671-22-198 Update CLC HVAC System IFC Drawings SEALED 2022-08-16 R1_01.pdf

PDF 12 MB Posted

Attached to
Z2DA-Solicitation Cancellation Notice for 36C25725B0006 Update CLC HVAC System – Project# 671-22-198
Solicitation number
36C25725B0006
Issued by

About this file

This document appears to be a set of IFC (Issued for Construction) drawings for updating the HVAC system at a Community Living Center (CLC) facility, related to Solicitation 36C25725B0006 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17. The solicitation is for the project titled "UPDATE CLC HVAC SYSTEM, Project# 671-22-198". The drawings provide technical details and specifications for the HVAC system upgrades required under this contract opportunity. No other details about the solicitation requirements, pricing, set-asides, or award information are included in this particular document.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

/1

/2

:2

:0

P

M C

U s e rs \l e n g e l\ D o c u m e n ts \A

-2

-V

A S a n A n to n io

-C L

C T

X le n g e l9

W S

P G

.r v t

G-001

COVER SHEET

1 6LE

UPDATE CLC HVAC SYSTEM

AUDIE L. MURPHY VAMC

7400 MERTON MINTER

SAN ANTONIO, TX 76504 AUGUST 16, 2022

100% CONSTRUCTION DOCUMENTS

671-22-19821-289-Q22

UPDATE CLC HVAC SYSTEM

AUDIE L. MURPHY VAMC

7400 MERTON MINTER

SAN ANTONIO, TX 76504

VA PROJECT #: 671-22-198

CK

DRAWING LIST

GENERAL

G-001 COVER SHEET 1 6

G-002 GENERAL INFORMATION 2 6

G-003 ICRA INFORMATION AND DETAILS 3 6

G-004 PRE-CONSTRUCTION RISK ASSESSMENT FORMS 4 6

GL101 FIRST FLOOR LIFE SAFETY 5 6

GL102 SECOND FLOOR LIFE SAFETY 6 6

PLUMBING

P-001 PLUMBING GENERAL INFORMATION 1 4

P-401 FIRST FLOOR ENLARGED MECHANICAL ROOM PLUMBING DEMOLITION PLAN 2 4

P-402 FIRST FLOOR ENLARGED MECHANICAL ROOM PLUMBING PLAN 3 4

P-501 PLUMBING DETAILS 4 4

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION 1 19

MD101A FIRST FLOOR MECHANICAL DEMOLITION PLAN - AREA A 2 19

MD101B FIRST FLOOR MECHANICAL DEMOLITION PLAN - AREA B 3 19

MD101C FIRST FLOOR MECHANICAL DEMOLITION PLAN - AREA C 4 19

MD102A SECOND FLOOR MECHANICAL DEMOLITION PLAN - AREA A 5 19

MD102B SECOND FLOOR MECHANICAL DEMOLITION PLAN - AREA B 6 19

MD102C SECOND FLOOR MECHANICAL DEMOLITION PLAN - AREA C 7 19

MP101A FIRST FLOOR MECHANICAL CONTROL PLAN - AREA A 8 19

MP101B FIRST FLOOR MECHANICAL CONTROL PLAN - AREA B 9 19

MP101C FIRST FLOOR MECHANICAL CONTROL PLAN - AREA C 10 19

MP102A SECOND FLOOR MECHANICAL CONTROL PLAN - AREA A 11 19

MP102B SECOND FLOOR MECHANICAL CONTROL PLAN - AREA B 12 19

MP102C SECOND FLOOR MECHANICAL CONTROL PLAN - AREA C 13 19

M-401 ENLARGED MECHANICAL ROOM PLANS 14 19

M-501 MECHANICAL DETAILS 15 19

M-502 MECHANICAL CONTROLS 16 19

M-503 MECHANICAL CONTROLS SCHEMATIC - EXISTING AHU 17 19

M-601 MECHANICAL SCHEDULES 18 19

M-901 MECHANICAL ISOMETRIC PLANS 19 19

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 9

EP101A FIRST FLOOR POWER PLAN - AREA A 2 9

EP101B FIRST FLOOR POWER PLAN - AREA B 3 9

EP101C FIRST FLOOR POWER PLAN - AREA C 4 9

EP102A SECOND FLOOR POWER PLAN - AREA A 5 9

EP102B SECOND FLOOR POWER PLAN - AREA B 6 9

EP102C SECOND FLOOR POWER PLAN - AREA C 7 9

E-401 ELECTRICAL ENLARGEMENTS 8 9

E-601 PANEL SCHEDULES 9 9

PROJECT LOCATIONPROJECT AREA

DAVID J.

REICHARD

Charlotte, NC

ST

AT

E OF SOUT H CAROL

I NA

REG IST ER ED A RCHITECT

DocuSign Envelope ID: 02BF77D1-802F-45CC-828C-1A4FC547C7F7

8/15/2022

WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

VIEW NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTHNORTH

0 4 8 16

PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO

PARTICIPATE IN VOLUNTARY STANDARD BODIES.

GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND

STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

• INTERNATIONAL BUILDING CODE (IBC) 2021 (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES

BELOW)

• NFPA 101 LIFE SAFETY CODE 2021 (SEE NOTES BELOW)

• DEPARTMENT OF VETERANS AFFAIRS: ELECTRICAL DESIGN MANUAL, DECEMBER 2019

• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• NFPA 70 NATIONAL ELECTRICAL CODE (NEC) 2020

• INTERNATIONAL PLUMBING CODE (IPC) 2021

• SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.

• ASME BOILER AND PRESSURE VESSEL CODE 2021

• ASME CODE FOR PROCESS PIPING B31.3- 2020

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

STANDARD (PG-18-13)

• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)

• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH- RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.

• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE

VA MASTER CONSTRUCTION SPECIFICATION.

• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2019.

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION

FEES.

NOTES:

1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY

HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:2

:0

P

M C

U s e rs \l e n g e l\ D o c u m e n ts \A

-2

-V

A S a n A n to n io

-C L

C T

X le n g e l9

W S

P G

.r v t

G-002

GENERAL INFORMATION

2 6LE

UPDATE CLC HVAC SYSTEM

AUDIE L. MURPHY VAMC

7400 MERTON MINTER

SAN ANTONIO, TX 76504 AUGUST 16, 2022

100% CONSTRUCTION DOCUMENTS

671-22-19821-289-Q22

DJR

GENERAL SYMBOL LEGEND CODE STANDARDS AND EXECUTIVE ORDERS

CLOSE COORDINATION BY THE CONTRACTOR

WILL BE REQUIRED WITH THE VA/COR TO

ENSURE WORK BEING COMPLETED UNDER

ANOTHER CONTRACTS DOES NOT DUPLICATE

WORK ACTIVITIES OR PREVENT EITHER

CONTRACTS FROM BEING COMPLETE. THE

CONTRACTOR SHOULD SCHEDULE ALL WORK

ACTIVITIES IN ADVANCE WITH THE COR.

THE CONTRACTOR IS RESPONSIBLE FOR ALL

REQUIREMENTS OF DIVISION I SPECIFICATIONS -

SEE SPECIFICATIONS.

DAVID J.

REICHARD

Charlotte, NC

ST

AT

E OF SOUT H CAROL

I NA

REG IST ER ED A RCHITECT

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS

FOR CONSTRUCTION AND RENOVATION

ISLM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

FOR UPDATE CLC HVAC SYSTEM

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

/2

/2

/2

/2

/2

/2

EQ.EQ.

III/IVLOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

II

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 IV

IV

IV

III/IV

III/IV

III

III/IV

I

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete ceiling system

- new construction

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet

- painting (but not sanding), wall covering

- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

- Bldg. #69 Therapy areas

- Respiratory Therapy

- Outpatient Clinics

- CBOC's

- Mental Health Units

- VACANT AREA ADJACENT TO

OCCUPIED AREA

- Office areas (non-clinical)

- Hallways

- FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

- Pharmacy

- Radiology/ CT Scanner

- Urgent Care

- Laboratories

- CLCs

- SPD; AMCU;

- Respiratory Isolation Rooms

- Surgery

III

TYPE DTYPE CTYPE B

Class IVor control procedures are necessary.

C

LA

S S

IV

C

LA

S

S

II

During Construction Project

C L-

I C

LA

S

S

II

I

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant after barriers are removed.

6. Remove or isolate HVAC system in areas where work was being performed.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering.

4. Vacuum work with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

1. Wipe surfaces to remove dust.

Upon Completion of Project

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

4. Complete all critical barriers before construction begins or implement control cube method.

5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.

6. Contain construction waste before transport in tightly covered containers.

7. Cover transport receptacles or carts. Tape covers.

8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.

9. Remove isolation of HVAC system in areas where work is being performed.

1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

1. Includes all activities required by Class I

2. Provide active means to prevent airborne dust from dispersing into atmosphere.

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape.

5. Block off and seal air vents.

6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.

4. Complete all critical barriers or implement control cube method before construction begins.

5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

6. Seal holes, pipes, conduits, and punctures appropriately.

7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.

8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

9. Place adhesive walk-off mats at entrance to work area within anteroom.

10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.

11. Cover transport receptacles or carts. Tape covering

12. Vacuum work area with HEPA filtered vacuums.

13. Wet mop with disinfectant after barriers are removed.

14. Remove isolation of HVAC system in areas where work is being performed.

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:2

:0

P

M C

U s e rs \l e n g e l\ D o c u m e n ts \A

-2

-V

A S a n A n to n io

-C L

C T

X le n g e l9

W S

P G

.r v t

G-003

ICRA INFORMATION AND DETAILS

3 6LE

UPDATE CLC HVAC SYSTEM

AUDIE L. MURPHY VAMC

7400 MERTON MINTER

SAN ANTONIO, TX 76504 AUGUST 16, 2022

100% CONSTRUCTION DOCUMENTS

671-22-19821-289-Q22

CK

Scale: 3" = 1'-0"

ILSM CONSTRUCTION EGRESS SIGNAGE

DUST CONTROL PLAN NOTES

A. DEMOLITION DEBRIS: DEBRIS SHALL BE

REMOVED IN CARTS WITH TIGHTLY FITTED COVERS,

USING DESIGNATED TRAFFIC ROUTES .EFFORTS SHALL

BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN

EMPHASIS ON TRANSPORT DURING THE LOWEST

PERIOD OF ACTIVITY. DEBRIS SHALL BE REMOVED

DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF

CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH

EFFICIENCY PARTICULATE AIR (HEPA) FILTERED

NEGATIVE AIR MACHINES SHALL BE USED, AND THE

CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE.

FILTERS SHALL BE BAGGED AND SEALED BEFORE

BEING TRANSPORTED OUT OF THE CONSTRUCTION

AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS

THROUGH PATIENT-CARE AREAS WITHOUT PRIOR

APPROVAL OF THE COR.

B. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE

CONSTRUCTION AREA SHALL BE NEGATIVE WITH

RESPECT TO SURROUNDING AREAS AND WITH NO

DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS.

USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN

THE ENCLOSURE TO REMOVE DUST SHALL PASS AIR

THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA

FILTER CAPABLE OF FILTRATION RATES OF 300-800

CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR

DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF

EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR

SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE

USED BEFORE EXHAUST TO PREVENT CONTAMINATION

OF THE DUCTS.

C. ADJACENT AREAS: THE STATUS OF SEALED

PENETRATIONS AND INTACT CEILING SHALL BE

VERIFIED DAILY.

D. AIR EXCHANGE RATES AND PRESSURE

RELATIONSHIPS: VAMC AND CONTRACTOR SHALL

VERIFY AND MAINTAIN PROPER RATES IN CRITICAL

AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE

AIR IS NOT BEING RE-CIRCULATED WITHOUT

FILTRATION FROM THE CONSTRUCTION AREA

ELSEWHERE. PROVIDE AIR PRESSURE TESTING

THROUGHOUT THE PROJECT IN THE FREQUENCY AS

IDENTIFIED BY THE COR.

E. TEMPORARY, REUSABLE ICRA BARRIER, (EX.

STARC WALL SYSTEM), CAN BE USED IF A NON RATED

BARRIER IS ACCEPTABLE.

MOBILE TENT WORK CARTS WILL BE USED TO REMOVE

AND REPLACE CEILING TILES TO INSTALL VAV BOXES

AND TO INSTALL CONTROL WIRING TO THERMOSTATS.

DAVID J.

REICHARD

Charlotte, NC

ST

AT

E OF SOUT H CAROL

I NA

REG IST ER ED A RCHITECT

DocuSign Envelope ID: 02BF77D1-802F-45CC-828C-1A4FC547C7F7

8/15/2022

VHASTXHernaM4 Snapshot

VHASTXHernaM4 Snapshot

UPDATE CLC HVAC SYS.

B

HIGHEST RISK

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:2

:0

P

M C

U s e rs \l e n g e l\ D o c u m e n ts \A

-2

-V

A S a n A n to n io

-C L

C T

X le n g e l9

W S

P G

.r v t

G-004

PRE-CONSTRUCTION RISK

ASSESSMENT FORMS

4 6LE

UPDATE CLC HVAC SYSTEM

AUDIE L. MURPHY VAMC

7400 MERTON MINTER

SAN ANTONIO, TX 76504 AUGUST 16, 2022

100% CONSTRUCTION DOCUMENTS

671-22-19821-289-Q22

DJR

MOBILE TENT WORK CARTS WILL BE USED TO REMOVE

AND REPLACE CEILING TILES TO INSTALL VAV BOXES

AND TO INSTALL CONTROL WIRING TO THERMOSTATS.

DAVID J.

REICHARD

Charlotte, NC

ST

AT

E OF SOUT H CAROL

I NA

REG IST ER ED A RCHITECT

UP

UP

UP

S S

S

S SS S

S S

S S

S S

S S

SS S

S

S

S

S SS

S S

S

S S

S

S

S

S

S S

S

S

S

S

EGRESS PATH

EGRESS PATH TAG

EGRESS PATH TAG - COMMON PATH

EGRESS IDENTIFICATION

XXX

XXX

CAPACITYCLR

EXTERIOR

EXIT

XX" ###

EXIT

IDENTIFICATION

EGRESS CLEAR

WIDTH

EGRESS CAPACITY

M

L

K

J

H

G

F

10987

5.91 1.6

CORRIDOR

C1

MECHANICAL

1B107

OFFICE

1B106 OFFICE

1B105

OFFICE

1B102

OFFICE

1B103

OFFICE

1B100

OFFICE

1B101

EXAM/

TREATMENT

1A119

EXAM/

TREATMENT

1A118

RESTROOM

1A118A

EXAM/

TREATMENT

1A117

EXAM/

TREATMENT

1A116

RESTROOM

1A116A

EXAM/

TREATMENT

1A115

EXAM/

TREATMENT

1A114

EXAM/

TREATMENT

1A113

EXAM/

TREATMENT

1A112

EXAM/

TREATMENT

1A111

RESTROOM

1A131

CORRIDOR

C6

RESTROOM

1A112A

RESTROOM

1A114A

MECHANICAL

1A107

OFFICE

1A104.1

OFFICE

1A106

OFFICE

1A105

HAC

1A-140

NURSE

WORKROOM

1B138

CLEAN

UTILITY

1A136

BATH

1A133

IDF

1A135

ELECT.

1A134

PATIENT

SHOWER

1A132

BEV.

1A109

STORAGE

1A110

MEDICATION

1A144.1

RESTROOM

1A143

ELEC

1C119

OFFICE

1C116

OFFICE

1C115

OFFICE

1C112

DENTAL

EQUIP.

1C114

CONFERENCE

RM

1C117

DENTAL

PROC.

RM

1C113

EXAM/

TREATMENT

1C111

RESTROOM

1C121

OFFICE

1C110

EXAM/

TREATMENT

1C108

WAITING

1C101

OFFICE

1C100.1

STAIR 4

1-S4

T R

A V

E L D

IS

T

A N

C E

TRAVEL DISTANCE = 104'-3" TRAVEL DISTANCE = 173'-3"

T R

A V

E L D

IS

T

A N

C E

T R

A V

E L D

IS

T

A N

C E

T R

A V

E L D

IS

T

A N

C E

1B112.8

OFFICE

1B112.4

OFFICE

1B115

OFFICE

1B109

OFFICE

1B112.3

WORKROOM

CLC1S3

STAIR 3

1C113.1

STORAGE

1C116.1

RESTROOM

1C106

EXAM/

TREATMENT

1C109

EXAM/

TREATMENT

1C107

EXAM/

TREATMENT

1C105

EXAM/

TREATMENT

1C104

EXAM/

TREATMENT

1C103

EXAM/

TREATMENT

1C102

EXAM/

TREATMENT

CHECK

IN/OUT

1C100

1C100.2

RESTROOM

CORR

C7

DIRTY

UTILITY

1A137

VESTIBULE

1A100

1A141

OFFICE

1A139

IDF

1A144

NURSE

1A108

WAITING

1A111A

RESTROOM

1A131A

CONFERENCE

RM

1A132.1

RESTROOM

1A130

LOCKER ROOM

1A129

WORKROOM

1A128

WORKROOM

1A127

EXAM/

TREATMENT

1A126

EXAM/

TREATMENT

1A125

WORKROOM

1A124

WORKROOM

1A122

WORKROOM

1A121

WORKROOM

1A128A

RESTROOM

1A126A

RESTROOM

1A124A

RESTROOM

1A123

STORAGE

1A121A

RESTROOM

1A120

ELEC

1A119A

RESTROOM

CLC1S2

STAIR 2

C5

CORRIDOR

1A102

ELEVATOR

LOBBY

1A101

WAITING

1A103

HAC

1A104

OFFICE

CLC1S1

STAIR 1

1B119

STORAGE

1B118

HAC

1B113

RESTROOM

1B112.1

OFFICE

1B112.5

BREAKROOM 1B112

RESTROOM

1B112.4A

CHAMPLAIN

OFFICE

1B112.4B

CLOSET

OXYGEN

STOR.

1B120

1B116

OFFICE

1B117

OFFICE

1B114

OFFICE

1B112.2

OFFICE

1B107.1

OFFICE

CORRIDOR

C3

CORR

C4

1B112.9

OFFICE

1B112.10

OFFICE

1B112.11

OFFICE

1B108

OFFICE

1B112.12

OFFICE

1B112

CORRIDOR

CORR

C2

ELEV

P-1

ELEV

P-2

3 4.7 6.8

D

C

B

A

E

I

EXISTING DEADEND CORRIDOR

EXCEEDING 30' SHALL BE

PERMITTED TO CONTINUE IN USE IF

IT IS UNPRACTICAL AND

UNFEASIBLE TO ALTER FROM.

INCREASE TRAVEL DISTANCE 50FT IF

BUILDING IS SPRINKLED

TOTAL SQUARE

FOOTAGE:

31,309 GSF

HEALTHCARE - OUTPATIENT

- 240 SF / PERSON

EGRESS LEGEND

REQUIRED # OF

EXITS

(per NFPA 101, 19.2.4)

- 2 EXITS MIN. PER FLOOR REQ'D

- 2 EXISTING EXITS, NOT BEING

MODIFIED

OCCUPANCY:

EGRESS

REQUIRED:

130 TOTAL OCCUPANTS

2 DOORS REQUIRED @ 36 & ACH

2 STARS REQ'D, STAIR WIDTH 36"

1. EGRESS WIDTH

EXIT DOORS = 36"/(0.20) = 160 PPL

# OF OCCUPANTS 130 X 0.2 = 26"

EGRESS WIDTH

COMMON PATH

OF TRAVEL

(NFPA 101 -

7.13.1(2) )

IN EXISTING BUILDING, COMMON

PATH OF TRAVEL NOT TO EXCEED

150'

TRAVEL

DISTANCE

INCREASE

(per NFPA 101-19.2.6.2.1)

150'-0" MAXIMUM DISTANCE.

DEAD END

CORRIDOR

(NFPA 101-19.2.5.2)

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/1

/2

:2

:0

P

M C

U s e rs \l e n g e l\ D o c u m e n ts \A

-2

-V

A S a n A n to n io

-C L

C T

X le n g e l9

W S

P G

.r v t

GL101

FIRST FLOOR LIFE SAFETY

5 6LE

UPDATE CLC HVAC SYSTEM

AUDIE L. MURPHY VAMC

7400 MERTON MINTER

SAN ANTONIO, TX 76504 AUGUST 16, 2022

100% CONSTRUCTION DOCUMENTS

671-22-19821-289-Q22

DJR

PROPOSED USE:

OWNED BY: VETERANS ADMINISTRATION

CODE ENFORCEMENT JURISDICTION: FEDERAL

APPLICABLE CODES:

GENERAL CODE INFORMATION:

NEW CONSTRUCTION

RENOVATION (EXISTING BUILDING)

CONSTRUCTION TYPE:

MIXED CONSTRUCTION

SPRINKLERED

MEZZANINE

MIXED OCCUPANCY

PRIMARY OCCUPANCY:

SECONDARY OCCUPANCY:

PROJECT NAME:

PROJECT ADDRESS:

OWNER OR AGENT:

COMMUNITY LIVING CENTER

I

HEALTHCARE

N/A

2021 NFPA 101 LIFE SAFETY CODE

UPDATE CLC HVAC SYSTEM

AUDIE L. MURPHY VAMC

7400 MERTON MINTER

SAN ANTONIO, TX 76504

AUDIE L. MURPHY VAMC

CODE INFORMATION

NORTH

0 8 16 32

LIFE SAFETY LEGEND

Scale: 1/16" = 1'-0"

FIRST FLOOR PLAN - LIFE SAFETY PLAN

OCCUPANCY CLASSIFICATION

(NFPA 2018 101 SECTION 4.1):

HEALTHCARE OCCUPANCY BUILDING, SPRINKLERED

CONSTRUCTION TYPE I (332)

MEANS OF EGRESS:

STAIR ENCLOSURE: 2-HR (NFPA 101.7.1.3.2.1)

MIN. EXIT WIDTH: 32" CLEAR (NFPA 101.2.1.2.2)

OCCUPANT LOAD: (NFPA 101.7.3)

HEALTHCARE INPATIENT: 1:240

STORAGE: 1:300

CAPACITY FACTORS: (NFPA 101.7.3.3):

STAIRS: 0.3

OTHER: 0.2

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

B

C

A

MATCH LINE "B"

MATCH LINE "A"

D

SEE ELECTRICAL DRAWINGS FOR THERMOSTATE UNIT

LOCATIONS.

DAVID J.

REICHARD

Charlotte, NC

ST

AT

E OF SOUT H CAROL

I NA

REG IST ER ED A RCHITECT

UP

UP

S S

S S

S

S SS S

S S

S S

S S

S

S

S

S S

S S

S

S

S S

S

S

S

S

SSS

S

SS

M

L

K

J

H

G

F

10987

5.91 1.6

STAIR 3

CLC2S3

BEDROOM

2C107

BEDROOM

2C109

RESTROOM

2C109.1

BEDROOM

2C110

RESTROOM

2C106.1

BEDROOM

2C106

STORAGE

2C111

ELEC.

2C108

BEDROOM

2C112

BEDROOM

2C105

RESTROOM

2C104.1

RESTROOM

2C112.1

BEDROOM

2C113

BEDROOM

2C104

BEDROOM

2C103

BEDROOM

2C114

BEDROOM

2C115

BEDROOM

2C102

RESTROOM

2C102.1

RESTROOM

2C114.1

BEDROOM

2C101

BEDROOM

2C116

RESTROOM

2C100.1RESTROOM

2C116.1

BEDROOM

2C117

BEDROOM

2C100

WAITING

2A100 DAYROOM

2A107

RESTROOM

2A129

PATIENT

SHOWER

2A131

RESTROOM

2A132

ELEC.

2A1332A134

IDF

CLEAN

SUPPLY

2A-135

DIRTY

UTILITY

2A136

NURSES

2A137

HAC

2A139

PHYSICIAN'S

2A140

RESTROOM,

UNISEX

2A102

LAUNDRY

2A141

WOUND

CARE

2A143.1

UNISEX

STAFF

2A-142

KITCHEN

2A108

STORAGE

2A108.1

TOILET

2A109.1

BEDROOM

2A110

RESTROOM

2A110.1

BEDROOM

2A111

BEDROOM

2A113

RESTROOM

2A112.1

BEDROOM

2A115

RESTROOM

2A114.1

BEDROOM

2A116

BEDROOM

2A117

RESTROOM

2A116.1 CLC2S2

STAIR 2

BEDROOM

2A119

ELEC

CLOSET

2A118

RESTROOM

2A119.1

BEDROOM

2A120

BEDROOM

2A122

BEDROOM

2A123

BEDROOM

2A124

BEDROOM

2A125

RESTROOM

2A126.1

RESTROOM

2A124.1

RESTROOM

2A122.1

STORAGE

2A121

ELEVATOR

MACHINE

ROOM

2A103

OFFICE

2A105

STORAGE

2B101.4

MECHANICAL

ROOM

2A106

OUTDOOR

PATIO

OFFICE

2B111

MULTIPURPOSE

2B110

LOCKER/

BREAK

ROOM

2B109

OFFICE

2B104

OFFICE

2B107

STORAGE

2B101.3

STORAGE

2B101.4

HAC

2B102

T R

A V

E L D

IS

T

A N

C E

'-9

TRAVEL DISTANCE = 124'-8" TRAVEL DISTANCE = 147'-6"

T R

A V

E L D

IS

T

A N

C E

T R

A V

E L D

IS

T

A N

C E

T R

A V

E L D

IS

T

A N

C E

ELEV

P-1

ELEV

P-2

CORR

1C5B

CORR

1C5A

2A131.1

TOILET

2A130

MEDS

2A128

NURSE

2A127

BEDROOM

2A126

BEDROOM

CORR

1C4

2A117.1

RESTROOM

2A114

BEDROOM

2A112

BEDROOM

2A109

MEDS

CORRIDOR

CLC

2A138

IDF

CLC2S1

STAIR 1 2A104

CLINICAL

NURSE

2B100

RESTROOM

2B101.2

THERAPY

2B105

OFFICE

2B110.1

RESTROOM

2B109.1

RESTROOM

HAC

2B108

1C1

CORRIDOR

2B103

STORAGE

2B101

OCCUPATIONAL

THERAPY

2B106

OFFICE

3 4.7 6.8

D

C

B

A

E

I

EGRESS PATH

EGRESS PATH TAG

EGRESS PATH TAG - COMMON PATH

EGRESS IDENTIFICATION

XXX

XXX

CAPACITYCLR

EXTERIOR

EXIT

XX" ###

EXIT

IDENTIFICATION

EGRESS CLEAR

WIDTH

EGRESS CAPACITY

EXISTING DEADEND CORRIDOR

EXCEEDING 30' SHALL BE

PERMITTED TO CONTINUE IN USE IF

IT IS UNPRACTICAL AND

UNFEASIBLE TO ALTER FROM.

INCREASE TRAVEL DISTANCE 50FT IF

BUILDING IS SPRINKLED

TOTAL SQUARE

FOOTAGE:

31,309 GSF

HEALTHCARE - OUTPATIENT

- 240 SF / PERSON

EGRESS LEGEND

REQUIRED # OF

EXITS

(per NFPA 101, 19.2.4)

- 2 EXITS MIN. PER FLOOR REQ'D

- 2 EXISTING EXITS, NOT BEING

MODIFIED

OCCUPANCY:

EGRESS

REQUIRED:

130 TOTAL OCCUPANTS

2 DOORS REQUIRED @ 36 & ACH

2 STARS REQ'D, STAIR WIDTH 36"

1. EGRESS WIDTH

EXIT DOORS = 36"/(0.20) = 160 PPL

# OF OCCUPANTS 130 X 0.2 = 26"

EGRESS WIDTH

COMMON PATH

OF TRAVEL

(NFPA 101 -

7.13.1(2) )

IN EXISTING BUILDING, COMMON

PATH OF TRAVEL NOT TO EXCEED

150'

TRAVEL

DISTANCE

INCREASE

(per NFPA 101-19.2.6.2.1)

150'-0" MAXIMUM DISTANCE.

DEAD END

CORRIDOR

(NFPA 101-19.2.5.2)

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/1

/2

:2

:1

P

M C

U s e rs \l e n g e l\ D o c u m e n ts \A

-2

-V

A S a n A n to n io

-C L

C T

X le n g e l9

W S

P G

.r v t

GL102

SECOND FLOOR LIFE SAFETY

6 6LE

UPDATE CLC HVAC SYSTEM

AUDIE L. MURPHY VAMC

7400 MERTON MINTER

SAN ANTONIO, TX 76504 AUGUST 16, 2022

100% CONSTRUCTION DOCUMENTS

671-22-19821-289-Q22

DJR

Scale: 1/16" = 1'-0"

SECOND FLOOR LIFE SAFETY PLAN

NORTH

0 8 16 32

PROPOSED USE:

OWNED BY: VETERANS ADMINISTRATION

CODE ENFORCEMENT JURISDICTION: FEDERAL

APPLICABLE CODES:

GENERAL CODE INFORMATION:

NEW CONSTRUCTION

RENOVATION (EXISTING BUILDING)

CONSTRUCTION TYPE:

MIXED CONSTRUCTION

SPRINKLERED

MEZZANINE

MIXED OCCUPANCY

PRIMARY OCCUPANCY:

SECONDARY OCCUPANCY:

PROJECT NAME:

PROJECT ADDRESS:

OWNER OR AGENT:

COMMUNITY LIVING CENTER

I

HEALTHCARE

N/A

2021 NFPA 101 LIFE SAFETY CODE

UPDATE CLC HVAC SYSTEM

AUDIE L. MURPHY VAMC

7400 MERTON MINTER

SAN ANTONIO, TX 76504

AUDIE L. MURPHY VAMC

CODE INFORMATION

LIFE SAFETY LEGEND

OCCUPANCY CLASSIFICATION

(NFPA 2018 101 SECTION 4.1):

HEALTHCARE OCCUPANCY BUILDING, SPRINKLERED

CONSTRUCTION TYPE I (332)

MEANS OF EGRESS:

STAIR ENCLOSURE: 2-HR (NFPA 101.7.1.3.2.1)

MIN. EXIT WIDTH: 32" CLEAR (NFPA 101.2.1.2.2)

OCCUPANT LOAD: (NFPA 101.7.3)

HEALTHCARE INPATIENT: 1:240

STORAGE: 1:300

CAPACITY FACTORS: (NFPA 101.7.3.3):

STAIRS: 0.3

OTHER: 0.2

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

B

C

A

MATCH LINE "B"

MATCH LINE "A"

SEE ELECTRICAL DRAWINGS FOR THERMOSTATE UNIT

LOCATIONS.

DAVID J.

REICHARD

Charlotte, NC

ST

AT

E OF SOUT H CAROL

I NA

REG IST ER ED A RCHITECT

DCWR

DHW

PIPING SYSTEM

NG NATURAL GAS

ST STORM

PD PUMP DISCHARGE

OFD OVERFLOW STORM DRAIN

GW GREASE WASTE

OW OIL WASTE

SAN SANITARY WASTE

CD CONDENSATE DRAIN

CA COMPRESSED AIR

AW ACID WASTE

N2 NITROGEN

N2O NITROUS OXIDE

MA MEDICAL AIR

O2 OXYGEN

WAGD WASTE ANESTHETIC GAS DISPOSAL

VAC VACUUM

V SANITARY VENT

OV OIL VENT

AV ACID VENT

NPCW NONPOTABLE COLD WATER

DI DE-IONIZED WATER

SCW SOFTENED COLD WATER

DCW DOMESTIC COLD WATER

RO REVERSE OSMOSIS WATER

DOMESTIC CW RECIRCULATION

DOMESTIC HOT WATER

CO2 CARBON DIOXIDE

DHW 140 DOMESTIC HOT WATER (OTHER TEMP)

PG PROPANE GAS

DHWR DOMESTIC HW RECIRCULATION

NG

ST

PD

OFD

GW

OW

SAN

CD

CA

AW

N2

N2O

MA

O2

WAGD

VAC

CO2

PG

V

OV

AV

HW 140

SCW

NPCW

DI

RO

EXISTING

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

NEW BOLD TEXT INDICATES NEW ITEM

ITALICIZED TEXT INDICATES EXISTING ITEM

NEW PLUMBING EQUIPMENT MARK

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

CONNECT TO EXISTING

LIMIT OF DEMOLITION

P-###

EXISTING PLUMBING EQUIPMENT MARKP-###

3-WAY CONTROL VALVE

ANGLE GATE VALVE

ANGLE GLOBE VALVE

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

CONTROL VALVE

GATE VALVE

GLOBE VALVE

SAFETY RELIEF VALVE

TWO POSITION CONTROL VALVE

BACKFLOW PREVENTER

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLOW ARROW

HOSE BIBB / SILLCOCK

PLUG VALVE

PRESSURE REDUCING VALVE (WATER)

PRESSURE REGULATOR (GAS)

PIPE ANCHOR

PIPE GUIDES

WALL CLEANOUT

SUSPENDED CLEANOUT

WCO

WYE STRAINER

WYE STRAINER W/DRAIN VALVE

FLOOR DRAIN - ROUND OR SQUARE

FLOOR CLEANOUT

PIPE CAP

PIPE TURNING DOWN

PIPE TURNING UP

TEE UP

TEE DOWN

DROP AND RUN

DROP AND TURN

TEE OFF TOP

TEE OFF BOTTOM

CROSS AND RISER

PLAN 90° ELBOW

PIPE TEE

PIPE UNION

FLEXIBLE PIPE CONNECTOR

WATER METER

PUMP

AUTOMATIC AIR VENT

PRESSURE SWITCH

PRESSURE GAUGE

THERMOMETER

FLOW SWITCH

TEMPERATURE SWITCH

OR

CO

PIPE SLOPE ARROW

AV

F

P

T

M

CIRCUIT SETTER

F FAHRENHEIT

FA FROM ABOVE

FB FROM BELOW

FBO FURNISHED BY OTHERS

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE)

CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FU FIXTURE UNITS

G GALLON

GC GENERAL CONTRACTOR

GCO GRADE CLEANOUTS

GD GARBAGE DISPOSAL

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

H&CW HOT AND COLD WATER

HB HOSE BIBB (INTERIOR)

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK

(DOMESTIC)

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

ICW INDUSTRIAL COLD WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

KW KILOWATT

KWHR KILOWATT-HOUR

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH THOUSANDS OF BTU PER HOUR

MC MECHANICAL CONTRACTOR

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MOU MEMORANDUM OF UNDERSTANDING

MSB MOP SINK BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N2O NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW

PA PASCAL

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAUGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH -

ABSOLUTE

PSIG POUNDS PER SQUARE INCH - GAUGE

PTRV PRESSURE TEMPERATURE RELIEF

VALVE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RO REVERSE OSMOSIS

RWL RAIN WATER LEADER

SAN SANITARY SEWER

SCFM STANDARD CUBIC FOOT/MIN

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT SQUARE FOOT

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL VALVE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TDL TEMPERATURE DIFFERENTIAL

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

UPC UNIFORM PLUMBING CODE

V SANITARY VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAUGE

WH WATER HEATER

WHA WATER HAMMER ARRESTOR

WHD WALL HYDRANT

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WS WASTE STACK

YCO YARD CLEANOUT

YH YARD HYDRANT

A/E ARCHITECT/ENGINEER

AC ABOVE CEILING

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

AFG ABOVE FINISHED GRADE

ASD ADJUSTABLE SPEED DRIVE

ASHRAE AMERICAN SOCIETY HEATING,

REFRIGERATING, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY PLUMBING

ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

BAS BUILDING AUTOMATION SYSTEM

BF BELOW FLOOR

BFP BACKFLOW PREVENTER

BG BELOW GRADE

BH BOOSTER HEATER

BHP BREAK HORSEPOWER

BJ BETWEEN JOISTS

BOP BOTTOM OF PIPE

BSP BLACK STEEL PIPE

BT BATHTUB

BTUH BRITISH THERMAL UNITS PER HOUR

C CELSIUS

CF COMBINATION FIXTURE

CGA COMPRESSED GAS ASSOCIATION

CI CAST IRON

CO CLEANOUT

COND CONDENSATE

CP CONDENSATE PUMP

CS CLINICAL SINK

CV CONTROL VALVE

DA DENTAL COMPRESSED AIR

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DF DRINKING FOUNTAIN

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DV DENTAL VACUUM

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

EC ELECTRICAL CONTRACTOR

EL ELEVATION

EMCS ENERGY MONOSERRAT AND CENTRAL

SYSTEM

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWS EYEWASH STATION

EX EXISTING

PLUMBING SYMBOLS PLUMBING SYMBOLS

ANNOTATION SYMBOLS

PLUMBING SYMBOLS & ABBREVIATIONS

ANNOTATION ABBREVIATIONS 1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE PROCEEDING WITH

WORK.

2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.

3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.

4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST

MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.

5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.

6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND APPROVAL.

7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES DAMAGED AT

NO ADDITIONAL COST.

8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.

9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW PLUMBING WORK

AND WORK OF OTHER TRADES.

PLUMBING DEMOLITION GENERAL NOTES

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE

PURPOSES INTENDED.

5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT

EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.

6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT

MAINTENANCE, REPAIRS, AND REPLACEMENT.

7. AT EACH PLUMBING FIXTURE, PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO

MANUFACTURER'S RECOMMENDATIONS.

8. SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE.

SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED OTHERWISE.

9. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH

SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.

10. FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF WALLS AND FLOORS.

11. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND APPLICABLE VA

STANDARDS.

12. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.

13. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND

APPLICABLE VA STANDARDS.

14. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.

15. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING OF PIPING WITH

EXISTING CONDITIONS.

16. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING

SYSTEMS.

17. CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE COR 2 WEEK IN ADVANCE AND

CONFIRM 48 HOURS PRIOR.

18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.

19. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

20. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.

PLUMBING GENERAL NOTES

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:1

:4

P

M C

U s e rs \p a c h a ry a \D o c u m e n ts

\M P

-2

-V

A S a n A n to n io

-C L

C T

X p a c h a ry a T

W Q

A u g

.r v t

P-001

PLUMBING GENERAL INFORMATION

1 4TB

UPDATE CLC HVAC SYSTEM

AUDIE L. MURPHY VAMC

7400 MERTON MINTER

SAN ANTONIO, TX 76504 AUGUST 16, 2022

100% CONSTRUCTION DOCUMENTS

671-22-19821-289-Q22

RBK

HWRP-2 MECH 1A-107 PATIENT CARE HOT WATER WATER 15 13.2 120 1/6 1 115 1750 1, 2, 3, 4

HWRP-1 MECH 1A-107 PATIENT CARE HOT WATER WATER 15 13.2 120 1/6 1 115 1750 1, 2, 3, 4

GPM FT °F HP

FLUID

FLOW HEAD TEMPERATURE NOMINAL POWER

PHASE VOLT MAX RPM REMARKS

MARK LOCATION

AREA AND/OR

BLDG SERVED

SYSTEM AND/OR

SERVICE

CIRCULATING FLUID ELECTRICAL MOTOR

RECIRCULATING PUMP SCHEDULE

WH-2 MECH 1A-107 PATIENT CARE HOT WATER WATER 56 60 140 3920 1960 69.12x81.63x40.88 80 50 1, 2, 3, 4

WH-1 MECH 1A-107 PATIENT CARE HOT WATER WATER 56 60 140 3920 1960 69.12x81.63x40.88 80 50 1, 2, 3, 4

GPM IN °F OUT °F

FLUID

FLOW TEMPERATURE ENTERING

CONTROL VALVE

ENTERING

GENERATOR

REMARKS

MARK LOCATION

AREA AND/OR

BLDG SERVED

SYSTEM

AND/OR

SERVICE

CIRCULATING FLUID

TRAP

LBS./HR.

CONTROL

VALVE

LBS./HR.

DIMENSIONS, IN

STEAM PSIG

STEAM DOMESTIC HOT WATER HEATER SCHEDULE

NOTES:

1. INSTALL PER MANUFACTURERS RECOMMENDATIONS.

2. DOMESTIC WATER HEATERS TO BE DOUBLE WALLED.

3. ENTERING STEAM PRESSURE TO BE HIGH PRESSURE STEAM FOR DOMESTIC HOT WATER HEATERS.

4. BASIS OF DESIGN IS AERCO B+08 WATERWIZARD.

PLUMBING MIXING VALVE SCHEDULE

MARK LOCATION TYPE OUTLET PIPE SIZE FLOW INLET TEMP OUTLET TEMP

ELECTRICAL

REMARKSVOLT PHASE

MTMV-1 MECH 1A-107 DIGITAL 2" 50.0 GPM 140 °F 140 °F 120 1 1, 2

NOTES:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

2. PROVIDE CONTROLLER AS REQUIRED TO INTEGRATE INTO EXISTING ANDOVER CONTROLS BUILDING AUTOMATION SYSTEM.

3. PROVIDE PREMIUM EFFICIENCY MOTOR.

4. PROVIDE INDEPENDENT SUPPORTS FOR PUMPS AND ASSOCIATED PIPING.

NOTES:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

2. BASIS OF DESIGN IS LEONARD NUCLEAS MODEL NV-150-LF.

S

S SS S

S S

SS S

S

S

S

S

2 1/2" DCW

1/2" DHWR

1 1/2" DHW

4" SAN

2" V

3 1/2" DHW

6" DCW

2" DHWR

S A N

2" DCW

1A107

MECHANICAL

S A N

2" V

S A N

3" SAN

FD-B

FD-B

FD-B

FD-B

FD-B

FCO

FD-B

FCO

D C W

1/ D H W R

D C W

1/

D H W

V

4" SAN

5.94.7 654

D

E

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/1

/2

:1

:5

P

M C

U s e rs \p a c h a ry a \D o c u m e n ts

\M P

-2

-V

A S a n A n to n io

-C L

C T

X p a c h a ry a T

W Q

A u g

.r v t

P-401

FIRST FLOOR ENLARGED MECHANICAL

ROOM PLUMBING DEMOLITION PLAN

2 4TB

UPDATE CLC HVAC SYSTEM

AUDIE L. MURPHY VAMC

7400 MERTON MINTER

SAN ANTONIO, TX 76504 AUGUST 16, 2022

100% CONSTRUCTION DOCUMENTS

671-22-19821-289-Q22

RBK

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE D

B

C

A

MATCH LINE "B"

MATCH LINE "A"

Scale: 1/2" = 1'-0"

FIRST FLOOR ENLARGED MECHANICAL ROOM PLUMBING DEMOLITION PLAN

A. DEMOLITION WORK SHALL BE PERFORMED

SUCH THAT ALL PIPES, HANGERS, SUPPORTS,

AND VALVES IN SCOPE ARE REMOVED

COMPLETELY TO MAINS. REMOVE ALL ITEMS TO

ENSURE NOTHING IS ABANDONED IN PLACE.

B. NO DEAD ENDS SHALL REMAIN. THE MAXIMUM

LENGTH OF DEAD ENDS SHALL BE TWO PIPE

DIAMETERS FROM THE BRANCH, RISER, OR

MAIN.

1 DEMOLISH EXISTING WATER HEATERS AND

ASSOCIATED DOMESTIC COLD WATER AND HOT

WATER PIPING WITH CONTROLS BACK TO MAIN.

2 DEMOLISH EXISTING RECIRCULATING PUMP AND

ASSOCIATED PIPING BACK TO MAIN.

3 DEMOLISH EXISTING 4" CONCRETE PAD.

NORTH

0 1 2 4

S

S SS S

S S

SS S

S

S

S

S S

S

S SS S

S S

SS S

S

S

S

S

2" DHWR

6" DCW

1A107

MECHANICAL

4" SAN

1 1/2" DHW

1/2" DHWR

2 1/2" DCW

4" SAN

S A N

1/ D H W R

S A N

V

2" V

FD-B

FD-B

FD-B

FCO

FD-B

FD-B

FCO

FD-B

V

2" V

3" SAN

S A N

WH-2WH-1

2" V

2" V

D C W

D C W

1/

D H W

HWRP-2

HWRP-1

3 1/2" DHW

MTMV-1

3" DCW

3" DHW

D H

W

5.94.7 654

D

E

2" DHWR

3" DCW

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/1

/2

:1

:5

P

M C

U s e rs \p a c h a ry a \D o c u m e n ts

\M P

-2

-V

A S a n A n to n io

-C L

C T

X p a c h a ry a T

W Q

A u g

.r v t

P-402

FIRST FLOOR ENLARGED MECHANICAL

ROOM PLUMBING PLAN

3 4TB

UPDATE CLC HVAC SYSTEM

AUDIE L. MURPHY VAMC

7400 MERTON MINTER

SAN ANTONIO, TX 76504 AUGUST 16, 2022

100% CONSTRUCTION DOCUMENTS

671-22-19821-289-Q22

RBK

1 PROVIDE (2) NEW HOT WATER HEATERS. SEE

DETAILS 2,3/P-501 FOR MORE INFORMATION.

REFER TO MECHANICALS PLANS FOR STEAM

PIPING MODIFICATIONS.

2 PROVIDE (2) NEW RECIRCULATING PUMPS. SEE

DETAIL 4/P-501 FOR MORE INFORMATION.

3 PROVIDE NEW MASTER DIGITAL THERMOSTATIC

MIXING VALVE WITH CONTROL PANEL. SEE

DETAIL 1/P-501 FOR MORE INFORMATION.

4 PROVIDE NEW HOT WATER HEATERS AND

RECIRCULATING PUMPS CONTROL

PANEL.REUSE EXISTING POWER CIRCUITS FOR

CONTROL AND POWER DEVICES. COORDINATE

FINAL LOCATIONS WITH VA.

5 PROVIDE NEW 3" DOMESTIC COLD WATER

PIPING TO EACH WATER HEATER, TIE INTO THE

EXISTING 6" DCW LINE.

6 PROVIDE NEW 3" DOMESTIC HOT WATER PIPING

TO EACH WATER HEATER, TIE INTO THE

EXISTING 3-1/2" DHW LINE.

7 CONNECT NEW 2" DOMESTIC HOT WATER

RETURN PIPING TO THE EXISTING 2" DHWR

LINE.

8 REUSE EXISTING STEAM AND CONDENSATE

PIPING, TRAPS, AND VALVES. RECONNECT

STEAM PIPING TO NEW DOMESTIC WATER

HEATERS.

9 PROVIDE NEW 4" HIGH HOUSEKEEPING

CONCRETE PAD.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE D

B

C

A

MATCH LINE "B"

MATCH LINE "A"

NORTH

0 1 2 4

Scale: 1/2" = 1'-0"

FIRST FLOOR ENLARGED MECHANICAL ROOM PLUMBING PLAN

A. SLEEVE ALL PENETRATIONS. FIRESTOP AND

SEAL WATER TIGHT.

ELECTRONIC CONTROL130°F OUT TO BLDG 124°F HOT WATER RETURN

TEST PORT/PURGE VALVE

SOLENOID VALVE

HW RETURN TO COLD WATER

FEED OF HOT WATER SOURCE

COLD WATER INLETHOT WATER INLET

SOLENOID (NC)

SOLENOID (NO)

NORMALLY CLOSED

CONNECTED TO BAS

NOTES:

1. VALVE TO REMAIN CLOSED DURING NORMAL OPERATION.

2. VALVE TO BE OPENED DURING THERMAL ERADICATION.

3. VALVE TO BE CLOSED DURING THERMAL ERADICATION.

4. ALARM TO BE SENT TO BAS WHEN TEMPERATURE FALLS

BELOW 124°F OR ABOVE 130°F.

1 2

FROM BUILDING

HIGH - LOW

THERMOSTATI C MI XER

ASSE 1017 Compliant

PART NO.

SET TEMP.

DATE CODE

RANGE

TEMP.

130°F

°F

PIPE SUPPORTS (TYP)

PRESSURE GAUGE

AND GAUGE COCK (TYP)

EXISTING HOT WATER

CIRCULATION

LINE TO WATER

HEATING SYSTEM

HOT WATER CIRCULATION PUMP. SEE

EQUIPMENT SCHEDULE - PUMP

MOTORS SHALL BE INSTALLED SO THAT

MOTOR IS IN A HORIZONTAL POSITION

1/2" FLEXIBLE ELECTRICAL CONDUIT

FROM AQUASTAT TO PUMP BY

ELECTRICAL CONTRACTOR

AQUASTAT TO OPERATE HOT WATER

CIRCULATION PUMP FURNISHED AND

INSTALLED BY PLUMBING CONTRACTOR.

THERMOMETER

POWER BY DIV. 26

SHUT-OFF VALVE (TYP)

CHECK VALVE

DIELECTRIC UNION (TYP)

CIRCUIT SETTER

EXISTING HOT WATER CIRCULATION LINE

FROM BUILDING SYSTEM

NORMALLY CLOSED

BYPASS TO BACKUP PUMP

(TYP OF 2)

CONNECT TO AQUASTAT

BACKUP PUMP - MOUNT

HORIZONTAL SHOWN

OFFSET FOR CLARITY

NOTE:

BACKUP PUMP IS TO BE USED IF THE MAIN PUMP FAILS,

SWITCH BYPASS TO BACKUP PUMP AND SWITCH OFF

SHUT-OFF VALVES TO MAIN PUMP, SWITCH OFF MAIN

POWER TO MAIN PUMP AND TURN ON POWER TO THE

BACKUP PUMP.

D

D

P

T

A

FLOOR SINK

D

D

T

STEAM CONDENSATE LINES

STEAM TYPE DOMESTIC

WATER HEATER (TYP OF 2)

THERMOSTATIC MIXING

VALVE - SEE 1/P-501

STEAM CONTROL

VALVE (TYP OF 2)

REDUCER AS

NECESSARY (TYP)

P

DHWR

DHW

DCW

SHUTOFF VALVE

(TYP)

HOT WATER RECIRCULATION

PUMPS - SEE 4/P-501

STEAM HEADER - SEE

MECH PIPING PLAN

ASME TEMPERATURE & PRESSURE

RELIEF VALVES. PIPE FULL SIZE

TO FLOOR DRAIN (TYP)

DIELECTRIC UNION (TYP)

TEMPERATURE SENSOR (TYP)

PRESSURE GAUGE (TYP)

4" CONCRETE PAD

STEAM TRAP (TYP)

STEAM CONDENSATE TO RECEIVER

EXPANSION TANK

NOTE:

STEAM WATER HEATER OUTPUT TEMPERATURE SHALL BE SET TO 140°F. THERMOSTATIC MIXING VALVE SHALL BE SET TO 130°F. AQUASTAT CONTROLLER FOR RECIRCULATION PUMP SHALL BE CONFIGURED TO TURN PUMP ON AT 125°F AND OFF AT 130°F.

NC HOT WATER

BYPASS

WH: DOMESTIC STEAM HOT WATER HEATER

HWRP: HOW WATER RECURCULATING PUMP

PT

TT

WH-1 WH-2

FLOOR

LP STEAM

NEW

DCWS

DHWS

D H

W R

TO

PLUMBING

FIXTURES

FROM PLUMBING

FIXTURES

MV-1 MV-2

LPS

TT

PT

MV-7

PT

2 TT

HWRP-1

MV-3

MV-4

MV-5

MV-6

FT

FT

(PLUMBING SINKS

AND LAVS TO

HAVE TMV WITH

MANUAL BYPASS)

FT

STEAM TRAP TYP.

LPR

L P

S

HWRP-2

NEW THERMOSTATIC

MIXING VALVE

TT

N E

W

D

H S

NOTE:

SEE FLOOR PLANS FOR PIPE SIZES.

N E

D C

W S

NEW

DHWR

NEW

DCWS

FT

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:1

:5

P

M C

U s e rs \p a c h a ry a \D o c u m e n ts

\M P

-2

-V

A S a n A n to n io

-C L

C T

X p a c h a ry a T

W Q

A u g

.r v t

P-501

PLUMBING DETAILS

4 4TB

UPDATE CLC HVAC SYSTEM

AUDIE L. MURPHY VAMC

7400 MERTON MINTER

SAN ANTONIO, TX 76504 AUGUST 16, 2022

100% CONSTRUCTION DOCUMENTS

671-22-19821-289-Q22

RBK

Scale: No Scale

HOT WATER RECIRCULATION PUMP

Scale: No Scale

STEAM WATER HEATER DETAIL

Scale: No Scale

DOMESTIC WATER SCHEMATIC

Scale: No Scale

MASTER DIGITAL THERMOSTATIC MIXING VALVE DETAIL

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACC AIR-COOLED CONDENSER

ACCH AIR-COOLED CHILLER

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

ACD AUTOMATIC CONTROL DAMPER,

MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER,TWO

POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERAGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND

REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN…

This is the start of the file's text. The full file is on GovTribe.