Distribution Pole Replacement Project-City of Gallup (Stagecoach)
Solicitation number
2025-ITB-012
Issued by
Quay County, New Mexico

About this file

This document is a City of Gallup Electric Department work order and project specification for the Stagecoach Pole Replacement Project located at 1714 Calle Pinon. The project involves removing existing Pole #6720 and a streetlight, then relocating a new 40-foot wood pole approximately 18 feet south of the current location. The work order, dated 04/24/2023, indicates the project is classified as maintenance and includes detailed instructions for installing midspan service drops to meters 4468 and 4642, reinstalling service drops to meters 4470 and 4640, and setting a new pole with grounding. The project was initially scheduled for completion between 5/2/2023 and 5/22/2023, but was subsequently aborted for a redesign with the scope of work to be determined.

The project will be charged to the Electric Department's maintenance overhead line expense account (507-6061-442.44-91). Comprehensive material specifications are provided, detailing the exact components required for the pole replacement, including a 40-foot wood power line pole, ground guards, copper grounding rods, wire, bolts, insulators, and other necessary hardware. The work order includes a detailed site map showing the location of meters, current pole placement, and proposed new pole location on Calle Pinon. The project appears to be part of the City of Gallup's ongoing infrastructure maintenance and improvement efforts for electrical distribution infrastructure.

View the file

Other files

File Type Posted
Distribution_Pole_Replacement_Project-City_of_Gallup_(Stagecoach)_(Addendum_#1_Revision).pdf PDF
6830.pdf PDF
10087.pdf PDF
6648.pdf PDF
6633.pdf PDF
6642.pdf PDF
6664.pdf PDF
6610.pdf PDF
6647.pdf PDF
6726.pdf PDF
6843.pdf PDF
6824.pdf PDF
Wage_Decision_MC-24-3299-A.pdf PDF
GALLUP_PERFORMANCE_BOND.pdf PDF
GALLUP_SAMPLE_CONTRACT.pdf PDF
GALLUP_PAYMENT_BOND.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE: PROJECT NAME:

POLE #:

NEW CONSTRUCTION SYSTEM IMPROVEMENT MAINTENANCE

CI YOF

ALLUP

DATE REQUESTED:

REFERENCE NO:

BEGINNING DATE:

COMPLETION DATE:

DATE REQUESTED:

REFERENCE NO:

BEGINNING DATE:

COMPLETION DATE:

ELECTRIC DEPARTMENT CHARGING ACCOUNTS

[~] PROJ ECT# 307-6061-442._-_

[J OVERHEAD LINE EXPENSE 507-6061-442.48-91

[J UNDERGROUND LINE EXPENSE 507-6061-442.48-92

El TRANSFORMER UNIT 507-6061-442.48-21

(~ MAINTENANCE

~] OVERHEAD LINE EXPENSE 507-6061442.44-91

LI UNDERGROUND LINE EXPENSE 507-6061-44244-92

ILl STATION & METER EXPENSE 507-6061-442.44-93

LI TRAFFIC SIGNAL EXPENSE 507-6061-442.44-94

~LI STREET LIGHTS EXPENSE 507-6061-442.44.95

Electric

RELEASE DATE:

WORK ORDER#: E23-1 26

BILLABLE

04/24/2023 PROJECT NAME: Stagecoach Project 1714 CaIle Pinon

ADDRESS:

PROJECT TYPE:

PROJECT

DESCRIPTION:

1714 Calle Pinon

~NEW CONSTRUCTION E~SYSTEM IMPROVEMENT EIMAINTENANCE

Remove Pole #6720, Streetlight and relocate new pole app rox. 1 8ft south of the present location.

Once new pole is set, coordinate with Communication to remove from old pole and re-attach to new pole.

NM ONE CALL (811)

( CAPITAL

Do not re-attach fixture, not being billed through utility

4/27/2023

23AP270356

5/2/2023 5/22/2023

Project abort for a redesign scope of work TBD

Stagecoach Project 1714 Calle Pinon

Install midspan Svc Drops to Meters 4468 &

1 7~1 8

Remove Pole; Al .1

Remove Streetlight

Relocate Svc Drops

Install 40-4 Pole wI GRD; AlA

Reinstall Svc Drops to Meters 4470 & 4640

C’L P1 0

C-) w

CD

Stagecoach Project 1714 Calle Pinon

40 WOOD POLE WITH GROUNDING

Sub Stk # Material Description Qty.

40 E5850 POLE WOOD POWER LINE 40’ 1

50 E5655 GROUND GUARD PLASTIC 1/2’ X 8’ 1

50 E5990 STAPLE CU GR WIRE 1-1/2”X3/8”X.162” 1

50 E5991 STAPLE GR GUARD GALV 2”X5/8”X.162” 8

130 E5229 CLAMPGRD.RODCOPPER5/8” I

130 E5911 RODCOPPERGROUND5/8”x8’ 1

160 E6242 WIRE CU SOLID BARE #6 35

10 Tangent A1.1 #2ACSR

Sub Stk # Material_Description Qty.

10 E5119 BOLTMACHINE5/8X1OGALV. 1

10 E5120 BOLT MACHINE 5/8X12 GALV. 2

10 E5157 BOLT SINGLE UPSET 5/8X12 GALV 1

20 E5647 NEUTRAL SPOOL TIE #2 AL W/PAD 1

~ 30 E5766 LOCKNUT GLV 5/8 SQUARE 4

30 E6178 WASHERSQFLAT2-1/4X21/4 4

50 E5673 INSULATOR PIN TYPE 15 Ky F-NECK 1

50 E5675 INSUL SPOOL WET PROC. 3’ UPSET 1

50 E5832 PIN POLE TOP 24 JOSLYN #J-2010 1

50 E6053 TIE WRAPLOCK F/#2ACSR F-NECK 1

050 j E6197 MID SPAN CABLE SPREADER FOR TRIPLEX/QUADRAPLEX I

undefined: 8/23/24
undefined_2: Stagecoach Pole Proj./Broken
undefined_3: 1714 Calle Pinion
NEW CONSTRUCTION: Off
SYSTEM IMPROVEMENT: Off
MAINTENANCE: Off
undefined_4: Shed in front of pole w/light (remove light, not paid by anyone)

Yard clear except for shed Possible relocate pole in yard Text1: 6720