671-22-198 Update CLC HVAC System IFC Drawings SEALED 2022-08-16 R1_01.pdf
PDF 12 MB Posted
- Attached to
- Z2DA-Solicitation Cancellation Notice for 36C25725B0006 Update CLC HVAC System – Project# 671-22-198
- Solicitation number
- 36C25725B0006
About this file
This document appears to be a set of IFC (Issued for Construction) drawings for updating the HVAC system at a Community Living Center (CLC) facility, related to Solicitation 36C25725B0006 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17. The solicitation is for the project titled "UPDATE CLC HVAC SYSTEM, Project# 671-22-198". The drawings provide technical details and specifications for the HVAC system upgrades required under this contract opportunity. No other details about the solicitation requirements, pricing, set-asides, or award information are included in this particular document.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/1
/2
:2
:0
P
M C
U s e rs \l e n g e l\ D o c u m e n ts \A
-2
-V
A S a n A n to n io
-C L
C T
X le n g e l9
W S
P G
.r v t
G-001
COVER SHEET
1 6LE
UPDATE CLC HVAC SYSTEM
AUDIE L. MURPHY VAMC
7400 MERTON MINTER
SAN ANTONIO, TX 76504 AUGUST 16, 2022
100% CONSTRUCTION DOCUMENTS
671-22-19821-289-Q22
UPDATE CLC HVAC SYSTEM
AUDIE L. MURPHY VAMC
7400 MERTON MINTER
SAN ANTONIO, TX 76504
VA PROJECT #: 671-22-198
CK
DRAWING LIST
GENERAL
G-001 COVER SHEET 1 6
G-002 GENERAL INFORMATION 2 6
G-003 ICRA INFORMATION AND DETAILS 3 6
G-004 PRE-CONSTRUCTION RISK ASSESSMENT FORMS 4 6
GL101 FIRST FLOOR LIFE SAFETY 5 6
GL102 SECOND FLOOR LIFE SAFETY 6 6
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 4
P-401 FIRST FLOOR ENLARGED MECHANICAL ROOM PLUMBING DEMOLITION PLAN 2 4
P-402 FIRST FLOOR ENLARGED MECHANICAL ROOM PLUMBING PLAN 3 4
P-501 PLUMBING DETAILS 4 4
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 19
MD101A FIRST FLOOR MECHANICAL DEMOLITION PLAN - AREA A 2 19
MD101B FIRST FLOOR MECHANICAL DEMOLITION PLAN - AREA B 3 19
MD101C FIRST FLOOR MECHANICAL DEMOLITION PLAN - AREA C 4 19
MD102A SECOND FLOOR MECHANICAL DEMOLITION PLAN - AREA A 5 19
MD102B SECOND FLOOR MECHANICAL DEMOLITION PLAN - AREA B 6 19
MD102C SECOND FLOOR MECHANICAL DEMOLITION PLAN - AREA C 7 19
MP101A FIRST FLOOR MECHANICAL CONTROL PLAN - AREA A 8 19
MP101B FIRST FLOOR MECHANICAL CONTROL PLAN - AREA B 9 19
MP101C FIRST FLOOR MECHANICAL CONTROL PLAN - AREA C 10 19
MP102A SECOND FLOOR MECHANICAL CONTROL PLAN - AREA A 11 19
MP102B SECOND FLOOR MECHANICAL CONTROL PLAN - AREA B 12 19
MP102C SECOND FLOOR MECHANICAL CONTROL PLAN - AREA C 13 19
M-401 ENLARGED MECHANICAL ROOM PLANS 14 19
M-501 MECHANICAL DETAILS 15 19
M-502 MECHANICAL CONTROLS 16 19
M-503 MECHANICAL CONTROLS SCHEMATIC - EXISTING AHU 17 19
M-601 MECHANICAL SCHEDULES 18 19
M-901 MECHANICAL ISOMETRIC PLANS 19 19
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 9
EP101A FIRST FLOOR POWER PLAN - AREA A 2 9
EP101B FIRST FLOOR POWER PLAN - AREA B 3 9
EP101C FIRST FLOOR POWER PLAN - AREA C 4 9
EP102A SECOND FLOOR POWER PLAN - AREA A 5 9
EP102B SECOND FLOOR POWER PLAN - AREA B 6 9
EP102C SECOND FLOOR POWER PLAN - AREA C 7 9
E-401 ELECTRICAL ENLARGEMENTS 8 9
E-601 PANEL SCHEDULES 9 9
PROJECT LOCATIONPROJECT AREA
DAVID J.
REICHARD
Charlotte, NC
ST
AT
E OF SOUT H CAROL
I NA
REG IST ER ED A RCHITECT
DocuSign Envelope ID: 02BF77D1-802F-45CC-828C-1A4FC547C7F7
8/15/2022
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO
PARTICIPATE IN VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND
STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• INTERNATIONAL BUILDING CODE (IBC) 2021 (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES
BELOW)
• NFPA 101 LIFE SAFETY CODE 2021 (SEE NOTES BELOW)
• DEPARTMENT OF VETERANS AFFAIRS: ELECTRICAL DESIGN MANUAL, DECEMBER 2019
• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• NFPA 70 NATIONAL ELECTRICAL CODE (NEC) 2020
• INTERNATIONAL PLUMBING CODE (IPC) 2021
• SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• ASME BOILER AND PRESSURE VESSEL CODE 2021
• ASME CODE FOR PROCESS PIPING B31.3- 2020
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
STANDARD (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH- RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE
VA MASTER CONSTRUCTION SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2019.
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION
FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY
HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:0
P
M C
U s e rs \l e n g e l\ D o c u m e n ts \A
-2
-V
A S a n A n to n io
-C L
C T
X le n g e l9
W S
P G
.r v t
G-002
GENERAL INFORMATION
2 6LE
UPDATE CLC HVAC SYSTEM
AUDIE L. MURPHY VAMC
7400 MERTON MINTER
SAN ANTONIO, TX 76504 AUGUST 16, 2022
100% CONSTRUCTION DOCUMENTS
671-22-19821-289-Q22
DJR
GENERAL SYMBOL LEGEND CODE STANDARDS AND EXECUTIVE ORDERS
CLOSE COORDINATION BY THE CONTRACTOR
WILL BE REQUIRED WITH THE VA/COR TO
ENSURE WORK BEING COMPLETED UNDER
ANOTHER CONTRACTS DOES NOT DUPLICATE
WORK ACTIVITIES OR PREVENT EITHER
CONTRACTS FROM BEING COMPLETE. THE
CONTRACTOR SHOULD SCHEDULE ALL WORK
ACTIVITIES IN ADVANCE WITH THE COR.
THE CONTRACTOR IS RESPONSIBLE FOR ALL
REQUIREMENTS OF DIVISION I SPECIFICATIONS -
SEE SPECIFICATIONS.
DAVID J.
REICHARD
Charlotte, NC
ST
AT
E OF SOUT H CAROL
I NA
REG IST ER ED A RCHITECT
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS
FOR CONSTRUCTION AND RENOVATION
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
FOR UPDATE CLC HVAC SYSTEM
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
III/IVLOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
II
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 IV
IV
IV
III/IV
III/IV
III
III/IV
I
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
- Bldg. #69 Therapy areas
- Respiratory Therapy
- Outpatient Clinics
- CBOC's
- Mental Health Units
- VACANT AREA ADJACENT TO
OCCUPIED AREA
- Office areas (non-clinical)
- Hallways
- FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
- Pharmacy
- Radiology/ CT Scanner
- Urgent Care
- Laboratories
- CLCs
- SPD; AMCU;
- Respiratory Isolation Rooms
- Surgery
III
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
C
LA
S
S
II
During Construction Project
C L-
I C
LA
S
S
II
I
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust.
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.
7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:0
P
M C
U s e rs \l e n g e l\ D o c u m e n ts \A
-2
-V
A S a n A n to n io
-C L
C T
X le n g e l9
W S
P G
.r v t
G-003
ICRA INFORMATION AND DETAILS
3 6LE
UPDATE CLC HVAC SYSTEM
AUDIE L. MURPHY VAMC
7400 MERTON MINTER
SAN ANTONIO, TX 76504 AUGUST 16, 2022
100% CONSTRUCTION DOCUMENTS
671-22-19821-289-Q22
CK
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
DUST CONTROL PLAN NOTES
A. DEMOLITION DEBRIS: DEBRIS SHALL BE
REMOVED IN CARTS WITH TIGHTLY FITTED COVERS,
USING DESIGNATED TRAFFIC ROUTES .EFFORTS SHALL
BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN
EMPHASIS ON TRANSPORT DURING THE LOWEST
PERIOD OF ACTIVITY. DEBRIS SHALL BE REMOVED
DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF
CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH
EFFICIENCY PARTICULATE AIR (HEPA) FILTERED
NEGATIVE AIR MACHINES SHALL BE USED, AND THE
CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE.
FILTERS SHALL BE BAGGED AND SEALED BEFORE
BEING TRANSPORTED OUT OF THE CONSTRUCTION
AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE COR.
B. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE
CONSTRUCTION AREA SHALL BE NEGATIVE WITH
RESPECT TO SURROUNDING AREAS AND WITH NO
DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS.
USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN
THE ENCLOSURE TO REMOVE DUST SHALL PASS AIR
THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA
FILTER CAPABLE OF FILTRATION RATES OF 300-800
CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR
DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF
EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR
SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE
USED BEFORE EXHAUST TO PREVENT CONTAMINATION
OF THE DUCTS.
C. ADJACENT AREAS: THE STATUS OF SEALED
PENETRATIONS AND INTACT CEILING SHALL BE
VERIFIED DAILY.
D. AIR EXCHANGE RATES AND PRESSURE
RELATIONSHIPS: VAMC AND CONTRACTOR SHALL
VERIFY AND MAINTAIN PROPER RATES IN CRITICAL
AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE
AIR IS NOT BEING RE-CIRCULATED WITHOUT
FILTRATION FROM THE CONSTRUCTION AREA
ELSEWHERE. PROVIDE AIR PRESSURE TESTING
THROUGHOUT THE PROJECT IN THE FREQUENCY AS
IDENTIFIED BY THE COR.
E. TEMPORARY, REUSABLE ICRA BARRIER, (EX.
STARC WALL SYSTEM), CAN BE USED IF A NON RATED
BARRIER IS ACCEPTABLE.
MOBILE TENT WORK CARTS WILL BE USED TO REMOVE
AND REPLACE CEILING TILES TO INSTALL VAV BOXES
AND TO INSTALL CONTROL WIRING TO THERMOSTATS.
DAVID J.
REICHARD
Charlotte, NC
ST
AT
E OF SOUT H CAROL
I NA
REG IST ER ED A RCHITECT
DocuSign Envelope ID: 02BF77D1-802F-45CC-828C-1A4FC547C7F7
8/15/2022
VHASTXHernaM4 Snapshot
VHASTXHernaM4 Snapshot
UPDATE CLC HVAC SYS.
B
HIGHEST RISK
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:0
P
M C
U s e rs \l e n g e l\ D o c u m e n ts \A
-2
-V
A S a n A n to n io
-C L
C T
X le n g e l9
W S
P G
.r v t
G-004
PRE-CONSTRUCTION RISK
ASSESSMENT FORMS
4 6LE
UPDATE CLC HVAC SYSTEM
AUDIE L. MURPHY VAMC
7400 MERTON MINTER
SAN ANTONIO, TX 76504 AUGUST 16, 2022
100% CONSTRUCTION DOCUMENTS
671-22-19821-289-Q22
DJR
MOBILE TENT WORK CARTS WILL BE USED TO REMOVE
AND REPLACE CEILING TILES TO INSTALL VAV BOXES
AND TO INSTALL CONTROL WIRING TO THERMOSTATS.
DAVID J.
REICHARD
Charlotte, NC
ST
AT
E OF SOUT H CAROL
I NA
REG IST ER ED A RCHITECT
UP
UP
UP
S S
S
S SS S
S S
S S
S S
S S
SS S
S
S
S
S SS
S S
S
S S
S
S
S
S
S S
S
S
S
S
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
EGRESS IDENTIFICATION
XXX
XXX
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS CAPACITY
M
L
K
J
H
G
F
10987
5.91 1.6
CORRIDOR
C1
MECHANICAL
1B107
OFFICE
1B106 OFFICE
1B105
OFFICE
1B102
OFFICE
1B103
OFFICE
1B100
OFFICE
1B101
EXAM/
TREATMENT
1A119
EXAM/
TREATMENT
1A118
RESTROOM
1A118A
EXAM/
TREATMENT
1A117
EXAM/
TREATMENT
1A116
RESTROOM
1A116A
EXAM/
TREATMENT
1A115
EXAM/
TREATMENT
1A114
EXAM/
TREATMENT
1A113
EXAM/
TREATMENT
1A112
EXAM/
TREATMENT
1A111
RESTROOM
1A131
CORRIDOR
C6
RESTROOM
1A112A
RESTROOM
1A114A
MECHANICAL
1A107
OFFICE
1A104.1
OFFICE
1A106
OFFICE
1A105
HAC
1A-140
NURSE
WORKROOM
1B138
CLEAN
UTILITY
1A136
BATH
1A133
IDF
1A135
ELECT.
1A134
PATIENT
SHOWER
1A132
BEV.
1A109
STORAGE
1A110
MEDICATION
1A144.1
RESTROOM
1A143
ELEC
1C119
OFFICE
1C116
OFFICE
1C115
OFFICE
1C112
DENTAL
EQUIP.
1C114
CONFERENCE
RM
1C117
DENTAL
PROC.
RM
1C113
EXAM/
TREATMENT
1C111
RESTROOM
1C121
OFFICE
1C110
EXAM/
TREATMENT
1C108
WAITING
1C101
OFFICE
1C100.1
STAIR 4
1-S4
T R
A V
E L D
IS
T
A N
C E
TRAVEL DISTANCE = 104'-3" TRAVEL DISTANCE = 173'-3"
T R
A V
E L D
IS
T
A N
C E
T R
A V
E L D
IS
T
A N
C E
T R
A V
E L D
IS
T
A N
C E
1B112.8
OFFICE
1B112.4
OFFICE
1B115
OFFICE
1B109
OFFICE
1B112.3
WORKROOM
CLC1S3
STAIR 3
1C113.1
STORAGE
1C116.1
RESTROOM
1C106
EXAM/
TREATMENT
1C109
EXAM/
TREATMENT
1C107
EXAM/
TREATMENT
1C105
EXAM/
TREATMENT
1C104
EXAM/
TREATMENT
1C103
EXAM/
TREATMENT
1C102
EXAM/
TREATMENT
CHECK
IN/OUT
1C100
1C100.2
RESTROOM
CORR
C7
DIRTY
UTILITY
1A137
VESTIBULE
1A100
1A141
OFFICE
1A139
IDF
1A144
NURSE
1A108
WAITING
1A111A
RESTROOM
1A131A
CONFERENCE
RM
1A132.1
RESTROOM
1A130
LOCKER ROOM
1A129
WORKROOM
1A128
WORKROOM
1A127
EXAM/
TREATMENT
1A126
EXAM/
TREATMENT
1A125
WORKROOM
1A124
WORKROOM
1A122
WORKROOM
1A121
WORKROOM
1A128A
RESTROOM
1A126A
RESTROOM
1A124A
RESTROOM
1A123
STORAGE
1A121A
RESTROOM
1A120
ELEC
1A119A
RESTROOM
CLC1S2
STAIR 2
C5
CORRIDOR
1A102
ELEVATOR
LOBBY
1A101
WAITING
1A103
HAC
1A104
OFFICE
CLC1S1
STAIR 1
1B119
STORAGE
1B118
HAC
1B113
RESTROOM
1B112.1
OFFICE
1B112.5
BREAKROOM 1B112
RESTROOM
1B112.4A
CHAMPLAIN
OFFICE
1B112.4B
CLOSET
OXYGEN
STOR.
1B120
1B116
OFFICE
1B117
OFFICE
1B114
OFFICE
1B112.2
OFFICE
1B107.1
OFFICE
CORRIDOR
C3
CORR
C4
1B112.9
OFFICE
1B112.10
OFFICE
1B112.11
OFFICE
1B108
OFFICE
1B112.12
OFFICE
1B112
CORRIDOR
CORR
C2
ELEV
P-1
ELEV
P-2
3 4.7 6.8
D
C
B
A
E
I
EXISTING DEADEND CORRIDOR
EXCEEDING 30' SHALL BE
PERMITTED TO CONTINUE IN USE IF
IT IS UNPRACTICAL AND
UNFEASIBLE TO ALTER FROM.
INCREASE TRAVEL DISTANCE 50FT IF
BUILDING IS SPRINKLED
TOTAL SQUARE
FOOTAGE:
31,309 GSF
HEALTHCARE - OUTPATIENT
- 240 SF / PERSON
EGRESS LEGEND
REQUIRED # OF
EXITS
(per NFPA 101, 19.2.4)
- 2 EXITS MIN. PER FLOOR REQ'D
- 2 EXISTING EXITS, NOT BEING
MODIFIED
OCCUPANCY:
EGRESS
REQUIRED:
130 TOTAL OCCUPANTS
2 DOORS REQUIRED @ 36 & ACH
2 STARS REQ'D, STAIR WIDTH 36"
1. EGRESS WIDTH
EXIT DOORS = 36"/(0.20) = 160 PPL
# OF OCCUPANTS 130 X 0.2 = 26"
EGRESS WIDTH
COMMON PATH
OF TRAVEL
(NFPA 101 -
7.13.1(2) )
IN EXISTING BUILDING, COMMON
PATH OF TRAVEL NOT TO EXCEED
150'
TRAVEL
DISTANCE
INCREASE
(per NFPA 101-19.2.6.2.1)
150'-0" MAXIMUM DISTANCE.
DEAD END
CORRIDOR
(NFPA 101-19.2.5.2)
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:2
:0
P
M C
U s e rs \l e n g e l\ D o c u m e n ts \A
-2
-V
A S a n A n to n io
-C L
C T
X le n g e l9
W S
P G
.r v t
GL101
FIRST FLOOR LIFE SAFETY
5 6LE
UPDATE CLC HVAC SYSTEM
AUDIE L. MURPHY VAMC
7400 MERTON MINTER
SAN ANTONIO, TX 76504 AUGUST 16, 2022
100% CONSTRUCTION DOCUMENTS
671-22-19821-289-Q22
DJR
PROPOSED USE:
OWNED BY: VETERANS ADMINISTRATION
CODE ENFORCEMENT JURISDICTION: FEDERAL
APPLICABLE CODES:
GENERAL CODE INFORMATION:
NEW CONSTRUCTION
RENOVATION (EXISTING BUILDING)
CONSTRUCTION TYPE:
MIXED CONSTRUCTION
SPRINKLERED
MEZZANINE
MIXED OCCUPANCY
PRIMARY OCCUPANCY:
SECONDARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
COMMUNITY LIVING CENTER
I
HEALTHCARE
N/A
2021 NFPA 101 LIFE SAFETY CODE
UPDATE CLC HVAC SYSTEM
AUDIE L. MURPHY VAMC
7400 MERTON MINTER
SAN ANTONIO, TX 76504
AUDIE L. MURPHY VAMC
CODE INFORMATION
NORTH
0 8 16 32
LIFE SAFETY LEGEND
Scale: 1/16" = 1'-0"
FIRST FLOOR PLAN - LIFE SAFETY PLAN
OCCUPANCY CLASSIFICATION
(NFPA 2018 101 SECTION 4.1):
HEALTHCARE OCCUPANCY BUILDING, SPRINKLERED
CONSTRUCTION TYPE I (332)
MEANS OF EGRESS:
STAIR ENCLOSURE: 2-HR (NFPA 101.7.1.3.2.1)
MIN. EXIT WIDTH: 32" CLEAR (NFPA 101.2.1.2.2)
OCCUPANT LOAD: (NFPA 101.7.3)
HEALTHCARE INPATIENT: 1:240
STORAGE: 1:300
CAPACITY FACTORS: (NFPA 101.7.3.3):
STAIRS: 0.3
OTHER: 0.2
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
B
C
A
MATCH LINE "B"
MATCH LINE "A"
D
SEE ELECTRICAL DRAWINGS FOR THERMOSTATE UNIT
LOCATIONS.
DAVID J.
REICHARD
Charlotte, NC
ST
AT
E OF SOUT H CAROL
I NA
REG IST ER ED A RCHITECT
UP
UP
S S
S S
S
S SS S
S S
S S
S S
S
S
S
S S
S S
S
S
S S
S
S
S
S
SSS
S
SS
M
L
K
J
H
G
F
10987
5.91 1.6
STAIR 3
CLC2S3
BEDROOM
2C107
BEDROOM
2C109
RESTROOM
2C109.1
BEDROOM
2C110
RESTROOM
2C106.1
BEDROOM
2C106
STORAGE
2C111
ELEC.
2C108
BEDROOM
2C112
BEDROOM
2C105
RESTROOM
2C104.1
RESTROOM
2C112.1
BEDROOM
2C113
BEDROOM
2C104
BEDROOM
2C103
BEDROOM
2C114
BEDROOM
2C115
BEDROOM
2C102
RESTROOM
2C102.1
RESTROOM
2C114.1
BEDROOM
2C101
BEDROOM
2C116
RESTROOM
2C100.1RESTROOM
2C116.1
BEDROOM
2C117
BEDROOM
2C100
WAITING
2A100 DAYROOM
2A107
RESTROOM
2A129
PATIENT
SHOWER
2A131
RESTROOM
2A132
ELEC.
2A1332A134
IDF
CLEAN
SUPPLY
2A-135
DIRTY
UTILITY
2A136
NURSES
2A137
HAC
2A139
PHYSICIAN'S
2A140
RESTROOM,
UNISEX
2A102
LAUNDRY
2A141
WOUND
CARE
2A143.1
UNISEX
STAFF
2A-142
KITCHEN
2A108
STORAGE
2A108.1
TOILET
2A109.1
BEDROOM
2A110
RESTROOM
2A110.1
BEDROOM
2A111
BEDROOM
2A113
RESTROOM
2A112.1
BEDROOM
2A115
RESTROOM
2A114.1
BEDROOM
2A116
BEDROOM
2A117
RESTROOM
2A116.1 CLC2S2
STAIR 2
BEDROOM
2A119
ELEC
CLOSET
2A118
RESTROOM
2A119.1
BEDROOM
2A120
BEDROOM
2A122
BEDROOM
2A123
BEDROOM
2A124
BEDROOM
2A125
RESTROOM
2A126.1
RESTROOM
2A124.1
RESTROOM
2A122.1
STORAGE
2A121
ELEVATOR
MACHINE
ROOM
2A103
OFFICE
2A105
STORAGE
2B101.4
MECHANICAL
ROOM
2A106
OUTDOOR
PATIO
OFFICE
2B111
MULTIPURPOSE
2B110
LOCKER/
BREAK
ROOM
2B109
OFFICE
2B104
OFFICE
2B107
STORAGE
2B101.3
STORAGE
2B101.4
HAC
2B102
T R
A V
E L D
IS
T
A N
C E
'-9
TRAVEL DISTANCE = 124'-8" TRAVEL DISTANCE = 147'-6"
T R
A V
E L D
IS
T
A N
C E
T R
A V
E L D
IS
T
A N
C E
T R
A V
E L D
IS
T
A N
C E
ELEV
P-1
ELEV
P-2
CORR
1C5B
CORR
1C5A
2A131.1
TOILET
2A130
MEDS
2A128
NURSE
2A127
BEDROOM
2A126
BEDROOM
CORR
1C4
2A117.1
RESTROOM
2A114
BEDROOM
2A112
BEDROOM
2A109
MEDS
CORRIDOR
CLC
2A138
IDF
CLC2S1
STAIR 1 2A104
CLINICAL
NURSE
2B100
RESTROOM
2B101.2
THERAPY
2B105
OFFICE
2B110.1
RESTROOM
2B109.1
RESTROOM
HAC
2B108
1C1
CORRIDOR
2B103
STORAGE
2B101
OCCUPATIONAL
THERAPY
2B106
OFFICE
3 4.7 6.8
D
C
B
A
E
I
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
EGRESS IDENTIFICATION
XXX
XXX
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS CAPACITY
EXISTING DEADEND CORRIDOR
EXCEEDING 30' SHALL BE
PERMITTED TO CONTINUE IN USE IF
IT IS UNPRACTICAL AND
UNFEASIBLE TO ALTER FROM.
INCREASE TRAVEL DISTANCE 50FT IF
BUILDING IS SPRINKLED
TOTAL SQUARE
FOOTAGE:
31,309 GSF
HEALTHCARE - OUTPATIENT
- 240 SF / PERSON
EGRESS LEGEND
REQUIRED # OF
EXITS
(per NFPA 101, 19.2.4)
- 2 EXITS MIN. PER FLOOR REQ'D
- 2 EXISTING EXITS, NOT BEING
MODIFIED
OCCUPANCY:
EGRESS
REQUIRED:
130 TOTAL OCCUPANTS
2 DOORS REQUIRED @ 36 & ACH
2 STARS REQ'D, STAIR WIDTH 36"
1. EGRESS WIDTH
EXIT DOORS = 36"/(0.20) = 160 PPL
# OF OCCUPANTS 130 X 0.2 = 26"
EGRESS WIDTH
COMMON PATH
OF TRAVEL
(NFPA 101 -
7.13.1(2) )
IN EXISTING BUILDING, COMMON
PATH OF TRAVEL NOT TO EXCEED
150'
TRAVEL
DISTANCE
INCREASE
(per NFPA 101-19.2.6.2.1)
150'-0" MAXIMUM DISTANCE.
DEAD END
CORRIDOR
(NFPA 101-19.2.5.2)
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:2
:1
P
M C
U s e rs \l e n g e l\ D o c u m e n ts \A
-2
-V
A S a n A n to n io
-C L
C T
X le n g e l9
W S
P G
.r v t
GL102
SECOND FLOOR LIFE SAFETY
6 6LE
UPDATE CLC HVAC SYSTEM
AUDIE L. MURPHY VAMC
7400 MERTON MINTER
SAN ANTONIO, TX 76504 AUGUST 16, 2022
100% CONSTRUCTION DOCUMENTS
671-22-19821-289-Q22
DJR
Scale: 1/16" = 1'-0"
SECOND FLOOR LIFE SAFETY PLAN
NORTH
0 8 16 32
PROPOSED USE:
OWNED BY: VETERANS ADMINISTRATION
CODE ENFORCEMENT JURISDICTION: FEDERAL
APPLICABLE CODES:
GENERAL CODE INFORMATION:
NEW CONSTRUCTION
RENOVATION (EXISTING BUILDING)
CONSTRUCTION TYPE:
MIXED CONSTRUCTION
SPRINKLERED
MEZZANINE
MIXED OCCUPANCY
PRIMARY OCCUPANCY:
SECONDARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
COMMUNITY LIVING CENTER
I
HEALTHCARE
N/A
2021 NFPA 101 LIFE SAFETY CODE
UPDATE CLC HVAC SYSTEM
AUDIE L. MURPHY VAMC
7400 MERTON MINTER
SAN ANTONIO, TX 76504
AUDIE L. MURPHY VAMC
CODE INFORMATION
LIFE SAFETY LEGEND
OCCUPANCY CLASSIFICATION
(NFPA 2018 101 SECTION 4.1):
HEALTHCARE OCCUPANCY BUILDING, SPRINKLERED
CONSTRUCTION TYPE I (332)
MEANS OF EGRESS:
STAIR ENCLOSURE: 2-HR (NFPA 101.7.1.3.2.1)
MIN. EXIT WIDTH: 32" CLEAR (NFPA 101.2.1.2.2)
OCCUPANT LOAD: (NFPA 101.7.3)
HEALTHCARE INPATIENT: 1:240
STORAGE: 1:300
CAPACITY FACTORS: (NFPA 101.7.3.3):
STAIRS: 0.3
OTHER: 0.2
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
B
C
A
MATCH LINE "B"
MATCH LINE "A"
SEE ELECTRICAL DRAWINGS FOR THERMOSTATE UNIT
LOCATIONS.
DAVID J.
REICHARD
Charlotte, NC
ST
AT
E OF SOUT H CAROL
I NA
REG IST ER ED A RCHITECT
DCWR
DHW
PIPING SYSTEM
NG NATURAL GAS
ST STORM
PD PUMP DISCHARGE
OFD OVERFLOW STORM DRAIN
GW GREASE WASTE
OW OIL WASTE
SAN SANITARY WASTE
CD CONDENSATE DRAIN
CA COMPRESSED AIR
AW ACID WASTE
N2 NITROGEN
N2O NITROUS OXIDE
MA MEDICAL AIR
O2 OXYGEN
WAGD WASTE ANESTHETIC GAS DISPOSAL
VAC VACUUM
V SANITARY VENT
OV OIL VENT
AV ACID VENT
NPCW NONPOTABLE COLD WATER
DI DE-IONIZED WATER
SCW SOFTENED COLD WATER
DCW DOMESTIC COLD WATER
RO REVERSE OSMOSIS WATER
DOMESTIC CW RECIRCULATION
DOMESTIC HOT WATER
CO2 CARBON DIOXIDE
DHW 140 DOMESTIC HOT WATER (OTHER TEMP)
PG PROPANE GAS
DHWR DOMESTIC HW RECIRCULATION
NG
ST
PD
OFD
GW
OW
SAN
CD
CA
AW
N2
N2O
MA
O2
WAGD
VAC
CO2
PG
V
OV
AV
HW 140
SCW
NPCW
DI
RO
EXISTING
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
NEW BOLD TEXT INDICATES NEW ITEM
ITALICIZED TEXT INDICATES EXISTING ITEM
NEW PLUMBING EQUIPMENT MARK
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
CONNECT TO EXISTING
LIMIT OF DEMOLITION
P-###
EXISTING PLUMBING EQUIPMENT MARKP-###
3-WAY CONTROL VALVE
ANGLE GATE VALVE
ANGLE GLOBE VALVE
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
CONTROL VALVE
GATE VALVE
GLOBE VALVE
SAFETY RELIEF VALVE
TWO POSITION CONTROL VALVE
BACKFLOW PREVENTER
ECCENTRIC REDUCER
CONCENTRIC REDUCER
FLOW ARROW
HOSE BIBB / SILLCOCK
PLUG VALVE
PRESSURE REDUCING VALVE (WATER)
PRESSURE REGULATOR (GAS)
PIPE ANCHOR
PIPE GUIDES
WALL CLEANOUT
SUSPENDED CLEANOUT
WCO
WYE STRAINER
WYE STRAINER W/DRAIN VALVE
FLOOR DRAIN - ROUND OR SQUARE
FLOOR CLEANOUT
PIPE CAP
PIPE TURNING DOWN
PIPE TURNING UP
TEE UP
TEE DOWN
DROP AND RUN
DROP AND TURN
TEE OFF TOP
TEE OFF BOTTOM
CROSS AND RISER
PLAN 90° ELBOW
PIPE TEE
PIPE UNION
FLEXIBLE PIPE CONNECTOR
WATER METER
PUMP
AUTOMATIC AIR VENT
PRESSURE SWITCH
PRESSURE GAUGE
THERMOMETER
FLOW SWITCH
TEMPERATURE SWITCH
OR
CO
PIPE SLOPE ARROW
AV
F
P
T
M
CIRCUIT SETTER
F FAHRENHEIT
FA FROM ABOVE
FB FROM BELOW
FBO FURNISHED BY OTHERS
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE)
CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FU FIXTURE UNITS
G GALLON
GC GENERAL CONTRACTOR
GCO GRADE CLEANOUTS
GD GARBAGE DISPOSAL
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H&CW HOT AND COLD WATER
HB HOSE BIBB (INTERIOR)
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK
(DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
ICW INDUSTRIAL COLD WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
KW KILOWATT
KWHR KILOWATT-HOUR
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH THOUSANDS OF BTU PER HOUR
MC MECHANICAL CONTRACTOR
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTANDING
MSB MOP SINK BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
PA PASCAL
PC PLUMBING CONTRACTOR
PD PRESSURE DROP
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAUGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH -
ABSOLUTE
PSIG POUNDS PER SQUARE INCH - GAUGE
PTRV PRESSURE TEMPERATURE RELIEF
VALVE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RO REVERSE OSMOSIS
RWL RAIN WATER LEADER
SAN SANITARY SEWER
SCFM STANDARD CUBIC FOOT/MIN
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT SQUARE FOOT
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL VALVE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TDL TEMPERATURE DIFFERENTIAL
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
UPC UNIFORM PLUMBING CODE
V SANITARY VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAUGE
WH WATER HEATER
WHA WATER HAMMER ARRESTOR
WHD WALL HYDRANT
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
YCO YARD CLEANOUT
YH YARD HYDRANT
A/E ARCHITECT/ENGINEER
AC ABOVE CEILING
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
AFG ABOVE FINISHED GRADE
ASD ADJUSTABLE SPEED DRIVE
ASHRAE AMERICAN SOCIETY HEATING,
REFRIGERATING, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
BAS BUILDING AUTOMATION SYSTEM
BF BELOW FLOOR
BFP BACKFLOW PREVENTER
BG BELOW GRADE
BH BOOSTER HEATER
BHP BREAK HORSEPOWER
BJ BETWEEN JOISTS
BOP BOTTOM OF PIPE
BSP BLACK STEEL PIPE
BT BATHTUB
BTUH BRITISH THERMAL UNITS PER HOUR
C CELSIUS
CF COMBINATION FIXTURE
CGA COMPRESSED GAS ASSOCIATION
CI CAST IRON
CO CLEANOUT
COND CONDENSATE
CP CONDENSATE PUMP
CS CLINICAL SINK
CV CONTROL VALVE
DA DENTAL COMPRESSED AIR
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DF DRINKING FOUNTAIN
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DV DENTAL VACUUM
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
EC ELECTRICAL CONTRACTOR
EL ELEVATION
EMCS ENERGY MONOSERRAT AND CENTRAL
SYSTEM
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYEWASH STATION
EX EXISTING
PLUMBING SYMBOLS PLUMBING SYMBOLS
ANNOTATION SYMBOLS
PLUMBING SYMBOLS & ABBREVIATIONS
ANNOTATION ABBREVIATIONS 1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE PROCEEDING WITH
WORK.
2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.
3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.
4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST
MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.
5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.
6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND APPROVAL.
7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES DAMAGED AT
NO ADDITIONAL COST.
8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.
9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW PLUMBING WORK
AND WORK OF OTHER TRADES.
PLUMBING DEMOLITION GENERAL NOTES
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE
PURPOSES INTENDED.
5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT
EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT
MAINTENANCE, REPAIRS, AND REPLACEMENT.
7. AT EACH PLUMBING FIXTURE, PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO
MANUFACTURER'S RECOMMENDATIONS.
8. SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE.
SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED OTHERWISE.
9. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH
SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.
10. FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF WALLS AND FLOORS.
11. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND APPLICABLE VA
STANDARDS.
12. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.
13. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND
APPLICABLE VA STANDARDS.
14. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.
15. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING OF PIPING WITH
EXISTING CONDITIONS.
16. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING
SYSTEMS.
17. CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE COR 2 WEEK IN ADVANCE AND
CONFIRM 48 HOURS PRIOR.
18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
19. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
20. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.
PLUMBING GENERAL NOTES
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:4
P
M C
U s e rs \p a c h a ry a \D o c u m e n ts
\M P
-2
-V
A S a n A n to n io
-C L
C T
X p a c h a ry a T
W Q
A u g
.r v t
P-001
PLUMBING GENERAL INFORMATION
1 4TB
UPDATE CLC HVAC SYSTEM
AUDIE L. MURPHY VAMC
7400 MERTON MINTER
SAN ANTONIO, TX 76504 AUGUST 16, 2022
100% CONSTRUCTION DOCUMENTS
671-22-19821-289-Q22
RBK
HWRP-2 MECH 1A-107 PATIENT CARE HOT WATER WATER 15 13.2 120 1/6 1 115 1750 1, 2, 3, 4
HWRP-1 MECH 1A-107 PATIENT CARE HOT WATER WATER 15 13.2 120 1/6 1 115 1750 1, 2, 3, 4
GPM FT °F HP
FLUID
FLOW HEAD TEMPERATURE NOMINAL POWER
PHASE VOLT MAX RPM REMARKS
MARK LOCATION
AREA AND/OR
BLDG SERVED
SYSTEM AND/OR
SERVICE
CIRCULATING FLUID ELECTRICAL MOTOR
RECIRCULATING PUMP SCHEDULE
WH-2 MECH 1A-107 PATIENT CARE HOT WATER WATER 56 60 140 3920 1960 69.12x81.63x40.88 80 50 1, 2, 3, 4
WH-1 MECH 1A-107 PATIENT CARE HOT WATER WATER 56 60 140 3920 1960 69.12x81.63x40.88 80 50 1, 2, 3, 4
GPM IN °F OUT °F
FLUID
FLOW TEMPERATURE ENTERING
CONTROL VALVE
ENTERING
GENERATOR
REMARKS
MARK LOCATION
AREA AND/OR
BLDG SERVED
SYSTEM
AND/OR
SERVICE
CIRCULATING FLUID
TRAP
LBS./HR.
CONTROL
VALVE
LBS./HR.
DIMENSIONS, IN
STEAM PSIG
STEAM DOMESTIC HOT WATER HEATER SCHEDULE
NOTES:
1. INSTALL PER MANUFACTURERS RECOMMENDATIONS.
2. DOMESTIC WATER HEATERS TO BE DOUBLE WALLED.
3. ENTERING STEAM PRESSURE TO BE HIGH PRESSURE STEAM FOR DOMESTIC HOT WATER HEATERS.
4. BASIS OF DESIGN IS AERCO B+08 WATERWIZARD.
PLUMBING MIXING VALVE SCHEDULE
MARK LOCATION TYPE OUTLET PIPE SIZE FLOW INLET TEMP OUTLET TEMP
ELECTRICAL
REMARKSVOLT PHASE
MTMV-1 MECH 1A-107 DIGITAL 2" 50.0 GPM 140 °F 140 °F 120 1 1, 2
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. PROVIDE CONTROLLER AS REQUIRED TO INTEGRATE INTO EXISTING ANDOVER CONTROLS BUILDING AUTOMATION SYSTEM.
3. PROVIDE PREMIUM EFFICIENCY MOTOR.
4. PROVIDE INDEPENDENT SUPPORTS FOR PUMPS AND ASSOCIATED PIPING.
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. BASIS OF DESIGN IS LEONARD NUCLEAS MODEL NV-150-LF.
S
S SS S
S S
SS S
S
S
S
S
2 1/2" DCW
1/2" DHWR
1 1/2" DHW
4" SAN
2" V
3 1/2" DHW
6" DCW
2" DHWR
S A N
2" DCW
1A107
MECHANICAL
S A N
2" V
S A N
3" SAN
FD-B
FD-B
FD-B
FD-B
FD-B
FCO
FD-B
FCO
D C W
1/ D H W R
D C W
1/
D H W
V
4" SAN
5.94.7 654
D
E
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:1
:5
P
M C
U s e rs \p a c h a ry a \D o c u m e n ts
\M P
-2
-V
A S a n A n to n io
-C L
C T
X p a c h a ry a T
W Q
A u g
.r v t
P-401
FIRST FLOOR ENLARGED MECHANICAL
ROOM PLUMBING DEMOLITION PLAN
2 4TB
UPDATE CLC HVAC SYSTEM
AUDIE L. MURPHY VAMC
7400 MERTON MINTER
SAN ANTONIO, TX 76504 AUGUST 16, 2022
100% CONSTRUCTION DOCUMENTS
671-22-19821-289-Q22
RBK
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE D
B
C
A
MATCH LINE "B"
MATCH LINE "A"
Scale: 1/2" = 1'-0"
FIRST FLOOR ENLARGED MECHANICAL ROOM PLUMBING DEMOLITION PLAN
A. DEMOLITION WORK SHALL BE PERFORMED
SUCH THAT ALL PIPES, HANGERS, SUPPORTS,
AND VALVES IN SCOPE ARE REMOVED
COMPLETELY TO MAINS. REMOVE ALL ITEMS TO
ENSURE NOTHING IS ABANDONED IN PLACE.
B. NO DEAD ENDS SHALL REMAIN. THE MAXIMUM
LENGTH OF DEAD ENDS SHALL BE TWO PIPE
DIAMETERS FROM THE BRANCH, RISER, OR
MAIN.
1 DEMOLISH EXISTING WATER HEATERS AND
ASSOCIATED DOMESTIC COLD WATER AND HOT
WATER PIPING WITH CONTROLS BACK TO MAIN.
2 DEMOLISH EXISTING RECIRCULATING PUMP AND
ASSOCIATED PIPING BACK TO MAIN.
3 DEMOLISH EXISTING 4" CONCRETE PAD.
NORTH
0 1 2 4
S
S SS S
S S
SS S
S
S
S
S S
S
S SS S
S S
SS S
S
S
S
S
2" DHWR
6" DCW
1A107
MECHANICAL
4" SAN
1 1/2" DHW
1/2" DHWR
2 1/2" DCW
4" SAN
S A N
1/ D H W R
S A N
V
2" V
FD-B
FD-B
FD-B
FCO
FD-B
FD-B
FCO
FD-B
V
2" V
3" SAN
S A N
WH-2WH-1
2" V
2" V
D C W
D C W
1/
D H W
HWRP-2
HWRP-1
3 1/2" DHW
MTMV-1
3" DCW
3" DHW
D H
W
5.94.7 654
D
E
2" DHWR
3" DCW
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:1
:5
P
M C
U s e rs \p a c h a ry a \D o c u m e n ts
\M P
-2
-V
A S a n A n to n io
-C L
C T
X p a c h a ry a T
W Q
A u g
.r v t
P-402
FIRST FLOOR ENLARGED MECHANICAL
ROOM PLUMBING PLAN
3 4TB
UPDATE CLC HVAC SYSTEM
AUDIE L. MURPHY VAMC
7400 MERTON MINTER
SAN ANTONIO, TX 76504 AUGUST 16, 2022
100% CONSTRUCTION DOCUMENTS
671-22-19821-289-Q22
RBK
1 PROVIDE (2) NEW HOT WATER HEATERS. SEE
DETAILS 2,3/P-501 FOR MORE INFORMATION.
REFER TO MECHANICALS PLANS FOR STEAM
PIPING MODIFICATIONS.
2 PROVIDE (2) NEW RECIRCULATING PUMPS. SEE
DETAIL 4/P-501 FOR MORE INFORMATION.
3 PROVIDE NEW MASTER DIGITAL THERMOSTATIC
MIXING VALVE WITH CONTROL PANEL. SEE
DETAIL 1/P-501 FOR MORE INFORMATION.
4 PROVIDE NEW HOT WATER HEATERS AND
RECIRCULATING PUMPS CONTROL
PANEL.REUSE EXISTING POWER CIRCUITS FOR
CONTROL AND POWER DEVICES. COORDINATE
FINAL LOCATIONS WITH VA.
5 PROVIDE NEW 3" DOMESTIC COLD WATER
PIPING TO EACH WATER HEATER, TIE INTO THE
EXISTING 6" DCW LINE.
6 PROVIDE NEW 3" DOMESTIC HOT WATER PIPING
TO EACH WATER HEATER, TIE INTO THE
EXISTING 3-1/2" DHW LINE.
7 CONNECT NEW 2" DOMESTIC HOT WATER
RETURN PIPING TO THE EXISTING 2" DHWR
LINE.
8 REUSE EXISTING STEAM AND CONDENSATE
PIPING, TRAPS, AND VALVES. RECONNECT
STEAM PIPING TO NEW DOMESTIC WATER
HEATERS.
9 PROVIDE NEW 4" HIGH HOUSEKEEPING
CONCRETE PAD.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE D
B
C
A
MATCH LINE "B"
MATCH LINE "A"
NORTH
0 1 2 4
Scale: 1/2" = 1'-0"
FIRST FLOOR ENLARGED MECHANICAL ROOM PLUMBING PLAN
A. SLEEVE ALL PENETRATIONS. FIRESTOP AND
SEAL WATER TIGHT.
ELECTRONIC CONTROL130°F OUT TO BLDG 124°F HOT WATER RETURN
TEST PORT/PURGE VALVE
SOLENOID VALVE
HW RETURN TO COLD WATER
FEED OF HOT WATER SOURCE
COLD WATER INLETHOT WATER INLET
SOLENOID (NC)
SOLENOID (NO)
NORMALLY CLOSED
CONNECTED TO BAS
NOTES:
1. VALVE TO REMAIN CLOSED DURING NORMAL OPERATION.
2. VALVE TO BE OPENED DURING THERMAL ERADICATION.
3. VALVE TO BE CLOSED DURING THERMAL ERADICATION.
4. ALARM TO BE SENT TO BAS WHEN TEMPERATURE FALLS
BELOW 124°F OR ABOVE 130°F.
1 2
FROM BUILDING
HIGH - LOW
THERMOSTATI C MI XER
ASSE 1017 Compliant
PART NO.
SET TEMP.
DATE CODE
RANGE
TEMP.
130°F
°F
PIPE SUPPORTS (TYP)
PRESSURE GAUGE
AND GAUGE COCK (TYP)
EXISTING HOT WATER
CIRCULATION
LINE TO WATER
HEATING SYSTEM
HOT WATER CIRCULATION PUMP. SEE
EQUIPMENT SCHEDULE - PUMP
MOTORS SHALL BE INSTALLED SO THAT
MOTOR IS IN A HORIZONTAL POSITION
1/2" FLEXIBLE ELECTRICAL CONDUIT
FROM AQUASTAT TO PUMP BY
ELECTRICAL CONTRACTOR
AQUASTAT TO OPERATE HOT WATER
CIRCULATION PUMP FURNISHED AND
INSTALLED BY PLUMBING CONTRACTOR.
THERMOMETER
POWER BY DIV. 26
SHUT-OFF VALVE (TYP)
CHECK VALVE
DIELECTRIC UNION (TYP)
CIRCUIT SETTER
EXISTING HOT WATER CIRCULATION LINE
FROM BUILDING SYSTEM
NORMALLY CLOSED
BYPASS TO BACKUP PUMP
(TYP OF 2)
CONNECT TO AQUASTAT
BACKUP PUMP - MOUNT
HORIZONTAL SHOWN
OFFSET FOR CLARITY
NOTE:
BACKUP PUMP IS TO BE USED IF THE MAIN PUMP FAILS,
SWITCH BYPASS TO BACKUP PUMP AND SWITCH OFF
SHUT-OFF VALVES TO MAIN PUMP, SWITCH OFF MAIN
POWER TO MAIN PUMP AND TURN ON POWER TO THE
BACKUP PUMP.
D
D
P
T
A
FLOOR SINK
D
D
T
STEAM CONDENSATE LINES
STEAM TYPE DOMESTIC
WATER HEATER (TYP OF 2)
THERMOSTATIC MIXING
VALVE - SEE 1/P-501
STEAM CONTROL
VALVE (TYP OF 2)
REDUCER AS
NECESSARY (TYP)
P
DHWR
DHW
DCW
SHUTOFF VALVE
(TYP)
HOT WATER RECIRCULATION
PUMPS - SEE 4/P-501
STEAM HEADER - SEE
MECH PIPING PLAN
ASME TEMPERATURE & PRESSURE
RELIEF VALVES. PIPE FULL SIZE
TO FLOOR DRAIN (TYP)
DIELECTRIC UNION (TYP)
TEMPERATURE SENSOR (TYP)
PRESSURE GAUGE (TYP)
4" CONCRETE PAD
STEAM TRAP (TYP)
STEAM CONDENSATE TO RECEIVER
EXPANSION TANK
NOTE:
STEAM WATER HEATER OUTPUT TEMPERATURE SHALL BE SET TO 140°F. THERMOSTATIC MIXING VALVE SHALL BE SET TO 130°F. AQUASTAT CONTROLLER FOR RECIRCULATION PUMP SHALL BE CONFIGURED TO TURN PUMP ON AT 125°F AND OFF AT 130°F.
NC HOT WATER
BYPASS
WH: DOMESTIC STEAM HOT WATER HEATER
HWRP: HOW WATER RECURCULATING PUMP
PT
TT
WH-1 WH-2
FLOOR
LP STEAM
NEW
DCWS
DHWS
D H
W R
TO
PLUMBING
FIXTURES
FROM PLUMBING
FIXTURES
MV-1 MV-2
LPS
TT
PT
MV-7
PT
2 TT
HWRP-1
MV-3
MV-4
MV-5
MV-6
FT
FT
(PLUMBING SINKS
AND LAVS TO
HAVE TMV WITH
MANUAL BYPASS)
FT
STEAM TRAP TYP.
LPR
L P
S
HWRP-2
NEW THERMOSTATIC
MIXING VALVE
TT
N E
W
D
H S
NOTE:
SEE FLOOR PLANS FOR PIPE SIZES.
N E
D C
W S
NEW
DHWR
NEW
DCWS
FT
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:5
P
M C
U s e rs \p a c h a ry a \D o c u m e n ts
\M P
-2
-V
A S a n A n to n io
-C L
C T
X p a c h a ry a T
W Q
A u g
.r v t
P-501
PLUMBING DETAILS
4 4TB
UPDATE CLC HVAC SYSTEM
AUDIE L. MURPHY VAMC
7400 MERTON MINTER
SAN ANTONIO, TX 76504 AUGUST 16, 2022
100% CONSTRUCTION DOCUMENTS
671-22-19821-289-Q22
RBK
Scale: No Scale
HOT WATER RECIRCULATION PUMP
Scale: No Scale
STEAM WATER HEATER DETAIL
Scale: No Scale
DOMESTIC WATER SCHEMATIC
Scale: No Scale
MASTER DIGITAL THERMOSTATIC MIXING VALVE DETAIL
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR-COOLED CONDENSER
ACCH AIR-COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,TWO
POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .