654321-26-0044-3.pdf
PDF 12 MB Posted
- Solicitation number
- 654321-26-0044
- Issued by
- Orleans Parish, New Orleans City, Louisiana
About this file
This document is Addendum No. 3 to Request for Proposal No. 26-0044 issued by the Orleans Parish School Board (OPSB) Procurement Department for HVAC Maintenance Services. The addendum provides clarifications and supplementary information to the original RFP issued October 23, 2025, and modifies the RFP documents. The RFP seeks comprehensive HVAC maintenance services across three school facilities: Timbers Building, Mahalia Jackson Elementary School, and The Leah Chase School. Services encompass preventative maintenance for chillers, boilers, air handling units, fan coil units, cassette units, and related HVAC equipment at all three locations. The addendum includes equipment lists with model and serial numbers for each facility, quarterly and annual preventative maintenance reports documenting service history from October 2024 through October 2025, and detailed floor plans for all three buildings. Proposers must acknowledge receipt of this addendum on the Addendum Form or face disqualification. The contract term is one year with options to renew for three additional one-year periods, and the project budget is $175,000.
The addendum clarifies that Building Automation Systems (BAS) are maintained by separate vendors—Synergy Building Solutions maintains Alerton systems at Timbers and Mahalia Jackson, and Commercial and Industrial Sales, LLC (CIS) maintains Automated Logic controls at The Leah Chase School—with the HVAC contractor responsible for communicating with BAS vendors as needed. Filter changes are expected as a regular service with varying sizes across sites to be observed during site visits. Repairs exceeding $5,000 may be subject to a separate bid process if they exceed $9,999.99 and should not be included in base pricing. Pre-disaster/emergency services including system shutdowns and securing outdoor units are mandatory and included in base pricing within a $5,000 deductible, requiring communication response within 2-3 hours and execution within 24-48 hours depending on circumstances. There are no specific computer management system requirements. The RFP includes a 35% Disadvantaged Business Enterprise (DBE) participation goal with required documentation including certification letters and compliance checklists. Monthly compliance reports documenting DBE participation and equal employment opportunity efforts are required throughout contract performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 654321-26-0044-2.pdf | ||
| 654321-26-0044-1.pdf | ||
| 654321-26-0044.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 26-0044 HVAC Maintenance Services Addendum No. 3
NOLA Public School Procurement Department
2401 Westbend Parkway, Suite 5076, New Orleans, LA 70114
Paul A. Lucius, Executive Director of Procurement
November 21, 2025
Addendum No. 3
REQUEST FOR PROPOSAL NO. 26-0044
HVAC MAINTENANCE SERVICES
This Addendum and Clarification item forms a part of the RFP Documents and modifies the original RFP Documents issued October 23, 2025. Acknowledge receipt of this Addendum on the Addendum Form of the Request for Proposal. Failure to do so may subject proposal to disqualification.
This Addendum consists of Page(s).
CLARIFICATION:
1. Question: What BA (Building Automation) systems and vendors are currently incorporated in the buildings?
Answer: Synergy Building Solutions maintains the Alerton BAS systems at Timbers and Mahalia Jackson School. Commercial and Industrial Sales, LLC (CIS) maintains the Automated Logic controls system at The Leah Chase School.
2. Question: We would like a list of requirements (if any) for the computer management system.
Answer: There is no list of requirements for computer management systems.
3. Question: Page 27 references city shelters. Are any of the buildings included in this RFP considered city shelters?
Answer: No city shelters are included in the RFP .
4. Question: Please provide equipment lists and run reports from the 3 buildings for the past 12 months.
Answer: See Quarterly and Annual Preventative Maintenance reports below.
RFP 26-0044 HVAC Maintenance Services Addendum No. 3
5. Question: What size filters are required for the HVAC systems and is filter change an expected service in this RFP?
Answer: Filter changes are expected regularly, and sizes vary at each site. They may be viewed during the site-visits.
6. Question: Please clarify the exact responsibilities related to the BAS controls. What are the specific expectations for BAS monitoring, programming, troubleshooting, and maintenance?
Answer: BAS controls are maintained by a separate vendor. It is the responsibility of the HVAC Maintenance vendor to communicate with the BAS monitoring vendor, when needed.
7. Question: Will repairs above $5,000 be subject to a separate bid process, or should they be included in our base proposal pricing structure?
Answer: Repairs above $5,000.00 may be subjected to a separate bid process if the amount exceeds $9,999.99 or an amendment to the contract may be executed to include the required repair. Therefore, you would not include this in your base price.
8. Question: Page 26, Section F-a states: "Proposer 'shall' provide pre-disaster/emergency services prior to an event (hurricane, freeze, etc.). These services 'shall' prevent damage to all components of the HVAC system prior to the event."
Please clarify the use of the word "shall" in this paragraph. Specifically:
• Is this a mandatory requirement or recommended best practice?
• What specific pre-disaster services are expected (e.g., system shutdowns, winterization, facility inspections)?
• What is the expected response time for pre-event services?
• Are these services to be included in the base contract pricing or billed separately?
Answer: Yes. These services are required and are included in the base pricing within the $5,000.00 deductible. The services are specific to the potential threats, but can include securing outdoor units and system shutdowns. Communication response is expected within 2-3 hours and execution response is expected within 24-48 hours depending on the circumstances.
9. Question: Equipment list in each school (with model & serial numbers)
Answer: Please see Equipment List below.
10. Question: Number of classrooms in each school
Answer: Please see attached floor plans for Timbers, Mahalia Jackson, and The Leah Chase School below.
RFP 26-0044 HVAC Maintenance Services Addendum No. 3
11. Question: Please clarify the exact responsibilities related to the BAS controls. What are the specific expectations for BAS monitoring, programming, troubleshooting, and maintenance?
Answer: BAS controls are maintained by a separate vendor. It is the responsibility of the HVAC Maintenance vendor to communicate with the BAS monitoring vendor, when needed.
12. Question: Will repairs above $5,000 be subject to a separate bid process, or should they be included in our base proposal pricing structure?
Answer: Repairs above $5,000.00 may be subjected to a separate bid process if the amount exceeds $9,999.99 or an amendment to the contract may be executed to include the required repair. Therefore, you would not include this in your base price.
RFP 26-0044 HVAC Maintenance Services Addendum No. 3
Equipment List
RFP 26-0044 HVAC Maintenance Services Addendum No. 3
Mahalia Jackson
Asset Make Model No Serial No AHU16 elevator room front of building
Sanyo KS1872 00524g1
AHU-14 Trane TSC017U0F K09F09687 AHU-12 Trane K4T665AB/MA K09F09696 AHU-8 Trane MCCB006UA0C00UB K09F08893 AHU-7 Trane MCCB003UA0C0UA K09F08920 AHU-4 Trane MCCB021UA0C0UA K09F08875 AHU-2 Trane MCCB012UA0C0UB K09F08863 AHU-1 Trane MCCB021UA0C0UA K09F08857 AHU-11 Trane MCCB003UA0C0UA K09F08914 AHU 13 Trane MCCB008UA0C0UB K09F08909 Ahu-9 The Trane Company MCCB010UAOCOUA KO9F08899 d104 Trane BCHC072D1D0A1GA4E000000BA4EF1EF1
03DBB312 T09G09684
storage classroom left unit Trane UV-15 T09H17371
A206 1st unit
Ahu-5 Trane MCCB003UA0C0UA K09F08881 Ahu 10 Trane MCCB012UA0C0UB K09F08904 ahu 6 Trane MCCB017UAC00UB K09F08887 Boiler 1
B106 left side cassette Trane 880AC T09H17366
201 ahu United Coolair Corporation C2G1AS 0910074
Rm206 2nd cassette
Boiler 2
Chiller 2 Trane RTAC 1554 UR0N VAFN N1TX 1CDL
NN6F A11A REEX N U09G05060
Chiller 1 Trane RTAC1554UR0NVAFNN1TX1CDLNN6FA
11AREEXN U09G05059
If model and serial is not provided it is because it is in our system as a picture.
RFP 26-0044 HVAC Maintenance Services Addendum No. 3
The Leah Chase School
Chiller 2 Carrier 30RBF15065PLJV5C 4920Q91821 Rm 108 hallway cassette Airedale Ccw20baeba 543306s4420-8172
Hallway cassette outside room 311 Airedale CCW08BAEBA 543306S4420-8163
Rm 238 Kreuger KHGP 6MHM 001538 1st floor right outside cafeteria door
Airedale CCWO8BAEBA 54330654420-8166
1st floor hall across from cafeteria Airedale CCW2OBAEBA 54330654420-8172 library fan coil (right hand side upon entering)
Kreuger KHFP 6MHM 001510
Fan coil outside room 328
Rm211
Boiler 1 Raypak H7-1505A 2009512188 Boiler 2 Raypak H7-1505A 2009512187 Cassette outside 201 Airedale CCW20BAEBA 543306S4420-8177 OAU-1 Carrier 39MW21W027FX11XCE 4620U31751 RTU-1 Carrier 39MW12WO27FX811XCE 4620U31752 Rm 210 air handler
Cassette in front of library
3rd floor southwest stairwell
Cassette outside cafeteria Airedale CCW08BAEBA 54330654420-8166
Rm108 fan coil Kruger KHGP 6MHM001537 Rm 108 thermostat
2nd floor northeast hallway
2nd floor conference room Emio WCP180300AA0BO 1-20 - L- 9288 - 25
Rm152 ahu Kreuger KHFP 6MHM 001516 Cassette outside rm 213 Airedale CCW08BAEBA 543306S4420-8170
Cassette outside rm 310 Airedale CCW20BAEBA 54330654420-8183
RFP 26-0044 HVAC Maintenance Services Addendum No. 3
Chiller2 Carrier 30RBF15065PLJV5C 4920Q91821 Chiller1 Carrier 30RBF15065PLJV5C 4920Q91831
Timbers
3rd floor northwest side heater
Continental Air products DTC-16
10597- 2663-24
Crac-3 Compu Aire ACC-1134
8939SY1
305- 6978C
1st floor split system condenser The Trane Company TTA150B400EA
4133J61
AD
1st floor split system condenser The Trane Company TTA150B400EA
4133J61
AD
Crac-2 Compu Aire ACC-1134
89395Y1 305- 6977C crac-1 Compu Aire ACC-1134
8939SY1
305- 6976C
CRAC-1 AIR
HANDLER CAA-1034
8939SY1
305-6976
Rs1 York XTO-078144-JAPA046A
AGAMX
T0137
RN2 York XTO-078X144-JAPA046A
AGAMX
T0136
Chiller 2 York
YVAA0218CDV46BAVSXXXE
AXLXXXX5544XOXXXS183W
1SXDA2BMXV5XNXXXXXXB
1SX
2FAM02
Chiller 1 York
YVAA0218CDV46BAVSXXXE
AXLXXXX5544XOXXXS183W
1SXDA2BMXV5XNXXXXXXB
1SX
2FAM02
RFP 26-0044 HVAC Maintenance Services Addendum No. 3
Quarterly/Annual Preventative Maintenance
Reports
36598 Luke Dr Geismar, LA, 70734
225-644-3643
Job Report #1334 Oct 9, 2024
TYPE
Service
CUSTOMER NAME
Orleans Parish School Board
ADDRESS
2401 Westbend Parkway New Orleans, LA, 70113
PROPERTY NAME
The Leah Chase School
PROPERTY ADDRESS
2727 S Carrollton Ave New Orleans, LA, 70118
AUTHORIZED BY
CUSTOMER PO#
CUSTOMER WO#
SALES AMOUNT
$0.00
NTE
$0.00
Job Description
Q3 Quarterly Preventative Maintenance 2024
Job Summary
Visit 001
DATE PERFORMED TECHNICIAN(S)
Oct 7, 2024 Corey Deno
ASSET MAKE MODEL NUMBER SERIAL NUMBER
WORK SUMMARY
Q3 Quarterly Preventative Maintenance 2024
Chillers
Clean Coils
Dedicated Outdoor Air Roof-Top Units
Furnish and replace disposable filters quarterly.
Clean Washable Filters.
Check controls and equipment for proper operation.
Check for unusual noise or vibration.
Check tension, condition, and alignment of belts, adjust or replace as necessary.
Clean coils, evaporator drain pan, blower, motor and drain piping, as required.
WORK SUMMARY
Inspect fan(s) or blower(s) for bent blades or imbalance; adjust as necessary.
Lubricate shaft and motor bearings as required.
Inspect piping and valves for leaks; tighten connections as required.
AHU
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Carrier Mini splits
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Fan Coil Units
Furnish and replace disposable filters.
Check controls and equipment for proper operation.
Check for unusual noise or vibration.
Clean coils, evaporator drain pan, blower, motor and drain piping, as required.
WORK SUMMARY
Check electrical wiring and connections; tighten loose connections.
Inspect fan(s) or blower(s) for bent blades or imbalance; adjust as necessary.
Lubricate shaft and motor bearings as required.
Inspect piping and valves for leaks; tighten connections as required.
36598 Luke Dr Geismar, LA, 70734
225-644-3643
Job Report #1612 Jul 9, 2025
TYPE
Service
CUSTOMER NAME
Orleans Parish School Board
ADDRESS
2401 Westbend Parkway New Orleans, LA, 70113
PROPERTY NAME
The Leah Chase School
PROPERTY ADDRESS
2727 S Carrollton Ave New Orleans, LA, 70118
AUTHORIZED BY
CUSTOMER PO#
CUSTOMER WO#
SALES AMOUNT
$0.00
NTE
$0.00
Job Description
Q4 Quarterly Preventative Maintenance
Job Summary
Visit 001
DATE PERFORMED TECHNICIAN(S)
Feb 28, 2025 Corey Deno
ASSET MAKE MODEL NUMBER SERIAL NUMBER
WORK SUMMARY
Q1 Quarterly Preventative Maintenance 2025
Chillers
Clean Coils
Dedicated Outdoor Air Roof-Top Units
Furnish and replace disposable filters quarterly.
Clean Washable Filters.
Check controls and equipment for proper operation.
Check for unusual noise or vibration.
Check tension, condition, and alignment of belts, adjust or replace as necessary.
Clean coils, evaporator drain pan, blower, motor and drain piping, as required.
Inspect fan(s) or blower(s) for bent blades or imbalance; adjust as necessary.
Lubricate shaft and motor bearings as required.
AHU
WORK SUMMARY
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Carrier Mini splits
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Fan Coil Units
Furnish and replace disposable filters.
Check controls and equipment for proper operation.
Check for unusual noise or vibration.
Clean coils, evaporator drain pan, blower, motor and drain piping, as required.
Check electrical wiring and connections; tighten loose connections.
Inspect fan(s) or blower(s) for bent blades or imbalance; adjust as necessary.
WORK SUMMARY
Issues:
Hot Water Pump #2 VFD (Quote Sent Waiting on Approval)
36598 Luke Dr Geismar, LA, 70734
225-644-3643
Job Report #2088 Nov 12, 2025
TYPE
Service
CUSTOMER NAME
Orleans Parish School Board
ADDRESS
2401 Westbend Parkway New Orleans, LA, 70113
PROPERTY NAME
The Leah Chase School
PROPERTY ADDRESS
2727 S Carrollton Ave New Orleans, LA, 70118
AUTHORIZED BY
CUSTOMER PO#
CUSTOMER WO#
Job Description
Q2 Quaterly Preventative Maintenance 2025
Job Summary
Visit 001
DATE PERFORMED TECHNICIAN(S)
Aug 7, 2025 Sammy Lodrigue
ASSET MAKE MODEL NUMBER SERIAL NUMBER
WORK SUMMARY
Q2 Quarterly Preventative Maintenance 2025
Chillers
Clean Coils
Dedicated Outdoor Air Roof-Top Units
Furnish and replace disposable filters quarterly.
Clean Washable Filters.
Check controls and equipment for proper operation.
Check for unusual noise or vibration.
Check tension, condition, and alignment of belts, adjust or replace as necessary.
Clean coils, evaporator drain pan, blower, motor and drain piping, as required.
Inspect fan(s) or blower(s) for bent blades or imbalance; adjust as necessary.
Lubricate shaft and motor bearings as required.
WORK SUMMARY
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Carrier Mini splits
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Fan Coil Units
Furnish and replace disposable filters.
Check controls and equipment for proper operation.
Check for unusual noise or vibration.
Clean coils, evaporator drain pan, blower, motor and drain piping, as required.
Check electrical wiring and connections; tighten loose connections.
Inspect fan(s) or blower(s) for bent blades or imbalance; adjust as necessary.
WORK SUMMARY
Multiple units with broken pans (I will send a quote on replacing the pans)
36598 Luke Dr Geismar, LA, 70734
225-644-3643
Job Report #2316 Nov 12, 2025
TYPE
Service
CUSTOMER NAME
Orleans Parish School Board
ADDRESS
2401 Westbend Parkway New Orleans, LA, 70113
PROPERTY NAME
The Leah Chase School
PROPERTY ADDRESS
2727 S Carrollton Ave New Orleans, LA, 70118
AUTHORIZED BY
CUSTOMER PO#
CUSTOMER WO#
Job Description
Q3 Quarterly Preventative Maintenance 2025
Job Summary
Visit 001
DATE PERFORMED TECHNICIAN(S)
Oct 29, 2025 Landon Westerfield, Stephen Cavallino
ASSET MAKE MODEL NUMBER SERIAL NUMBER
WORK SUMMARY
Chillers
Clean Coils
Dedicated Outdoor Air Roof-Top Units
Furnish and replace disposable filters quarterly.
Clean Washable Filters.
Check controls and equipment for proper operation.
Check for unusual noise or vibration.
Check tension, condition, and alignment of belts, adjust or replace as necessary.
Clean coils, evaporator drain pan, blower, motor and drain piping, as required.
Inspect fan(s) or blower(s) for bent blades or imbalance; adjust as necessary.
Lubricate shaft and motor bearings as required.
Inspect piping and valves for leaks; tighten connections as required.
Replace filters.
WORK SUMMARY
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Carrier Mini splits
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Fan Coil Units
Furnish and replace disposable filters.
Check controls and equipment for proper operation.
Check for unusual noise or vibration.
Clean coils, evaporator drain pan, blower, motor and drain piping, as required.
Check electrical wiring and connections; tighten loose connections.
Inspect fan(s) or blower(s) for bent blades or imbalance; adjust as necessary.
Inspect piping and valves for leaks; tighten connections as required
WORK SUMMARY
Issues:
-Multiple chill water and heating lines actuator for valves at fan coil units in rooms are disconnected from valves CIS needs to repair and hook valve actuator back up for them to work properly.
-Boiler 2needs to be repaired gas valve is leaking natural gas and filling boiler room. (We are currently Working on this)
CIS needs to reconnect controls to boiler 1 Drive to get boiler 1 operational. (Currently asked by Erik Trosclair to bypass BAS for boiler to work)
Fan coil units and cassette all seem operating in good order except for valve not operating properly. Spray painted ceiling tiles that were too stained to be cleaned.
Before & After Photos
Before Photos
Boiler two needs new gas valve
Added by: Stephen Cavallino Nov 3, 2025 9:33 AM
Boiler 2gas valve that’s. Needed it’s leaking
Added by: Stephen Cavallino Nov 3, 2025 9:34 AM
Leaking aswell
Added by: Stephen Cavallino Nov 5, 2025 8:59 AM
F830330B-17BB-4824-8D79-AF18C1F7598B.jpg
Added by: Stephen Cavallino Nov 10, 2025 7:34 AM
36598 Luke Dr Geismar, LA, 70734
225-644-3643
Job Report #1659 Mar 31, 2025
TYPE
Service
CUSTOMER NAME
Orleans Parish School Board
ADDRESS
2401 Westbend Parkway New Orleans, LA, 70113
PROPERTY NAME
Mahalia Jackson Elementary
PROPERTY ADDRESS
2405 Jackson Ave New Orleans New Orleans, LA, 70113
AUTHORIZED BY
CUSTOMER PO#
CUSTOMER WO#
SALES AMOUNT
$0.00
NTE
$0.00
Job Description
Q1 Quarterly Preventative Maintenance 2025
Job Summary
Visit 001
DATE PERFORMED TECHNICIAN(S)
Mar 21, 2025 Corey Deno
ASSET MAKE MODEL NUMBER SERIAL NUMBER
WORK SUMMARY
Q1 Preventative Maintenance 2025
2 EA Chillers
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
WORK SUMMARY
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
2EA Rheos Gas Boilers
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
6EA Trane Climate Changer AHUs
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
32EA Bathroom Exhaust Fans
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
3EA Condensing units
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
2EA Mini splits
Replace filters.
Clean washable filters.
Clean Grilles.
WORK SUMMARY
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
27EA Ceiling mounted cassettes
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
1EA Trane Rooftop package Unit
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
ISSUES ENCOUNTERED:
WORK SUMMARY
Boiler Awaiting Replacement (Parts on Order)
36598 Luke Dr Geismar, LA, 70734
225-644-3643
Job Report #1791 May 19, 2025
TYPE
Service
CUSTOMER NAME
Orleans Parish School Board
ADDRESS
2401 Westbend Parkway New Orleans, LA, 70113
PROPERTY NAME
Mahalia Jackson Elementary
PROPERTY ADDRESS
2405 Jackson Ave New Orleans New Orleans, LA, 70113
AUTHORIZED BY
CUSTOMER PO#
CUSTOMER WO#
SALES AMOUNT
$0.00
NTE
$0.00
Job Description
Q2 Quarterly Preventative Maintenance 2025
Job Summary
Visit 001
DATE PERFORMED TECHNICIAN(S)
May 12, 2025 Stephen Cavallino
ASSET MAKE MODEL NUMBER SERIAL NUMBER
WORK SUMMARY
Q2 Preventative Maintenance 2025
2 EA Chillers (Chiller 2 is out of commission)
Clean Coils
Verify amperage and voltage.
Verify contactors & relays.
Verify all systems operation.
Clear error codes.
2EA Rheos Gas Boilers
WORK SUMMARY
Verify all systems operation.
Clear error codes.
6EA Trane Climate Changer AHUs
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
32EA Bathroom Exhaust Fans
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
3EA Condensing units
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
2EA Mini splits
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify all systems operation.
WORK SUMMARY
Clear error codes.
Verify refrigerant levels. Adjust as required.
27EA Ceiling mounted cassettes
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
1EA Trane Rooftop package Unit
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
Issues:
room B-106 one of the cassettes needs to be investigated blower motor isn’t running (Will need to have a Tech look at this)
Chiller had a high oil temp error code. reset error code tripped again the next day. Oil pressure and temperature were too high. Amp draw on compressor was high as well. (Techs are looking into this issue)
Before & After Photos
Before Photos
7F505EFF-D112-4B74-B6BA-1AC81C70B901.jpg
Added by: Stephen Cavallino May 15, 2025 9:18 AM
A9F2955D-0838-487F-8D93-1D588003F173.jpg
Added by: Stephen Cavallino May 15, 2025 9:18 AM
5B82745F-EAC1-479D-8A97-165BB1AFB620.jpg
Added by: Stephen Cavallino May 15, 2025 9:19 AM
Chiller high oil temp error
Added by: Stephen Cavallino May 15, 2025 9:20 AM
Water temp before resetting error
Added by: Stephen Cavallino May 15, 2025 9:20 AM
Amp reading of compressor 1A and oil temp compressor amps high and oil pressure high
Added by: Stephen Cavallino May 15, 2025 9:20 AM
2A compressor amps and oil pressure looks good
Added by: Stephen Cavallino May 15, 2025 9:21 AM
Chiller coils be for cleaning coils
Added by: Stephen Cavallino May 15, 2025 9:35 AM
Before
Added by: Stephen Cavallino May 15, 2025 9:35 AM
Before
Added by: Stephen Cavallino May 15, 2025 9:36 AM
Chiller coils after cleaning
Added by: Stephen Cavallino May 15, 2025 9:36 AM
After cleaning
Added by: Stephen Cavallino May 15, 2025 9:36 AM
After cleaning
Added by: Stephen Cavallino May 15, 2025 9:36 AM
Chiller coils after cleaning.
Added by: Stephen Cavallino May 15, 2025 9:37 AM
Water temp after resetting error code
Added by: Stephen Cavallino May 15, 2025 9:42 AM
Blower motor not working needs to be inspected
Added by: Stephen Cavallino May 16, 2025 2:03 PM
Unit with bad blower motor
Added by: Stephen Cavallino May 16, 2025 2:03 PM
Room of cassette that blower isn’t working
Added by: Stephen Cavallino May 16, 2025 2:03 PM
36598 Luke Dr Geismar, LA, 70734
225-644-3643
Job Report #1427 Dec 4, 2024
TYPE
Service
CUSTOMER NAME
Orleans Parish School Board
ADDRESS
2401 Westbend Parkway New Orleans, LA, 70113
PROPERTY NAME
Mahalia Jackson Elementary
PROPERTY ADDRESS
2405 Jackson Ave New Orleans New Orleans, LA, 70113
AUTHORIZED BY
CUSTOMER PO#
CUSTOMER WO#
SALES AMOUNT
$0.00
NTE
$0.00
Job Description
Q4 Preventative Maintenance Nov 2024
Job Summary
Visit 001
DATE PERFORMED TECHNICIAN(S)
Nov 22, 2024 Corey Deno
ASSET MAKE MODEL NUMBER SERIAL NUMBER
WORK SUMMARY
Q4 Preventative Maintenance Nov 2024
3EA Chillers
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
WORK SUMMARY
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
2EA Rheos Gas Boilers
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
6EA Trane Climate Changer AHUs
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
32EA Bathroom Exhaust Fans
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
3EA Condensing units
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
2EA Mini splits
Replace filters.
Clean washable filters.
WORK SUMMARY
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
27EA Ceiling mounted cassettes
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
1EA Trane Rooftop package Unit
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
ISSUES ENCOUNTERED:
WORK SUMMARY
Chiller 1 awaiting compressor replacement.
36598 Luke Dr Geismar, LA, 70734
225-644-3643
Job Report #1661 Apr 11, 2025
TYPE
Service
CUSTOMER NAME
Orleans Parish School Board
ADDRESS
2401 Westbend Parkway New Orleans, LA, 70113
PROPERTY NAME
Timbers Building
PROPERTY ADDRESS
2401 Westbend Parkway New Orleans, LA, 70113
AUTHORIZED BY
CUSTOMER PO#
CUSTOMER WO#
SALES AMOUNT
$0.00
NTE
$0.00
Job Description
Q1 Quarterly Preventative Maintenance 2025
Job Summary
Visit 001
DATE PERFORMED TECHNICIAN(S)
Apr 2, 2025 Stephen Cavallino
ASSET MAKE MODEL NUMBER SERIAL NUMBER
WORK SUMMARY
2EA York Chillers
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Add anti-bacterial pan tabs to primary pans.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
2EA Marathon Pumps
WORK SUMMARY
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
5EA Air Handling Units
Replace filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
3EA Compu-Aire Units – IT Room
Replace filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
20EA Exhaust Fans
Clean Grilles.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
2EA Daikin VRV Heat Pumps
Clean Grilles.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
6EA Daikin VRV 1.5T Cassettes
WORK SUMMARY
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
2EA Amana PTACs
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
1EA Trane DX Split System
Replace filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Issues Encountered:
The drive for RS1 is jumped out control (Dove Group and Synergy will be on site Tuesday 4-15-24 to address this issue.
Drain lines are cracked on fresh air units (PM Crew repaired this on site)
AHU on first floor wires were out of terminal (PM Crew repaired this on site)
IT Room Minit Split not working (Quote sent on replacing 2 compressors for this Unit)
36598 Luke Dr Geismar, LA, 70734
225-644-3643
Job Report #2097 Aug 14, 2025
TYPE
Service
CUSTOMER NAME
Orleans Parish School Board
ADDRESS
2401 Westbend Parkway New Orleans, LA, 70113
PROPERTY NAME
Timbers Building
PROPERTY ADDRESS
2401 Westbend Parkway New Orleans, LA, 70113
AUTHORIZED BY
CUSTOMER PO#
CUSTOMER WO#
SALES AMOUNT
$0.00
NTE
$0.00
Job Description
Q2 Quarterly Preventative Maintenance 2025
Job Summary
Visit 001
DATE PERFORMED TECHNICIAN(S)
Aug 11, 2025 Stephen Cavallino
ASSET MAKE MODEL NUMBER SERIAL NUMBER
WORK SUMMARY
2EA York Chillers
Clean Coils
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
2EA Marathon Pumps
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
5EA Air Handling Units
Replace filters.
Clean drain lines.
WORK SUMMARY
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
3EA Compu-Aire Units – IT Room
Replace filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
20EA Exhaust Fans
Clean Grilles.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
2EA Daikin VRV Heat Pumps
Clean Grilles.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
6EA Daikin VRV 1.5T Cassettes
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
WORK SUMMARY
Verify contactors & relays. Replace as required.
Verify all systems operation.
2EA Amana PTACs
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
1EA Trane DX Split System
Replace filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Issues Encountered:
Contactor for air compressor on first floor. Needs to be replaced. Controls need to be check and verified that it’s calling for their compressor to turn on and cycle as they should.
Before & After Photos
Before Photos
Hose bib on roof both sides need to be replaced to ensure cleaning of units
Added by: Stephen Cavallino Aug 11, 2025 12:54 PM
36598 Luke Dr Geismar, LA, 70734
225-644-3643
Job Report #2139 Sep 11, 2025
TYPE
Service
CUSTOMER NAME
Orleans Parish School Board
ADDRESS
2401 Westbend Parkway New Orleans, LA, 70113
PROPERTY NAME
Mahalia Jackson Elementary
PROPERTY ADDRESS
2405 Jackson Ave New Orleans New Orleans, LA, 70113
AUTHORIZED BY
CUSTOMER PO#
CUSTOMER WO#
Job Description
Q3 Annual Preventative Maintenance 2025
Job Summary
Visit 001
DATE PERFORMED TECHNICIAN(S)
Aug 22, 2025 Landon Westerfield, Stephen Cavallino
ASSET MAKE MODEL NUMBER SERIAL NUMBER
WORK SUMMARY
Q3 Preventative Maintenance 2025
2 EA Chillers (Chiller 2 is out of commission)
Clean Coils
Verify amperage and voltage.
Verify contactors & relays.
Verify all systems operation.
Clear error codes.
2EA Rheos Gas Boilers
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
6EA Trane Climate Changer AHUs
WORK SUMMARY
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
32EA Bathroom Exhaust Fans
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
3EA Condensing units
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
2EA Mini splits
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
27EA Ceiling mounted cassettes
WORK SUMMARY
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
1EA Trane Rooftop package Unit
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Clear error codes.
Verify refrigerant levels. Adjust as required.
Everything is working properly at this time.
Before & After Photos
Before Photos
AHU-5
Added by: Landon Westerfield Aug 22, 2025 12:38 PM
Unit isn’t cooling as it should elevator room front of building
Added by: Stephen Cavallino Aug 25, 2025 2:03 PM
B864A729-0FBE-4E19-8030-C0AD9B0B1D4F.jpg
Added by: Stephen Cavallino Aug 26, 2025 9:12 AM
F6482B55-5E48-4166-A274-6EA71B5F2B6C.jpg
Added by: Stephen Cavallino Aug 26, 2025 9:13 AM
FFA57D1F-D009-405C-8DC6-593E0296694E.jpg
Added by: Stephen Cavallino Aug 26, 2025 9:13 AM
After Photos
F1068DD3-88C4-426B-B1F0-FAE623B24758.jpg
Added by: Stephen Cavallino Aug 26, 2025 11:11 AM
36598 Luke Dr Geismar, LA, 70734
225-644-3643
Job Report #1522 Jan 17, 2025
TYPE
Service
CUSTOMER NAME
Orleans Parish School Board
ADDRESS
2401 Westbend Parkway New Orleans, LA, 70113
PROPERTY NAME
Timbers Building
PROPERTY ADDRESS
2401 Westbend Parkway New Orleans, LA, 70113
AUTHORIZED BY
CUSTOMER PO#
CUSTOMER WO#
SALES AMOUNT
$0.00
NTE
$0.00
Job Description
Q4 Annual Preventative Maintenance 2024
Job Summary
Visit 001
DATE PERFORMED TECHNICIAN(S)
Jan 10, 2025 Corey Deno
ASSET MAKE MODEL NUMBER SERIAL NUMBER
WORK SUMMARY
2EA York Chillers
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Add anti-bacterial pan tabs to primary pans.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Cleaned Coils
WORK SUMMARY
2EA Marathon Pumps
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
5EA Air Handling Units
Replace filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Cleaned Coils
3EA Compu-Aire Units – IT Room
Replace filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
20EA Exhaust Fans
Clean Grilles.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
2EA Daikin VRV Heat Pumps
Clean Grilles.
Verify amperage and voltage.
WORK SUMMARY
6EA Daikin VRV 1.5T Cassettes
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
2EA Amana PTACs
Replace filters.
Clean washable filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
1EA Trane DX Split System
Replace filters.
Clean Grilles.
Clean drain lines.
Clean auxiliary drain pans.
Add anti-bacterial pan tabs to primary pans.
Verify belt condition. Replace as required.
Verify amperage and voltage.
Verify contactors & relays. Replace as required.
Verify all systems operation.
Cleaned Coils
Issues:
Chiller 1 Still has a leak we are still doing a leak search
Suite 5000 needs new blow motor (Scheduled with technicians)
RFP 26-0044 HVAC Maintenance Services Addendum No. 3
Mahalia Jackson Elementary Floor Plan
S
O
U
T
H
R
B
E
R
T
S
N
R
E
E
T
F
R
E
R
E
R
E
E
T
J
O
S
E
P
H
I
R
E
E
T
J
O
S
E
P
H
I
R
E
E
T
S
A
D
R
W
R
E
E
T
J
A
C
K
S
V
E
N
U
E
BLDG 1-2/C
BLDG 3/B
BLDG 4A
BLDG 5/D
SITE AREA- 3.29 ACRES
PLAYGROUND
N
AERIAL SITE PHOTO
of
UPDATES
N e w r l e a n s
L
G e n e r a l
D e G u a l l e
D r i v e
O r l e a n s
P a r i s h c h o o l
B o a r d
M a h a l i a
J c k s o n
E l e m e n t a r y c k s o n
A v e
N e w
O r l e a n s
L
A
GRAPHIC BARSCALE
GROSS SQ. : 46,773 SF
DRAFT
April 17, 2017
AutoCAD SHX Text SHEET No.
AutoCAD SHX Text Site Code
AutoCAD SHX Text OPSB Facility Condition Assessment - 2017
AutoCAD SHX Text CAD Conversion for Schematic Reference Only - Not for Construction
AutoCAD SHX Text File Name:
AutoCAD SHX Text 089_Jackson ES
AutoCAD SHX Text 225'
AutoCAD SHX Text 125'
AutoCAD SHX Text 25'
AutoCAD SHX Text
AutoCAD SHX Text 50'
AutoCAD SHX Text 75'
U
B
E
R
T
S
R
E
E
T
F
R
E
R
R
E
E
T
J
O
S
E
P
H
I
R
E
E
T
J
O
S
E
P
H
I
R
E
E
T
S
D
R
R
E
E
T
J
A
C
K
S
E
N
U
E
BLDG 01
BLDG 02
BLDG 03
BLDG 04
BLDG 05
SITE AREA- 3.29 ACRES
PLAYGROUND
N
SITE PLAN
of
UPDATES
N l e a n s
G e n e r a l
D e G u a l l e
D r i v e
O r l e a n s
P a r i h o o l
B o a r d
M a h a l c k s o n
E l e m e n t a r y c k s o n
A v e
N e w
O r l e a n s
L
A
GRAPHIC BARSCALE DRAFT
April 17, 2017
AutoCAD SHX Text SHEET No.
AutoCAD SHX Text Site Code
AutoCAD SHX Text OPSB Facility Condition Assessment - 2017
AutoCAD SHX Text CAD Conversion for Schematic Reference Only - Not for Construction
AutoCAD SHX Text File Name:
AutoCAD SHX Text 089_Jackson ES
AutoCAD SHX Text 225'
AutoCAD SHX Text 125'
AutoCAD SHX Text 25'
AutoCAD SHX Text
AutoCAD SHX Text 50'
75'
BLDG 01 BLDG 02
BLDG 03
BLDG 04
BLDG 05
N
ROOF PLAN
of
UPDATES
N l e a n s
G e n e r a l
D e G u a l l e
D r i v e
O r l e a n s
P a r i h o o l
B o a r d
M a h a l c k s o n
E l e m e n t a r y c k s o n
A v e
N e w
O r l e a n s
L
A
GRAPHIC BARSCALE DRAFT
April 17, 2017
AutoCAD SHX Text SHEET No.
AutoCAD SHX Text Site Code
AutoCAD SHX Text OPSB Facility Condition Assessment - 2017
AutoCAD SHX Text CAD Conversion for Schematic Reference Only - Not for Construction
AutoCAD SHX Text File Name:
AutoCAD SHX Text 089_Jackson ES
AutoCAD SHX Text 100'
AutoCAD SHX Text 50'
AutoCAD SHX Text 10'
AutoCAD SHX Text
AutoCAD SHX Text 20'
30'
U
B
E
R
T
S
R
E
E
T
F
R
E
R
R
E
E
T
J
O
S
E
P
H
I
R
E
E
T
J
O
S
E
P
H
I
R
E
E
T
S
D
R
R
E
E
T
J
A
C
K
S
E
N
U
E
BLDG 01
BLDG 02
BLDG 03
BLDG 04
BLDG 05
SITE AREA- 3.29 ACRES
PLAYGROUND
N
BUILDINGS 1/C - 1ST FLOOR
of
UPDATES
N l e a n s
G e n e r a l
D e G u a l l e
D r i v e
O r l e a n s
P a r i h o o l
B o a r d
M a h a l c k s o n
E l e m e n t a r y c k s o n
A v e
N e w
O r l e a n s
L
A
KEY PLAN
BLDG 1/C FLR 1 : 3,061 SF
GRAPHIC BARSCALE DRAFT
April 17, 2017
AutoCAD SHX Text C-133
AutoCAD SHX Text
FAC
AutoCAD SHX Text C-131
AutoCAD SHX Text
RR
AutoCAD SHX Text C-130
AutoCAD SHX Text
RR
AutoCAD SHX Text C-132
AutoCAD SHX Text
OFF
AutoCAD SHX Text C-128
AutoCAD SHX Text
DAY CARE
AutoCAD SHX Text C-125
AutoCAD SHX Text
OFF
AutoCAD SHX Text
100 SF
AutoCAD SHX Text C-126
AutoCAD SHX Text
STO.
AutoCAD SHX Text
57 SF
AutoCAD SHX Text C-124
AutoCAD SHX Text
MALL
AutoCAD SHX Text C-123
AutoCAD SHX Text
TOI
AutoCAD SHX Text C-122
AutoCAD SHX Text
OFF
AutoCAD SHX Text
199 SF
AutoCAD SHX Text C-118
AutoCAD SHX Text
MEET
AutoCAD SHX Text
140 SF
AutoCAD SHX Text C-120
AutoCAD SHX Text
OFF
AutoCAD SHX Text
98 SF
AutoCAD SHX Text C-116
AutoCAD SHX Text
OFF
AutoCAD SHX Text
72 SF
AutoCAD SHX Text C-115
AutoCAD SHX Text
COORD.
AutoCAD SHX Text C-112
AutoCAD SHX Text
UNISEX
AutoCAD SHX Text
71 SF
AutoCAD SHX Text C-112
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text C-110
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
940 SF
AutoCAD SHX Text C-109
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
100 SF
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text
110 SF
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text
80 SF
AutoCAD SHX Text
1063 SF
AutoCAD SHX Text
CHILDREN
AutoCAD SHX Text C-127
AutoCAD SHX Text
ADULT UNI. RR
AutoCAD SHX Text
48 SF
AutoCAD SHX Text C-119
AutoCAD SHX Text
COUN
AutoCAD SHX Text
96 SF
AutoCAD SHX Text C-113
AutoCAD SHX Text
DINING
AutoCAD SHX Text
40 SF
AutoCAD SHX Text SHEET No.
AutoCAD SHX Text Site Code
AutoCAD SHX Text OPSB Facility Condition Assessment - 2017
AutoCAD SHX Text CAD Conversion for Schematic Reference Only - Not for Construction
AutoCAD SHX Text File Name:
AutoCAD SHX Text 089_Jackson ES
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text 50'
AutoCAD SHX Text 25'
AutoCAD SHX Text 5'
AutoCAD SHX Text
10'
U
B
E
R
T
S
R
E
E
T
F
R
E
R
R
E
E
T
J
O
S
E
P
H
I
R
E
E
T
J
O
S
E
P
H
I
R
E
E
T
S
D
R
R
E
E
T
J
A
C
K
S
E
N
U
E
BLDG 01
BLDG 02
BLDG 03
BLDG 04
BLDG 05
SITE AREA- 3.29 ACRES
PLAYGROUND
N
BUILDINGS 1/C - 2ND FLOOR
of
UPDATES
N l e a n s
G e n e r a l
D e G u a l l e
D r i v e
O r l e a n s
P a r i h o o l
B o a r d
M a h a l c k s o n
E l e m e n t a r y c k s o n
A v e
N e w
O r l e a n s
L
A
KEY PLAN
GRAPHIC BARSCALE
BLDG 1/C FLR 2 : 3,061 SF
DRAFT
April 17, 2017
AutoCAD SHX Text C-236
AutoCAD SHX Text
CHILD. AREA
AutoCAD SHX Text
AutoCAD SHX Text
UNISEX RM
AutoCAD SHX Text
AutoCAD SHX Text Classroom
AutoCAD SHX Text
714 SF
AutoCAD SHX Text
AutoCAD SHX Text
MAHALIA
AutoCAD SHX Text
262 SF
AutoCAD SHX Text
JACKSON
AutoCAD SHX Text
ROOM
AutoCAD SHX Text C-235
AutoCAD SHX Text
LIBRARY CENTER
AutoCAD SHX Text C-230
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
56 SF
AutoCAD SHX Text C-241
AutoCAD SHX Text
VEST.
AutoCAD SHX Text
82 SF
AutoCAD SHX Text C-233
AutoCAD SHX Text
LIB. OFF
AutoCAD SHX Text
81 SF
AutoCAD SHX Text C-230
AutoCAD SHX Text
PRACTICE
AutoCAD SHX Text
68 SF
AutoCAD SHX Text
RM
AutoCAD SHX Text C-224
AutoCAD SHX Text
PRACTICE
AutoCAD SHX Text
68 SF
AutoCAD SHX Text
RM
AutoCAD SHX Text C-223
AutoCAD SHX Text
PRACTICE
AutoCAD SHX Text
65 SF
AutoCAD SHX Text
RM
AutoCAD SHX Text C-225
AutoCAD SHX Text
PRACTICE
AutoCAD SHX Text
68 SF
AutoCAD SHX Text
RM
AutoCAD SHX Text C-239
AutoCAD SHX Text
VIDEO ROOM
AutoCAD SHX Text
67 SF
AutoCAD SHX Text C-238
AutoCAD SHX Text
VIDEO ROOM
AutoCAD SHX Text
76 SF
AutoCAD SHX Text
64 SF
AutoCAD SHX Text SHEET No.
AutoCAD SHX Text Site Code
AutoCAD SHX Text OPSB Facility Condition Assessment - 2017
AutoCAD SHX Text CAD Conversion for Schematic Reference Only - Not for Construction
AutoCAD SHX Text File Name:
AutoCAD SHX Text 089_Jackson ES
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text 50'
AutoCAD SHX Text 25'
AutoCAD SHX Text 5'
AutoCAD SHX Text
U
B
E
R
T
S
R
E
E
T
F
R
E
R
R
E
E
T
J
O
S
E
P
H
I
R
E
E
T
J
O
S
E
P
H
I
R
E
E
T
S
D
R
R
E
E
T
J
A
C
K
S
E
N
U
E
BLDG 01
BLDG 02
BLDG 03
BLDG 04
BLDG 05
SITE AREA- 3.29 ACRES
PLAYGROUND
N
BUILDINGS 2/C - 1ST FLOOR
of
UPDATES
N l e a n s
G e n e r a l
D e G u a l l e
D r i v e
O r l e a n s
P a r i h o o l
B o a r d
M a h a l c k s o n
E l e m e n t a r y c k s o n
A v e
N e w
O r l e a n s
L
A
KEY PLAN
GRAPHIC BARSCALE
BLDG 2/C FLR 1 : 4,644 SF
DRAFT
April 17, 2017
AutoCAD SHX Text C-125
AutoCAD SHX Text
100 SF
AutoCAD SHX Text C-124
AutoCAD SHX Text C-123
AutoCAD SHX Text
TOI
AutoCAD SHX Text C-122
AutoCAD SHX Text
OFF
AutoCAD SHX Text
199 SF
AutoCAD SHX Text C-118
AutoCAD SHX Text
MEET
AutoCAD SHX Text
140 SF
AutoCAD SHX Text C-120
AutoCAD SHX Text
OFF
AutoCAD SHX Text
98 SF
AutoCAD SHX Text C-116
AutoCAD SHX Text
OFF
AutoCAD SHX Text
72 SF
AutoCAD SHX Text C-115
AutoCAD SHX Text
COORD.
AutoCAD SHX Text C-112
AutoCAD SHX Text
UNISEX
AutoCAD SHX Text
71 SF
AutoCAD SHX Text C-112
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text C-110
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
940 SF
AutoCAD SHX Text C-109
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
100 SF
AutoCAD SHX Text C-106
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
959 SF
AutoCAD SHX Text C-105
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
932 SF
AutoCAD SHX Text C-104
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
100 SF
AutoCAD SHX Text C-101
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
995 SF
AutoCAD SHX Text
1063 SF
AutoCAD SHX Text
ADULT UNI. RR
AutoCAD SHX Text C-119
AutoCAD SHX Text
COUN
AutoCAD SHX Text
96 SF
AutoCAD SHX Text C-113
AutoCAD SHX Text
DINING
AutoCAD SHX Text
40 SF
AutoCAD SHX Text SHEET No.
AutoCAD SHX Text Site Code
AutoCAD SHX Text OPSB Facility Condition Assessment - 2017
AutoCAD SHX Text CAD Conversion for Schematic Reference Only - Not for Construction
AutoCAD SHX Text File Name:
AutoCAD SHX Text 089_Jackson ES
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text 50'
AutoCAD SHX Text 25'
AutoCAD SHX Text 5'
AutoCAD SHX Text
U
B
E
R
T
S
R
E
E
T
F
R
E
R
R
E
E
T
J
O
S
E
P
H
I
R
E
E
T
J
O
S
E
P
H
I
R
E
E
T
S
D
R
R
E
E
T
J
A
C
K
S
E
N
U
E
BLDG 01
BLDG 02
BLDG 03
BLDG 04
BLDG 05
SITE AREA- 3.29 ACRES
PLAYGROUND
N
BUILDINGS 2/C - 2ND FLOOR
of
UPDATES
N l e a n s
G e n e r a l
D e G u a l l e
D r i v e
O r l e a n s
P a r i h o o l
B o a r d
M a h a l c k s o n
E l e m e n t a r y c k s o n
A v e
N e w
O r l e a n s
L
A
KEY PLAN
GRAPHIC BARSCALE
BLDG 2/C FLR 2 : 4,644 SF
DRAFT
April 17, 2017
AutoCAD SHX Text
AutoCAD SHX Text
MEN RR
AutoCAD SHX Text
215 SF
AutoCAD SHX Text
AutoCAD SHX Text
VEST.
AutoCAD SHX Text
129 SF
AutoCAD SHX Text
AutoCAD SHX Text
WOMEN RR
AutoCAD SHX Text
215 SF
AutoCAD SHX Text
AutoCAD SHX Text Classroom A
AutoCAD SHX Text
886 SF
AutoCAD SHX Text
AutoCAD SHX Text Classroom B
AutoCAD SHX Text
885 SF
AutoCAD SHX Text
AutoCAD SHX Text Classroom C
AutoCAD SHX Text
885 SF
AutoCAD SHX Text
AutoCAD SHX Text Classroom D
AutoCAD SHX Text
896 SF
AutoCAD SHX Text SHEET No.
AutoCAD SHX Text Site Code
AutoCAD SHX Text OPSB Facility Condition Assessment - 2017
AutoCAD SHX Text CAD Conversion for Schematic Reference Only - Not for Construction
AutoCAD SHX Text File Name:
AutoCAD SHX Text 089_Jackson ES
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text 50'
AutoCAD SHX Text 25'
AutoCAD SHX Text 5'
AutoCAD SHX Text
U
B
E
R
T
S
R
E
E
T
F
R
E
R
R
E
E
T
J
O
S
E
P
H
I
R
E
E
T
J
O
S
E
P
H
I
R
E
E
T
S
D
R
R
E
E
T
J
A
C
K
S
E
N
U
E
BLDG 01
BLDG 02
BLDG 03
BLDG 04
BLDG 05
SITE AREA- 3.29 ACRES
PLAYGROUND
N
BUILDINGS 3/B - 1ST FLOOR
of
UPDATES
N l e a n s
G e n e r a l
D e G u a l l e
D r i v e
O r l e a n s
P a r i h o o l
B o a r d
M a h a l c k s o n
E l e m e n t a r y c k s o n
A v e
N e w
O r l e a n s
L
A
KEY PLAN
GRAPHIC BARSCALE
BLDG 3/B FLR 1: 4,644 SF
DRAFT
April 17, 2017
AutoCAD SHX Text B-103
AutoCAD SHX Text
RR
AutoCAD SHX Text
80 SF
AutoCAD SHX Text B-105
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
925 SF
AutoCAD SHX Text B-106
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
947 SF
AutoCAD SHX Text B-111
AutoCAD SHX Text
OP/TP AREA
AutoCAD SHX Text
517 SF
AutoCAD SHX Text B-102
AutoCAD SHX Text
RR
AutoCAD SHX Text
72 SF
AutoCAD SHX Text B-104
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
97 SF
AutoCAD SHX Text B-101
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
975 SF
AutoCAD SHX Text B-107
AutoCAD SHX Text
RR
AutoCAD SHX Text
72 SF
AutoCAD SHX Text B-108
AutoCAD SHX Text
RR
AutoCAD SHX Text
69 SF
AutoCAD SHX Text B-109
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
97 SF
AutoCAD SHX Text B-109
AutoCAD SHX Text
W. STN.
AutoCAD SHX Text
97 SF
AutoCAD SHX Text B-114
AutoCAD SHX Text
TEST. AREA
AutoCAD SHX Text
216 SF
AutoCAD SHX Text B-115
AutoCAD SHX Text
CORDN.
AutoCAD SHX Text
106 SF
AutoCAD SHX Text B-118
AutoCAD SHX Text R.R.
AutoCA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .