This document is a Request for Proposal (RFP) issued by the State of Nebraska, Department of Administrative Services (DAS), Materiel Division, State Purchasing Bureau (SPB), for the purpose of selecting a qualified Contractor to provide KUON TV Tower Cross Member Replacement and Remediation. The scope of work includes installing parts provided by the tower manufacturer within a specified timeframe and with minimal downtime or reduced power operation of the KUON TV transmitter. The contractor is expected to provide a project schedule, communicate with the client, document the work completed, and coordinate with the tower manufacturer as needed. Proposals are due by July 22, 2024.

The cost proposal indicates that the initial contract period is for one year, with an optional renewal year. Pricing is requested for the initial contract period and optional renewal year. The contractor is required to provide pricing that is net, including transportation and delivery charges, F.O.B. destination. No additional charges will be allowed for packing, packages, or partial delivery costs. The State reserves the right to contract for the same or similar services from other sources.

View the file

Other files

File Type Posted
6905 Z1 Revised Evaluation Criteria.docx DOCX document
118643 O5 RFP.doc DOC document
6905 Z1 Addendum Four Revised Schedule of Events.pdf PDF
6905 Z1 Addendum Two Q&A.pdf PDF
6905 Z1 Addendum One Revised Schedule of Events.pdf PDF
6905 Z1 Exhibit A Inspection Report.pdf PDF
6905 Z1 Revised Cost Proposal.xlsx XLSX spreadsheet
118643 O5 RFP.pdf PDF
6905 Precision Response.pdf PDF
6905 Z1 Attachment A - Technical Requirements.docx DOCX document
6905 Z1 RFP Respondents List.pdf PDF
6905 Z1 Addendum Three Revised RFP Webinar Link.pdf PDF
6905 Z1 Final Evaluation Document.pdf PDF
6905 Z1 RFP Intent to Award.pdf PDF
6905 National Tower Response.pdf PDF
118643 O5 RFP.pdf PDF
6905 Z1 Cost Proposal.xlsx XLSX spreadsheet
6905 Z1 Attachment A - Technical Requirements.docx DOCX document
6905 Z1 Evaluation Criteria.docx DOCX document
6905 Z1 Exhibit A Inspection Report.pdf PDF
118643 O5 RFP.doc DOC document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALLSTATE

TOWER

PITTSBURG ~~LJ~

TANK & TOWER ~:~i "'~~ GROUP Since 1919

Company Information, Qualifications and Experience

About AST

232 Heilman Avenue PO Box 25

Henderson, KY 42419 P: (270) 830-8512 F: (270) 228-4551 www.pttg.com

AST is a full service tower-contracting firm formed in 2003. AST manufactures solid rod, self supporting, guyed towers and monopoles for the Broadcast, Cable, Utility and Telecommunications Industries. AST's most recent addition includes Catwalks, Equipment Supports and Support Towers for a variety of industries supporting conveyors and various equipment for Agricultural and other material handling applications.

AST's engineering staff utilizes ETA/TIA, TBC, AWS and AISC Standards in conjunction with Weisman and RISA programs for tower design and finite element analysis to ensure structural integrity. AST's drafting department is slate of the art utilizing AutoCAD 2009 and where applicable 3D modeling sun.ware.

AST installs towers and foundations of all sizes throughout the United States. AST' s crews are fully trained and equipped for a trouble free installation. Matter of fact, AST has been recognized by ENR magazine as a top 20 contractor for steel erection in lhe United States with the total project values exceeding 15 million.

Commitment to Safety

AST Management takes very seriously its responsibility for the safety and health of each employee and creating a safe working environment in our offke, fabrication facility and for the crews in the field. AST's Safety Dept. and instructors continue to gain knowledge in order to effectively train all of our employees on how to safely perform their duties in the high exposure environment they work in each day.

Safety: AST prides itself in providing a safe working environment for our employees.

Drug Free Workplace: AST is a drug free facility and all AST employees are subject to random drug screenings.

Full Service Tower Company• Licensed Engeering Firm• Design-Build Steel Manufacturing Maintenance • Inspection • Modification • Tower Steel • Structural Steel • Material Handling Solutions

PTTG~ .~-,FP·-

li.- •• 1910

ALLSTATE TOWER

Training and Certifications: AS T's safety training exceeds the requirement of State and Federal regulatory agencies and industry standards. All new employees are required to complete safety training prior to being assigned to their new positions. All existing employees are retrained annually. AST field and shop employees receive the following training and certifications.

I. OSHA 10 hour

2. Confined space entry.

3. Pall protection.

4. HAZCOM

5. Personal Protective Equipment Requirements

6. General Health and Safety Rules

7. Safe Working Procedures

8. Welding Safety

9. Respiratory Protection

10. Radio Frequency awareness safety.

11. Comtrain Tower Rescue Certification.

12. Rigger Qualification; hand signaling and rigging.

13. National Commission for the Certification of Crane Operators. NCCCO

14. E-Railsafe system training (Roadway Worker Training).

15. CSX training (Roadway Worker Protection)

16. American Red Cross Certifications.

• Cardio Pulmonary Resuscitation (CPR)

• First Aid (FA)

• Blood Borne Pathogens (BBP)

ISNetworld Certified: lSNetworld is the global resource for connecting corporations with safe, reliable contractors/suppliers from capital-intensive industries. !SN collects self-reported conformance information from contractors/suppliers, verilies its accuracy, and then reports the results in an easy-to-follow format. This allows corporations to select those resources that best meet internal and governmental requirements, while providing contractors/suppliers the opportunity to centralize their conformance information, saving time and gaining presence in the marketplace.

NATE Member: AST is a member of the National Association of Tower Erectors.

PTTG~ ~¼-,JP""F

,-... ,- l!Jlfj

ALLSTATE TOWER

Milestones:

11-03-03 - AST founded 02-01-08 - AST purchases National Tank and Tower 03-0 l-10 - Purchased 250,000 Sq/Ft facility to upgrade manufacturing capability 06-0 t- t 0 - AST implements formal Quality Control program for field and shop 12-31-10 - Sales exceed $10,000,000.00 02-02-11 - AST implements Business Management System for continuous seJt:.improvement 12-31-11 - AST ranked in ENR top 600 specialty contractors - 2010 12-31-12 - Sales exceed $15,000,000.00 12-31-12 - AST ranked in ENR top 600 specialty contractors - 2011 12-31-13 - Sales exceed $20,000,000.00 10-10-13 - AST ranked in ENR top 600 specialty contractors - 2012 I 0-01-14 - AST ranked in ENR top 600 specialty contractors - 2013 I 0-01-15 - AST ranked in ENR top 600 specialty contractors - 2014 12-31-15 - Sales Exceed $25,000,000.00 I 0-01-16 - AST ranked in ENR top 600 specialty contractors - 2015 I 0-01-17 - AST ranked in ENR top 600 specialty contractors - 2016 09-30-17 -AST fabrication facility becomes AISC certified 10-01-18 - AST ranked in ENR top 600 specialty contractors - 2017

Bonding: AST has a bonding capacity of $10,000,000.00

6905 21

ATTACHMENT A- TECHNICAL REQUIREMENTS

KUON TV Tower Cross Member Replacement and Remediation

Bidder Name: ALLSTATE TOWER, INC.

Bidder should fully respond to each question in enough detail to allow for comprehensive evaluation of the response. Responses will be considered in evaluating Technical Approach.

Technical Requirements

Describe the bidder's timeframe for completion of items listed in the RFP scope of work and deliverables.

1. Response: Allstate Tower, Inc. would be able to be on site within 45 days of notice to proceed, work is anticipated to be completed within 30 days from start date.

Describe overall approach and steps that the bidder will take to minimize downtime or reduced power operation of the KUON TV transmitter within specified remediation timeframe.

2.

Response: We have a dedicated Project Manager that will work with the Station Engineer on ideal times to reduce transmitter power (if required). Crew will be directed to perform work within those time frames.

Describe the bidder's preferred method for communicating with the client.

3. Response: Preferred method is e-mail and then follow up with a phone call to verify the e-mail was read and understood.

Describe the bidder's process for developing a project schedule and staying on task.

4. Response: The Project Manager will work with our contact to develop the ideal schedule then work to complete within that timeframe

Describe the bidder's process for documenting work completed and document format for presentation to the client at conclusion of the project.

5. Response: The Project Manager will provide close out documentation with pictures and description of work performed.

This project requires installing parts provided by the tower manufacturer. Describe the bidder's process of communicating with the tower manufacturer for technical information as needed to meet specified timeframe for project completion.

6. Response: The Project Manager will work with the tower manufacturer to schedule material delivery to fit within scheduled time frame. Once material is received PM will confirm installation drawings are provided and complete, if any question arise PM will contact manufacturer for clarification.

II. TERMS AND CONDITIONS

Bidders should complete Sections II thru V as part of their proposal. Bidder is expected to read the Terms and Conditions and should initial either accept, reject, or reject and provide alternative language for each clause. The bidder should also provide an explanation of why the bidder rejected the clause or rejected the clause and provided alternate language. By signing the Request for Proposal, bidder is agreeing to be legally bound by all the accepted terms and conditions, and any proposed alternative terms and conditions submitted with the proposal. The State reserves the right to negotiate rejected or proposed alternative language. If the State and bidder fail to agree on the final Terms and Conditions, the State reserves the right to reject the proposal. The State of Nebraska is soliciting proposals in response to this Request for Proposal. The State of Nebraska reseNes the right to reject proposals that attempt to substitute the bidder's commercial contracts and/or documents for this Request for Proposal.

The bidders should submit with their proposal any license, user agreement. service level agreement, or similar documents that the bidder wants incorporated in the Contract. The State will not consider incorporation of any document not submitted with the bidder's proposal as the document will not have been included in the evaluation process. These documents shall be subject to negotiation and will be incorporated as addendums if agreed to by the Parties.

If a conflict or ambiguity arises after the Addendum to Contract Award have been negotiated and agreed to, the Addendum to Contract Award shall be interpreted as follows:

1. If only one Party has a particular clause then that clause shall control,

2. If both Parties have a similar clause, but the clauses do not conflict, the clauses shall be read together,

3. If both Parties have a similar clause, but the clauses conflict, the State's clause shall control.

A. GENERAL

Accept (Initial)

Reject & Provide Reject Alternative within

NOTESICOMMENTS: (Initial) RFP Response llnitial)

1. The contract resulting from this Request for Proposal shall incorporate the following documents:

a. Request for Proposal, including any attachments and addenda,

b. Amendments to the Request for Proposal,

c. Questions and Answers,

d. Bidder's properly submitted proposal. including any terms and conditions or agreements submitted by the bidder; and

e. Amendments and Addendums to the Contract.

These documents constitute the entirety of the contract.

Unless otherwise specifically stated in a future contract amendment, in case of any conflict between the incorporated documents, the documents shall govern in the following order of preference with number one (1) receiving preference over all other documents and with each lower numbered document having preference over any higher numbered document: 1) Amendment or Addendum to the executed Contract with the most recent dated amendment or addendum having the highest priority, 2) Amendments to the Request for Proposal, 3) Questions and Answers, 4) the original Request for Proposal document and any Addenda or attachments, and 4) the Contractor's submitted Proposal, including any terms and conditions or agreements submitted by the that are accepted by the State.

For the avoidance of doubt, unless otherwise explicitly and specifically agreed to in writing by the State, the State's standard terms and conditions, as executed by the State and, shall always control over any terms and conditions or agreements submitted or included by the Contractor.

Any ambiguity or conflict in the contract discovered after its execution, not otherwise addressed herein, shall be resolved in accordance with the rules of contract interpretation as established in the State of Nebraska.

RFP Boilerplate I 03292023

B. NOTIFICATION

Accept (Initial)

Sit

Reject & Provide Reject Alternative within NOTES/COMMENTS: (Initial) RFP Response

Clniliall

Bidder and State shall identify the contract manager who shall serve as the point of contact for the executed contract.

Communications regarding the executed contract shall be in writing and shall be deemed to have been given if delivered personally; electronically, return receipt requested; or mailed, return receipt requested. All notices, requests, or communications shall be deemed effective upon receipt.

Either party may change its address for notification purposes by giving notice of the change and setting forth the new address and an effective dale.

C. BUYER'S REPRESENTATIVE

The State reserves the right to appoint a Buyer's Representative to manage or assist the Buyer in managing the contract on behalf of the State. The Buyer's Representative will be appointed in writing, and the appointment document will specify the extent of the Buyer's Representative authority and responsibilities. If a Buyer's Representative is appointed, the bidder will be provided a copy of the appointment document and is expected to cooperate accordingly with the Buyer's Representative. The Buyer's Representative has no authority to bind the State to a contract, amendment, addendum, or other change or addition to the contract.

D. GOVERNING LAW (Nonnegotiable) Notwithstanding any other provision of this contract, or any amendment or addendum(s) entered into contemporaneously or at a later time, the parties understand and agree that, (1) the State of Nebraska is a sovereign state and its authority to contract is therefore subject to limitation by the State's Constitution, statutes, common law, and regulation; (2) this contract will be interpreted and enforced under the laws of the State of Nebraska; (3) any action to enforce the provisions of this agreement must be brought in the State of Nebraska per state law; (4) the person signing this contract on behalf of the State of Nebraska does not have the authority to waive the State's sovereign immunity, statutes, common law, or regulations; (5) the indemnity, limitation of liability, remedy, and other similar provisions of the final contract, if any, are entered into subject to the State's Constitution, statutes, common law, regulations, and sovereign immunity; and, (6) all terms and conditions of the final contract, including but not limited to the clauses concerning third party use, licenses, warranties, limitations of liability, governing law and venue, usage verification, indemnity, liability, remedy or other similar provisions of the final contract are entered into specifically subject to the State's Constitution, statutes, common law, regulations, and sovereign immunity.

The Parties must comply with all applicable local, state, and federal laws, ordinances, rules, orders, and regulations.

E. DISCOUNTS

Accept (Initial)

0/J

Reject & Provide Reject Alternative within NOTES/COMMENTS: (Initial) RFP

Response (Initial)

Prices quoted shall be inclusive of ALL trade discounts. Cash discount terms of less than thirty (30) days will not be considered as part of the proposal. Cash discount periods will be computed from the date of receipt of a properly executed claim voucher or the date of completion of delivery of all items in a satisfactory condition, whichever is later.

F. PRICES

(Initial)

::st

Reject & Provide Reject Alternative within NOTES/COMMENTS: (Initial! RFP

Resc>onse (Initial)

Prices quoted shall be net, including transportation and delivery charges fully prepaid by the bidder, F.O.8.

destination named in the Request for Proposal. No additional charges will be allowed for packing, packages, or partial delivery costs. When an arithmetic error has been made in the extended total, the unit price will govern.

All prices, costs, and terms and conditions submitted in the proposal shall remain fixed and valid commencing on the opening date of the proposal until an award is made, or the Request for Proposal is cancelled.

The State reserves the right to deny any requested price increase. No price increases are to be billed to any State Agencies prior to written amendment of the contract by the parties.

The State will be given full proportionate benefit of any dee reases for the term of the contract.

G. BEGINNING OF WORK & SUSPENSION OF SERVICES

Accept (Initial)

Reject & Provide Reject Alternative within NOTES/COMMENTS: (Initial) RFP Response

(Initial)

The bidder shall not commence any billable work until a valid contract has been fully executed by the State and the successful Contractor. The Contractor will be notified in writing when work may begin.

The State may, at any time and without advance notice, require the Contractor to suspend any or all performance or deliverables provided under this Contract. In the event of such suspension, the Contract Manager or POC, or their designee, will issue a written order to stop work The written order will specify which activities are to be immediately suspended and the reason(s) for the suspension. Upon receipt of such order, the Contractor shall immediately comply with its terms and take all necessary steps to mitigate and eliminate the incurrence of costs allocable to the work affected by the order during the period of suspension . The suspended performance or deliverables may only resume when the State provides the Contractor with written notice that such performance or deliverables may resume, in whole or in part.

H. AMENDMENT

This Contract may be amended in writing, within scope, upon the agreement of both parties.

I. CHANGE ORDERS OR SUBSTITUTIONS

Accept (Initial)

-:>8

Reject & Provide Reject Alternatlve within

NOTES/COMMENTS: (Initial! RFP Response {In ltlal}

The Stale and the Contractor, upon the written agreement, may make changes to the contract within the general scope of the Request for Proposal. Changes may involve specifications, the quantity of work, or such other items as the State may find necessary or desirable. Corrections of any deliverable, service, or work required pursuant to the contract shall not be deemed a change. The Contractor may not claim forfeiture of the contract by reasons of such changes.

The Contractor shall prepare a written description of the work required due to the change and an itemized cost sheet for the change. Changes in wor1< and the amount of compensation lo be paid lo the Contractor shall be determined in accordance with applicable unit prices if any, a pro-rated value, or through negotiations. The State shall not incur a price increase for changes that should have been included in the Contractor's proposal, were foreseeable, or result from difficulties with or failure of the Contractor's proposal or performance.

No change shall be implemented by the Contractor until approved by the State, and the Contract is amended to reflect the change and associated costs, if any. If there is a dispute regarding the cost, but both parties agree that immediate implementation is necessary, the change may be implemented, and cost negotiations may continue with both Parties retaining all remedies under the contract and law.

-•contractor will not substitute any item that has been awarded without prior written approval of SPB or ordering agency_,.

J. RECORD OF VENDOR PERFORMANCE

Accept (lnltlall

;s(3

Reject & Provide Reject Alternatlve within

NOTES/COMMENTS: (Initial) RFP Response (Initial)

The State may document the vendor's performance, which may include, but is not limited to, the customer service provided by the vendor, the ability of the vendor, the skill of the vendor, and any instance(s) of products or services delivered or performed which fail to meet the terms of the purchase order, contract, and/or Request for Proposal specifications. In addition to other remedies and options available to the State, the State may issue one or more notices lo the vendor outlining any issues the State has regarding the vendor's performance for a specific contract ("Vendor Performance Notice"). The Slate may also document the Vendor's performance in a report, which may or may not be provided to the vendor ("Vendor Improvement Request"). The Vendor shall respond to any Vendor Performance Notice or Vendor Improvement Request in accordance with such notice or request. At the sole discretion of the State, such Vendor Performance Notices and Vendor Improvement Requests may be placed in the State's records regarding the vendor and may be considered by the State and held against the vendor in any future contract or award opportunity.

K. CORRECTIVE ACTION PLAN

If Contractor is failing to meet the Scope of Work, in whole or in part, the Stale may require the Contractor to complete a corrective action plan ("CAP"). The State will identify issues with the Contractor's performance and will set a deadline for the CAP lo be provided. The Contractor must provide a written response to each identified issue and what steps the Contractor will take to resolve each issue, including the timeline(s) for resolution. If the Contractor fails to adequately provide the CAP in accordance with this section, fails to adequately resolve the issues described in the CAP, or fails to resolve the issues described in the CAP by the relevant deadline, the State may withhold payments and exercise any legal remedy available.

L. NOTICE OF POTENTIAL CONTRACTOR BREACH

Accept (lnitlall

0~

Reject & Provide Reject Alternative within NOTES/COMMENTS: (Initial) RFP Response

(Initial)

If Contractor breaches the contract or anticipates breaching the contract, the Contractor shall immediately give written notice to the Stale. The notice shall explain the breach or potential breach, a proposed cure, and may include a request for a waiver of the breach if so desired. The State may, in its discretion, temporarily or permanently waive the breach. By granting a waiver, the State does not forfeit any rights or remedies to which the State is entitled by law or equity, or pursuant to the provisions of the contract. Failure to give immediate notice, however, may be grounds for denial of any request for a waiver of a breach.

M. BREACH

(Initial)

:56

Reject & Provide Reject AlternaUve within

NOTESfCOMMENTS: (Initial) RFP Response llnltlal)

Either Party may terminate the contract, in whole or in part, if the other Party breaches its duty to perform its obligations under the contract in a timely and proper manner. Tennination requires written notice of default and a thirty (30) calendar day (or longer al the non-breaching Party's discretion considering the gravity and nature of the default) cure period. Said notice shall be delivered by email to the contractor's point of contact with acknowledgement from the contractor, Certified Mail - Return Receipt Requested, or in person with proof of delivery. Allowing time to cure a failure or breach of contract does not waive the right to immediately tenninate the contract for the same or different contract breach which may occur at a different time. In case of default of the Contractor, the State may contract the service from other sources and hold the Contractor responsible for any excess cost occasioned thereby.

The State's failure to make payment shall not be a breach, and the Contractor shall retain all available statutory remedies and protections.

N. NON-WAIVER OF BREACH

Accept (lnltlal)

-Sb

Reject & Provide Reject Alternative within NOTES/COMMENTS: (Initial) RFP Response

(lnltial)

The acceptance of late performance with or without objection or reservation by a Party shall not waive any rights of the Party nor constitute a waiver of !he requirement of timely performance of any obligations remaining to be performed.

0. SEVERABILITY

Accept (lnltlall

-se, Reject & Provide Reject Alternative within

NOTES/COMMENTS: (Initial) RFP Response (Initial)

If any term or condition of the contract is declared by a court of competent jurisdiction lo be illegal or in conflict with any law, the validity of the remaining terms and conditions shall not be affected, and the rights and obligations of the parties shall be construed and enforced as if the contract did not contain the provision held to be invalid or illegal.

P. INDEMNIFICATION

(Initial)

-est

Reject & Provide Reject Alt.emative within NOTES/COMMENTS: (Initial) RFP Response

(Initial)

1. GENERAL

The Contractor agrees to defend, indemnify, and hold harmless the State and its employees, volunteers, agents, and its elected and appointed officials ("the indemnified parties") from and against any and all third party claims, liens, demands, damages, liability, actions. causes of action, losses, Judgments, costs, and expenses of every nature, including investigation costs and expenses, settlement costs, and attorney fees and expenses ("the claims"), sustained or asserted against the State for personal injury, death, or property loss or damage, arising out of, resulting from, or attributable to the willful misconduct, negligence, error, or omission of the Contractor, its employees, Subcontractors, consultants, representatives, and agents, resulting from this contract, except to the extent such Contractor liability is attenuated by any action of the State which directly and proximately contributed to the claims.

2. PERSONNEL

The Contractor shall, at its expense, indemnify and hold harmless the indemnified parties from and against any claim with respect to withholding laxes, worker's compensation, employee benefits, or any other claim, demand, liability, damage, or loss of any nature relating to any of the personnel, including subcontractor's and their employees, provided by the Contractor.

3. SELF-INSURANCE

The State of Nebraska is self-insured for any loss and purchases excess insurance coverage pursuant to Neb. Rev. Stat. § 81-8,239.01 . If there is a presumed loss under the provisions of this agreement, Contractor may file a claim with the Office of Risk Management pursuant to Neb. Rev. Stat. §§ 81- 8,239. 01 to 81-8,306 for review by the State Claims Board. The State retains all rights and immunities under the Slate Miscellaneous {Neb. Rev. Stat. § 81-8,294), Tort (Neb. Rev. Stat. § 81-8,209), and Contract Claim Acts {Neb. Rev. Stat. § 81-8,302), as outlined in state law and accepts liability under this agreement only to the extent provided by law.

Q. ATTORNEY'S FEES

Accept (Initial) of!>

Reject & Provide Reject Alternative within NOTES/COMMENTS: (Initial) RFP Response

(lnltiall

In the event of any litigation, appeal, or other legal action to enforce any provision of the contract, the Parties agree to pay all expenses of such action, as permitted by law and if ordered by the court, including attorney's fees and costs, if the other Party prevails.

R. ASSIGNMENT, SALE, OR MERGER

Reject & Provide Accept Reject Alternative within NOTESICOMMENTS: (Initial) (Initial) RFP Response

(Initial)

-:5()

Either Party may assign the contract upon mutual written agreement of the other Party. Such agreement shall not be unreasonably withheld.

The Contractor retains the right to enter into a sale, merger, acquisition, internal reorganization, or similar transaction involving Contractor's business. Contractor agrees to cooperate with the State in executing amendments to the contract to allow for the transaction. If a third party or entity is involved in the transaction, the Contractor will remain responsible for performance of the contract until such time as the person or entity involved in the transaction agrees in writing to be contractually bound by this contract and perform all obligations of the contract.

S. CONTRACTING WITH OTHER NEBRASKA POLITICAL SUBDIVISIONS OF THE STATE OR ANOTHER STATE

Accept (Initial)

:5/'J

Reject & Provide Reject Alternative within

NOTES/COMMENTS: (Initial) RFP Response (Initial)

The Contractor may, but shall not be required lo, allow agencies, as defined in Neb. Rev. Stat.§ 81-145{3), to use this contract. The terms and conditions, including price, of the contract may not be amended. The State shall not be contractually obligated or liable for any contract entered into pursuant to this clause. A listing of Nebraska political subdivisions may be found al the website of the Nebraska Auditor of Public Accounts.

The Contractor may, but shall not be required to, allow other states, agencies or divisions of other states, or political subdivisions of other states to use this contract. The terms and conditions, including price, of this contract shall apply to any such contract, but may be amended upon mutual consent of the Parties. The State of Nebraska shall not be contractually or otherwise obligated or liable under any contract entered into pursuant to this clause. The State shall be notified if a contract is executed based upon this contract.

T. FORCE MAJEURE

Accept (Initial)

J0

Reject & Provide Reject Alternative within

NOTES/COMMENTS: (lnl11al) RFP Resoonse llnitial)

Neither Party shall be liable for any costs or damages, or for default resulting from its inability to perform any of its obligations under the contract due to a natural or manmade event outside the control and not the fault of the affected Party ("Force Majeure Event") that was not foreseeable at the time the Contract was executed. The Party so affected shall immediately make a written request for relief to the other Party and shall have the burden of proof to justify the request. The other Party may grant the relief requested; relief may not be unreasonably withheld.

Labor disputes with the impacted Party's own employees will not be considered a Force Majeure Event.

U. CONFIDENTIALITY

Accept (Initial)

Reject & Provide Reject Alternative within

NOTESfCOMMENTS: (lnitiall RFP Response (Initial)

All materials and information provided by the Parties or acquired by a Party on behalf of the other Party shall be regarded as confidential information. All materials and information provided or acquired shall be handled in accordance with federal and state law, and ethical standards. Should said confidentiality be breached by a Party, the Party shall notify the other Party immediately of said breach and take immediate corrective action.

It is incumbent upon the Parties to inform their officers and employees of the penalties for improper disclosure imposed by the Privacy Act of 1974, 5 U.S.C. 552a. Specifically, 5 U.S.C. 552a (i)(1 ), which is made applicable by 5 U.S.C. 552a (m){1 ), provides that any officer or employee, who by virtue of his/her employment or official position has possession of or access to agency records which contain individually identifiable information, the disclosure of which is prohibited by the Privacy Act or regulations established thereunder, and who knowing that disclosure of the specific material is prohibited, willfully discloses the material in any manner to any person or agency not entitled to receive ii, shall be gLiilty of a misdemeanor and fined not more than $5,000.

V. EARLY TERMINATION

Accept (Initial)

-:5/J

Reject & Provide Reject Alternative within

NOTES/COMMENTS: (Initial) RFP Response (Initial)

The contract may be terminated as follows:

1. The State and the Contractor, by mutual written agreement, may terminate the contract, in whole or in part, at any time.

2. The State, in its sole discretion, may terminate the contract, in whole or in part, for any reason upon thirty

(30) calendar day's written notice to the Contractor. Such termination shall not relieve the Contractor of warranty or other service obligations incurred under the terms of the contract. In the event of termination, the Contractor shall be entitled to payment, determined on a pro rata basis, for products or services satisfactorily performed or provided.

3. The State may terminate the contract, in whole or in part, immediately for the following reasons:

a. if directed lo do so by statute,

b. Contractor has made an assignment for the benefit of creditors, has admitted in writing its inability to pay debts as they mature, or has ceased operating in the normal course of business,

c. a trustee or receiver of the Contra eta r or of any substantial part of the Contraclo r's assets has been appointed by a court,

d. fraud, misappropriation, embezzlement, malfeasance, misfeasance, or illegal conduct pertaining to performance under the contract by its Contractor, its employees, officers, directors, or shareholders,

e. an involuntary proceeding has been commenced by any Party against the Contractor under any one of the chapters of Title 11 of the United States Code and (i) the proceeding has been pending for at least sixty (60) calendar days; or (ii) the Contractor has consented, either expressly or by operation of law, to the entry of an order for relief; or {iii) the Contractor has been decreed or adjudged a debtor, f . a voluntary petition has been filed by the Contractor under any of the chapters of Title 11 of the United States Code,

g. Contractor intentionally discloses confidential infonmation,

h. Contractor has or annoLJnces it will discontinue support of the deliverable; and,

i. In the event funding is no longer available.

W. CONTRACT CLOSEOUT

Reject & Provide Accept Reject Alternative within

NOTESfCOMMENTS: (Initial) (Initial) RFP Response (Initial)

J~ Upon contract closeout for any reason the Contractor shall within 30 days, unless stated otherwise herein:

1. Transfer all completed or partially completed deliverables to the Slate,

2. Transfer ownership and title to all completed or partially completed deliverables to the State,

3. Return to the State all information and data, unless the Contractor is pem,ilted to keep the information or data by contract or rule of law. Contractor may retain one copy of any information or data as required to comply with applicable work product documentation standards or as are automatically retained in the course of Contractor's routine back up procedures,

4. Cooperate with any successor Contactor, person or entity in the assumption of any or all of the obligations of this contract,

5. Cooperate with any successor Contactor, person or entity with the transfer of information or data related to th is contract,

6. Return or vacate any state owned real or personal property; and,

7. Return all data in a mutually acceptable format and manner.

Nothing in this Section should be construed to require the Contractor to surrender intellectual property, real or personal property, or information or data owned by the Contractor for which the State has no legal claim.

Ill. CONTRACTOR DUTIES

A. INDEPENDENT CONTRACTOR/ OBLIGATIONS

Accept (Initial)

Reject & Provide Reject Alternative within NOTES/COMMENTS: (Initial) RFP Response llnlliall

It is agreed that the Contractor is an independent contractor and that nothing contained herein is intended or should be construed as creating or establishing a relationship of employment, agency, or a partnership.

The Contractor is solely responsible for fulfilling the contract. The Contractor or the Contractor's representative shall be the sole point of contact regarding all contractual matters.

The Contractor shall secure, at its own expense, all personnel required to perform the services under the contract.

The personnel the Contractor uses to fulfill the contract shall have no contractual or other legal relationship with the State; they shall not be considered employees of the State and shall not be entitled to any compensation, rights or benefits from the State, including but not limited to, tenure rights, medical and hospital care, sick and vacation leave, severance pay, or retirement benefits.

By-name personnel commitments made in the bidder's proposal shall not be changed without the prior written approval of the State. Replacement of these personnel, if approved by the State, shall be with personnel of equal or greater ability and qualifications.

All personnel assigned by the Contractor to the contract shall be employees of the Contractor or a subcontractor and shall be fully qualified to perfonn the work required herein. Personnel employed by the Contractor or a subcontractor to fulfill the terms of the contract shall remain under the sole direction and control of the Contractor or the subcontractor respectively.

With respect to its employees, the Contractor agrees to be solely responsible for the following:

1. Any and all pay, benefits, and employment taxes and/or other payroll with holding,

2. Any and all vehicles used by the Contractor's employees, including all insurance required by state law,

3. Damages incurred by Contractor's employees within the scope of their duties under the contract,

4. Maintaining Workers' Compensation and health insurance that complies with state and federal law and submitting any reports on such insurance to the extent required by governing law,

5. Determining the hours to be worked and the duties to be performed by the Contractor's employees; and,

6. All claims on behalf of any person arising out of employment or alleged employment (including without limit claims of discrimination alleged against the Contractor, its officers, agents, or subcontractors or subcontractor's employees).

If the Contractor intends to utilize any subcontractor, the subcontractor's level of effort, tasks, and time allocation should be clearly defined in the bidder's proposal. The Contractor shall agree that it will not utilize any subcontractors not specifically included in its proposal in the performance of the contract without the prior written authorization of the Stale.

The State reserves the right to require the Contractor to reassign or remove from the proJect any Contractor or subcontractor employee.

Contractor shall insure that the terms and conditions contained in any contract with a subcontractor does not conflict with the terms and conditions of this contract.

The Contractor shall include a similar provision, for the protection of the State, in the contract with any Subcontractor engaged to perform work on this contract.

B. EMPLOYEE WORK ELIGIBILITY STATUS

(Initial)

:51>

Reject & Provide Reject Altemative within NOTES/COMMENTS: (Initial) RFP

Response (Initial)

The Contractor is required and hereby agrees to use a federal immigration verification system to determine the work eligibility status of employees physically performing services within the State of Nebraska. A federal immigration verification system means the electronic verification of the work authorization program authorized by the Illegal Immigration Reform and Immigrant Responsibility Act of 1996, 8 U.S.C. 1324a, known as the E-Verify Program, or an equivalent federal program designated by the United States Department of Homeland Security or other federal agency authorized to verify the work eligibility status of an employee.

If the Contractor is an individual or sole proprietorship, the following applies:

1.

2.

The Contractor must complete the United States Citizenship Attestation Form, available on the Department of Administrative Services website at https://das.nebraska.qov/materiel/docs/pdf/lndividual%20or%20Sole%20Proprietor%20United%20States% 20Attestation%20Form%20English%20and%20Spanish.pdf

The completed United States Attestation Form should be submitted with the Request for Proposal response.

3. If the Contractor indicates on such attestation form that he or she is a qualified alien, the Contractor agrees to provide the US Citizenship and Immigration Services documentation required to verify the Contractor's lawful presence in the United States using the Systematic Alien Verification for Entitlements (SAVE) Program.

4. The Contractor understands and agrees that lawful presence in the United States is required, and the Contractor may be disqualified or the contract terminated if such lawful presence cannot be verified as required by Neb. Rev. Stat. § 4-108.

C. COMPLIANCE WITH CIVIL RIGHTS LAWS AND EQUAL OPPORTUNITY EMPLOYMENT

NON DISCRIMINATION (Nonnegotiable) The Contractor shall comply with all applicable local, state, and federal statutes and regulations regarding civil rights laws and equal opportunity employment. The Nebraska Fair Employment Practice Act prohibits Contractors of the State of Nebraska, and their Subcontractors, from discriminating against any employee or applicant for employment, with respect to hire, tenure, terms, conditions, compensation, or privileges of employment because of race, color, religion, sex, disability, marital status, or national origin (Neb. Rev. Stat. §§ 48-1101 to 48-1125). The Contractor guarantees compliance with the Nebraska Fair Employment Practice Act, and breach of this provision shall be regarded as a material breach of contract. The Contractor shall insert a similar provision in all Subcontracts for goods and services to be covered by any contract resulting from this Request for Proposal.

D. COOPERATION WITH OTHER CONTRACTORS

Accept (Initial)

:5r;

Reject & Provide Reject Al1ernative within

NOTESICOMMENTS: (Initial) RFP Response {Initial)

Contractor may be required to work with or in close proximity to other contractors or individuals that may be working on same or different projects. The Contractor shall agree to cooperate with such other contractors or individuals and shall not commit or permit any act which may interfere with the performance of work by any other contractor or individual. Contractor is not required to compromise Contractor's intellectual property or proprietary information unless expressly required to do so by this contract.

E. PERMITS, REGULATIONS, LAWS

(lnHial)

:56

Reject & Provide Reject Alternative within NOTESfCOMM ENTS: (Initial) RFP Response

(Initial)

The contract price shall include the cost of all royalties, licenses, permits, and approvals, whether arising from patents, trademarks, copyrights or otherwise, that are in any way involved in the contract. The Contractor shall obtain and pay for all royalties, licenses, and permits, and approvals necessary for the execution of the contract.

The Contractor must guarantee that it has the full legal right to the materials, supplies, equipment, software, and other items used to execute this contract.

F. INSURANCE REQUIREMENTS

Accept (Initial)

-56

Reject & Provide Reject Altematlve within

NOTES!COMMENTS: (lnltlal) RFP Response (Initial)

The Contractor shall throughout the term of the contract maintain insurance as specified herein and provide the State a current Certificate of Insurance/Acord Form (COi) verifying the coverage. The Contractor shall not commence work on the contract until the insurance is in place. If Contractor subcontracts any portion of the Contract the Contractor must, throughout the term of the contract, either:

1. Provide equivalent insurance for each subcontractor and provide a COi verifying the coverage for the subcontractor,

2. Require each subcontractor to have equivalent insurance and provide written notice to the State that the Contractor has verified that each subcontractor has the required coverage; or,

3. Provide the State with copies of each subcontractor's Certificate of Insurance evidencing the required coverage.

The Contractor shall not allow any Subcontractor to commence work until the Subcontractor has equivalent insurance. The failure of the State lo require a COi, or the failure of the Contractor to provide a COi or require subcontractor insurance shall not limit, relieve, or decrease the liability of the Contractor hereunder.

In the event that any policy written on a claims-made basis terminates or is canceled during the term of the contract or within three (3) years of termination or expiration of the contract, the contractor shall obtain an extended discovery or reporting period, or a new insurance policy, providing coverage required by this contract for the term of the contract and three (3) years following termination or expiration of the contract.

If by the terms of any insurance a mandatory deductible is required, or if the Contractor elects to increase the mandatory deductible amount, the Contractor shall be responsible for payment of the amount of the deductible in the event of a paid claim.

Notwithstanding any other clause in this Contract, the State may recover up to the liability limits of the insurance policies required herein.

1. WORKERS' COMPENSATION INSURANCE

The Contractor shall take out and maintain during the life of this contract the statutory Workers' Compensation and Employer's Liability Insurance for all of the contactors' employees to be engaged in work on the project under this contract and, in case any such work is sublet, the Contractor shall require the Subcontractor similarly to provide Worker's Compensation and Employer's Liability Insurance for all of the Subcontractor's employees to be engaged in such work This policy shall be written to meet the statutory requirements for the state in which the work is to be performed, including Occupational Disease.

The policy shall include a waiver of subrogation in favor of the State. The COi shall contain the mandatoiy COi subrogation waiver language found hereinafter. The amounts of such insurance shall not be less than the limits stated hereinafter. For employees working in the State of Nebraska, the polrcy must be written by an entity authorized by the State of Nebraska Department of Insurance to write Workers' Compensation and Employer's Liability Insurance for Nebraska employees.

2. COMMERCIAL GENERAL LIABILITY INSURANCE AND COMMERCIAL AUTOMOBILE LIABILITY

INSURANCE

The Contractor shall take out and maintain during the life of this contract such Commercial General Liability Insurance and Commercial Automobile Liability Insurance as shall protect Contractor and any Subcontractor performing work covered by this contract from claims for damages for bodily injury, including death, as well as from claims for property damage, which may arise from operations under this contract, whether such operation be by the Contractor or by any Subcontractor or by anyone directly or indirectly employed by either of them, and the amounts of such insurance shall not be less than limits stated hereinafter.

The Commercial General Liability Insurance shall be written on an occurrence basis, and provide Premises/Operations, Products/Completed Operations, Independent Contractors, Personal Injury, and Contractual Liability coverage. The policy shall include the State, and others as required by the contract documents, as Additional lnsured(s). This policy shall be primary, and any insurance or self-insurance carried by the State shall be considered secondary and non-contributory. The COi shall contain the mandatoiy COi liability waiver language found hereinafter. The Commercial Automobile Liability Insurance shall be written to cover all Owned, Non-owned, and Hired vehicles.

REQUIRED INSURANCE COVERAGE

COMMERCIAL GENERAL LIABILITY

General AaareQate $2,000,000 Products/Completed Operations Aaareaate $2,000,000 Personal/Advertisinq Injury $1 ,000 000 per occurrence Bodily lniurv/Propertv DamaQe $1,000,000 per occurrence Medical Pavments $10,000 anv one oerson Damage to Rented Premises (Firel $300,000 each occurrence Contractual Included xcu Liability (Explosion, Collapse, and Included Underaround DamaQe} lndecendent Contractors Included If hi_qher limits are required, the Umbrella/Excess Liabilitv limits are allowed to satisfy the higher limit

WORKER'S COMPENSATION

Emclovers Liabilitv Limits $500K/$500K/$500K Statutorv Limits- All States Statutorv - State of Nebraska Voluntarv Compensation Statutorv

UMBRELLA/EXCESS LIABILITY

Over Primary Insurance $5,000,000 oer occurrence MANDATORY COi SUBROGATION WAIVER LANGUAGE "Workers' Compensation policy shall include a waiver of subroaation in favor of the State of Nebraska."

MANDATORY COi LIABILITY WAIVER LANGUAGE "Commercial General Liability & Commercial Automobile Liability policies shall name the State of Nebraska as an Additional Insured and the policies shall be primary and any insurance or self-insurance carried by the State shall be considered secondarv and non-contributorv as additionally insured."

3. EVIDENCE OF COVERAGE

The Contractor shall furnish the Contract Manager, via email, with a certificate of insurance coverage complying with the above requirements prior to beginning work at:

Nebraska Educational Telecommunications Commission

RFP # 6905 21

1800 N 33rd St.

Lincoln, NE 68503 lsun@nebraskapublicmedia.org

These certificates or the cover sheet shall reference the RFP number, and the certificates shall include the name of the company, policy numbers, effective dates, dates of expiration, and amounts and types of coverage afforded. If the State is damaged by the failure of the Contractor to maintain such insurance, then the Contractor shall be responsible for all reasonable costs properly attributable thereto.

Reasonable notice of cancellation of any required insurance policy must be submitted to the contract manager as listed above when issued and a new coverage binder shall be submitted immediately to ensure no break in coverage.

4. DEVIATIONS

The insurance requirements are subject to limited negotiation. Negotiation typically includes, but is not necessarily limited to, the correct type of coverage, necessity for Workers' Compensation, and the type of automobile coverage carried by the Contractor.

G. ANTITRUST

Accept (Initial)

(513

Reject & Provide Reject Alternative within

NOTES/COMMENTS: (Initial) RFP Response (Initial)

The Contractor hereby assigns to the State any and all claims for overcharges as to goods and/or services provided in connection with this contract resulting from antitrust violations which arise under antitrust laws of the United States and the antitrust laws of the State.

H. CONFLICT OF INTEREST

Accept (Initial)

U6

Reject & Provide Reject Alternative within

NOTESfCOMMENTS: (Initial) RFP Response (lnitlall

By submitting a proposal, bidder certifies that no relationship exists between the bidder and any person or entity which either is, or gives the appearance of, a conflict of interest related to this Request for Proposal or project.

Bidder further certifies that bidder will not employ any individual known by bidder to have a conflict of interest nor shall bidder take any action or acquire any interest, either directly or indirectly, which will conflict in any manner or degree with the performance of its contractual obligations hereunder or which creates an actual or appearance of conflict of interest.

If there is an actual or perceived conflict of interest, bidder shall provide with its proposal a full disclosure of the facts describing such actual or perceived conflict of interest and a proposed mitigation plan for consideration. The State will then consider such disclosure and proposed mitigation plan and either approve or reject as part of the overall bid evaluation.

I. STATE PROPERTY

Accept (Initial)

S6

Reject & Provide Reject Alternative within NOTES/COMMENTS: (Initial) RFP Response flnitiall

The Contractor shall be responsible for the proper care and custody of any State-owned property which is furnished for the Contractor's use during the performance of the contract. The Contractor shall reimburse the State for any loss or damage of such property; normal wear and tear is expected.

J. SITE RULES AND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .