PROJECT_DESCRIPTION.pdf

PDF 23 KB Posted

Attached to
WA RIDGE MAIN (1), MAIN AVENUE ACCESS IMPROVEMENT Federal contract opportunity
Solicitation number
69056718B000010
Issued by
Department of Transportation Federal Highway Administration

View the file

Other files for this federal contract opportunity

Other files attached to WA RIDGE MAIN (1), MAIN AVENUE ACCESS IMPROVEMENT, newest first.
File Type Posted
BidSum.pdf PDF
Q&A_10-25-18.pdf PDF
Amendment_A005.pdf PDF
Amendment_A004.pdf PDF
Q&A_10-17-18.pdf PDF
WA_RIDGE_MAIN_FINAL_10-12-18.xml XML file
Amendment_A003.pdf PDF
WA_RIDGE_MAIN_FINAL_10-12-18.tin —
Utility_relocation_agreement_NW_Natural.pdf PDF
Q&A_10-12-18.pdf PDF
Amendment_A002.pdf PDF
Amendment_A001.pdf PDF
Q&A_10-4-18.pdf PDF
Q&A_10-1-18.pdf PDF
WA_RIDGE_MAIN(1)_Hydraulic_Report.pdf PDF
WA_RIDGE_MAIN(1)_Plans_3-5-18.pdf.pdf PDF
Geo_Rpt_12-16_WA_RIDGE_MAIN_(1)_Final_Geotech_Report.pdf PDF
WA_RIDGE_MAIN_FINAL.tin —
WA-a2015008_EW.pdf PDF
SWPPP_WA_RIDGE_MAIN(1)_Main_Avenue_Access_Improvements.pdf PDF
IFB.pdf PDF
Mitigation_Site.tin —
WA_RIDGE_MAIN_(1)_Cross_Sections.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA RIDGE MAIN (1), MAIN AVENUE ACCESS IMPROVEMENT, Ridgefield, Clark County, Washington

The work consists of grading, paving, drainage, guardrail, roadside development, utility and arch-culvert and other small items of work.

Project length: .246 Miles

Tentative Fixed Completion Date: Summer, Fall, 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $3 million to $5 million

Location: 0 Miles North of Ridgefield, WA

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

O ne

S ch ed ul e Sc h N am e

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) Silt Fence Fiber roll Check dam Inlet protection

1860 lnft 4650 lnft 19 each 7 each

158 Watering for Dust Control 100 Mgal

DIVISION 200 – Earthwork 201 Clearing & Grubbing 3.8 acres 203 Removal of Structures & Obstructions (structures, demolition) Yes 204 Excavation & Embankment Road excavation Embankment Select Borrow

9,138 cuyd 25,792 cuyd

5,045 ton

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Riprap ditch, filter rock Placed Riprap, Class 2 Placed Riprap, Class 3 Placed Riprap, Class 4

430 lnft 133 cuyd 155 cuyd

1,640 cuyd

S ch ed ul e Sc h N

261 Reinforced Soil Slopes 1,370 sqft DIVISION 300 – Aggregate and Base Courses

302 Minor Crushed Aggregate 2,270 ton

DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 1,220 ton

DIVISION 600 – Incidental Construction 601 Minor Concrete Structures (concrete – minor structures) 602 Culverts & Drains (indicate one or both) 12 inch 18 inch 24 inch 120 inch Large Precast Arch-Culvert (40-ft)

169 lnft 28 lnft 622 lnft 115 lnft 74 lnft

604 Manholes, Inlets, & Catch Basins(culverts & drains) (indicate which) Manholes Catch Basins

609 Curb & Gutter (concrete – minor structures) (indicate which) 1,300 lnft 611 Water Systems 8-inch ductile iron 1,730 lnft 612 Sanitary Sewer Systems 4-inch C900 2,005, lnft 615 Sidewalks, Pads & Paved Medians (concrete – minor structures) Concrete Asphalt

1,060 sqyd 1,305 sqyd

617 Guardrail 1,500 lnft 619 Fences, Gates, Cattle Guards & Bollard Posts Chain link 65 lnft 621 Monuments & Markers (construction survey & staking) (yes/no) Yes 625 Turf Establishment (indicate seeding or mulching separately) 3 acres 626 Plants, Trees, Shrubs, Vines & Groundcovers Plantings, wetland plant Cuttings

1,500 each 1,670 each

629 Rolled Erosion Control Products & Cellular Confinement Systems (turf establishment) 310 sqyd 633 Permanent Traffic Control (traffic control devices) Sign system 8 each 634 Permanent Pavement Markings (traffic pavement markings) 2,600 lnft 635 Temporary Traffic Control – Flagger 800 hr

S ch ed ul e Sc h N

635 Temporary Traffic Control Portable changeable Message sign Construction sign

2 each 240 sqft

636 Traffic Signal, Traffic Counter, Lighting, & Electrical Systems Utility Trench Directional bore

2,600 lnft 810 lnft

647 Environmental Mitigation (use pay item description) Rock weir Root wad Streambed material

5 each 5 each

1,175 cuyd

File details come from the government source that posted it.