67225_2.pdf
PDF 4 MB Posted
- Solicitation number
- 67225,2
- Issued by
- Illinois
About this file
Summary: Shuttle Bus Services at Chicago O'Hare International Airport
This is a Scope of Work document for the City of Chicago Department of Aviation regarding shuttle bus services at Chicago O'Hare International Airport. The contractor is required to provide shuttle bus transportation services, including vehicle operation, maintenance, fueling, cleaning, and staffing with qualified drivers. The service encompasses multiple shuttle routes connecting various airport terminals, parking facilities, and ground transportation areas, with specific requirements for vehicle capacity, frequency of service, and hours of operation. The contract specifies performance standards including on-time service delivery, vehicle condition requirements, and passenger safety protocols. The term of the contract is multi-year with renewal options to be determined by the City, and the contractor must maintain continuous service throughout the contract period with minimal service interruptions.
The Scope of Work establishes detailed operational requirements including vehicle maintenance standards, driver qualifications and training, customer service expectations, and compliance with Federal Aviation Administration and City of Chicago regulations. The contractor must provide comprehensive liability insurance, maintain a fleet of vehicles in excellent condition, and implement safety procedures consistent with airport security requirements. The document outlines performance metrics for service reliability, cleanliness, and driver conduct, with the City retaining the right to conduct inspections and audits. Additional requirements include scheduling flexibility to accommodate airport traffic patterns, emergency response procedures, and coordination with other airport service providers to ensure seamless passenger transportation throughout the airport complex.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City Of Chicago Solicitation #67225,2
BRANDON JOHNSON SHARLA ROBERTS
MAYOR CHIEF PROCUREMENT OFFICER
Specification Number: 1275339 Type of Funding:
Title: 1275339: Shuttle Bus Services at Chicago O'Hare International Airport
Work Service Solicitation #67225,2 (BID)
Shuttle Bus Services at Chicago O'Hare International Airport - Spec 1275339
Specification Number:1275339
Required for use by: CHICAGO DEPARTMENT OF AVIATION
Bid/Proposal Submittal Date and Time: 11:00 AM Central Time, 13-AUG-2026
Deadline for Questions: 04:00 PM Central Time, 27-MAY-2026 Buyer: MAGNO, THOMAS Email Address: Thomas.Magno@cityofchicago.org Phone Number: 3127444941 Pre-Solicitation Conference Date and Time: 10:00 AM Central Time, 21-MAY-2026 Pre-Solicitation Conference Location: 10510 W. Zemke Road, Chicago IL 60666 O'Hare AAB Site Visit Date & Time: N/A Site Visit Location: N/A
Please submit your response to:
http://www.cityofchicago.org/eProcurement iSupplier vendor portal registration is required.
Allow 3 business days to complete registration.
Specification Number: 1275339 Page 2 Type of Funding:
Title: 1275339: Shuttle Bus Services at Chicago O'Hare International Airport
Table of Contents
1 Header Information
1.1 General Information
1.2 Terms
1.3 Requirements
1.4 Attachments
1.5 Response Rules
2 Price Schedule
2.1 Line Information
2.2 Line Details
2.2.1 Line 1
2.2.2 Line 2
2.2.3 Line 3
2.2.4 Line 4
2.2.5 Line 5
2.2.6 Line 6
2.2.7 Line 7
Specification Number: 1275339 Page 3 Type of Funding:
Title: 1275339: Shuttle Bus Services at Chicago O'Hare International Airport
1 Header Information
1.1 General Information
Title 1275339: Shuttle Bus Services at Chicago O'Hare International Airport
Description Shuttle Bus Services at Chicago O'Hare International Airport - Spec 1275339
Amendment Date 10-JUL-2026 11:27:19 Amendment
Description Addendum 2 - Bid Due Date Extension
Preview Date Not Specified Open Date 05-MAY-2026 09:00:00 Close Date 11:00 AM Central
Time, 13-AUG-2026 Award Date Not Specified
Time Zone Central Time Buyer MAGNO, THOMAS Quote Style Sealed Email Thomas.
Magno@cityofchicago.org Event Work Service Outcome Blanket Purchase Agreement
Note Bidders should submit a PDF of the completed bid documents with their electronic bid.
Complete the Exhibit 4 and 4.1 and include the April Index.
Bidders should also provide Key Personnel and experience.
See BID Submittal Checklist
1.2 Terms
Effective Start Date Not Specified Effective End Date Not Specified
Ship-To Address 085-2015 CHICAGO-
O'HARE INT'L
AIRPORT
11601 W. Touhy Chicago, IL 60666 United States
Bill-To Address 085-2015 CHICAGO-
O'HARE INT'L AIRPORT
11601 W. Touhy Chicago, IL 60666 United States
Payment Terms IMMEDIATE Carrier FOB Freight Terms Paid
Total Agreement Amount (USD)
Not Specified Minimum Release Amount (USD)
Not Specified
1.3 Requirements
<B>KEY SOLICITATION PARAMETERS</B>
BID DEPOSIT: NONE OR AMOUNT
Type No Response Required
PERFORMANCE BOND: NONE
Type No Response Required
CITY BUSINESS PREFERENCE:
Type No Response Required
LOCAL MANUFACTURE PREFERENCE:
Type No Response Required
ALTERNATIVE FUEL VEHICLE PREFERENCE:
Type No Response Required
CONTRACT SPECIFIC GOALS: MBE - 25% WBE - 5%
Specification Number: 1275339 Page 4 Type of Funding:
Title: 1275339: Shuttle Bus Services at Chicago O'Hare International Airport
<B>KEY SOLICITATION PARAMETERS</B>
Type No Response Required FUNDING SOURCE: City
Type No Response Required
FUND NUMBER:
Type No Response Required DPS UNIT: Aviation
Type No Response Required
DRAWINGS:
Type No Response Required Value Type Numeric Value only
EXHIBITS:
Type No Response Required Value Type Numeric Value only
MAPS:
Type No Response Required Value Type Numeric Value only CONTRACT TERM: 60 (Sixty) MONTHS
Type No Response Required PRE-BID/PRE-PROPOSAL CONFERENCE: Aviation Administration Building, 10510 West Zemke Road Chicago, IL 60666
Type No Response Required
<B>BIDDER EXCEPTIONS</B>
Any deviations from or exceptions to any provisions or requirements of the bidding documents, including but not limited to the specifications of the goods and/or services to be provided, must be noted here or in an attachment, with the exact nature of the change outlined in sufficient detail, and as provided in the contract terms and conditions "Trade Names and Substitutions," as applicable. Bidder must provide the reason for which deviations were made. Failure of a bidder to comply with the terms of this paragraph may be cause for rejection of its bid.
Type Optional Provide your answer below
Enter the EDS number from your EDS Certificate and attach the certificate.
Value Type Numeric Value only Provide your answer below
Specification Number: 1275339 Page 5 Type of Funding:
Title: 1275339: Shuttle Bus Services at Chicago O'Hare International Airport
<B>BIDDER EXCEPTIONS</B>
<B>COMMODITIES/WORK
SERVICES/HEAVY EQUIPMENT/SMALL
ORDERS/CONSTRUCTION/JOC
CHECKLIST</B>
This is a checklist of all supporting documents that must be attached to your bid response. Attach all documents specified below. After attaching, click "YES" to indicate that the attachment was completed.
Type No Response Required
- Proposal Page completed, signed and notarized - (ALL)
Circle one from the response values below:
YES
NO
- Proposal To Be Completed By a Corporation - (ALL)
Circle one from the response values below:
YES
NO
- Proposal To Be Completed By a Partnership - (ALL)
Circle one from the response values below:
YES
NO
- Proposal To Be Completed By a Joint Venture - (ALL)
Circle one from the response values below:
YES
NO
- Proposal To Be Completed By a Sole Proprietor - (ALL)
Circle one from the response values below:
YES
NO
- Bid Execution Page - (ALL)
Circle one from the response values below:
YES
NO
- Request for a reduction or waiver of MBE/WBE goals - (ALL)
Circle one from the response values below:
YES
NO
- Certificate of Filing of Economic Disclosure Statement and Affidavit (EDS) - (ALL)
Circle one from the response values below:
YES
NO
- Certificate of Insurance
Specification Number: 1275339 Page 6 Type of Funding:
Title: 1275339: Shuttle Bus Services at Chicago O'Hare International Airport
<B>COMMODITIES/WORK
SERVICES/HEAVY EQUIPMENT/SMALL
ORDERS/CONSTRUCTION/JOC
CHECKLIST</B>
Circle one from the response values below:
YES
NO
BID INCENTIVE / PREFERENCE AFFIDAVIT(S)
Type No Response Required
- Local Manufacture Affidavit - (ALL)
Circle one from the response values below:
YES
NO
- Chicago Business Affidavit - (ALL)
Circle one from the response values below:
YES
NO
- Small Business/Veterans Preference Joint Venture - (ALL)
Circle one from the response values below:
YES
NO
- Alternatively Powered Vehicles affidavit - (ALL)
Circle one from the response values below:
YES
NO
- Copy of current Registration for Authority to Deal in Vehicles issued by the Illinois Secretary of State (Vehicle/Heavy Equipment)
Circle one from the response values below:
YES
NO
- Evidence validating the Contractor’s current status of authorized dealer or distributor of the manufacturer of the proposed vehicles and/or parts (Vehicle/Heavy Equipment)
Circle one from the response values below:
YES
NO
- Literature / Data (i.e. Manufacturer's published literature for the proposed vehicle) (if required) (Vehicle/Heavy Equipment)
Circle one from the response values below:
YES
NO
- Manuals, Certificates, Applications(if required)
Circle one from the response values below:
YES
NO
- Bidder Contact Information - (ALL)
Specification Number: 1275339 Page 7 Type of Funding:
Title: 1275339: Shuttle Bus Services at Chicago O'Hare International Airport
<B>COMMODITIES/WORK
SERVICES/HEAVY EQUIPMENT/SMALL
ORDERS/CONSTRUCTION/JOC
CHECKLIST</B>
Circle one from the response values below:
YES
NO
- Bidder qualifications and/or certifications, permits, licenses, vehicle stickers, etc. (if required)
Circle one from the response values below:
YES
NO
M/WBE DOCUMENTS
Type No Response Required
- Schedule B - MBE/WBE Affidavit of Joint Venture - (ALL)
Circle one from the response values below:
YES
NO
- Schedule C-1 - – MBE/WBE Letter of Intent To Perform As a Subcontractor or Supplier - (ALL)
Circle one from the response values below:
YES
NO
-Schedule D-1 - Compliance Plan Regarding MBE and WBE Utilization - (ALL)
Circle one from the response values below:
YES
NO
- Schedule F - Report of Subcontractor Solicitations - (Construction)
Circle one from the response values below:
YES
NO
- Schedule H -Documentation of Good Faith Efforts (Construction)
Circle one from the response values below:
YES
NO
- Request for Full or Partial Waiver - (ALL)
Circle one from the response values below:
YES
NO
- Letters of Certification for all M/WBE’s - (ALL)
Circle one from the response values below:
YES
NO
NON BID LINE REQUIREMENT (GROUPS)
Type No Response Required
- If you are not bidding a specific line(s) within a Group, enter a price of $0.0000000001 into the unit price
Specification Number: 1275339 Page 8 Type of Funding:
Title: 1275339: Shuttle Bus Services at Chicago O'Hare International Airport
<B>COMMODITIES/WORK
SERVICES/HEAVY EQUIPMENT/SMALL
ORDERS/CONSTRUCTION/JOC
CHECKLIST</B>
field of the bid line(s). Please comply with other solicitation provisions, if any, requiring bidding of all lines in order for your bid to be considered responsive.
Type No Response Required
1.4 Attachments
Name Data Type Description ATTACHMENT 01: Bid Documents
File Attachment 01: Bid Documents, Exhibits and Forms
ATTACHMENT 02:
Addendum 1
File Addendum 1 - Bid Due Date Extension
ATTACHMENT 03:
Addendum 2
File Addendum 2 - Bid Due Date Extension
1.5 Response Rules
Solicitation is restricted to invited suppliers Suppliers are allowed to view other suppliers' contract terms, notes and attachments Suppliers are allowed to respond to selected lines X Suppliers are allowed to provide multiple responses Buyer may close the solicitation before the Close Date Buyer may manually extend the solicitation while it is open
Specification Number: 1275339 Page 9 Type of Funding:
Title: 1275339: Shuttle Bus Services at Chicago O'Hare International Airport
2 Price Schedule
2.1 Line Information
Display Rank As No indicator displayed
Ranking Price Only Cost Factors None
Line Item, Rev / Job
Target Quantity
Unit Unit Price Amount
1 SHUTTLE BUS
SERVICES AT
O'HARE INT'L
AIRPORT - BUS
PRIMARILY USED
IN LOT E
9621797
220,000 Hour
2 SHUTTLE BUS
SERVICES AT
O'HARE INT'L
AIRPORT - BUS
PRIMARILY USED
IN LOTS F AND H
9621710
175,000 Hour
3 SHUTTLE BUS
SERVICES AT
O'HARE INT'L
AIRPORT - BUS
PRIMARILY USED
AIRSIDE
9621710
130,000 Hour
4 SHUTTLE BUS
SERVICES AT
O'HARE INT'L
AIRPORT - BUS
PRIMARILY USED
IN LOTS F AND G
9621797
175,000 Hour
5 SHUTTLE BUS
SERVICES AT
O'HARE INT'L
AIRPORT - BUS
PRIMARILY USED
IN LOTS F, G and H
9621797
350,000 Hour
6 ANNUAL FUEL
RECONCILIATION-
ACCOUNTING
PLACEHOLDER
ONLY, NOT FOR
BIDDING
1 USD
7 SHUTTLE BUS
SERVICES AT ORD
INT'L AIRPORT-
PROVIDE &
INSTALL
GPS+SYSTEM TO
ALL SHUTTLE
BUSES. SYSTEM
INCL. GPS,
PASSENGER
COUNTER,
INTERNAL LED
SIGN,
ANNUNCIATION,
9621797
100,000 Lump Sum
Specification Number: 1275339 Page 10 Type of Funding:
Title: 1275339: Shuttle Bus Services at Chicago O'Hare International Airport
Line Item, Rev / Job
Target Quantity
Unit Unit Price Amount
DETAILED REPORT
GENERATION &
ALL NECESSARY
HARDWARE,
SOFTWARE &
PROGRAMMING
2.2 Line Details
2.2.1 Line 1 SHUTTLE BUS SERVICES AT O'HARE INT'L AIRPORT - BUS PRIMARILY USED
IN LOT E
Category 96217. Start Price (USD) Not Specified Shopping Category Not Specified Target Price (USD) Not Specified Minimum Release
Amount (USD) Not Specified
Estimated Total Amount (USD)
Not Specified
2.2.2 Line 2 SHUTTLE BUS SERVICES AT O'HARE INT'L AIRPORT - BUS PRIMARILY USED
IN LOTS F AND H
Category 96217. Start Price (USD) Not Specified Shopping Category Not Specified Target Price (USD) Not Specified Minimum Release
Amount (USD) Not Specified
Estimated Total Amount (USD)
Not Specified
2.2.3 Line 3 SHUTTLE BUS SERVICES AT O'HARE INT'L AIRPORT - BUS PRIMARILY USED
AIRSIDE
Category 96217. Start Price (USD) Not Specified Shopping Category Not Specified Target Price (USD) Not Specified Minimum Release
Amount (USD) Not Specified
Estimated Total Amount (USD)
Not Specified
2.2.4 Line 4 SHUTTLE BUS SERVICES AT O'HARE INT'L AIRPORT - BUS PRIMARILY USED
IN LOTS F AND G
Category 96217. Start Price (USD) Not Specified Shopping Category Not Specified Target Price (USD) Not Specified Minimum Release
Amount (USD) Not Specified
Estimated Total Amount (USD)
Not Specified
2.2.5 Line 5 SHUTTLE BUS SERVICES AT O'HARE INT'L AIRPORT - BUS PRIMARILY USED IN LOTS F, G and H
Category 96217. Start Price (USD) Not Specified Shopping Category Not Specified Target Price (USD) Not Specified Minimum Release
Amount (USD) Not Specified
Estimated Total Amount (USD)
Not Specified
Specification Number: 1275339 Page 11 Type of Funding:
Title: 1275339: Shuttle Bus Services at Chicago O'Hare International Airport
2.2.6 Line 6 ANNUAL FUEL RECONCILIATION-ACCOUNTING PLACEHOLDER ONLY, NOT
FOR BIDDING
Category 96217.97 Start Price (USD) Not Specified Shopping Category Not Specified Target Price (USD) Not Specified Minimum Release
Amount (USD) Not Specified
Estimated Total Amount (USD)
Not Specified
2.2.7 Line 7 SHUTTLE BUS SERVICES AT ORD INT'L AIRPORT-PROVIDE & INSTALL
GPS+SYSTEM TO ALL SHUTTLE BUSES. SYSTEM INCL. GPS, PASSENGER COUNTER,
INTERNAL LED SIGN, ANNUNCIATION, DETAILED REPORT GENERATION & ALL
NECESSARY HARDWARE, SOFTWARE & PROGRAMMING
Category 96217. Start Price (USD) Not Specified Shopping Category Not Specified Target Price (USD) Not Specified Minimum Release
Amount (USD) Not Specified
Estimated Total Amount (USD)
Not Specified
Shuttle Bus Services at Chicago O’Hare International Airport, Chicago Dept. of Aviation, Specification Number 1275339 Work Services Form Contract
Table of Contents i
Table of Contents
BID SUBMITTAL CHECKLIST
Article 1. Requirements for Bidding and Instructions to Bidders
1.1. The Bid Documents
1.2. Obtaining the Bid Documents
1.3. Clarifications and Addenda
1.4. Examination of the Bid Documents and Work Site
1.5. Pre-Bid Conference
1.6. Questions Regarding the Bid Documents; Bidder Inquiry Deadline
1.7. Exceptions
1.8. Taxes Included in Bid Prices
1.9. Bid Prices Must Incorporate All Costs
1.10. Completion of the Bid Documents
1.11. Conflicts of Interest
1.12. Technical Difficulties
1.13. Required Forms and Fees
1.13.1. Certificate of Filing for Online EDS
1.13.2. MBE/WBE and VBE Programs
1.13.3. Bid Deposits and Bid Bonds
1.13.4. Performance and Payment Bonds
1.13.5. Contractor's Financial Statement
1.13.6. Other Required Forms and Documents
1.14. Trade Names and Substitutions
1.15. Authorized Dealer/Distributor
1.16. Estimated Quantities
1.17. Submission of Bids
1.17.1. Date, Time, and Place
1.17.2. Transparency Website; Trade Secrets
1.18. Withdrawal of Bids
1.19. Bid Opening
1.20. Effective Term of Bid
1.21. Evaluation of Bids
1.21.1. Determination of Responsiveness
1.21.1.1. Must Bid All Line Items
1.21.1.2. Mathematical Calculations
1.21.1.3. Unbalanced Bids
1.21.1.4. Cash Billing Terms
1.21.2. Determination of Responsibility
1.21.2.1. Bidder Debts or Defaults
1.21.2.2. Competency of Bidder
1.22. Rejection of Bids and Waiver of Informalities
1.23. Statutory Adjustments to the Bid
1.23.1. City-based Businesses (Chicago Business Preference)
1.23.2. Locally Manufactured Goods
1.23.3. Alternatively Powered Vehicles Bid Incentive
1.23.3.1. Definitions for Alternatively Powered Vehicles Bid Incentive
Shuttle Bus Services at Chicago O’Hare International Airport, Chicago Dept. of Aviation, Specification Number 1275339
Table of Contents ii
1.23.3.2. Eligibility for Alternatively Powered Vehicles Bid Incentive
1.23.4. Bid Incentives for Veteran-Owned Business Enterprise and Eligible Joint Ventures
1.23.4.1. Definitions
1.23.4.2. Bid Incentive
1.23.5. Business Enterprises Owned By People With Disabilities (BEPD) Commitment
1.23.5.1. Policy and Terms
1.23.5.2. Definitions
1.23.5.3. Commitments
1.23.5.4. Records and Reports
1.23.6. Mentoring Program Bid Preference (MCC 2-92-535)
1.23.7. Child Support Arrearage
1.23.8. Bid Incentive to Encourage Diverse Management and Workforce (MCC 2-92-407)
1.23.9. MacBride Principles Ordinance
1.24. Consideration of Bids
1.25. Bid Protests
1.26. Award of Contract; Notice of Award
1.27. Title VI Solicitation Notice
1.28. Policy Prohibiting Sexual Harassment (MCC 2-92-612)
1.29. Policy Regarding Non-Disclosure of Salary History (MCC 2-92-385)
Article 2. Incorporation of Exhibits Article 3. Standard Terms And Conditions
3.1. General Provisions
3.1.1. Definitions
3.1.2. Interpretation of Contract
3.1.2.1. Order of Precedence
3.1.2.2. Interpretation and Rules
3.1.2.3. Severability
3.1.2.4. Entire Contract
3.1.3. Subcontracting and Assignment
3.1.3.1. No Assignment of Contract
3.1.3.2. Subcontracts
3.1.3.3. No Pledging or Assignment of Contract Funds Without City Approval
3.1.3.4. City’s Right to Assign
3.1.3.5. Assigns
3.1.4. Contract Governance
3.1.4.1. Governing Law and Jurisdiction
3.1.4.2. Consent to Service of Process
3.1.4.3. Cooperation by Parties and between Contractors
3.1.4.4. No Third Party Beneficiaries
3.1.4.5. Independent Contractor
3.1.4.6. Authority
3.1.4.7. Joint and Several Liability
3.1.4.8. Notices
3.1.4.9. Amendments
3.1.4.10. No Waiver of Legal Rights
3.1.4.11. Non-appropriation of Funds
3.1.4.12. Participation By Other Government Agencies
3.1.5. Confidentiality
Shuttle Bus Services at Chicago O’Hare International Airport, Chicago Dept. of Aviation, Specification Number 1275339
Table of Contents iii
3.1.6. Indemnity
3.1.7. Non-Liability of Public Officials
3.1.8. Contract Extension For Continuity of Services
3.2. Compensation Provisions
3.2.1. Ordering, Invoices, and Payment
3.2.1.1. Purchase Orders
3.2.1.2. Invoices
3.2.1.3. Payment
3.2.1.4. Electronic Ordering and Invoices
3.2.1.5. City Right to Offset
3.2.1.6. Records
3.2.1.7. Audits
3.2.1.7.1. City’s Right to Conduct Audits
3.2.1.7.2. Recovery for Over-Billing
3.2.2. Subcontractor Payment Reports
3.2.3. Prompt Payment to Subcontractors
3.2.3.1. Incorporation of Prompt Payment Language in Subcontracts
3.2.3.2. Payment to Subcontractors Within Seven Days
3.2.3.2.1. Reporting Failures to Promptly Pay
3.2.3.2.2. Whistleblower Protection
3.2.3.3. Liquidated Damages for Failure to Promptly Pay
3.2.3.4. Action by the City
3.2.3.5. Direct Payment to Subcontractors By City
3.2.4. General Price Reduction – Automatic Eligibility for General Price Reductions
3.3. Compliance With All Laws
3.3.1. General
3.3.2. Certification of Compliance with Laws
3.3.3. Federal Affirmative Action
3.3.4. Civil Rights Act of 1964, Title VI, Compliance With Nondiscrimination Requirements
3.3.4.1. Title VI List of Pertinent Non-Discrimination Acts and Authorities
3.3.4.2. Compliance with Regulations
3.3.4.3. Nondiscrimination
3.3.4.4. Solicitations for Subcontracts, including Procurements of Materials and Equipment
3.3.4.5. Information and Reports
3.3.4.6. Sanctions for Noncompliance
3.3.4.7. Incorporation of Provisions
3.3.5. Other Non-Discrimination Requirements
3.3.5.1. Illinois Human Rights Act
3.3.5.1.1. Generally
3.3.5.1.2. State of Illinois Duties of Public Contractors (44 Ill. Admin. Code 750 et seq.)
3.3.5.1.3. State of Illinois Equal Employment Opportunity Clause
3.3.5.2. Chicago Human Rights Ordinance MCC Ch. 6-10
3.3.5.3. City of Chicago Equal Employment Opportunity Goals MCC 2-92-390
3.3.5.4. Business Enterprises Owned by People With Disabilities (BEPD)
3.3.6. Wages
3.3.7. Economic Disclosure Statement and Affidavit and Appendix A ("EDS")
3.3.7.1. Business Relationships With Elected Officials MCC Sect. 2-156-030(b)
Shuttle Bus Services at Chicago O’Hare International Airport, Chicago Dept. of Aviation, Specification Number 1275339
Table of Contents iv
3.3.7.2. MCC 1-23 and 720 ILCS 5/33E Bribery, Debts, and Debarment Certification
3.3.7.3. Federal Terrorist (No-Business) List
3.3.7.4. Governmental Ethics Ordinance 2-156
3.3.7.5. Lobbyists
3.3.8. Restrictions on Business Dealings
3.3.8.1. Prohibited Interests in City Contracts
3.3.8.2. Conflicts of Interest
3.3.8.3. Prohibition on Certain Contributions, Mayoral Executive Order 2011-4
3.3.9. Debts Owed to the City; Anti-Scofflaw, MCC Sect. 2-92-380
3.3.10. Other City Ordinances and Policies
3.3.10.1. False Statements
3.3.10.2. MacBride Principles Ordinance, MCC Sect. 2-92-580
3.3.10.3. City Hiring Plan Prohibitions
3.3.10.4. Inspector General
3.3.10.5. Duty to Report Corrupt Activity
3.3.10.6. Electronic Mail Communication
3.3.10.7. Participation By Other Local Government Agencies
3.3.10.8. Policy Prohibiting Sexual Harassment (MCC 2-92-612)
3.3.10.9. Policy on Non-Disclosure of Salary History (MCC 2-92-385)
3.3.10.10. Business Diversity Program Reporting
3.3.10.10.1. Policy
3.3.10.10.2. Definitions
3.3.10.10.3. Business Diversity Program Reports
3.3.10.10.4. Applicability
3.3.11. Compliance with Environmental Laws and Related Matters
3.3.11.1. Definitions
3.3.11.2. Joint Ventures
3.3.11.3. Compliance With Environmental Laws
3.3.11.4. Costs
3.3.11.5. Proof of Noncompliance; Authority; Cure
3.3.11.6. Copies of Notices and Reports; Related Matters
3.3.11.7. Requests for Documents and Information
3.3.11.8. Environmental Claims and Related Matters
3.3.11.9. Preference for Recycled Materials
3.3.11.10. No Waste Disposal in Public Way MCC 11-4-1600(E)
3.4. Contract Disputes
3.4.1. Procedure for Bringing Disputes to the Department
3.4.2. Procedure for Bringing Disputes before the CPO
3.5. Events of Default and Termination
3.5.1. Events of Default
3.5.2. Cure or Default Notice
3.5.3. Remedies
3.5.4. Non-Exclusivity of Remedies
3.5.5. City Reservation of Rights
3.5.6. Early Termination
3.6. Department-specific Requirements
3.6.1. Department of Aviation Standard Requirements
3.6.1.1. Confidentiality of Airport Security Data
Shuttle Bus Services at Chicago O’Hare International Airport, Chicago Dept. of Aviation, Specification Number 1275339
Table of Contents v
3.6.1.2. Aviation Security
3.6.1.3. Airport Security Badges
3.6.1.4. General Requirements Regarding Airport Operations
3.6.1.4.1. Priority of Airport Operations
3.6.1.4.2. Interruption of Airport Operations
3.6.1.4.3. Safeguarding of Airport Property and Operations
3.6.1.4.4. Work on the Airfield
3.6.1.4.5. Parking Restrictions
3.6.1.5. General Civil Rights (Airport and Airway Improvement Act of 1982, Section 520) .. 52
3.6.1.6. Firearms and Other Weapons Prohibited
3.6.2. Emergency Management and Communications (OEMC) Security Requirements
3.6.2.1. Identification of Workers and Vehicles
3.6.2.2. Access to Facilities
3.6.2.3. Security Badges and Vehicle Permits
3.6.2.4. Gates and Fences
3.6.2.5. Hazardous or Illegal Materials
3.6.3. Chicago Police Department Security Requirements
3.6.4. Department of Water Management ("DOWM") Security Requirements
3.6.4.1. Identification of Workers and Vehicles
3.6.4.2. Access to Facilities
3.6.4.3. Security Badges and Vehicle Permits
3.6.4.4. Gates and Fences
3.6.4.5. Hazardous or Illegal Materials
Article 4. Terms for Work Services Contracts
4.1. The Services
4.1.1. Scope of Services
4.1.2. Estimated Quantities/Level of Service
4.1.3. Unspecified Services
4.2. Performance of the Services
4.2.1. Standard of Performance
4.2.2. Standard Working Hours
4.2.3. Character of Workers
4.2.4. Quality of Materials and Inspection
4.2.5. Manufacturer's Warranty and Product Information
4.2.6. Contractor's Warranties
4.2.6.1. Correction or Re-Performance of Services
4.2.6.2. Timeliness
4.2.6.3. Delay
4.2.7. Public Convenience
4.2.8. Clean Up
4.2.9. Work Performed on City Property
4.2.10. Work In Progress
4.3. Compensation
4.4. Submission of Invoices
4.5. Clean Diesel Fleet MCC 2-92-595
Article 5. Scope of Work and Detailed Specifications
5.1. General
5.2. Basis of Award
Shuttle Bus Services at Chicago O’Hare International Airport, Chicago Dept. of Aviation, Specification Number 1275339
Table of Contents vi
5.3. No Stated Goals for VBE Participation
5.4. Illinois Prevailing Wage Act
5.5. Funding
5.6. Contract Term
5.7. Contract Extension Option
5.8. Safety Enhancing Vehicle Equipment Contracting (MCC 2-92-597)
5.8.1. Definitions
5.8.2. Safety Enhancing Requirements
5.8.3. Compliance
5.8.4. Annual Waiver Requests
5.8.5. Costs
5.8.6. Enforcement
5.9. Price Adjustments
Notwithstanding the foregoing price adjustment terms and provisions, the Chief Procurement Officer, in their sole discretion, will determine whether a price adjustment will ultimately be granted. 66
5.9.1. Loaded Hourly Rate: Bid Lines 1, 2, 3, 4 and 5
5.9.2. Consumer Price Index (CPI): Bid Lines 1-5
5.10. Bid Canvassing (Bid Lines 1, 2. 3. 4, 5 )
5.11. Technical Requirements
5.12. Liquidated Damages
5.13. Letter of Credit
5.13.1. Terms of the Letter of Credit
5.13.2. Qualified Issuers
5.13.3. No Excuse from Performance
5.13.4. Non-waiver
Article 6. Special Conditions Regarding Minority Business Enterprise Commitment, Women Business Enterprise Commitment, and veteran-Owned business enterprise commitment For Commodities or Services 73
6.1. Policy and Terms
6.2. Definitions
6.3. Joint Ventures
6.4. Counting MBE/WBE and VBE Participation Toward the Contract Specific Goals
6.5. Reductions to or Waiver of MBE, WBE, and VBE Goals
6.5.1. Direct Participation
6.5.2. Assist Agency Participation in wavier/reduction requests
6.5.3. Impracticability
6.6. Procedure to Determine Bid Compliance
6.7. Reporting Requirements During the Term of the Contract
6.8. Changes to Compliance Plans
6.8.1. Permissible Basis for Change Required
6.8.2. Procedure for Requesting Approval
6.9. Non-Compliance and Damages
6.10. Arbitration
6.11. Equal Employment Opportunity
6.12. Attachments and Schedules
Attachment B - Sample Format for Requesting Assist Agency Comments on Bidder’s Request for Reduction or Waiver of MBE/WBE/VBE Goals
Shuttle Bus Services at Chicago O’Hare International Airport, Chicago Dept. of Aviation, Specification Number 1275339
Table of Contents vii
Schedule B – Affidavit of MBE/WBE/VBE Joint Venture Schedule C-1: Letter of Intent From MBE/WBE To Self-Perform or Perform As Subcontractor, Supplier and/or Consultant
SCHEDULE C-1
SCHEDULE D-1
SCHEDULE C-V
Article 7. Insurance Requirements
MYCOI REGISTRATION
Article 8. Economic Disclosure Statement and Affidavit (EDS)
8.1. Online EDS Filing Required Prior To Bid Opening
8.2. Online EDS Web Link
8.3. Online EDS Number
8.4. Online EDS Certification of Filing
8.5. Preparation Checklist for Registration
8.6. Preparation Checklist for EDS Submission
8.7. EDS Frequently Asked Questions
Article 9. Proposal Pages Article 10. Bidder Contact Information City-Based Business Affidavit Local Manufacturing Affidavit Eligible Business For Bid Incentive For Alternatively Powered Vehicles Affidavit Veteran-Owned Business Enterprise And Eligible Joint Ventures Affidavit Bidder must complete the applicable signature line(s) BELOW Bidder's Commitment To Utilize Business Enterprises Owned By People With Disabilities (BEPD) Mentoring Program Bid Preference Affidavit Diverse Management and Workforce Bid Incentives Affidavit ARTICLE 11. Execution And Acceptance Pages
11.1. Bid Execution By a Corporation
11.2. Bid Execution By A Joint Venture
11.3. Bid Execution By A Partnership
11.4. Bid Execution By a Sole Proprietor
11.5. Bid Acceptance by City
EXHIBITS
Exhibit 1: Example Insurance Certificate of Coverage Exhibit 2: SEXUAL HARASSMENT POLICY AFFIDAVIT (SECTION 2-92-612)
Shuttle Bus Services at Chicago O’Hare International Airport, Chicago Dept. of Aviation, Specification Number 1275339
Bid Submittal Checklist 1
BID SUBMITTAL CHECKLIST
Missing Information, Documents, and/or Bonds May Invalidate Your Bid.
To help ensure that you are submitting a complete bid, place an "X" next to each item below after completing and incorporating the item into your bid package. Write “N/A” if an item does not apply to your bid.
1. _____ Bid Submittal Checklist
2. _____ Responsiveness as to Shuttle Bus Specifications: Bid Submittal Requirements (See Section 2 of Exhibit 3: Technical Requirements of the Scope of Services for additional details)
a. At least three (3) references from past clients, indicating significant experience in performing Services of comparable scope and magnitude to this Specification
b. Photographs, renderings, or sketches of the Shuttle Busses that the Bidder intends to provide
3. Documentation from manufacturer, dealer, or distributor (if new) or dealer or distributor (if on order or used) of the Shuttle Busses that Bidder intends to provide, evidencing the readiness, willingness, and ability of the manufacturer, dealer, or supplier to provide the Shuttle Busses according to the specifications and delivery requirements set forth herein. _____ Insurance Certificate of Coverage
4. _____ MBE/WBE Compliance Plan
a. _____ Schedule B – Affidavit of Joint Venture MBE/WBE – (only if bidder is a joint venture)
b. _____ Schedule C-1: Letter(s) of Intent from MBE/WBE to Perform as Sub-contractor, Supplier and/or Consultant (if applicable).
c. _____ Schedule D-1: Affidavit of MBE/WBE Goal Implementation Plan (if applicable).
d. _____ Request for a reduction or waiver of MBE/WBE goals (if applicable)
5. _____ Certificate of Filing of Economic Disclosure Statement and Affidavit (EDS)
6. _____ Bid incentive/preference affidavit(s): Chicago Business, Local Manufacture, Alternatively Powered Vehicles, Veteran-Owned Small Local Business or Eligible Joint Venture, Utilization of Veteran-Owned Subcontractors, Mentoring Program, Commitment Regarding BEPD, and/or Diverse Management and Workforce (if applicable)
7. _____ Proposal Page(s) (Schedule of Prices) (4.1 Additional Proposal Page)
8. _____ Bid Execution Page
9. _____ Bid Deposit (if required)
10. _____ Sexual Harassment Policy Affidavit
11. _____ List of key personnel and their professional background of personnel proposed to be assigned to the Contract
12. _____ Maintenance Plan and Cleaning Plan (see Section 5 of Exhibit 3 for additional details).
13. _____ Training Plan ( see Section 4 of Exhibit 3 for additional details).
Shuttle Bus Services at Chicago O’Hare International Airport, Chicago Dept. of Aviation, Specification Number 1275339
Bid Submittal Checklist 2
Fueling Plan (see Section 7 of Exhibit 3 for additional details)
NOTE: Each page requiring a signature must be signed by the person with proper authority and sworn before a Notary Public where noted.
NOTE: Each Bidder must acknowledge the receipt of a full set of Bid Documents and any and all Addenda at the top of the Bid Execution Page.
Shuttle Bus Services at Chicago O’Hare International Airport, Chicago Dept. of Aviation, Specification Number 1275339
City-Funded: Requirements for Bidding and Instructions for Bidders (non-construction) 03.29.2022 1
ARTICLE 1. REQUIREMENTS FOR BIDDING AND INSTRUCTIONS TO BIDDERS
Read this carefully before preparing your bid.
1.1. The Bid Documents
This is an eProcurement Bid. Bids are to be submitted through the City’s “iSupplier” system, the City’s eProcurement computer system for electronic bidding and providing Contractors with access to contract, ordering and payment information for their City contracts.
The Bid Documents means all the documents issued by the Chief Procurement Officer, or referenced by the Chief Procurement Officer as being available in the iSupplier system and incorporated by such reference, in connection with an invitation for bids or proposals and include the various components of the solicitation which include the Cover Page, Legal Advertisement Notice, these Contract Terms and Conditions, the Detailed Specifications, Plans and Drawings (if any), Insurance Requirements, and all other attachments as listed in the iSupplier Header Information, “Attachments” section, and any and all Clarifications and Addenda issued by the City. Bid Proposal Pages, Requirements for Bidding and Instructions for bidding and the following provisions apply to this bid. Upon the award and execution of a contract pursuant to the Bid Documents, the Bid Documents become the Contract Documents.
1.2. Obtaining the Bid Documents
Bidders are solely responsible for obtaining all Bid Documents, including Clarifications and Addenda.
Documents may be downloaded from the Department of Procurement Services (“DPS”) website at the following URL:
http://www.cityofchicago.org/eProcurement
Click on “Current Bids”
In order to receive notice of clarifications and addenda, Bidders be registered for and log-in to iSupplier, search for the solicitation number, open the solicitation for review, accept the disclaimer. This will sign Bidders up for notifications.
Bid Document Holders are listed on the Bid & Bond Room Opportunity Take Out List. The Opportunity Take Our List is public information and is posted to the DPS web site at www.cityofchicago.org/TOL. To find Opportunity Take Out lists go to “Get Started Online” and search by the specification number.
1.3. Clarifications and Addenda
The City will send an email notification to suppliers who have indicated intent in a Bid that an addendum or clarification has been issued. The Clarifications and Addenda incorporated into the electronic bid document available at the following URL:
https://www.cityofchchicago.org/eProcurement
Suppliers that have indicated interest in a Bid will receive email notification that an addendum or clarification has been issued. There may be multiple Clarifications and Addenda. Failure to obtain Clarifications and/or Addenda, for whatever cause, will not relieve a Bidder from the obligation to bid accordingly to and comply with any changed or additional terms and conditions contained in the Clarifications and Addenda.
Electronic Acknowledgement of Clarifications and/or Addenda is mandatory to submit an electronic Bid. Any harm to the bidder resulting from failure to obtain all necessary documents, for whatever cause, will not be valid grounds for a protest against award(s) made under this bid Solicitation.
1.4. Examination of the Bid Documents and Work Site
Bidders are required to carefully examine all of the Bid Documents before completing the forms and submitting a Bid. If the specification calls for work to be performed onsite, Bidders are also required to inspect the site of the work to be performed, and familiarize itself with the conditions at the site that will affect the work.
http://www.cityofchicago.org/eProcurement http://www.cityofchicago.org/TOL https://www.cityofchchicago.org/eProcurement
Shuttle Bus Services at Chicago O’Hare International Airport, Chicago Dept. of Aviation, Specification Number 1275339
City-Funded: Requirements for Bidding and Instructions for Bidders (non-construction) 03.29.2022 2
A Bidder that is awarded a contract will be solely responsible for all costs arising from and associated with that Bidder’s (i) failure to comply with the requirements of the Bid Documents, including, without limitation, this requirement to inspect the Bid Documents and site of the work, and (ii) failure to include any costs or expense attributable to site conditions that could have reasonably been discovered through a site inspection or examination of the Bid Documents.
1.5. Pre-Bid Conference
The City will hold a Pre-Bid Conference at Aviation Administration Building, 10510 West Zemke Road, Chicago, IL 60666 at 10:00 a.m. Central Time on May 21, 2026. All parties interested in responding to this Specification are strongly encouraged to attend in person.
All interested Attendees are encouraged to register in advance of the Pre-Bid Conference. Attendees should send an e-mail to thomas.magno@cityofchicago.org.
E-mail Subject line must read: Shuttle Bus Services at O’Hare, Spec 1275339.
The City will answer questions and clarify the terms of the Specification at the Pre-Bid Conference. The City may respond both to questions posed on the day of the conference and to questions sent via online discussion in iSupplier prior to the conference.
Anything stated at this Pre-Bid Conference is not intended to change the solicitation document. Any changes will be in writing in the form of an Addendum issued by the Department of Procurement Services.
1.6. Questions Regarding the Bid Documents; Bidder Inquiry Deadline All inquiries regarding the Bid Documents or procurement process must be directed to the Procurement Specialist/Senior Procurement Specialist via online discussion in iSupplier or via the address listed on the front cover of the Bid Documents.
The Bidder Inquiry Deadline is listed on the front cover of the Bid Documents under “Deadline for Questions.” Inquiries received after the Bidder Inquiry Deadline will not be answered except at the discretion of the Chief Procurement Officer.
Bidders may only rely on written answers in a Clarification or in an Addendum duly issued by the Chief Procurement Officer. Bidders cannot rely on oral or informal responses; such answers will not be binding upon the City.
1.7. Exceptions
Any deviations from or exceptions to any provisions or requirements of the Bidding documents, including but not limited to the specifications of the goods and/or services to be provided, must be noted on the Proposal Page(s) or attached thereto, with the exact nature of the change outlined in sufficient detail, and as provided below under “Trade Names and Substitutions,” as applicable. Bidder must provide the reason for which deviations were made. Failure of a Bidder to comply with the terms of this paragraph may be cause for rejection of its Bid.
If a Bidder takes exception to or deviates from any provision or requirement, the Chief Procurement Officer shall reject the Bid as non-responsive in the event that the Chief Procurement Officer, in his or her sole opinion, determines such exception(s) or deviations to be material.
1.8. Taxes Included in Bid Prices
With few exceptions, materials purchased by the City of Chicago are not subject to the Federal Excise Tax.
The Illinois Retailers’ Occupation Tax, Use Tax, and Municipal Retailers’ Occupation Tax do not apply to materials or services purchased by the City of Chicago.
Bidders shall include all other applicable federal, state and local taxes, direct or indirect, in their Bid Prices.
1.9. Bid Prices Must Incorporate All Costs
Bid pricing must incorporate any/all peripheral costs including, but not limited to the costs of products/services, delivery/transportation charges, training, materials, labor, insurance, applicable taxes, warranty, overhead and profit, etc. that are required by the Bid Documents.
Shuttle Bus Services at Chicago O’Hare International Airport, Chicago Dept. of Aviation, Specification Number 1275339
City-Funded: Requirements for Bidding and Instructions for Bidders (non-construction) 03.29.2022 3
1.10. Completion of the Bid Documents
Bids for this Specification must be submitted electronically through iSupplier. Each Bidder must complete all of the forms listed on the Bid Submittal Checklist (with the exception of the Proposal Pages) in the Requirements section and scan and upload them as attachments to the electronic bid submission via iSupplier. Bidders may not change any of the Bid Documents. Any changes made by a Bidder to the Bid Documents may result in rejection of the Bid, and will not be binding upon the City.
Bidders must submit their pricing electronically by filling out bid lines in the electronic Price Schedule in the iSupplier system.
Bidders must use the Bid Execution Page that is appropriate for their form of business organization (e.g. sole proprietorship, corporation, partnership, or joint venture). The individual(s) that sign the Bid Execution Page on behalf of the Bidder, by their signature, represents and warrants to the City that such individual is authorized to execute bids and contracts on behalf of the Bidder, and that the Bidder agrees and shall be bound to all of the terms and conditions of the Bid Documents and, upon execution by the City, the Contract Documents, Signatures must be sworn before a Notary Public. The form must be printed, signed, notarized and scanned then uploaded as an attachment to the electronic bid submission.
1.11. Conflicts of Interest
If any Bidder (or any partner in a joint venture or partnership or any member of the limited liability company if the Bidder is a joint venture, partnership, LLP, or LLC) has assisted the City in the preparation of these Bidding Documents such that provision of such assistance would give Bidder an unfair advantage or otherwise impair the integrity of the procurement process, or if Bidder has an organizational conflict of interest that might compromise Bidder’s ability to perform the contract, that Bidder may be disqualified from bidding. If applicable, Bidder must provide a statement and information disclosing its participation with respect to the Bid Documents and/or potential organizational conflicts of interest.
1.12. Technical Difficulties
The bidder is solely responsible for ensuring timely submission of their electronic solicitation response.
Failure to allow adequate time prior to the Bid Opening to complete and submit a response to a solicitation, particularly in the event technical support assistance is required, places the bidder and their response at risk of not being accepted on time. The bidder is advised that the iSupplier system requires acknowledgement of a disclaimer and an electronic signature before a solicitation response is accepted. The bidder is further advised that the iSupplier system checks for the completion of system-required fields before allowing the bidder to electronically sign and submit their response electronically. Bidders who wait until nearly the time of Bid Opening may not be allowed to sign and submit their document due to missing required fields.
Should the bidder encounter technical difficulty with their bid submission, the bidder must contact the City’s eProcurement Help Desk at 312-744-HELP or customersupport@cityofchicago.org, Monday through Friday, 8:30 a.m. to 4:30 p.m., excluding City holidays.
1.13. Required Forms and Fees
1.13.1. Certificate of Filing for Online EDS
Bidders must complete an online EDS prior to the bid due date. A Bidder who does not file an electronic EDS prior to the bid due date may be found non-responsive and its bid rejected. If you are unable to complete the EDS online and print a Certificate of Filing prior to the response due date, the City will accept a paper EDS provided written justification is provided explaining the Bidders good faith efforts to complete it before the response due date and the reasons why it could not be completed. Refer to the Instructions for Completing Economic Disclosure Statement and Affidavit On-Line.
1.13.2. MBE/WBE and VBE Programs
The goals for MBE, WBE, and VBE participation are set forth in the Special Conditions Regarding Minority Business Enterprise Commitment, Women Business Enterprise Commitment, and Veteran-Owned Business Enterprise Commitment (“M/W/VBE Special Conditions”). The rules, regulations, and forms for achieving these goals are set forth in M/W/VBE Special Conditions.
• Schedule B: Affidavit of Joint Venture (if applicable)
Shuttle Bus Services at Chicago O’Hare International Airport, Chicago Dept. of Aviation, Specification Number 1275339
City-Funded: Requirements for Bidding and Instructions for Bidders (non-construction) 03.29.2022 4
If applicable, complete and submit this form if a non-certified firm has formed a joint venture with one or more MBE/WBE or VBE certified firms (as applicable) to submit a Bid.
Such Affidavit should be signed by the appropriate Joint Venture members and notarized.
• MBE/WBE Letter of Intent to Perform as a Subcontractor, Supplier, or Consultant (Schedule C, C-1, C-2, or C-3 as specified in M/W/VBE Special Conditions.)
If applicable, include a completed Letter of Intent from each certified MBE or WBE that will perform as a Subcontractor, Supplier and/or Consultant. Such letter(s) must be signed and notarized.
• Affidavit of Prime Contractor Regarding MBE/WBE Utilization Compliance Plan (Schedule D, D-1, D-2, or D-3 as specified in M/WBE Special Conditions.)
If applicable, include the Bidder’s Affidavit of MBE/WBE Goal Implementation Plan. This Affidavit must be signed and notarized.
• VBE Letter of Intent to Perform as a Subcontractor, Supplier, or Consultant
(Schedule C-V, C-V-1, C-V-2, or C-V-3 as specified in the M/W/VBE Special Conditions.)
If applicable, include a completed Letter of Intent from each certified VBE that will perform as a Subcontractor, Supplier and/or Consultant. Such letter(s) must be signed and notarized.
• Affidavit of Prime Contractor Regarding VBE Utilization Compliance Plan
(Schedule D-V, D-V-1, D-V-2, or D-V-3 as specified in the M/W/VBE Special Conditions.)
If applicable, include the Bidder’s Affidavit of VBE Goal Implementation Plan. This Affidavit must be signed and notarized.
• Request for a Reduction or Waiver of the MBE/WBE/VBE Goals If applicable, after making good faith efforts, the Bidder is unable to provide a plan for the utilization of MBE, WBE, and VBE firms that will achieve compliance with the MBE/WBE/VBE goals, the Bidder must, as required by the M/W/VBE Special Conditions, submit a request for whole or partial waiver of the goals with its Bid. Any waiver request must include documentation as required by the M/W/VBE Special Conditions including but not limited to notification to an assist agency.
1.13.3. Bid Deposits and Bid Bonds
If a bid deposit is required, it will be indicated on the front cover of the Bid Documents.
When submitting an electronic bid, scan and upload a copy of your bid deposit with your submittal documents. The 1st and 2nd apparent low bidders will be required to deliver their original and properly executed bid deposit to the Bid and Bond Room within two business days following the Bid Opening Date.
1.13.4. Performance and Payment Bonds
If a performance and payment bond is required, failure to provide the required bond within the required time period when requested will result in rejection of the bid and forfeit of the bid deposit, if a deposit was required. The forfeiture shall not limit any other City remedies against the Bidder. Performance and payment bonds must be in the form specified by the City, a specimen of which will be attached to the Bid Documents as an exhibit or available from the Bid & Bond Room.
MCC Section 2-92-040 requires that the surety be listed as a certified surety in the current edition of U.S.
Treasury Department Circular 570 and have an underwriting limitation in that publication in an amount greater than the amount bid. Circular 570 is available at https://www.fiscal.treasury.gov/surety-bonds/circular-570.html. Co-sureties may be accepted in the sole discretion of the CPO, but each co-security must individually meet the requirement. Reinsurance may not be used to achieve a sufficient underwriting limitation.
https://www.fiscal.treasury.gov/surety-bonds/circular-570.html https://www.fiscal.treasury.gov/surety-bonds/circular-570.html
Shuttle Bus Services at Chicago O’Hare International Airport, Chicago Dept. of Aviation, Specification Number 1275339
City-Funded: Requirements for Bidding and Instructions for Bidders (non-construction) 03.29.2022 5
If a performance and payment bond is required to be provided prior to contract award, it will be indicated on the front cover of the Bid Documents.
1.13.5. Contractor's Financial Statement
If requested by the Chief Procurement Officer, Bidder must file a "Contractor's Statement of Experience and Financial Condition" dated not earlier than the end of Bidder's last fiscal year period. The "Contractor's Statement of Experience and Financial Condition" will be kept on file as a representative statement for one year. The "Contractor's Statement of Experience and Financial Condition" forms are available in the Bid & Bond Room, City Hall Room 103, Chicago, IL 60602, or may be downloaded at https://www.chicago.gov/dam/city/depts/dps/ContractAdministration/StandardFormsAgreements/cont ractorsstatementexperiencefinancialcondition.pdf. Failure to provide a "Contractor's Statement of Experience and Financial Condition" if requested may be cause for rejection of the Bid.
1.13.6. Other Required Forms and Documents
Other forms required to be provided with the Bid include:
• Insurance Certificate of Coverage
• Sexual Harassment Policy Affidavit
• Economic Disclosure Statement and Affidavit (“EDS”)
• DBE or MBE/WBE compliance forms as applicable
• Proposal Page(s) (Schedule of Prices)
• Bid Execution Page
1.14. Trade Names and Substitutions
Reference to a specific manufacturer or trade name in this solicitation is intended to be descriptive (but not restrictive) and to indicate to prospective bidders those product(s) that have been deemed by the City to be satisfactory. The Bidder must, if awarded the Contract, provide the product(s) specified, unless equivalent alternatives have been proposed as described below and found acceptable to the Chief Procurement Officer.
A Bidder that chooses to respond to this solicitation for bids with alternate product(s) from those specified in the solicitation, must identify such alternate items with its Bid with a detailed explanation and documentation in support of how the alternate items proposed by the Bidder can perform as well as or better than those specified. Unless an alternate item is so identified, it is understood that the Bidder proposes, and will be required to provide, the specific item described in the specifications. No substitution of specified items will be allowed thereafter except as otherwise provided for in the specifications.
Documentation in support of alternate items includes:
1) Complete data substantiating compliance of proposed alternate items with requirements stated in the solicitation, including:
a) Product identification, including manufacturer's name and address.
b) Manufacturer's literature identifying:
i) Product description
ii) Reference standards
iii) Performance and test data
c) Samples, as applicable
d) Name and address of similar projects on which the product has been used, and date of usage.
2) Itemized comparison of the proposed alternate item with product or service specified; listing of significant variations.
A Bidder warrants and represents that in making a formal request for substitution with alternate items that:
1) The proposed alternate item is equivalent to or superior in all respects to the product specified, and
Shuttle Bus Services at Chicago O’Hare International Airport, Chicago Dept. of Aviation, Specification Number 1275339
City-Funded: Requirements for Bidding and Instructions for Bidders (non-construction) 03.29.2022 6
2) The same warranties and guarantees will be provided for the alternate item…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .