTS LNFT 38 38
A0140 61702-0600 TERMINAL SECTION, TYPE FLARED EACH 2 2
A0160 61704-4000 REPLACEMENT BLOCKOUT, (STEEL) EACH 4 4
A0180 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID, YELLOW LNFT 996 50 1,046
A0200 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID, WHITE LNFT 996 50 1,046
A0220 63502-0700 TEMPORARY TRAFFIC CONTROL,
CONE EACH 160 160
A0240 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 63 63
A0260 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 200 200
2- M ay -2
2:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
K
EF
J1
5-
EE
.x ls x] Sh ee t
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.1NPS KEFJ 10(5)AK
SHEET
NUMBER
NPS Drwg No. 186/80043
GPSGPS
11663
GPSGPS
11664
PLAN & QUANTITIES
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d k e fj fa .d g n
AK NPS KEFJ 10(5)
p r il
B
V in c e n t
L
T o w n s e d
C h e c k e d b y
D e s ig n e d b y
N
BEGIN PROJECT
10+26.00
AK NPS KEFJ 10(5)
13+85.00
AK NPS KEFJ 10(5)
END PROJECT
R E S
U R
R E
C T I O
N R I V
E R
See Sheet I.1
Epoxy Overlay
Apply Thin
13+84.00
11+06.00 to
10+85.75 to 10+98.25
Type 2, Class A Steel Posts
Install Guardrail System, G4, 10+48.25 to 10+85.75
Install Terminal Section, Flared
10+42.00 to 10+98.25
Removal of Guardrail
10+88.50 to 11+03.00
Install Replacement Blockout, Steel (4)
10+63.50 to 10+88.50
Type 2, Class A Steel Posts
Install Guardrail System, G4, Removal of Guardrail and
10+26.00 to 10+63.50
Install Terminal Section, Flared
Removal of Guardrail and
300 300
60D SPIKE
B R
E A
K A
W A
Y B
A S
E O
N L Y
M S
G B
R D
M S
G B
R D
T R A
IL
M P
H N
O H
U N
T I N
G
CHUG
ACH
N
FTRRESRVR
S T O P
D O N
O T E
N T E R
PLAN & QUANTITIES
CONTROL
EROSION AND SEDIMENT
E.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d k e fj e a .d g n
AK NPS KEFJ 10(5)
p r il
C h e c k e d b y B
V I N
C E
N T
D e s ig n e d b y L
T O
W N
S E
N D
N
Fiber Roll
LEGEND
10+17.00 to 11+09.00
Install Soil Erosion Control, Fiber Roll
R E S
U R
R E
C T I O
N R I V
E R
NO SCALE
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FIBER ROLL
(FT)
(FT)
W157-21
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS KEFJ 10(5) AK
U S
C c m y fi le s p w p r o d u c ti o n d k e fj e b .d g n
M a r c h
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
NOTE:
BLOCKOUT DETAIL
REPLACEMENT
TOP
SIDE
F.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d k e fj fa .d g n
AK NPS KEFJ 10(5)
A p r il
C h e c k e d b y B
V I N
C E
N T
D e s ig n e d b y L
T O
W N
S E
N D
GUARDRAIL DETAIL
STEEL BLOCKOUT
DETAIL
W8X15
LC
(4 total each flange)
" Ø holes16
Replace damaged blockouts (4)
Existing ground
Steel Post Block
W8 x15 x 22"
Normal edge of pavement
L Thread Length
617-11
STANDARD APPROVED FOR USE 1/1994
DRAFT: 9/2017
REVISED: 4/1994 6/2005
STEEL POSTS
G4 W-BEAM GUARDRAIL
6'-0"
STATE PROJECT
NUMBER
SHEET
F.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS KEFJ 10(5)AK
U S
C c m y fi le s p w p r o d u c ti o n d k e fj fb .d g n
M a r c h
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
STANDARD POST SECTION
POST SPACING
1:10 or flatter slope fill slope
Variable
TOP
symmetry ofCL
FRONTSIDE
TYPICAL GUARDRAIL CROSS SECTION
BLOCK
POST AND BLOCK DETAIL
ARRANGEMENT
ALTERNATE HOLE
GUARDRAIL BOLT AND RECESS NUT
GUARDRAIL MOUNT
FLEXIBLE GUIDE POST
POST AND BLOCK DETAIL
ARRANGEMENT
STANDARD HOLE
steeper than fill slope
Variable slope but not
A about
Symmetrical
CL
A
RAIL ELEVATION
SECTION A-A
W BEAM RAIL
shown on Typical Section
Aggregate base or as rail as applicable ground line at face of
Edge of pavement or
Lap in direction of traffic
Reflector tab
W beam rail
(See Note 5)
Modified Block
Post length stamp on terminal sections
All posts except those beyond nut by more
Thread not to extend spacing, center to center slots
Splice bolt
Neutral axis
Splice bolt slots
When encountering impenetrable material, see
6.
5.
4.
3.
2.
1.
including its appearance, and accepted manufacturing practices.
those consistent with the proper functioning of the part, Dimensional tolerances not shown or implied are intended to be
Use consistent material throughout the length of guardrail run.
Modified block may be wood, plastic, or composite material.
the manufacturer.
both sides, a lock washer, and nut; or fasten as specified by
Install delineator every fourth post. Fasten delineator to post arrangement is specified.
See Special Contract Requirements when the alternative hole are specified.
S e e N o te
L e n g th
L
(STANDARD HOLE ARRANGEMENT)
STRUCTURAL SHAPE POST
and departure terminal sections
Widening required for approach
Subgrade shoulder.
Hinge line of foreslope
Top edge of reflective sheeting
See Note 4 yellow to left of traffic)
(white to right of traffic, Reflective sheeting to accommodate future overlays
Upper 2 holes for raising guardrail
10°
8 required, each end of rail
Thickness
Sheet recess both sides o r g r o u n d l in e o f p a v e m e n t a b o v e t r a v e le d w a y e d g e
See Special Contract Requirements when 7 foot or longer posts
Standards 617-13 or 617-24.
" splice bolt slot.8 1" x 132
" post bolt slot at 6'-3"2 1" x 24
" GUARDRAIL BOLT8
"4
25"
18"
10"
2"
" minimum8
" minimum4
4" minimum
4" minimum
4" minimum
" RECESS NUT8
" high (typ.)2
"32
"4 t o e d g
W6 x 9
" x 10" guardrail post bolt8
" dia. (typ.)4
" x 10" guardrail bolt8
" bolts with a washer on8 3using two galvanized 2" x
"4 14 "4
142"
" deep16 11" dia. x
(t yp
6" ty p ty p
S e e N o te ty p
" dia4
" dia.4 m in
" x 10" guardrail8
" guardrail splice4 1" x 18
"4 11 "16
Post spacing 6'-3"
(typ.)
8"
Traffic bolts and nuts (8 per splice) bolt and recess nut groundline at face of rail
Edge of pavement or
"16 1"16 ty p
"16
"32
"16
"8
SIDE
TOP
POST FACE
NOTE:
"32
"16
"32
6"
"4
"4
"4
" plain round washer4
" recess nut.8
"2 1than
" R16
6"
" R16
See Note 2
2'-0" (typ.)
8" m a x s lo p e
TEST LEVEL
L W m a x s lo p e
NO SCALE
TEST LEVEL
L W
617-19
STANDARD APPROVED FOR USE 6/2005
DRAFT: 3/2016
REVISED:
(ft)(ft)
3 (> 45 mph)
(ft)
37.5
(ft)
3.0 or 4.0
TYPE FLARED TERMINAL
G4 W-BEAM GUARDRAIL
STATE PROJECT
NUMBER
SHEET
F.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS KEFJ 10(5) AK
U S
C c m y fi le s p w p r o d u c ti o n d k e fj fc .d g n
M a r c h
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
7.
6.
5.
4.
3.
2.
1.
STRAIGHT FLARED OPTION
PARABOLIC FLARED OPTION
ELEVATION
PLAN
ELEVATION
PLAN
See Note 6
Hinge line of foreslope last two post blocks in the standard post section
Tangent line projected from the face of the shoulder widening
Edge of
W W at face of rail as applicable
Finished surface elevation at face of rail as applicable
Finished surface elevation
See Note 6
Length of Need shoulder widening
Edge of
Length of Need
Hinge line of foreslope post section
Standard post section
Standard
Pay limits terminal section type flared (FLEAT)
Guardrail system G4
Pay limits
Pay limits terminal section type flared (SRT-350)
Guardrail system G4
Pay limits fl a tt e r
V
H o r fl a tt e r
V
H o r last two post blocks in the standard post section
Tangent line projected from the face of the manufacturer's recommendations.
Install a reflectorized object marker according to the rail end section may be used.
A flat attenuator terminal head is shown. A rounded W-beam to the terminal.
Construction of widening for terminal installation is incidental
See manufacturer's drawings for other details.
indicated on the plans.
Pave widened shoulder on both ends of guardrail runs when rail is at the edge of the shoulder.
inside of a curve), install the posts so that the face of the result in the rail encroaching onto the shoulder (e.g., the
When placing terminal on a curve and post offsets would meets appropriate test level for the project.
manufacturer's recommendations. Ensure that terminal that meets NCHRP-350 or MASH requirements per details vary. Install a flared G4 W-beam guardrail terminal
Use details shown as a general guide since manufacturer's
2.5-4.0
1.67-2.67
37.5
25.0
3 (> 45 mph)
2 (≤ 45 mph) using 6' posts using 6' posts
NOTE:
20'
3'
3'
20'
QUANTITIES
TEMPORARY TRAFFIC CONTROL
TABULATION OF
G.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d k e fj n a .d g n
AK NPS KEFJ 10(5)
A p r il
C h e c k e d b y B
V I N
C E
N T
D e s ig n e d b y L
T O
W N
S E
N D
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
LENGTH
BUFFER SPACE
Expressway / Freeway
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
xx
MPH
xxx
FEET
ROAD WORK
END
635-6
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
MPH FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
(WITH FLAGGERS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
SPACING IN FEET
STATE PROJECT
NUMBER
SHEET
G.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS KEFJ 10(5) AK
U S
C c m y fi le s p w p r o d u c ti o n d k e fj n c .d g n
M a r c h
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
Traffic flow
Traffic flow
See Note 4
W20-1 W20-7W20-4
See Note 4
G20-2
Spacing Table)
(See Length and
(optional)
WORK SPACE (optional)(optional)
(optional)
W13-1P
(optional)
W16-2P
7.
6.
5.
4.
3.
2.
1.
the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Requirements, Section 156.
For project specific minimum width, refer to the Special Contract
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD name of the contractor on the pilot car.
a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to
NOTE:
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table) TERMINATION AREA
Device spacing
BUFFER SPACE
Channelizing devices
Flagger location
Flagger location
NPS Drwg. No. 186/80043
NPS PMIS No. 204568A
50' - 100' 50' - 100' (optional)
See Note 6
10' min.
LAYOUT & QUANTITIES
PAVEMENT MARKING
PERMANENT
H.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d k e fj p a .d g n
AK NPS KEFJ 10(5)
a y
B
V in c e t
T o w n s e d
C h e c k e d b y
D e s ig n e d b y
N
R E S
U R
R E
C T I O
N R I V
E R type A, solid white
Pavement markings, type A, solid white
Pavement markings, type A, double solid yellow
Pavement markings, End Pavement markings
Begin Pavement markings
W634-2
REVISED: 10/2012
DETAIL APPROVED FOR USE 10/2007
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PAVEMENT MARKINGS
LINEAR
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
H.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS KEFJ 10(5) AK
U S
C c m y fi le s p w p r o d u c ti o n d k e fj p b .d g n
F e b r u a r y required by the maintaining agency.
pavement markings when specified on the plans or when
Typical pavement marking widths are shown. Use wider for curve widening transition locations.
throughout the curve widening area. See staking details the roadway. Maintain a constant shoulder width "s" curve widening "w" to achieve equal lane widths within
Paint centerline pavement markings on curves with curb interface when curb is present.
Place edge line pavement markings at asphalt/concrete
3.
2.
1.
TYPICAL PAVEMENT MARKING APPLICATIONS
CENTERLINE MODIFICATION FOR CURVES WITH WIDENING APPLIED ON INSIDE
CENTERLINE DETAIL
See Note 2 for treatment of curves when widening "w" is split equally on both sides of centerline
CL
CL
L a n e
L a n e s s w
Transition
Curve widening
Transition
S h o u ld e r s
T ra v e l
L
T ra v e l
L
S h o u ld e r s s L s h o u ld e r
L a n e
T r a v e l
L a n e
T r a v l h o u ld e r
L w w w w when specified in plans required by the maintaining agency when specified in the plans or when
Increase spacing between parallel lines markings when specified
Approach road pavement break specified in plans extension when edge line line when specified in plans yellow centerline line extension
Turnout
Edge of pavement allow sufficient sight distance
Major approach road
Minor approach
Centerline as required
Edge line when specified in plans and location of top lift pavement joint
Offset centerline for pavement markings
Design
Edge line when specified in plans
NPS Drwg. No. 186/80043
NPS PMIS No. 204568A
4" solid white edge line
4" dotted white line 4" dotted white
4" solid white edge
4" solid double
Locate 12" wide stop line to 4" broken yellow centerline m a x m in
2' 10'30'10'30'10'
2' to 6'
NOTE:
See Section 575.
Limits of thin epoxy overlay.
PLAN
ELEVATION
(Looking ahead)
Scale: 1" = 15'-0"
Scale: 1" = 15'-0"
TYPICAL SECTION
Epoxy overlay: 5 psf
R e s u r r e c ti o n R iv e r
Scale: 1" = 4'-0"
125'-0"125'-0" Measured Along L RoadwayCL
R a d ia l
S id e w a lk
L Pier
Begin Bridge
L Roadway
Bridge Chord
250'-0"
CL
CL
L PierCL
Begin Bridge
End Bridge
End Bridge
4'-6"
36'-5 "
CLL Roadway
SCOPE OF WORK
4.
3.
2.
1.
A C
T U
A L F I L E X
X K
E F J
P
E .D
G N
N
14'-0"14'-0"
(Lane) (Lane)
(Walkway)
554.07.
with a two-part epoxy material meeting ASTM A755 as per
Repair damaged steel rebar coating along upstream bridge rail provide a summary to the CO.
actual condition, document condition noting damage and
Prior to start of bridge rail work, inspect the bridge rail for
Place epoxy overlay along deck and sidewalk surfaces.
Clean deck of debris prior to placement of epoxy overlay.
Structure Number
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
STATE PROJECT
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
KEFJ 10(5)AK
KENAI FJORDS NATIONAL PARK
EXIT GLACIER BRIDGE
PLAN AND ELEVATION
SKL SKL B. OLTMANN 1AS SHOWN
9845-001P
AF
I.1
1 APRIL 2018
D e fa u lt m y fi le s p w p r o d u c ti o n d H
K J E F P
E .D
G N
A p r il
GENERAL NOTES:
SPECIFICATIONS:
Construction:
DESIGN LOADING:
and Bridges on Federal Highway Projects, FP-14.
Standard Specifications for Construction of Roads
Dead Load: