6905 Z1 Evaluation Criteria.docx

DOCX document 27 KB Posted

Attached to
KUON TV Tower Cross Member Replacement and Remediation
Solicitation number
6905 Z1
Issued by
Saline County, Nebraska

About this file

This document is a Request for Proposal (RFP) issued by the State of Nebraska, Department of Administrative Services (DAS), Materiel Division, State Purchasing Bureau (SPB), for the purpose of selecting a qualified Contractor to provide KUON TV Tower Cross Member Replacement and Remediation at a Competitive and Reasonable Cost. The RFP outlines the mandatory requirements that proposals must meet, as well as the evaluation criteria that will be used to assess the responses. The evaluation criteria include Corporate Overview, Technical Approach, and Cost Proposal, with a total of 100 possible points. The Cost Proposal points will be calculated based on a formula that awards the maximum points to the lowest cost submitted.

The RFP provides details on the specific project, which involves the replacement and remediation of the KUON TV Tower Cross Members. The contract resulting from this RFP may not be an exclusive contract, as the State reserves the right to contract for the same or similar services from other sources in the future.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EVALUATION CRITERIA

RFP NUMBER 6905 Z1

KUON TV Tower Cross Member Replacement and Remediation Opening Date: July 11, 2024

Mandatory Requirements The proposals will first be examined to determine if all mandatory requirements listed below have been addressed to warrant further evaluation. Proposals not meeting mandatory requirements will be excluded from further evaluation. The mandatory requirement items are as follows:

Request for Proposal For Contractual Services form, signed in ink, Corporate Overview, Technical Approach; and Cost Proposal.

Evaluation Criteria All responses to this Request for Proposal, which fulfill all mandatory requirements, will be evaluated. Each category will have a maximum possible point potential. Areas that will be addressed and scored during the evaluation include:

Evaluation Criteria
Possible Points
Part 1 Corporate Overview
15

Part 2 Technical Approach (Project & Business Requirements)

Part 3 Cost Proposal Points
45
Total Points without Oral Interviews
100

Part 4 – Cost Proposal Points Cost points should be calculated as follows:

0. Establish lowest cost submitted – lowest cost submitted receives the maximum points.

0. To assign points to all others, the following formula should be followed:

Lowest Cost Submitted Cost Submitted x Maximum Possible Cost Points = Cost Points to Award (see samples below)

Formula

Sample

Sample

Sample

Lowest Cost Submitted

$100,000

$100,000

$100,000

Cost Submitted

$100,000

$200,000

$150,000 x Maximum Possible Cost Points

= Points To Award

26.7