This is a Memorandum of Agreement (MOA) between the U.S. Department of Veterans Affairs Marion VA Medical Center and the Illinois State Historic Preservation Officer regarding mitigation of adverse effects to the Marion Veterans Administration Hospital Historic District resulting from the proposed demolition and replacement of Building 14 (boiler plant) due to identified seismic deficiencies. The undertaking is subject to Section 106 of the National Historic Preservation Act and 36 CFR Part 800.
The Marion VAMC determined that Building 14, a contributing resource to the National Register-listed Marion Veterans Administration Hospital Historic District, will experience an adverse effect from its demolition. The MOA establishes mitigation measures requiring the Marion VAMC to complete Historic Illinois Buildings Survey (HIBS) documentation of Building 14 conducted by a professional meeting Secretary of Interior Qualifications standards, following IL SHPO guidelines. Fieldwork including site visits, photography, measurements, and field notes must occur before project commencement. The professional shall submit draft photography and field notes to IL SHPO for 15-day review, followed by submission of a 95% draft HIBS recordation in PDF format for another 15-day review period. Upon IL SHPO written confirmation, the Marion VAMC shall submit one archival clamshell, one copy of HIBS recordation on archival materials per Abraham Lincoln Presidential Library specifications, and one digital record for posting on the IL SHPO website. The MOA includes interpretive installations requiring photographic documentation and blueprints of the original boiler plant in the new boiler plant hallway, a plaque at the entrance describing the original building, and salvage of a window from the original structure if feasible to incorporate in the photography exhibit. The MOA expires in five years unless its terms are carried out and may be amended only by written agreement of all signatories. Provisions address post-review discoveries, annual reporting, dispute resolution procedures, and termination protocols.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VAMC ADDRESS MOA 1
SHPO Log # 006060925
MEMORANDUM OF AGREEMENT
AMONG
THE U.S. DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER
MARION, ILLINOIS
AND THE
ILLINOIS STATE HISTORIC PRESERVATION OFFICER
REGARDING VAMC MARION PROJECT NO. 657-507 CORRECT SEISMIC DEFICIENCES
BUILDING 14
(SHPO LOG # 006060925)
WHEREAS, the U.S. Department of Veterans Affairs (VA) is a federal agency that operates the Marion
VA Medical Center (VAMC) located in the City of Marion, Williamson County, Illinois (IL) and has identified seismic deficiencies in the boiler plant (Building 14) necessitating the building’s demolition and replacement; and
WHEREAS, the Marion VAMC determined that the proposed demolition and replacement of Building
14 is a federal action that meets the definition of an undertaking, per 36 CFR § 800.16(y), and is the type of activity that has the potential to cause effects on historic properties, and therefore subject to Section
106 of the National Historic Preservation Act (NHPA) (54 USC § 306108) and its implementing regulations (36 CFR Part 800 – Protection of Historic Properties); and
WHEREAS, the Marion VAMC consulted with the IL State Historic Preservation Officer (SHPO), a
Division of the Illinois Department of Natural Resources (IDNR), consistent with 36 CFR § 800.2(c)(1);
and
WHEREAS, the Marion VAMC invited the following federally-recognized Indian tribes to be consulting parties, consistent with 36 CFR § 800.2(c)(2), on August 27th, 2025: the Kaw Nation of Oklahoma, the
Ponca Tribe of Oklahoma, the Ponca Tribe of Nebraska, the Peoria Tribe, the Osage Nation, the Miami
Nation, the Menominee Tribe of Wisconsin, and none have chosen not to participate in the consultation pursuant to 36 CFR§ 800.6(a)(1)(iii); and
WHEREAS, the Marion VAMC invited the following to be consulting parties, consistent with 36 CFR §
800.2(c)(3 through 5), on August 27th, 2025: Landmarks Illinois, Williamson County Historical Society, and City of Marion Municipal Planning Department, and none chose to participate in consultation; and
WHEREAS, the Marion VAMC notified the public of the undertaking and sought public comment through the Marion VAMC’s public portal (https://www.va.gov/marion-health-care/stories/public-notice-national-historic-preservation-act-public-comment-solicitation-for-project-657-507-correct-seismic/) on
August 27th, 2025, with no comments received; and
WHEREAS, the Marion VAMC, in consultation with the IL SHPO and consistent with 36 CFR §
800.4(a)(1), has determined the area of potential effects (APE) to be the boundary of the Marion Veterans
Administration Hospital Historic District (Historic District) (Attachment A); and
WHEREAS, the Marion VAMC has identified the Historic District, listed on the National Register of
Historic Places on November 20, 2012 (REF # 219300, Attachment B), as a historic property within the
APE that may be affected by the undertaking consistent with 36 CFR § 800.4(b); and
WHEREAS, the Marion VAMC has determined that there are no archaeological resources within the
APE that will be affected by the undertaking; and
VAMC ADDRESS MOA 2
WHEREAS, the Marion VAMC, in accordance with 36 CFR § 800.5(d)(2), has found the undertaking will have an adverse effect on the Historic District, as Building 14 is a contributing resource to the
Historic District; and
WHEREAS, the Marion VAMC has consulted to resolve the adverse effect per 36 CFR § 800.6; and
WHEREAS, the Marion VAMC, in accordance with 36 CFR § 800.6(a)(1), has notified the Advisory
Council on Historic Preservation (ACHP) of the adverse effect finding, and on August 12, 2025 the
ACHP has chosen not to participate in the consultation pursuant to 36 CFR § 800.6(a)(1)(iii); and
NOW, THEREFORE, the Marion VAMC and the IL SHPO agree that the adverse effect will be resolved through the execution of this Memorandum of Agreement (MOA) pursuant to 36 CFR §
800.6(b)(1)(iv), and that the undertaking shall be implemented in accordance with the following stipulations in order to mitigate the adverse effects of this undertaking on historic properties.
STIPULATIONS
The Marion VAMC shall ensure that the following measures are carried out.
I. MITIGATION
A. Historic Illinois Buildings Survey (HIBS) Documentation
1. The Marion VAMC shall ensure that a professional who meets the Secretary of the
Interior’s Qualifications (36 CFR Part 61) will document Building 14 for the HIBS.
2. The recordation will follow the HIBS guidelines established by the IL SHPO, according to the specifications listed in Attachment C.
3. The professional will consult with the IL SHPO prior to the initiation of the work to ensure that expectations are understood.
4. The IL SHPO may approve alterations to the format and/or requirements of the HIBS, depending on the circumstances of the project.
5. Fieldwork, in the form of a site visit, draft photography, measurements, and final photography must take place before the Project may commence.
6. Upon completion of draft photography, the professional shall digitally submit the images and copies of field notes to the IL SHPO for a 15-day review and comment period.
7. Upon IL SHPO confirmation in writing that all of the final HIBS photographs to complete HIBS recordation have been collected, or after the comment period has closed and no comments have been received, the Project may commence.
8. The professional shall prepare and email a 95% draft of the HIBS recordation in .pdf format to the IL SHPO for a 15-day review and comment period.
9. When the IL SHPO accepts the 95% draft submission, in writing, the professional shall incorporate into the recordation any comments that the IL SHPO provides and complete the final documentation.
10. Upon completion of the final documentation, the Marion VAMC shall submit the following to the IL SHPO:
a. One archival clamshell of sufficient size to encapsulate the HIBS recordation.
b. One copy of the HIBS recordation, on archival materials, according to HIBS
VAMC ADDRESS MOA 3
specifications for deposit in the Abraham Lincoln Presidential Library and Museum.
c. One digital record (download, link, flash drive, CD, or DVD) with the complete
HIBS recordation for posting on the IL SHPO website.
B. Interpretive Installations
1. The Marion VAMC will install photographic documentation of the original boiler plant
(i.e., printed, framed, and placed) in the hallway of the new boiler plant. Blueprints of the original plant will also be included.
2. The Marion VAMC will place a plaque at the entrance of the new boiler plant; with picture and description of original building.
3. The Marion VAMC will attempt to salvage a window from the original boiler plant, if feasible, and incorporate it in the photography exhibit as a picture frame.
II. DURATION
This MOA will expire if its terms are not carried out within five (5) years from the date of its execution. Prior to such time, the Marion VAMC may consult with the other signatories to reconsider the terms of the MOA and amend it in accordance with Stipulation VI
AMENDMENTS below. The Marion VAMC shall notify the signatories as to the course of action it will pursue.
III. POST-REVIEW DISCOVERIES
If potential historic properties are encountered or unanticipated effects on historic properties found during implementation of the undertaking, the Marion VAMC shall immediately consult with the IL SHPO and federally recognized Indian tribes, as appropriate, and make reasonable efforts to avoid, minimize, or mitigate adverse effects to such properties. In the event of an unanticipated encounter of human remains or burials, the Marion VAMC must immediately stop work within 100 feet of the area, notify the Coroner, IL SHPO, and federally recognized Indian tribes, and comply with the Native American Graves Protection and Repatriation Act of 1990
(NAGPRA).
IV. MONITORING AND REPORTING
Each year following the execution of this MOA until it expires or is terminated, the Marion
VAMC shall provide the IL SHPO a summary report detailing work undertaken pursuant to its terms. Such report shall include any scheduling changes proposed, any problems encountered, and any disputes and objections received in the VAMC’s efforts to carry out the terms of this
MOA.
V. DISPUTE RESOLUTION
Should any signatory to this MOA object at any time to any actions proposed or the manner in which the terms of this MOA are implemented, the Marion VAMC shall consult with the signatories to resolve the objection. If the signatories cannot agree regarding a dispute, the signatories shall:
A. Forward all documentation relevant to the dispute, including any timely advice or comments regarding the dispute from the signatories and concurring parties and the
Marion VAMC’s proposed resolution, to the ACHP. The ACHP shall provide the Marion
VAMC ADDRESS MOA 4
VAMC with its advice on the resolution of the objection within thirty (30) days of receiving adequate documentation. Prior to reaching a final decision on the dispute, the
Marion VAMC shall prepare a written response that takes into account any timely advice or comments regarding the dispute from the ACHP, signatories and concurring parties, and provide them with a copy of this written response. The Marion VAMC will then proceed according to its final decision.
B. If the ACHP does not provide its advice regarding the dispute within the thirty (30) day time period, the Marion VAMC will make a final decision on the dispute and proceed accordingly. Prior to reaching such a final decision, VAMC shall prepare a written response that takes into account any timely comments regarding the dispute from the signatories and concurring parties to the MOA and provide them and the ACHP with a copy of such written response.
C. The Marion VAMC’s responsibility to carry out all other actions subject to the terms of this MOA that are not the subject of the dispute remain unchanged.
VI. AMENDMENTS
This MOA may be amended when such an amendment is agreed to in writing by all signatories.
The amendment will be effective on the date a copy is signed by all of the signatories.
VII. TERMINATION
If any signatory to this MOA determines that its terms become impossible to carry out, that party shall immediately consult with the other signatories to attempt to develop an amendment per
Stipulations V and VI above. If within thirty (30) days an amendment cannot be reached, any signatory may terminate the MOA upon written notification to the other signatories.
Once this MOA is terminated, and prior to work continuing on the undertaking, the Marion
VAMC must either (a) execute a MOA pursuant to 36 CFR § 800.6 or (b) request, take into account, and respond to the comments of the ACHP under 36 CFR § 800.7. The Marion VAMC shall notify the signatories as to the course of action it will pursue.
VIII. COUNTERPARTS; FACSIMILE OR .PDF SIGNATURES
This MOA may be executed in counterparts, each of which shall be considered an original and together shall be one and the same MOA. A facsimile or .pdf copy of this MOA and any signatures thereon will be considered for all purposes as an original.
IX. DISTRIBUTION OF AGREEMENT
In order to meet the requirements of Section 106. 36 CFR § 800.6(b)(1)(iv), upon the execution of this MOA and prior to approving the undertaking, the Marion VAMC must transmit to the
ACHP the executed MOA along with the documentation specified in Section 800.11(f).
EXECUTION of this MOA by the Marion VAMC and the IL SHPO and implementation of its terms evidence that the Marion VAMC has taken into account the effects of this undertaking on historic properties and afforded the ACHP an opportunity to comment.
VAMC ADDRESS MOA 5
[Signature Pages to follow]
VAMC ADDRESS MOA 6
MEMORANDUM OF AGREEMENT AMONG
VETERANS AFFAIRS MEDICAL CENTER (VAMC)
MARION, ILLINOIS,
AND THE
ILLINOIS STATE HISTORIC PRESERVATION OFFICER
REGARDING VAMC MARION PROJECT NO. 657-507 CORRECT SEISMIC DEFICIENCES
BUILDING 14,
SIGNATORY
UNITED STATES DEPARTMENT OF VETERANS AFFAIRS
Signature: Date:
Name: Zachary Sage
Title: Executive Director, Marion VA Healthcare System
VHAMRNSageZ Typewritten Text January 8, 2026
VAMC ADDRESS MOA 7
MEMORANDUM OF AGREEMENT AMONG
VETERANS AFFAIRS MEDICAL CENTER (VAMC)
MARION, ILLINOIS,
AND THE
ILLINOIS STATE HISTORIC PRESERVATION OFFICER
REGARDING VAMC MARION PROJECT NO. 657-507 CORRECT SEISMIC DEFICIENCES
BUILDING 14,
SIGNATORY
ILLINOIS DEPUTY STATE HISTORIC PRESERVATION OFFICER
By: Date:
Carey L. Mayer, AIA
Deputy State Historic Preservation Officer
Illinois Department of Natural Resources
Figure 1 – National Historic Register Boundary (Building 14 is in the lower, right corner of the site).
Figure 2 – Area of Potential Effects and Proposed Conceptual Site Layout
Historic Illinois Building Survey(HIBS) and Historic Illinois Engineering Record (HIER)
Standards and Guidelines
The Illinois State Historic Preservation Office (SHPO) within the Illinois Department of Natural Resources (IDNR) administers the state cultural resources program and is responsible for the Historic Illinois Buildings Survey/Historic Illinois Engineering Record (HIBS/HIER) Program of documentation of historic buildings, sites, structures, and objects located in the State of Illinois. HIBS/HIER documentation includes measured drawings, large-format photographs, and written contextual histories and descriptions. The Abraham Lincoln Presidential Library (ALPL) is the repository for these documents.
This document outlines the SHPO’s Documentation Standards the HIBS/HIER Standards. These performance standards define the criteria for projects to be accessioned into the HIBS/HIER Collection located at the ALPL.
Acceptable IL HIBS/HIER documentation often includes:
• Measured Drawings
• Large-Format Photographs
• Detailed Historical Context Development
• Physical Descriptions in a Prescribed Written Outline Format
These standards are intended to be used in conjunction with the accompanying guidelines for historical, architectural and engineering documentation. Other publications listed in the bibliography should be consulted.
These standards will be used:
• In preparation of documentation to fulfill mitigative requirements in accordance with the Illinois State Agency Historic Resources Preservation Act [20 ILCS 3420/1 et seq] and Section 106 of the National Historic Preservation Act of 1966, as amended.
• In preparation of voluntary documentation to be submitted for inclusion in the HIBS/HIER Collection.
HIBS/HIER Documentation Standards
The IL HIBS/HIER Documentation Standards address the development of documentation for historic buildings, sites, structures, and objects. HIBS/HIER documentation provides relevant graphic and written information on a property’s significance for use by scholars, researchers, preservationists, architects, engineers, and others interested in preserving and understanding historic properties. HIBS/HIER documentation is important for several reasons. It provides for accurate repair or reconstruction of parts of a property, records existing conditions for easements and preserves information about a property that is to be demolished or altered.
Standard 1: Documentation shall adequately explicate and illustrate that which is significant or valuable about the historic building, site, structure, or object.
The historic significance of the building, site, structure, or object identified in the evaluation process should be conveyed by the drawings, photographs, and written materials that comprise the documentation. The historical, architectural, engineering, or cultural values of the subject property, in conjunction with the purpose of the documentation, will determine the level and methods of documentation.
Standard 2: Documentation shall be prepared accurately from reliable sources with limitations clearly stated to permit independent verification of the information.
The purpose of documentation is to preserve an accurate record of historic properties that can be used in research and other preservation activities. To serve these purposes, the documentation must include information that permits assessment of its reliability.
Standard 3: Documentation shall be prepared on and submitted in materials that are readily reproducible, durable, and in standard sizes.
The size and quality of documentation materials are important factors in the preservation of information for future use.
Selection of materials is based on the length of time expected for storage, the anticipated frequency of use, and a size convenient for storage and document management.
Standard 4: Documentation will be clearly and concisely produced.
In order for documentation to be useful for future research, written materials must be fully developed, legible and understandable. Graphic materials must contain scale information and location references.
HIBS/HIER Documentation Guidelines
The HIBS/HIER Documentation Guidelines supply more specific guidance and technical information for HIBS/HIER
Documentation Standards. They describe the general approach for meeting the Standards. Agencies, organizations, and individuals proposing to undertake the production of HIBS/HIER documentation in a different manner will need to review and gain approval of their strategy with the HIBS/ HIER Coordinator prior to the execution of a contract for or the initiation of production of HIBS/HIER documentation.
The following definitions are used in conjunction with these guidelines:
• Documentation – Measured drawings, photographs, contextual histories, physical descriptions, inventory cards, or other media that provide graphic and written information on historic buildings, sites, structures, or objects.
• Field Photography – Photography other than large-format negatives, intended for the purpose of producing documentation, usually 35 mm.
• Field Records – Notes of measurements taken, field photographs, and other recorded information intended for the purpose of producing documentation.
• Large-Format Photographs – Photographs made from 4” x 5” negatives. Appropriate techniques are to be implemented to correct perspective distortion.
• Measured Drawings – Drawings produced on HIBS/HIER acceptable materials depicting historic or existing conditions and other relevant features of the subject. Measured drawings are produced in ink on archivally stable mylar.
• Photocopy – A photograph, with large-format negative, of a photograph or drawing.
• Select Existing Drawings – Drawings of original construction or later alterations that portray or depict the subject’s historic value or significance.
• Sketch Plan – A floor plan, generally not to exact scale although often drawn from measurements, where the features are shown in proper relation and proportion to each other.
Goal of Documentation
The goal of the HIBS/HIER Collection is to provide historians, architects, engineers, scholars, and interested members of the public with comprehensive documentation of buildings, sites, structures, and objects significant in Illinois’ history.
HIBS/HIER documentation often consists of measured drawings, photographs, and written data that provide a detailed record of a property’s significance. Measured drawings and properly executed photographs act as a form of insurance against fires and natural disasters by permitting the repair and, if necessary, reconstruction of historic structures damaged by such disasters. HIBS/HIER documentation is sometimes used to provide the basis for enforcing preservation easements.
In addition, HIBS/HIER documentation is often the last means of preservation when a historic property is to be demolished or permanently altered. HIBS/HIER documentation provides future researchers access to valuable information that would otherwise be lost.
HIBS/HIER documentation is developed as a result of two separate catalysts. First, the SHPO, pursuant to the Illinois State Agency Historic Resources Preservation Act (20 ILCS 3420/l et seq] and/or Section 106 of the National Historic Preservation Act of 1966, as amended, requires recordation of historic properties proposed for demolition or substantial alteration as a result of adverse undertakings conducted on those properties (referred to as mitigation projects). Secondly, individuals and organizations, on their own initiative, can prepare documentation according to HIBS/HIER Standards and donate that documentation to the HIBS/HIER Collection. Required documentation levels will vary.
HIBS/HIER Standards describe the fundamental principles of the development of HIBS/HIER documentation. The HIBS/HIER Guidelines listed under each of the following HIBS/HIER Standards provide basic information about developing documentation for the HIBS/HIER Collection. The HIBS/HIER Guidelines are augmented by more specific graphic and written documentation requirements which are included here as supplemental information. Additional specific information concerning the production of HIBS/HIER documentation is included in a separate document entitled HIBS/HIER Program/Technical Commentary, which can be made available upon request.
Documentation prepared for the purpose of inclusion in the HIBS/HIER Collection must meet the requirements listed below.
The SHPO HIBS/HIER Coordinator retains the right to refuse documentation for inclusion in the HIBS/HIER Collection when that documentation does not meet HIBS/HIER requirements specified in this document.
Standard l: Content – HIBS/HIER documentation shall adequately explicate and illustrate what is significant or valuable about the historic building, site, structure, or object being documented.
Guidelines
Documentation shall meet one of the following levels to be considered adequate for inclusion in the HIBS/HIER Collection, unless another agreed-upon method for recordation is approved by the HIBS/HIER Coordinator.
1. Documentation Level I
a. Drawings: a full set of measured drawings depicting existing or historic conditions.
b. Photographs
i. large-format (4” x 5”) negatives and 5” x 7” prints of exterior and interior views
ii. photocopies with large format (4” x 5”) negatives of select existing drawings, site plans or historic views
c. Written Data
i. contextual history(ies)
ii. architectural/site description
2. Documentation Level II
a. Drawings: original drawings photographically reproduced on archivally stable HIBS/HIER mylar.
b. Photographs
i. large-format (4” x 5”) negatives and 5” x 7” prints of exterior and interior views
ii. historic views
c. Written Data
i. contextual history(ies)
ii. architectural/site description
3. Documentation Level III
a. Drawings: sketched floor plan
b. Photographs: large-format (4” x 5”) negatives and 5” x 7” prints of exterior and interior views
c. Written Data
i. contextual history(ies)
ii. architectural/site description
The HIBS/HIER Program retains the right to refuse any documentation of buildings, sites, structures or objects lacking historical significance. Buildings, site, structures, or objects must be listed on or eligible for listing on the National Register of Historic Places to be considered for inclusion in the HIBS/HIER Collection.
The type and amount of documentation should be appropriate to the nature and significance of the properties being documented. Similarly, the aspect of the property that is being documented should reflect the nature and significance of the property.
Standard 2: Quality - HIBS/HIER documentation shall be prepared accurately from reliable sources with limitations clearly stated to permit independent verification of information.
Guidelines
For all levels of documentation, the following quality requirements shall be met:
1. Measured Drawings shall be produced from recorded, accurate measurements. Portions of buildings or structures that are not accessible for measurement should not be drawn on the measured drawing but clearly labeled as not accessible or drawn from available construction drawings or other sources, and so identified.
No part of the measured drawings shall be produced from hypothesis or non-measurement related activities.
Documentation Level I measured drawings shall be accompanied by a set of field notebooks in which measurements were first recorded. Other drawings prepared for Documentation Levels II and III, shall include a statement describing where the original drawings are located.
2. Large-Format Photographs shall clearly depict the appearance of the property and areas of significance of the recorded building, structure, site, or object. Each view shall be perspective corrected and fully captioned.
3. Written Contextual History(ies) and Physical Descriptions for documentation Levels I and II shall be based on primary sources to the greatest extent possible. For Level III, secondary sources may provide adequate information; if not, primary research will be necessary. An assessment of the reliability and limitations of sources shall be included. Within the written contextual history(ies), statements shall be footnoted, or end noted as to their sources, where appropriate. The written data shall include a methodology section specifying research strategy, names of research staff, dates of research, sources searched, limitations of the project and a project information statement.
The reliability of the HIBS/HIER Collection is dependent upon high-quality documentation. Quality is not easily prescribed or quantified, but it derives from a process in which thoroughness and accuracy play a large part. The principle of independent verification of HIBS/HIER documentation is critical to the HIBS/HIER Collection.
Standard 3: Materials HIBS/HIER documentation shall be prepared on materials that are readily reproducible for ease of access, durable for long storage, and in standard sizes for ease of handling.
For all levels of documentation, the following material requirements shall be met.
1. Measured Drawings – Ink on translucent, archivally stable materials in standard size of 24” x 36”.
2. Large-Format Photographs – Black and white film only, printed on archival paper, mounted on properly labeled archival board; 4” x 5” negatives will accompany prints; print size will be 5” x 7”.
3. Written History(ies) and Physical Description – Text contained within the HIBS/HIER Written Outline Format; submitted on 8.5” x 11” archival bond paper.
4. Field Records – Field notebooks and field photography; photo identification sheet will accompany 35 mm negatives and contact sheet; no archival requirements; submitted field records must fit into 9.5” x 12” folding file.
5. 95% Submittals – 95% review documentation shall be emailed to the SHPO HIBS/HIER Program Coordinator/Cultural Resources Coordinator.
6. 100% Submittals - All 100% IL HIBS/HIER documentation accepted by the IL HIBS/HIER Program Coordinator must be submitted in the standard, archival formats in an archival clamshell.
7. All IL HIBS/HIER Documentation is intended for reproduction. Although field records are not intended for quality reproduction, it is specified that they be used to supplement the formal documentation. Field records are not required to meet the archival standard but are maintained as a courtesy to the collection user.
8. The basic durability standard for IL HIBS/HIER Documentation is 500 years.
Standard 4: Presentation - IL HIBS/HIER documentation shall be clearly and concisely produced.
For all levels of documentation, the following requirements for presentation will be met.
1. Measured Drawings - Level I measured drawings will be lettered mechanically (i.e., Leroy or similar) or in a hand-printed equivalent style. Adequate dimensions shall be included on all sheets. Levels I and II title sheet(s) shall include state, local, and site maps; property significance statement; project information statement; and drawings index listing. Level III sketch plans shall be neat and orderly.
2. Large-Format Photographs - 5x7”, black and white, fiber paper prints will be mounted on archival card stock and labeled in the appropriate manner.
3. Written History(ies) and Physical Description - Data shall be typewritten on 8.5’ x 11” archival, bond paper using the required IL HIBS/HIER outline format and follow accepted rules of grammar and notation.
4. Sources of Technical Information for IL HIBS/HIER Documentation
a) Burns, John A. Recording Historic Structures. Washington, D.C.: The AIA Press, 1989.
b) Turabian, Kate L. A Manual for Writers of Term Papers, Theses, and Dissertations.
Chicago: University of Chicago Press, 1987.
c) A Manual of Style. Chicago: University of Chicago Press, 1980.
d) HABS Field Instructions for Measured Drawings. Washington, D.C.: HABS/HAER, National Park
Service, 1981.
e) HABS Historical Reports. Washington, D. C.: HABS/HAER, National Park Service, 1995. (Draft)
f) HABS Historian’s Procedures Manual. Washington, D.C.: HABS/HAER, National Park Service, 1983.
g) HAER Field Instructions. Washington, D.C.: HABS/HAER, National Park Service, 1981.
h) HABS/HAER Program IHPA Program/Technical Commentary. Springfield, IL: IL HIBS/HIER, Illinois Historic Preservation Agency, 1999.
i) Manual for Preparing Historic American Buildings Survey/Historic American Engineering Record
Documents. Omaha, NE: Great Plains Systems Office, National Park Service, 1996. (Draft)
j) Photographic Specifications for the Historic American Buildings Survey and the Historic American
Engineering Record. Omaha, NE: Great Plains Systems Office, National Park Service, 1996.
k) Transmitting Documentation to HABS/HAER WASO. Washington, D.C.: HABS/HAER, National
Park Service, 1995. (Draft)
Effective Date: 1-21-1999 Revised 10-27-2022
Historic Illinois Building Survey (HIBS) and Historic Illinois Engineering Record (HIER) Program Administrative Policies
1. The Historic Illinois Building Survey/Historic Illinois Engineering Record (HIBS/HIER)
Coordinator/Cultural Resources Coordinator within the State Historic Preservation Office (SHPO) in the Illinois Department of Natural Resources (IDNR) administers the HIBS/HIER Program.
2. HIBS/HIER documentation can be generated as result of state and federal statutory compliance requirements, local government/commission mandates, or through voluntary contribution.
3. HIBS/HIER documentation requirements are established through the HIBS/HIER Standards and Guidelines. For general technical assistance, contact the HIBS/HIER Coordinator.
4. All HIBS/HIER documentation accepted for inclusion in the HIBS/HIER Collection must meet the HIBS/HIER Standards and Guidelines, HIBS/HIER technical requirements, and specific scopes of work, as established by the HIBS/HIER Program Coordinator/Cultural Resources Coordinator.
5. No movement, demolition, alteration or other form of modification will be authorized on properties that are part of historic-preservation statute mitigation until fieldwork HIBS/HIER documentation is received, reviewed, and accepted in writing by the HIBS/HIER Program Coordinator/Cultural Resources Coordinator.
6. A list of HIBS/HIER consultants/contractors will be maintained and updated as needed by the SHPO for public use. Firms, organizations, and/or individuals on the list must have successfully completed at least one HIBS/HIER documentation project and have expressed a desire to be considered for HIBS/HIER work. This list is not to be considered an endorsement by SHPO or IDNR. Consultants/ Contractors can be deleted from this list at their own request or through SHPO initiative, due to consultant/contractor failure to meet HIBS/HIER Standards and Guidelines or SHPO-generated scopes of work.
7. Specific HIBS/HIER documentation scopes of work are not formally established until the subject scopes are issued in writing by the SHPO and acknowledged in writing by lead agencies participating in regulatory project mitigation or entities generating HIBS/HIER documentation through self-initiative. It is strongly recommended that HIBS/HIER consultants/contractors not bid on HIBS/HIER documentation projects until the SHPO, and the concerned parties agree to scopes of work in writing.
8. HIBS/HIER consultants/contractors shall consult with the SHPO HIBS/HIER Coordinator/Cultural Resources Coordinator prior to commencing work to confirm the scope of work and specific historic contextual requirements.
9. HIBS/HIER consultants/contractors, or their clients, will submit to the SHPO a 95% digital HIBS/HIER draft for review and comment prior to producing and submitting 100% HIBS/HIER documentation for review and acceptance.
Attachment 2
10. The HIBS/HIER Program requires submittal of one archival set of 100% HIBS/HIER documentation with color printed images of the subject property, and one digital version of the 100% documentation to be displayed on the SHPO website.
11. SHPO review and comment period for HIBS/HIER documentation is generally thirty (30) working days. The review and comment period begins upon receipt of complete HIBS/HIER documentation at SHPO offices.
12. HIBS/HIER Collection is curated and managed by the Abraham Lincoln Presidential Library (ALPL).
HIBS/HIER documentation is available for public use. The 100% archival set of HIBS/HIER documentation is available for use, provided the HIBS/HIER Coordinator or the ALPL Chief of Acquisitions authorizes such use.
Effective 1-21-1999 Revised 10-27-2022
Attachment 3 Historic Illinois Building Survey (HIBS) and
Historic Illinois Engineering Record (HIER) Written Outline Format
HISTORIC ILLINOIS BUILDING SURVEY
NAME OF BUILDING (SECONDARY NAME)
Location:
Present Owner: This heading may be combined to Present Owner and Occupant if they are one and the same. Include address of owner if it is different from address of structure.
Present Use:
Significance:
PART I. HISTORICAL INFORMATION
(Double space between outline headings -- single space text. Omit any heading or part of a heading that is not appropriate, and re-number other outline headings as needed.)
A. Physical History
1. Date(s) of construction:
2. Architect:
3. Original and subsequent owners:
4. Builder, contractor, suppliers:
5. Original plans and construction:
6. Alterations and additions:
B. Historical Context:
PART II. ARCHITECTURAL INFORMATION
A. General Statement:
B. Description of Exterior:
1. Over-all dimensions:
2. Foundations:
3. Walls:
4. Structural system, framing:
5. Porches, stoops, balconies, bulkheads:
6. Chimneys:
7. Openings:
a. Doorways and doors:
b. Windows and shutters:
8. Roof:
a. Shape, covering:
b. Cornice, eaves:
c. Dormers, cupolas, towers:
C. Description of Interior:
1. Floor plans:
a. Describe by floors
b. Etc.
2. Stairways:
3. Flooring:
NAME OF STRUCTURE
{Secondary Name, if applicable) HIBS No. MX-2018-1
4. Wall and ceiling finish:
5. Openings:
a. Doorways and doors:
b. Windows:
6. Decorative features and trim:
7. Hardware:
8. Mechanical equipment:
a. Heating, air conditioning, ventilation:
b. Lighting:
c. Plumbing:
d. Etc.
D. Site:
1. General setting and orientation:
2. Historic landscape design:
3. Outbuildings:
PART III. SOURCES OF INFORMATION
A. Original Architectural Drawings:
B. Early Views:
C. Interviews:
D. Bibliography:
1. Primary and unpublished sources: 2.
Secondary and published sources:
E. Likely Sources Not Yet Investigated:
F. Supplemental Material:
PART IV. METHODOLOGY OF RESEARCH
A. Research Strategy:
B. Actual Research Process:
C. Archives and Repositories Used:
D. Research Staff:
1. Primary Preparer: Name, Title, Organization
2. Photographer: Name, Title, Organization
3. Delineator: Name, Title, Organization
4. Additional Staff: Name, Title, Organization
PART V. PROJECT INFORMATION
NOTE: The project information statement will be provided by the SHPO Cultural Resources Manager handling the mitigation proceedings. This statement will cite the state or federal statute the general project is being reviewed under and the applicable Memorandum of Agreement requiring HIBS recordation.
For HIBS/HIER projects submitted without statutory involvement, a short statement identifying why the project was undertaken will be appropriate.
The project information statement will be duplicated on the title sheet of HIBS/HIER Level I and II mylars under the heading of “Project Information Statement.”
| Att A - Area of Potential Effects |
| Att. B - NRHP Registration Form 10-900 |
| Att C - HIBS-HIER Specifications |
| 2026-01-08T15:03:39-0600 | |
| ZACHARY SAGE |
File details come from the government source that posted it. Updated .