Plan_Set_-_OR_WASCO_102(1)_FINAL.pdf
PDF 5 MB Posted
- Solicitation number
- 69056718B000008
About this file
Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum.pdf | ||
| Q&A_5-16-18.pdf | ||
| Q&A_5-15-18.pdf | ||
| Q&A_5-9-18.pdf | ||
| A001.pdf | ||
| Plan_Request_for_Internet.docx | DOCX document | |
| IFB_OR_Wamic_Market.pdf | ||
| PROJECT_DESCRIPTION_OR_Wasco_102(1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet and Description
Section C Section D Section E Section F
Typical Section Guardrail Temporary
Traffic Control Permanent
Traffic Control ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL ALL
A0040 15214-0000 SURVEY AND STAKING, MISCELLANEOUS LPSM ALL ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL ALL
A0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 725 725
A0140 20301-0700 REMOVAL OF DELINEATOR EACH 25 3 28
A0160 20301-2400 REMOVAL OF SIGN EACH 41 4 45
A0180 20301-2400 REMOVAL OF SIGN, (OBJECT MARKER) EACH 13 3 16
A0200 20301-3700 REMOVAL OF TERMINAL SECTION EACH 6 6
A0220 20302-1200 REMOVAL OF GUARDRAIL LNFT 725 5 730
A0240 30205-0500 ROADWAY AGGREGATE, SHOULDER FINISHING MILE 5 1 6
A0260 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 4,984 416 5,400
A0280 41201-0000 TACK COAT TON 19 6 25
A0300 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH SQYD 2,873 227 3,100
A0320 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2, FULL DEPTH SQYD 306 19 325
A0340 61701-1400 GUARDRAIL SYSTEM G4, TYPE 2, CLASS B WOOD POSTS (WAMIC MARKET ROAD) LNFT 150 25 175
A0360 61701-1450 GUARDRAIL SYSTEM G4, TYPE 2, CLASS B STEEL OR WOOD POSTS (RAMSEY CREEK) LNFT 350 25 375
A0380 61702-0800 TERMINAL SECTION TYPE TANGENT EACH 6 6
A0400 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 24 24
A0420 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH HOUR 24 24
A0440 63302-0000 SIGN SYSTEM SQFT 161 5 166
A0460 63308-1000 OBJECT MARKER, TYPE 1, (YELLOW) EACH 13 2 15
A0480 63309-0100 DELINEATOR, TYPE 1, (WHITE) EACH 25 5 30
A0500 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH EACH 100 5 105
A0520 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 139 18 157
A0540 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 160 15 175
A0560 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 420 30 450
3- A pr
-2
:3
A M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
O
R -a
1b a (E st im at e-xl sx
]S he et
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B.1WASCO 102(1)OR
SHEET
NUMBER
NO SCALE
APPROACH ROAD
DETAIL
45°25'56" N, 121°14'08" W
APPROACH ROAD DETAIL (PAVED)
C.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft
D c m y fi le s p w p r o d u c ti o n d O
R a c c .d g n
OR WASCO 102(1)
P
M
M a r c h
C h e c k e d b y
D e s ig n e d b y
C L o f a p p r o a c h
End pavement
E d g e o f s h o u ld e r
E n d p a v e m e n t
Variable 60° to 90°
Aggregate base
Asphalt concrete pavement
Edge of shoulder
Edge of traveled way
Edge of shoulder
C L
Normal shoulder o f a p p r o a c h
E d g e o f s h o u ld e r
E n d p a v e m e n t
Edge of shoulder
Edge of traveled way
Edge of shoulder Match existing
Match existing
Existing pavement
10'
Asphalt concrete pavement, type 1, 2-inch depth
Paving transition
4'
2% to 4%
Match existing
Match existing
APRON DETAIL (PLAN)
UNPAVED APPROACH ROAD
APRON DETAIL (PROFILE)
UNPAVED APPROACH ROAD
Match Existing (16' R minimum)
(16' R minimum)
Match Existing
(16' R Minimum)
Match Existing
(16' R minimum)
Match Existing and approval of the CO.
Fiber roll placement locations are subject to field conditions and approval of the CO.
are approximate. Exact locations are subject to field conditions
See Vicinity Map, sheet A.3, for general locations. All locations asphalt concrete pavement.
Apply tack coat on all existing asphalt before placing of the CO.
For final approach road apron locations are subject to approval compatible with adjacent roadway construction.
Construct side slope ratio and degree of finish of approaches adjacent roadbed, but limit the depth to 1½" maximum.
wearing surface of the same treatment as shown for the
Finish other approaches with untreated base. Provide a
6.
5.
4.
3.
2.
1.
Saw cut
NOTE:
| Plan Set - OR WASCO 102(1)_FINAL |
| OR-a6501021cc-Int_ft2D-000 |
| Plan Set - OR WASCO 102(1)_FINAL |
File details come from the government source that posted it.