642-16-108 Drawings PART 04 of 06.pdf

PDF 35 MB Posted

Attached to
Z2DA--642-16-108 | Upgrade Patient Bedrooms CLC Unit B
Solicitation number
36C24421B0017
Issued by

About this file

This document provides details on a federal contract solicitation for upgrading patient bedrooms at a Veterans Affairs medical center. Solicitation number 36C24421B0017 calls for offers to upgrade patient bedrooms in building unit B of the Corporal Michael J. Crescenz Veterans Affairs Medical Center in Philadelphia, Pennsylvania. The statement of work involves upgrading existing patient bedrooms to meet current standards. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4. The response due date and award date are not specified.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

RX 16x10

R X x x

RX 12x8 x

RX 8x6

RX 8x6 x x x

RX 8x6

RX 8x6

H

T

T

H

T

T

T

T

T

T

T

T

T T

2 3

JHGFE

R

L P

S U W CC

Y

Z

UP

UP

UP

2/G101 G1012/

RX 16x10

RX 20x10

RX 16x10

RX 14x10

RX 12x10

RX 12x8

RX 20x10

RX 18x10 RX 16x8

RX 12x8

TT

T T T T

T

T

T

T

T

H T

H T x

RX 30x12 x

36x20

36x12

RX 10x8

EX 12x8

EX 8x10

T

T

T

30x10 x

55555

11 7

3 3

8 11

5 5 5 5 5

FD

FD

FD

FD

FD

FD

10x6

1 2

10"Ø x x x x x x x x

RX 22x10

12x6

36x12

8x10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

A R

L

G

D r a w i n g s A c a d B

I D o c u m e n t s M

M

H C

D

S

T

F

L

P

N

U C

T

D

P l o t t e d

B y

B r e n d o n

J

B u r l e y

P

M

BKM# 17022.01

N

Plan North Key Plan

N

True North

07/27/20 212OfDwg.

Unit C

Unit A

Court

C o u r t

(N.I.C.)

(N.I.C.)

(N.I.C.)

N

I C

BURDETTE KOEHLER MURPHY &

ASSOCIATES, INC.

MECHANICAL / ELECTRICAL ENGINEERS

6300 BLAIR HILL LANE, SUITE 400

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

KOFFEL ASSOCIATES

FIRE PROTECTION ENGINEERS

8815 CENTRE PARK DRIVE, SUITE 200

COLUMBIA, MARYLAND 21045

410.750.2246 - FAX 410.750.2588

RICKERT ENGINEERING, INC.

STRUCTURAL ENGINEERING

8813 WALTHAM WOODS ROAD, SUITE 301

BALTIMORE, MARYLAND 21234

410.663.5110 - FAX 410.663.5114

BID DOCUMENTS

Sequence

C

Sequence

D

Sequence B

Sequence

A

BUILDING COST CONSULTANTS

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

24'16'8'4'

SCALE: 1/8"=1'-0"

30-MH2(CD)

FIRST FLOOR PLAN

DUCTWORK - DEMOLITION

DRAWING NOTES:

GENERAL NOTES:

SCALE: 1/8" = 1'-0"

PART FIRST FLOOR - DUCTWORK - DEMOLITION

1. REMOVE EXISTING SUPPLY DUCTWORK AND ALL ASSOCIATED

APPURTENANCES.

2. REMOVE EXISTING EXHAUST / RETURN DUCTWORK AND ALL

ASSOCIATED APPURTENANCES.

3. REMOVE EXISTING AIR DEVICE (TYPICAL).

4. REMOVE EXISTING THERMOSTAT OR SENSOR AND ALL

ASSOCIATED APPURTENANCES.

5. REMOVE EXISTING RADIANT CEILING PANELS AND ALL

ASSOCIATED APPURTENANCES. CAP HS/HR PIPING AT MAIN.

(TYPICAL).

6. SINGLE DUCT TERMINAL UNIT WITH HYDRONIC HEATING COIL

INSTALLED IN SEQUENCE A AND B.

7. RETURN / EXHAUST DUCTWORK INSTALLED IN SEQUENCES A

AND B.

8. SUPPLY DUCTWORK INSTALLED IN SEQUENCES A AND B.

9. SUPPLY AIR DEVICE INSTALLED IN SEQUENCES A AND B.

10. RETURN / EXHAUST AIR DEVICES INSTALLED IN SEQUENCES A

AND B.

11. CONTRACTOR IS RESPONSIBLE FOR REPLACING AND REPAIRING

ANY DAMAGED OR UNINSTALLED DUCTWORK INSULATION ON

DUCTWORK INSTALLED IN SEQUENCE A AND B.

12. REFER TO SEQUENCES A AND B FOR WORK IN THIS AREA.

13. EXISTING WALL MOUNTED AC UNIT TO REMAIN.

14. PROVIDE 10"Ø TEMPORARY SUPPLY DUCTWORK TO CONNECT EX

8x10 DUCTWORK IN SEQUENCE A AND B. TEMPORARY CONNECT

SHALL BE COMPLETE PRIOR TO DUCTWORK DEMOLITION.

15. PROVIDE 10"Ø TEMPORARY RETURN DUCTWORK TO CONNECT

DUCTWORK IN SEQUENCE A AND B. TEMPORARY CONNECTION

SHALL BE COMPLETE PRIOR TO DUCTWORK DEMOLITION.

16. THERMOSTAT INSTALLED IN SEQUENCES A AND B.

17. REMOVE EXISTING HYDRONIC HEATING COIL AND ALL

ASSOCIATED APPURTENANCES.

SCALE: 1/8" = 1'-0"

PART FIRST FLOOR - DUCTWORK - DEMOLITION

JDS JDT

1. REFER TO 30-MH1 FOR MECHANICAL LEGEND, ABBREVIATIONS

AND GENERAL NOTES.

2. CONTRACTOR SHALL MAKE ALL NEW TO EXISTING CONNECTIONS

FOR DUCTWORK, PIPING, AND CONTROLS TO SUPPORT

SEQUENCED CONSTRUCTION. IT IS ASSUMED THESE

CONNECTIONS WILL OCCUR AT OR NEAR THE PHASED WORK

SHOWN. HVAC SYSTEMS SERVING SEQUENCED AREAS NOT IN

CONTRACT OR DEMOLITION WHICH ARE OCCUPIED SHALL

REMAIN OPERATIONAL.

3. SYSTEMS SHUT DOWNS SHALL BE COORDINATED WITH THE

OWNER AND SHALL BE DONE WITH A 2 WEEKS HOUR ADVANCED

NOTICE.

4. EACH NEW SEQUENCE IS TO BE TESTED AND BALANCED IN

ACCORDANCE WITH SPECIFICATIONS PER THE AIRFLOWS

SCHEDULE AND SHALL BE COORDINATED WITH TESTING AND

BALANCING REQUIREMENTS. AT THE COMPLETION OF THE

PROJECT TESTING AND BALANCING SHALL BE PERFORMED FOR

THE NEW AND EXISTING COMPONENTS OF THE HVAC SYSTEM.

5. REFER TO ARCHITECTURAL DIVISION FOR SEQUENCING

CONSIDERATIONS.

(e) S.Tlt.

RX 18x8

JHGFE

R

L P

S U W CC

Y

Z

DN

DN

DN

(e) S.Tlt.

1B134

I.T.

CLOSET

RX 8x6

RX 10x6

RX 8x6 RX 10x6 x x x

RX 34x12

RX 48x12 x

10x6

RX 8x6 x x

RX 24x12 x

RX 10x6

RX 10x6 x x

RX 24x10

RX 12x8

RX 12x6

RX 10x6

RX 52x14

RX 8x6 RX 8x6

T

T T

T

T

RX 8x10

RX 12x6

RX 12x6 x

RX 8x10

RX 12x4

RX 12x6

RX 12x6

RX 12x6

RX 12x6

RX 12x6

RX 12x6

RX 12x6 x x x

RX 8x10

RX 8x10

RX 8x10 x x x x

RX 12x6

RX 12x6

RX 12x6

RX 24x12

RX 40x12

RX 20x10

RX 10x10

RX 8x6

RX 36x12 x x x x

RX 20x10RX 20x10

RX 8x10

RX 10x10

RX 6x10

Ø

RX 14x10

RX 8x10

RX 8x10

RX 8x10

RX 8x10

RX 8x10

RX 8x10

RX 10x10 x

52x14

EX AC-4

RX 44x12

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

A R

L

G

D r a w i n g s A c a d B c u m e n t s M

M

H A

B

N

D

F

C

T

D

P l o t t e d

B y

B r e n d o n

J

B u r l e y

P

M

BKM# 17022.01

N

Plan North Key Plan

N

True North

07/27/20 212OfDwg.

Unit C

Unit A

Court

C o u r t

(N.I.C.)

(N.I.C.)

(N.I.C.)

N

I C

Sequence B

Sequence

A

BURDETTE KOEHLER MURPHY &

ASSOCIATES, INC.

MECHANICAL / ELECTRICAL ENGINEERS

6300 BLAIR HILL LANE, SUITE 400

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

KOFFEL ASSOCIATES

FIRE PROTECTION ENGINEERS

8815 CENTRE PARK DRIVE, SUITE 200

COLUMBIA, MARYLAND 21045

410.750.2246 - FAX 410.750.2588

RICKERT ENGINEERING, INC.

STRUCTURAL ENGINEERING

8813 WALTHAM WOODS ROAD, SUITE 301

BALTIMORE, MARYLAND 21234

410.663.5110 - FAX 410.663.5114

BID DOCUMENTS

Sequence

C

Sequence

D

BUILDING COST CONSULTANTS

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

24'16'8'4'

SCALE: 1/8"=1'-0"

30-MH3(AB)

SECOND FLOOR PLAN

DUCTWORK - DEMOLITION

JDS JDT

DRAWING NOTES:

GENERAL NOTES:

SCALE: 1/8" = 1'-0"

PART SECOND FLOOR - DUCTWORK - DEMOLITION

1. REMOVE EXISTING SUPPLY DUCTWORK AND ALL ASSOCIATED

APPURTENANCES IN SEQUENCE B.

2. REMOVE EXISTING EXHAUST / RETURN DUCTWORK AND ALL

ASSOCIATED APPURTENANCES IN SEQUENCE B.

3. REMOVE EXISTING AIR DEVICE AND ALL ASSOCIATED

APPURTENANCES IN SEQUENCE B.

4. REMOVE EXISTING THERMOSTAT AND ALL ASSOCIATED

APPURTENANCES (TYP).

5. REMOVE EXISTING RADIANT CEILING PANEL AND ALL ASSOCIATED

APPURTENANCES, AND CAP HS/HR PIPING AT MAINS.

6. REMOVE EXISTING SINGLE DUCT TERMINAL WITH HYDRONIC HEATING

COIL IN SEQUENCE.

7. REMOVE EXISTING RETURN/EXHAUST DUCTWORK IN SEQUENCE A.

8. REMOVE EXISTING SUPPLY DUCTWORK IN SEQUENCE A.

9. REMOVE EXISTING EXISTING AIR DEVICE IN SEQUENCE A.

10. REMOVE EXISTING RADIANT CEILING PANEL.

11. CONTRACTOR IS RESPONSIBLE TO COORDINATE DEMOLITION UP TO

30-RTU-1 & TO AC-4 WITH BUILDING OWNER AND OCCUPANTS. SEE

30-MH11(AB) FOR DEMOLITION TO UNITS.

12. REMOVE EXISTING DUCTWORK.

13. EXISTING DUCTLESS SPLIT SYSTEM UNIT MOUNTED ON WALL TO

REMAIN.

14. REMOVE EXISTING DUCT MOUNTED HOT WATER HEATING COIL AND

ALL ASSOCIATED APPURTENANCES.

SCALE: 1/8" = 1'-0"

PART SECOND FLOOR - DUCTWORK - DEMOLITION

1. REFER TO 30-MH1 FOR MECHANICAL LEGEND, ABBREVIATIONS

AND GENERAL NOTES.

2. CONTRACTOR SHALL MAKE ALL NEW TO EXISTING CONNECTIONS

FOR DUCTWORK, PIPING, AND CONTROLS TO SUPPORT

SEQUENCED CONSTRUCTION. IT IS ASSUMED THESE

CONNECTIONS WILL OCCUR AT OR NEAR THE PHASED WORK

SHOWN. HVAC SYSTEMS SERVING SEQUENCED AREAS NOT IN

CONTRACT OR DEMOLITION WHICH ARE OCCUPIED SHALL

REMAIN OPERATIONAL.

3. SYSTEMS SHUT DOWNS SHALL BE COORDINATED WITH THE

OWNER AND SHALL BE DONE WITH A 72 HOUR ADVANCED

NOTICE.

4. EACH NEW SEQUENCE IS TO BE TESTED AND BALANCED IN

ACCORDANCE WITH SPECIFICATIONS PER THE AIRFLOWS

SCHEDULED AND SHALL BE COORDINATED WITH TESTING AND

BALANCING REQUIREMENTS. AT THE COMPLETION OF THE

PROJECT TESTING AND BALANCING SHALL BE PERFORMED FOR

THE NEW AND EXISTING COMPONENTS OF THE HVAC SYSTEM.

RX 16x10 x

RX 12x8

RX 12x6

RX 10x6 x x x

RX 8x6

T

T

T

T

T

T

T

T

H

T

T

H x x

RX 12x6

T

T

3 3

2 2

3 3

2 2

1 1

3 3

1 1

2 2

JHGFE

R

L P

S U W CC

Y Z

DN

DN

RX 16x10

10x6

RX 16x10

RX 14x10

RX 12x10

RX 12x8

RX 12x6

RX 18x10 RX 16x8

T T

T T

T

T

T

RX 12x6

H T

H T

30x12 x

36x12 x

10x6 x

FD

36x12

36x20

30x10

RX 20x10

T

T

T

T

5 5 5 5 5

5 5 5 5 5

3 3 3 3 3 3

3 3

8x10

12x8

RX 8x6 x

T

8 6

FD

FD

FD

FD

FD

1 2

10"Ø

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

A R

L

G

D r a w i n g s A c a d B c u m e n t s M

M

H C

D

N

D

F

C

T

D

P l o t t e d

B y

B r e n d o n

J

B u r l e y

P

M

BKM# 17022.01

N

Plan North Key Plan

N

True North

07/27/20 212OfDwg.

Unit C

Unit A

Court

C o u r t

(N.I.C.)

(N.I.C.)

(N.I.C.)

N

I C

BURDETTE KOEHLER MURPHY &

ASSOCIATES, INC.

MECHANICAL / ELECTRICAL ENGINEERS

6300 BLAIR HILL LANE, SUITE 400

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

KOFFEL ASSOCIATES

FIRE PROTECTION ENGINEERS

8815 CENTRE PARK DRIVE, SUITE 200

COLUMBIA, MARYLAND 21045

410.750.2246 - FAX 410.750.2588

RICKERT ENGINEERING, INC.

STRUCTURAL ENGINEERING

8813 WALTHAM WOODS ROAD, SUITE 301

BALTIMORE, MARYLAND 21234

410.663.5110 - FAX 410.663.5114

BID DOCUMENTS

Sequence

C

Sequence

D

Sequence B

Sequence

A

BUILDING COST CONSULTANTS

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

24'16'8'4'

SCALE: 1/8"=1'-0"

30-MH3(CD)

SECOND FLOOR PLAN

DUCTWORK - DEMOLITION

SCALE: 1/8" = 1'-0"

PART SECOND FLOOR - DUCTWORK - DEMOLITION

SCALE: 1/8" = 1'-0"

PART SECOND FLOOR - DUCTWORK - DEMOLITION

JDS JDT

DRAWING NOTES:

1. REMOVE EXISTING SUPPLY DUCTWORK AND ALL ASSOCIATED

APPURTENANCES (TYP).

2. REMOVE EXISTING EXHAUST/RETURN DUCTWORK AND ALL

ASSOCIATED APPURTENANCES (TYP).

3. REMOVE EXISTING AIR DEVICE (TYP).

4. REMOVE EXISTING THERMOSTAT (TYP).

5. REMOVE EXISTING RADIANT CEILING PANEL AND ALL

ASSOCIATED APPURTENANCES (TYP). CAP HS/HR PIPING AT

MAIN.

6. SINGLE DUCT TERMINAL UNIT WITH HYDRONIC HEATING COIL

INSTALLED IN SEQUENCE A AND B.

7. RETURN/EXHAUST DUCTWORK INSTALLED IN SEQUENCES A

AND B.

8. SUPPLY DUCTWORK TO REMAIN INSTALLED IN SEQUENCES A

AND B.

9. AIR DEVICE INSTALLED IN SEQUENCES A AND B.

10. CONTRACTOR IS RESPONSIBLE TO REPLACE AND REPAIR ANY

DAMAGED OR UNINSTALLED DUCTWORK INSULATION ON

DUCTWORK INSTALLED IN SEQUENCES A AND B.

11. REFER TO SEQUENCES A AND B FOR WORK IN THIS AREA.

12. EXISTING WALL MOUNTED AC UNIT TO REMAIN.

13. PROVIDE 10"Ø TEMPORARY SUPPLY DUCTWORK TO CONNECT

EX 8x10 DUCTWORK IN PHASE 2. TEMPORARY CONNECT

SHALL BE COMPLETE PRIOR TO DUCTWORK DEMOLITION.

14. PROVIDE 10"Ø TEMPORARY RETURN DUCTWORK TO CONNECT

DUCTWORK IN PHASE 2. TEMPORARY CONNECTION SHALL BE

COMPLETE PRIOR TO DUCTWORK DEMOLITION.

15. REMOVE EXISTING DUCT-MOUNTED HYDRONIC HEATING COIL

AND ALL ASSOCIATED APPURTENANCES.

GENERAL NOTES:

1. REFER TO 30-MH1 FOR MECHANICAL LEGEND, ABBREVIATIONS

AND GENERAL NOTES.

2. CONTRACTOR SHALL MAKE ALL NEW TO EXISTING CONNECTIONS

FOR DUCTWORK, PIPING, AND CONTROLS TO SUPPORT PHASED

CONSTRUCTION. IT IS ASSUMED THESE CONNECTIONS WILL

OCCUR AT OR NEAR THE PHASED WORK SHOWN. HVAC SYSTEMS

SERVING PHASE AREAS NOT IN CONTRACT OR DEMOLITION

WHICH ARE OCCUPIED SHALL REMAIN OPERATIONAL.

3. SYSTEMS SHUT DOWNS SHALL BE COORDINATED WITH THE

OWNER AND SHALL BE DONE WITH A 2 WEEK HOUR ADVANCED

NOTICE.

4. EACH NEW PHASE IS TO BE TESTED AND BALANCED IN

ACCORDANCE WITH SPECIFICATIONS PER THE AIRFLOWS

SCHEDULED AND SHALL BE COORDINATED WITH TESTING AND

BALANCING REQUIREMENTS. AT THE COMPLETION OF THE

PROJECT TESTING AND BALANCING SHALL BE PERFORMED FOR

THE NEW AND EXISTING COMPONENTS OF THE HVAC SYSTEM.

5. REFER TO ARCHITECTURAL DIVISION FOR PHASING AND

SEQUENCING CONSIDERATIONS.

1"

1"

1"

1"

JHGFE

R

L P

S U W CC

Y Z

UP

UP

UP

1B134

I.T.

CLOSET

CHWS &

CHWR DN

RX 1"

2"

1 1/4"

1 1/4"

H R

1 1/4"

1"

1"

1"

HS

HR

2"

1 1/4"

RX 1"

C W

S

1"

1 1/4"

3/4"

3/4"

2"

3/4"

3/4"

1"

3/4"

3/4"

1"

3/4"

1"

1"

3/4"

3/4"

1"

3/4"

H R

3/4"

1"

1 1/4"

1 1/4"

1"

1"

3/4"

3/4"

4 4

C W

R

HS

HR

H R

CWS

C W

S

H P

R

H S

C W

R

C W

R

H R

H R

H R

H S

3/4"

3/4"

3/4"

3/4"

3/4"1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

A R

L

G

D r a w i n g s A c a d B c u m e n t s M

M

H A

B

S

T

F

P

I N

G

D

P l o t t e d

B y

B r e n d o n

J

B u r l e y

P

M

BKM# 17022.01

N

Plan North Key Plan

N

True North

07/27/20 212OfDwg.

Unit C

Unit A

Court

C o u r t

(N.I.C.)

(N.I.C.)

(N.I.C.)

N

I C

Sequence B

Sequence

A

BURDETTE KOEHLER MURPHY &

ASSOCIATES, INC.

MECHANICAL / ELECTRICAL ENGINEERS

6300 BLAIR HILL LANE, SUITE 400

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

KOFFEL ASSOCIATES

FIRE PROTECTION ENGINEERS

8815 CENTRE PARK DRIVE, SUITE 200

COLUMBIA, MARYLAND 21045

410.750.2246 - FAX 410.750.2588

RICKERT ENGINEERING, INC.

STRUCTURAL ENGINEERING

8813 WALTHAM WOODS ROAD, SUITE 301

BALTIMORE, MARYLAND 21234

410.663.5110 - FAX 410.663.5114

BID DOCUMENTS

Sequence

C

Sequence

D

BUILDING COST CONSULTANTS

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

24'16'8'4'

SCALE: 1/8"=1'-0"

30-MH4(AB)

FIRST FLOOR PLAN

HVAC PIPING - DEMOLITION

JDS JDT

DRAWING NOTES:

GENERAL NOTES:

SCALE: 1/8" = 1'-0"

PART FIRST FLOOR - HVAC PIPING - DEMOLITION

1. EXISTING HEATING WATER SUPPLY / HEATING WATER RETURN

PIPING TO REMAIN.

2. EXISTING CHILLED WATER SUPPLY / CHILLED WATER RETURN

PIPING.

3. EXISTING CABINET UNIT HEATER TO REMAIN.

4. REMOVE EXISTING SINGLE DUCT TERMINAL UNIT WITH

HYDRONIC HEATING COIL IN SEQUENCE A.

5. REMOVE EXISTING CHILLED WATER SUPPLY / CHILLED WATER

RETURN PIPING AND ALL ASSOCIATED APPURTENANCES.

6. REMOVE EXISTING HEATING WATER COIL AND ALL ASSOCIATED

APPURTENANCES.

7. REMOVE EXISTING HEATING WATER SUPPLY / HEATING WATER

RETURN PIPING AND ALL ASSOCIATED APPURTENANCES.

8. EXISTING DUCTLESS SPLIT SYSTEM TO REMAIN.

9. EXISTING REFRIGERANT SUCTION / REFRIGERANT LIQUID PIPING

TO REMAIN.

10. REMOVE EXISTING BALANCE VALVE.

11. HEATING WATER COIL. REFER TO SEQUENCES C AND D FOR

REMOVAL INFO.

SCALE: 1/8" = 1'-0"

PART FIRST FLOOR - HVAC PIPING - DEMOLITION

1. REFER TO 30-MH1 FOR MECHANICAL LEGEND, ABBREVIATIONS

AND GENERAL NOTES.

2. CONTRACTOR SHALL MAKE ALL NEW TO EXISTING CONNECTIONS

FOR DUCTWORK, PIPING, AND CONTROLS TO SUPPORT

SEQUENCED CONSTRUCTION. IT IS ASSUMED THESE

CONNECTIONS WILL OCCUR AT OR NEAR THE SEQUENCED

WORK SHOWN. HVAC SYSTEMS SERVING SEQUENCED AREAS

NOT IN CONTRACT OR DEMOLITION WHICH ARE OCCUPIED SHALL

REMAIN OPERATIONAL.

3. SYSTEMS SHUT DOWNS SHALL BE COORDINATED WITH THE

OWNER AND SHALL BE DONE WITH A 72 HOUR ADVANCED

NOTICE.

4. EACH NEW SEQUENCE IS TO BE TESTED AND BALANCED IN

ACCORDANCE WITH SPECIFICATIONS PER THE WATER FLOWS

SCHEDULED AND SHALL BE COORDINATED WITH TESTING AND

BALANCING REQUIREMENTS. AT THE COMPLETION OF THE

PROJECT TESTING AND BALANCING SHALL BE PERFORMED FOR

THE NEW AND EXISTING COMPONENTS OF THE HVAC SYSTEM.

RX 1"

1"

RX 1 1/4"

C W

R

C W

S

H S

H R

H S

H R

C W

R

C W

S

RX 1"

1"

1"

RX 1"

1"

RX 1"

JHGFE

R

L P

S U W CC

Y

Z

UP

UP

UP

2/G101 G1012/

3/4"

1 1/4"

RX 1 1/4"

RX 2"

HS

H S

RX 1"

1"

1"

HR

HS

H S

H R

HR

HS

1" 1 1/4" 1 1/4"

1"

RX 2"

1"

1"

HR

H R

1 1/2"

CWS

CWR

1 1/2"

C W

S

C W

R

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

A R

L

G

D r a w i n g s A c a d B c u m e n t s M

M

H C

D

S

T

F

P

I N

G

D

P l o t t e d

B y

B r e n d o n

J

B u r l e y

P

M

BKM# 17022.01

N

Plan North Key Plan

N

True North

07/27/20 212OfDwg.

Unit C

Unit A

Court

C o u r t

(N.I.C.)

(N.I.C.)

(N.I.C.)

N

I C

BURDETTE KOEHLER MURPHY &

ASSOCIATES, INC.

MECHANICAL / ELECTRICAL ENGINEERS

6300 BLAIR HILL LANE, SUITE 400

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

KOFFEL ASSOCIATES

FIRE PROTECTION ENGINEERS

8815 CENTRE PARK DRIVE, SUITE 200

COLUMBIA, MARYLAND 21045

410.750.2246 - FAX 410.750.2588

RICKERT ENGINEERING, INC.

STRUCTURAL ENGINEERING

8813 WALTHAM WOODS ROAD, SUITE 301

BALTIMORE, MARYLAND 21234

410.663.5110 - FAX 410.663.5114

BID DOCUMENTS

Sequence

C

Sequence

D

Sequence B

Sequence

A

BUILDING COST CONSULTANTS

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

24'16'8'4'

SCALE: 1/8"=1'-0"

30-MH4(CD)

FIRST FLOOR PLAN

HVAC PIPING - DEMOLITION

JDS JDT

DRAWING NOTES:

SCALE: 1/8" = 1'-0"

PART FIRST FLOOR - HVAC PIPING - DEMOLITION

1. EXISTING HEATING WATER SUPPLY / HEATING WATER RETURN

PIPING TO REMAIN.

2. CWS/CWR PIPING AND HS/HR PIPING SERVING FAN COIL UNITS IN

ADDITION.

3. REMOVE EXISTING HEATING WATER SUPPLY / HEATING WATER

RETURN PIPING AND ALL ASSOCIATED APPURTENANCES TO

RADIANT CEILING PANELS AND HEATING WATER COILS. REFER

TO DRAWING 30-MH2 (CD) FOR RADIANT CEILING PANEL

LOCATIONS. CAP OPEN END AT MAIN.

4. REMOVE EXISTING CHILLED WATER SUPPLY / CHILLED WATER

RETURN PIPING AND ALL ASSOCIATED APPURTENANCES.

REMOVE CHILLED WATER SUPPLY / CHILLED WATER RETURN

PIPING GOING TO RADIANT CEILING PANELS. REFER TO DRAWING

30-MH2 (CD) FOR RADIANT CEILING PANEL LOCATIONS.

5. REMOVE EXISTING HEATING WATER COIL AND ALL ASSOCIATED

APPURTENANCES.

6. REMOVE EXISTING CHILLED WATER PIPING UP TO SECOND

FLOOR.

7. EXISTING WALL MOUNTED AC UNIT TO REMAIN.

8. REMOVE EXISTING BALANCE VALVE.

SCALE: 1/8" = 1'-0"

PART FIRST FLOOR - HVAC PIPING - DEMOLITION

GENERAL NOTES:

1. REFER TO 30-MH1 FOR MECHANICAL LEGEND, ABBREVIATIONS

AND GENERAL NOTES.

2. CONTRACTOR SHALL MAKE ALL NEW TO EXISTING CONNECTIONS

FOR DUCTWORK, PIPING, AND CONTROLS TO SUPPORT

SEQUENCED CONSTRUCTION. IT IS ASSUMED THESE

CONNECTIONS WILL OCCUR AT OR NEAR THE PHASED WORK

SHOWN. HVAC SYSTEMS SERVING PHASE AREAS NOT IN

CONTRACT OR DEMOLITION WHICH ARE OCCUPIED SHALL

REMAIN OPERATIONAL.

3. SYSTEMS SHUT DOWNS SHALL BE COORDINATED WITH THE

OWNER AND SHALL BE DONE WITH A 2 WEEKS ADVANCED

NOTICE.

4. EACH NEW SEQUENCE IS TO BE TESTED AND BALANCED IN

ACCORDANCE WITH SPECIFICATIONS PER THE WATER FLOWS

LISTED AND SHALL BE COORDINATED WITH TESTING AND

BALANCING REQUIREMENTS. AT THE COMPLETION OF THE

PROJECT TESTING AND BALANCING SHALL BE PERFORMED FOR

THE NEW AND EXISTING COMPONENTS OF THE HVAC SYSTEM.

JHGFE

R

L P

S U W CC

Y

Z

DN

DN

DN

(e) S.Tlt.

1B134

I.T.

CLOSET

CWS &

CWR DN

1"

1"

2"

2"1 1/4"

2 1/2"

3"

RX 3/4"

2"

1 1/4"

1"

HR

HS

HS

HR

1"

3/4"

3/4"

1"

H R

1"

3/4"

1"

3/4"

1"

1"

1"

3/4"

1"

RX 3/4"

CWR

CWS

2"

HS HR

CWS

CWR

RX 3/4"

RX 3/4"

CWS

CWR

HS

C W

S

C W

R

H R

C W

R

C W

S

CWS

CWR

CWS

CWR

C W

S

C W

S

C W

R

H S

H R

HS

H R

3/4"

3/4"

3/4"

3 3

RX 3/4"

H S

HR

HS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

A R

L

G

D r a w i n g s A c a d B c u m e n t s M

M

H A

B

N

D

F

P

I N

G

D

P l o t t e d

B y

B r e n d o n

J

B u r l e y

P

M

BKM# 17022.01

N

Plan North Key Plan

N

True North

07/27/20 212OfDwg.

Unit C

Unit A

Court

C o u r t

(N.I.C.)

(N.I.C.)

(N.I.C.)

N

I C

Sequence B

Sequence

A

BURDETTE KOEHLER MURPHY &

ASSOCIATES, INC.

MECHANICAL / ELECTRICAL ENGINEERS

6300 BLAIR HILL LANE, SUITE 400

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

KOFFEL ASSOCIATES

FIRE PROTECTION ENGINEERS

8815 CENTRE PARK DRIVE, SUITE 200

COLUMBIA, MARYLAND 21045

410.750.2246 - FAX 410.750.2588

RICKERT ENGINEERING, INC.

STRUCTURAL ENGINEERING

8813 WALTHAM WOODS ROAD, SUITE 301

BALTIMORE, MARYLAND 21234

410.663.5110 - FAX 410.663.5114

BID DOCUMENTS

Sequence

C

Sequence

D

BUILDING COST CONSULTANTS

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

24'16'8'4'

SCALE: 1/8"=1'-0"

30-MH5(AB)

SECOND FLOOR PLAN

HVAC PIPING - DEMOLITION

JDS BKM

DRAWING NOTES:

GENERAL NOTES:

SCALE: 1/8" = 1'-0"

PART SECOND FLOOR - HVAC PIPING - DEMOLITION

1. EXISTING HEATING WATER SUPPLY / HEATING WATER

RETURN PIPING TO REMAIN.

2. EXISTING CHILLED WATER SUPPLY / CHILLED WATER

RETURN PIPING TO REMAIN IN SEQUENCES A AND B. REFER

TO SEQUENCES C AND D FOR REMOVAL INFO.

3. REMOVE EXISTING SINGLE DUCT TERMINAL UNIT WITH

HYDRONIC HEATING COIL AND ALL ASSOCIATED

APPURTENEANCES.

4. REMOVE EXISTING CHILLED WATER SUPPLY / CHILLED

WATER RETURN PIPING AND ALL ASSOCIATED

APPURTENANCES.

5. REMOVE EXISTING HEATING WATER COIL AND ALL

ASSOCIATED APPURTENANCES.

6. REMOVE EXISTING HEATING WATER SUPPLY / HEATING

WATER RETURN PIPING AND ALL ASSOCIATED

APPURTENANCES.

7. EXISTING DUCTLESS SPLIT SYSTEM TO REMAIN.

8. EXISTING REFRIGERANT SUCTION / REFRIGERANT LIQUID TO

REMAIN.

9. REMOVE EXISTING BALANCE VALVE.

SCALE: 1/8" = 1'-0"

PART SECOND FLOOR - HVAC PIPING - DEMOLITION

1. REFER TO 30-MH1 FOR MECHANICAL LEGEND, ABBREVIATIONS

AND GENERAL NOTES.

2. CONTRACTOR SHALL MAKE ALL NEW TO EXISTING CONNECTIONS

FOR DUCTWORK, PIPING, AND CONTROLS TO SUPPORT PHASED

CONSTRUCTION. IT IS ASSUMED THESE CONNECTIONS WILL

OCCUR AT OR NEAR THE PHASED WORK SHOWN. HVAC SYSTEMS

SERVING SEQUENCED AREAS NOT IN CONTRACT OR DEMOLITION

WHICH ARE OCCUPIED SHALL REMAIN OPERATIONAL.

3. SYSTEMS SHUT DOWNS SHALL BE COORDINATED WITH THE

OWNER AND SHALL BE DONE WITH A 72 HOUR ADVANCED

NOTICE.

4. EACH NEW SEQUENCE IS TO BE TESTED AND BALANCED IN

ACCORDANCE WITH SPECIFICATIONS PER THE WATER FLOW

SCHEDULED AND SHALL BE COORDINATED WITH TESTING AND

BALANCING REQUIREMENTS. AT THE COMPLETION OF THE

PROJECT TESTING AND BALANCING SHALL BE PERFORMED FOR

THE NEW AND EXISTING COMPONENTS OF THE HVAC SYSTEM.

C W

R

C W

S

H R

H S

H R

C W

S

C W

R

H S

RX 1/4"

RX 1"

RX 1/4"

RX 1/4"

RX 1"

RX 1"

JHGFE

R

L P

S U W CC

Y Z

DN

DN

1 1/4"

2"

1 1/4"

1 1/4"

HR

HS

CWS

CWR

HR

HS

CWR

CWS

RX 1"RX 1"

1" 1"

RX 1"

RX 1"

RX 1 1/4"

RX 1"

RX 1 1/4"

RX 3/4"

2 1/2"

HS

HR

3"

CWR

CWS

RX 3/4"

2"

HS

HR

CWS

CWR

RX

1 1/2"

RX 2"

RX 1"

TO

AHUS

C W

S

C W

R

HS

HR

1"

11/2"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

A R

L

G

D r a w i n g s A c a d B c u m e n t s M

M

H C

D

N

D

F

P

I N

G

D

P l o t t e d

B y

B r e n d o n

J

B u r l e y

P

M

BKM# 17022.01

N

Plan North Key Plan

N

True North

07/27/20 212OfDwg.

Unit C

Unit A

Court

C o u r t

(N.I.C.)

(N.I.C.)

(N.I.C.)

N

I C

BURDETTE KOEHLER MURPHY &

ASSOCIATES, INC.

MECHANICAL / ELECTRICAL ENGINEERS

6300 BLAIR HILL LANE, SUITE 400

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

KOFFEL ASSOCIATES

FIRE PROTECTION ENGINEERS

8815 CENTRE PARK DRIVE, SUITE 200

COLUMBIA, MARYLAND 21045

410.750.2246 - FAX 410.750.2588

RICKERT ENGINEERING, INC.

STRUCTURAL ENGINEERING

8813 WALTHAM WOODS ROAD, SUITE 301

BALTIMORE, MARYLAND 21234

410.663.5110 - FAX 410.663.5114

BID DOCUMENTS

Sequence

C

Sequence

D

Sequence B

Sequence

A

BUILDING COST CONSULTANTS

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

24'16'8'4'

SCALE: 1/8"=1'-0"

30-MH5(CD)

SECOND FLOOR PLAN

HVAC PIPING - DEMOLITION

SCALE: 1/8" = 1'-0"

PART SECOND FLOOR - HVAC PIPING - DEMOLITION

SCALE: 1/8" = 1'-0"

PART SECOND FLOOR - HVAC PIPING - DEMOLITION

2/30-MH5(CD)

1/30-MH5(CD)

JDS JDT

1. EXISTING HEATING WATER SUPPLY / HEATING WATER RETURN

PIPING TO REMAIN.

2. EXISTING CHILLED WATER SUPPLY / CHILLED WATER RETURN

PIPING SERVING EXISTING AHUS.

3. REMOVE EXISTING HEATING WATER SUPPLY / HEATING WATER

RETURN PIPING AND ALL ASSOCIATED APPURTENANCES TO

RADIANT CEILING PANELS AND HEATING WATER COILS. REFER

TO DRAWING 30-MH2 (CD) FOR RADIANT CEILING PANEL

LOCATIONS. CAP OPEN END AT MAIN.

4. REMOVE EXISTING CHILLED WATER SUPPLY / CHILLED WATER

RETURN PIPING AND ALL ASSOCIATED APPURTENANCES.

REMOVE CHILLED WATER SUPPLY / CHILLED WATER RETURN

PIPING GOING TO RADIANT CEILING PANELS. REFER TO DRAWING

30-MH2 (CD) FOR RADIANT CEILING PANEL LOCATIONS.

5. REMOVE EXISTING HEATING WATER COIL AND ALL ASSOCIATED

APPURTENANCES.

6. REMOVE CHILLED WATER DOWN TO FIRST FLOOR AND CAP END

AT MAIN.

7. EXISTING WALL MOUNTED AC UNIT TO REMAIN.

8. EXISTING HS/HR PIPING AND CWS/CWR PIPING UP FROM FLOOR

BELOW SERVING FCUS IN ADDITION..

9. REMOVE EXISTING FLOOR MOUNTED END SUCTION PUMPS.

10. REMOVE EXISTING BALANCE VALVES.

GENERAL NOTES:

1. REFER TO 30-MH1 FOR MECHANICAL LEGEND, ABBREVIATIONS

AND GENERAL NOTES.

2. CONTRACTOR SHALL MAKE ALL NEW TO EXISTING CONNECTIONS

FOR DUCTWORK, PIPING, AND CONTROLS TO SUPPORT

SEQUENCED CONSTRUCTION. IT IS ASSUMED THESE

CONNECTIONS WILL OCCUR AT OR NEAR THE SEQUENCED

WORK SHOWN. HVAC SYSTEMS SERVING PHASE AREAS NOT IN

CONTRACT OR DEMOLITION WHICH ARE OCCUPIED SHALL

REMAIN OPERATIONAL.

3. SYSTEMS SHUT DOWNS SHALL BE COORDINATED WITH THE

OWNER AND SHALL BE DONE WITH A 2 WEEKS ADVANCED

NOTICE.

4. EACH NEW SEQUENCE IS TO BE TESTED AND BALANCED IN

ACCORDANCE WITH SPECIFICATIONS PER THE WATER FLOWS

SCHEDULED AND SHALL BE COORDINATED WITH TESTING AND

BALANCING REQUIREMENTS. AT THE COMPLETION OF THE

PROJECT TESTING AND BALANCING SHALL BE PERFORMED FOR

THE NEW AND EXISTING COMPONENTS OF THE HVAC SYSTEM.

5. REFER TO ARCHITECTURAL DIVISION FOR SEQUENCING

DRAWING NOTES:

x x

18x10

1B134A

JHGFE

R

L P

S U W CC

Y Z

UP

UP

UP

P-2

P-2

P-2 P-2

P-2 P-2

P-2

P-2

P-2

P-2

1C114

1B104

1B101

1B105

1C110

1B107

1B108

1B109

1B110

1B111

1B112

1B113

1B114

1B115

1B116

36x20

30x10

12x6

16x8

10x6

10x4

16x8

12x6

12x6

12x6

12x6

12x6

12x6

12x6

12x6 x x x x x

8x10

8x10

8x10

8x10

8x10

8x10

8x10 x x x x

1C111

T

T

T

T

T

TT

T

T

T

T

T

44x24 x

44x24

20x10

T

1B118 x

8x10

T

T

12x4

30x10

8x10

1B153

T

12x6

10x6

10x6

10x6

10x6

D

2 2

H

H

H

H

B

A

A

A

H

H

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

B

A

A

EX

14x6

G

E

J

F

F

D

A

G

A

A

H

A

H

A

J

A

A

A

H

H

H

D

A

A

H

H

H

H

H 100

D 80

D 80

D 80

D

D

D

D

D

D

10x6

10x6

10x6

10x6

10x6

T

T

T

H

6x10

A

10x6

10x6

12x6

TT

1B151

1B156

30x12

10x6

8x10

1B148

T x

T

T

A

D

B

A

B

C

C

D

H

D

D

E

A 80 x

36x12

36x12

1B152

20x10

20x10

1B158

18x10

1B133A

1B133

1B134

1B134A

1B145A

1B146

1B151

1B152

1B156

C1-17

1B158

C1-16

1B117

1B116

1B116A

1B115

1B115A

1B114

1B114A

1B113

1B113A

1B112

1B112A

1B111

1B111A

1B110A

1B110

1B109A

1B109

1B108A

1B108

1B107A

1B107

1B106

1B105B

1B105

1B105A

1B118

C1-10A

1B102

1B101

1B103

1B104

1B154

1B153

C1-14

1B149

1B150

1B102

1B102

1B155

A

36x12

E

8x6 x

12 5

12 5

1 5

12 5

12 5 12 5

10x6

12 5 12 5

12 5

12 5

1B134

4"Ø

4"Ø

FD

FD

FD

FD

FD

FD

DF1-1

DF1-2

8x6

H

12x6

36x20

12x6

22x10

10x4

8x10

12x4

10x10

A

A x

A

A

A

1B101

1B150

H

A

10x6

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

A R

L

G

D r a w i n g s A c a d B c u m e n t s M

M

H A

B

S

T

F

C

T

N

P l o t t e d

B y

B r e n d o n

J

B u r l e y

P

M

BKM# 17022.01

N

Plan North Key Plan

N

True North

07/27/20 212OfDwg.

Unit C

Unit A

Court

C o u r t

(N.I.C.)

(N.I.C.)

(N.I.C.)

N

I C

Sequence B

Sequence

A

BURDETTE KOEHLER MURPHY &

ASSOCIATES, INC.

MECHANICAL / ELECTRICAL ENGINEERS

6300 BLAIR HILL LANE, SUITE 400

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

KOFFEL ASSOCIATES

FIRE PROTECTION ENGINEERS

8815 CENTRE PARK DRIVE, SUITE 200

COLUMBIA, MARYLAND 21045

410.750.2246 - FAX 410.750.2588

RICKERT ENGINEERING, INC.

STRUCTURAL ENGINEERING

8813 WALTHAM WOODS ROAD, SUITE 301

BALTIMORE, MARYLAND 21234

410.663.5110 - FAX 410.663.5114

BID DOCUMENTS

Sequence

C

Sequence

D

BUILDING COST CONSULTANTS

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

24'16'8'4'

SCALE: 1/8"=1'-0"

30-MH6(AB)

FIRST FLOOR PLAN

DUCTWORK - NEW WORK

JDS JDT

DRAWING NOTES:

GENERAL NOTES:

SCALE: 1/8" = 1'-0"

PART FIRST FLOOR - DUCTWORK - NEW WORK

1. PROVIDE SUPPLY DUCTWORK IN SEQUENCE A.

2. PROVIDE SINGLE DUCT AIR TERMINAL UNIT WITH HYDRONIC HEATING COIL IN

SEQUENCE A.

3. COORDINATE NEW SUPPLY AIR REGISTER INSTALLATION WITH EXISTING OPENING

IN BULKHEAD. BALANCE TO INDICATED CFM.

4. WALL MOUNTED THERMOSTAT (TYP). CONNECT TO EXISTING TERMINAL UNIT.

5. REFER TO PHASE 1 FOR EXISTING WORK IN THIS AREA.

6. AIR DEVICE MOUNTED IN CEILING (TYP).

7. PROVIDE SUPPLY DUCTWORK IN SEQUENCE B.

8. PROVIDE RETURN/EXHAUST DUCTWORK IN SEQUENCE B.

9. PROVIDE RETURN/EXHAUST DEVICE (TYP).

10. PROVIDE SINGLE DUCT AIR TERMINAL UNIT WITH HYDRONIC HEATING COILS IN

SEQUENCE B.

11. REFER TO SEQUENCES C AND D FOR WORK IN THIS AREA.

12. PROVIDE RETURN/EXHAUST DUCTWORK IN SEQUENCE A.

13. SEQUENCE SWING SPACE.

14. DRYER VENT BOOSTER FAN - 4"Ø - ELECTRIC: 120V/1/60, 100 WATTS.

15. WALL VENTS FOR DRYER EXHAUST MOUNTED IN EXTENSION WALL WITH

BACKDRAFT DAMPER.

16. EXISTING DUCTLESS SPLIT SYSTEM UNIT.

17. AIR DEVICE MOUNTED IN CEILING.

SCALE: 1/8" = 1'-0"

PART FIRST FLOOR - DUCTWORK - NEW WORK

1. REFER TO 30-MH1(P2) FOR MECHANICAL LEGEND, ABBREVIATIONS AND GENERAL

NOTES.

2. CONTRACTOR SHALL MAKE ALL NEW TO EXISTING CONNECTIONS FOR DUCTWORK,

PIPING, AND CONTROLS TO SUPPORT SEQUENCED CONSTRUCTION. IT IS ASSUMED

THESE CONNECTIONS WILL OCCUR AT OR NEAR THE SEQUENCED WORK SHOWN.

HVAC SYSTEMS SERVING PHASE AREAS NOT IN CONTRACT OR DEMOLITION WHICH

ARE OCCUPIED SHALL REMAIN OPERATIONAL.

3. SYSTEMS SHUT DOWNS SHALL BE COORDINATED WITH THE OWNER AND SHALL BE

DONE WITH A 72 HOUR ADVANCED NOTICE.

4. EACH NEW SEQUENCE IS TO BE TESTED AND BALANCED IN ACCORDANCE WITH

SPECIFICATIONS PER THE AIRFLOWS LISTED AND SHALL BE COORDINATED WITH

TESTING AND BALANCING REQUIREMENTS. AT THE COMPLETION OF THE PROJECT

TESTING AND BALANCING SHALL BE PERFORMED FOR THE NEW AND EXISTING

COMPONENTS OF THE HVAC SYSTEM.

5. REFER TO ARCHITECTURAL DIVISION FOR SEQUENCING CONSIDERATIONS.

RESIDENT ROOM

(e)1 BED ROOM

NURSE MANAGER

RESTROOM

RESIDENT ROOM

RESTROOM

MEDICATION

RESTROOM

RESIDENT ROOM

RESTROOM

RESTROOM

RESIDENT ROOM

BARIATRIC RESTROOM

RESIDENT ROOM

1B115

1B117

1B115A

1B116

1B116A

1B118

1B122

1B112

1B111A

1B114

1B114A

1B113A

1B113

1B122A

RESTROOM

RESIDENT ROOM

RESTROOM

BARIATRIC RESIDENT ROOM

RESTROOM

RESIDENT ROOM

BARIATRIC RESIDENT ROOM

BARIATRIC RESTROOM

RESIDENT ROOM

KITCHEN

ACTIVITY

NURSE MANAGER

RESTROOM

CLEAN UTILITY

DINING

1B107A

1B110A

1B111

1B109

1B109A

1B110

1B108A

1B108

1B105

1B104

1B103

1B106

1B105B

1B105A

1B107

(t)SOILED LINEN

FAMILY CONSULTATION

ROOM NAME LIST

1B101

1B102

CORRIDOR

CORRIDORC1-17

C1-16

NEIGHBORHOOD STATION

(e) CORRIDOR

NEIGHBORHOOD STATIONC1-10A

C1-13

C1-14

(e) PRIVATE TOILET

(e) 2 BED ROOM

1B134A

1B134

(e) CONGREGATE BATH1B133

(e) 2 BED ROOM

(e) STANDARD TOILET1B145A

1B146

MEDICATION1B149

ELECTRICAL ROOM1B150

LAUNDRY1B151

SPA BATHING1B152

JAN CLOSET

CLEAN LINEN1B153

1B154

ELEC ROOM1B155

NURSE PRACTITIONER1B156

CLEAN LAUNDRY1B158

I.T. CLOSET1B134

ATC GENERAL NOTES

1. THE ATC WORK SHALL INCLUDE PROVISIONS FOR A COMPLETE AND OPERABLE CONTROL SYSTEM, INCLUDING ALL DEVICES REQUIRED TO ACHIEVE THE SEQUENCES AND FUNCTIONS INDICATED

THROUGHOUT THE CONTRACT DOCUMENTS.

2. THE ATC CONTRACTOR SHALL FURNISH AND INSTALL ALL ELECTRICAL WIRING AND CONDUIT FROM

POWER SOURCE, INCLUDING TERMINATION TO ALL REQUIRED ATC RELATED POWER CONNECTIONS

INCLUDING, BUT NOT LIMITED TO, DDC CONTROLLERS (PROVIDE LOW VOLTAGE CONTROLLER FOR

AIR TERMINAL UNITS INCLUDING TRANSFORMERS AND DISCONNECT SWITCHES AS REQUIRED),

SENSORS, VALVE AND DAMPER ACTUATORS, AIR FLOW MONITORS, ATC PANELS, ETC. THE ATC

CONTRACTOR SHALL OBTAIN A SEPARATE ELECTRICAL PERMIT AS REQUIRED BY THE LOCAL

AUTHORITY. THE ATC CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR ALL POWER

REQUIREMENTS NECESSARY FOR A COMPLETE INSTALLATION FROM THE POWER SOURCE TO ALL

ATC RELATED CONNECTIONS.

3. THE ATC CONTRACTOR SHALL COORDINATE AND VERIFY THAT ALL CONTROLLERS, DEVICES AND

ACCESSORIES ARE PROVIDED AS REQUIRED TO ACCOMPLISH ALL CONTROL FUNCTIONS AND

SEQUENCES INDICATED IN THE CONTRACT DOCUMENTS. WHERE CONTROL RELATED DEVICES ARE

NOT PROVIDED BY AN EQUIPMENT MANUFACTURER, IT SHALL BE THE RESPONSIBILITY OF THE ATC

CONTRACTOR TO PROVIDE THE CONTROL DEVICES REQUIRED TO ACCOMPLISH THE FUNCTIONS AND

SEQUENCES INDICATED.

4. THE ATC CONTRACTOR SHALL PROVIDE ALL CONTROLLERS, DEVICES, POINTS, ETC REQUIRED TO

ACCOMPLISH THE CONTROL SEQUENCES AND FUNCTIONS INDICATED ON THE DRAWINGS AND IN THE

SPECIFICATIONS. ALL POINTS SHALL BE TIED INTO THE BUILDING AUTOMATION SYSTEM (BAS). IN

ADDITION, THE ATC CONTRACTOR SHALL PROVIDE ALL CONTROLLERS, DEVICES, POINTS, ETC

REQUIRED TO CONTROL, OPERATE AND MONITOR ALL EQUIPMENT (IE. AIR HANDLING UNITS, AIR

VOLUME TERMINALS, FANS, VALVES, DAMPERS, ETC.) INDICATED THROUGHOUT THE CONTRACT

DOCUMENTS.

5. PROVIDE EQUIPMENT STATUS FOR ALL MECHANICAL EQUIPMENT. EQUIPMENT FAILURES SHALL BE

ALARMED AT THE BAS.

6. PROVIDE TEMPERATURE SENSORS TIED INTO THE BAS IN SUPPLY DUCTWORK DOWNSTREAM OF ALL

VAV TERMINALS.

7. GENERAL EXHAUST FANS SHALL BE PROVIDED WITH MOTOR OPERATED DAMPERS. UNLESS

OTHERWISE NOTED, DAMPERS SHALL OPEN WHEN FAN IS ENERGIZED AND CLOSED WHEN FAN IS

DE-ENERGIZED.

8. ALL AIR FLOW MONITORS (AFM) SHALL GENERATE AN ALARM CONDITION AT THE BAS WHENEVER

CONDITIONS EXCEED SETPOINT (ADJUSTABLE) BY 10% OR MORE.

9. WATER PRESSURE DROP THROUGH ATC CONTROL VALVES SHALL NOT EXCEED 10 FT. HEAD.

TWO-POSITION ATC VALVES UTILIZED FOR ISOLATION, BY-PASS OR SHUT-OFF PURPOSES SHALL BE

FULL LINE SIZE.

10. PROVIDE A TEMPERATURE SENSOR FOR ALL IT ROOMS AND ELECTRICAL ROOMS. MONITOR

TEMPERATURE AT THE BAS. SHOULD TEMPERATURE RISE ABOVE 90°F SETPOINT (ADJUSTABLE), ALARM AT THE BAS.

11. ALL SETPOINTS INDICATED ON THE SEQUENCES SHALL BE ADJUSTABLE.

12. ALL ATC WIRING SHALL BE INSTALLED IN CONDUIT.

BOX W/REHEAT CONTROL

VARIABLE VOLUME TERMINAL

1. ON A FALL IN TEMPERATURE, SPACE THERMOSTAT SHALL MODULATE

VAV TERMINAL DAMPER TOWARD MINIMUM SETTING.

2. ON A CONTINUED FALL IN TEMPERATURE, SPACE THERMOSTAT

SHALL MODULATE HEATING COIL VALVE TO MAINTAIN SETPOINT.

3. ON A RISE IN TEMPERATURE THE OPPOSITE SHALL OCCUR .

VARIABLE AIR

VOLUME

TERMINAL

DAMPER MOTOR

ROOM

THERMOSTAT

HEATING COIL VALVE

T

DRYER BOOSTER FAN CONTROL

1. PRESSURE SENSING SWITCH LOCATED IN DRYER VENT OUTLET

SHALL ENERGIZE THE DRYER BOOSTER FAN WHEN DRYER IS

ENERGIZED AND OPERATRING. WHEN THE DRYER DE-ENERGIZES,

THE PRESSURE SWITCH WILL DE-ENERGIZE THE DRYER BOOSTER

FAN.

2. PRESSURE SENSING SWITCH SHALL BE FURNISSHED BY THE DRYER

BOOSTER FAN MANUFACTURER. INSTALLATION SHALL BE IN

ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS

AND THE LATEST EDITION OF THE IMC.

DRYER

EA

TERMINATION HOOD

W/BACKDRAFT DAMPER

INLINE DRYER

BOOSTER FAN

PRESSURE SENSING SWITCH BY DRYER

BOOSTER FAN MANUFACTURER

VFD

SPS-1 SPS-2

EXISTING EXHAUST

DUCT

OA

EXISTING

FILTERS

EXISTING

EXHAUST FAN

AFM-3

EXISTING

EXHAUST DUCT

EXISTING

SUPPLY FAN

AFM-2

EXISTING

COIL

VAV AIR HANDLING UNIT CONTROL (WITH RA FAN)

1. GENERAL

1.1. SUPPLY AIR FAN AND EXHAUST AIR FAN OPERATION FOR EACH VENTILATION SYSTEM SHALL BE INTERLOCKED.

SUPPLY AND RETURN FANS SHALL OPERATE CONTINUOUSLY.

1.2. 30-AC-4 AND 30-ERU-2 ARE EXISTING AND OPERATE TOGETHER TO PROVIDE VENTILATION / EXHAUST AIR TO THE

FIRST FLOOR OF EXISTING NHCU ROOMS FOR "UNIT B" AND ARE LOCATED IN THE SECOND FLOOR MECHANICAL

ROOM.

1.3. RTU-1 IS EXISTING AND OPERATES CONTINUOUSLY TO PROVIDE VENTILATION / EXHAUST AIR TO THE SECOND

FLOOR OF THE EXISTING NHCU ROOMS FOR "UNIT B" AND IS LOCATED ON THE ROOF ABOVE THE SECOND FLOOR

MECHANICAL ROOM.

1.4. PROVIDE A HUMIDITY SENSOR IN THE EXHAUST AIR INLET OF 30-ERU-2 FOR CONTROL OF THE EXISTING

HUMIDIFIER LOCATED IN 30-AC-4. INTERLOCK WITH EXISTING HUMIDIFIER TO MAINTAIN A HUMIDITY SET POINT

(ADJUSTABLE). HUMIDITY SETPOINT SHALL BE ADJUSTABLE AND FROM ECMS

2. AIR FLOW / FAN CONTROL

2.1. OCCUPIED:

A. STATIC PRESSURE SENSOR, SPS-2, SHALL MODULATE THE SUPPLY FAN VARIABLE FREQUENCY DRIVE, VFD TO

MAINTAIN THE SUPPLY DUCT STATIC PRESSURE SETPOINT.

1) FAN PRESSURE OPTIMIZATION (STATIC PRESSURE RESET): EVERY 10 MINUTES (ADJUSTABLE) DURING THE

OCCUPIED MODE, THE DAMPER POSITIONS OF EACH VAV TERMINAL ASSOCIATED WITH THE AHU SHALL BE

POLLED. BASED ON FEEDBACK FROM THE VAV DAMPER POSITIONS, THE STATIC PRESSURE SETPOINT SHALL

BE RESET IN +/- 0.1" W.C. INCREMENTS (MAX 0.1" PER 10 MINUTE POLLING CYCLE) BETWEEN A FIXED RANGE

(LOW END SHALL BE MINIMUM 1.0" W.C. - ADJUSTABLE, UPPER END SHALL BE 0.25" W.C. ABOVE THE STATIC

PRESSURE SETPOINT DETERMINED BY THE BALANCE CONTRACTOR). IF THERE ARE NO VAV DAMPER

POSITIONS GREATER THAN 90% OPEN (ADJUSTABLE), THEN THE STATIC PRESSURE SET POINT SHALL BE

LOWERED UNTIL AT LEAST ONE VAV DAMPER IS AT LEAST 90% OPEN (ADJUSTABLE). IF ANY ONE VAV DAMPER

OPENS GREATER THAN 95% OPEN (ADJUSTABLE), THEN THE STATIC PRESSURE SET POINT SHALL BE RAISED

UNTIL THE MAXIMUM VAV DAMPER POSITION IS BELOW 95% OPEN (ADJUSTABLE). IF THE MAX. VAV DAMPER

POSITION IS BETWEEN 90% AND 95% OPEN (ADJUSTABLE), THEN THE STATIC PRESSURE SET POINT SHALL

REMAIN IN STEADY STATE UNTIL THE NEXT TEN MINUTE POLLING CYCLE.

B. AIR FLOW MONITORS LOCATED IN THE SUPPLY AND EXHAUST DUCTWORK SHALL MODULATE THE EXHAUST AIR

FAN VARIABLE FREQUENCY DRIVE, VFD, TO MAINTAIN AN AIR FLOW OFFSET EQUAL TO THE SUPPLY AIR FLOW.

C. HIGH LIMIT STATIC PRESSURE SENSOR, SPS-1 SHALL DE-ENERGIZE AHU FANS WHEN STATIC PRESSURE

REACHES 6.0" (ADJUSTABLE). ALARM AT THE BAS.

EA

EXISTING SUPPLY

DUCT

EXISTING

COIL

EXISTING EXHAUST

DUCT

RH

VFD

(30-AC-4 / 30-ERU-2 AND RTU-1)

OCCUPIED CYCLE:

THE ROOM THERMOSTAT SHALL, ON A RISE IN SPACE TEMPERATURE ABOVE ITS SETPOINT,

MODULATE THE VVB CONTROL DAMPER TO THE OPENED POSITION. ON A DROP IN SPACE

TEMPERATURE, THE REVERSE SHALL OCCUR.

UNOCCUPIED CYCLE:

WHEN THE VAV BOXES RESPECTIVE AIR HANDLING UNIT IS PROGRAMMED TO THE UNOCCUPIED

CYCLE, THE VAV BOX CONTROL DAMPER SHALL CLOSE.

VARIABLE VOLUME BOX CONTROL

M 20 PSIG

BY VAV BOX

MANUFACTURER

DAMPER

ACTUATOR

N.C.

VAV

N.O.

N.C.

C.

T

M

OCCUPIED/UNOCCUPIED

ROOM THERMOSTAT

NOTES:

1. ATC NOTE PROVIDED AT THE REQUEST OF THE VA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

A R

L

G

D r a w i n g s A c a d B c u m e n t s M

M

H

M

E C

H A

N I C

A L

C

O N

T R

O L S

P l o t t e d

B y

B r e n d o n

J

B u r l e y

P

M

BKM# 17022.01

07/27/20 212OfDwg.

BURDETTE KOEHLER MURPHY &

ASSOCIATES, INC.

MECHANICAL / ELECTRICAL ENGINEERS

6300 BLAIR HILL LANE, SUITE 400

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

KOFFEL ASSOCIATES

FIRE PROTECTION ENGINEERS

8815 CENTRE PARK DRIVE, SUITE 200

COLUMBIA, MARYLAND 21045

410.750.2246 - FAX 410.750.2588

RICKERT ENGINEERING, INC.

STRUCTURAL ENGINEERING

8813 WALTHAM WOODS ROAD, SUITE 301

BALTIMORE, MARYLAND 21234

410.663.5110 - FAX 410.663.5114

BID DOCUMENTS

BUILDING COST CONSULTANTS

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

30-MH11

MECHANICAL CONTROLS

JDS JDT 99

AutoCAD SHX Text

AutoCAD SHX Text

CORPORAL MICHAEL J. CRESCENZ VA MEDICAL CENTER PHILADELPHIA, PA

AutoCAD SHX Text

UPGRADE PATIENT BEDROOMS CLC UNIT B

AutoCAD SHX Text 642-16-108

AutoCAD SHX Text

ARCHITECTURE

AutoCAD SHX Text

PLANNING

AutoCAD SHX Text

ENGINEERING

AutoCAD SHX Text 2215 Conowingo Rd, Suite 100 Bel Air, Maryland 21015-1436 410.803.0009 fax 410.836.6611

055-30-AS43
056-30-AS44
057-30-AS45
058-30-AS46
059-30-AS47
060-30-AS48
061-30-AS49
062-30-AS50
063-30-AS51
064-30-AS52
065-30-AS53
066-30-AS54
067-30-AS55
068-30-AS56
069-30-AS57
070-30-AS58
071-30-AS59
072-30-AS60
073-30-AS61
074-30-AS62
075-30-AS63
076-30-AS64
077-30-AS65
078-30-SS1
Sheets and Views
17016 VA Phila CLC-SS1
079-30-SS2
Sheets and Views
17016 VA Phila CLC-SS2
080-30-MH1 MECHANICAL LEGEND ABBREVIATIONS AND GENERAL NOTES
Sheets and Views
Work
081-30-MH2(AB) 1ST FLR PLN DUCT D
Sheets and Views
Work
082-30-MH2(CD) 1ST FLR PLN DUCT D
Sheets and Views
Work
083-30-MH3(AB) 2ND FLR PLN DUCT D
Sheets and Views
Work
084-30-MH3(CD) 2ND FLR PLN DUCT D
Sheets and Views
Work
085-30-MH4(AB) 1ST FLR PLN PIPING D
Sheets and Views
Work
086-30-MH4(CD) 1ST FLR PLN PIPING D
Sheets and Views
Work
087-30-MH5(AB) 2ND FLR PLN PIPING D
Sheets and Views
Work
088-30-MH5(CD) 2ND FLR PLN PIPING D
Sheets and Views
Work
089-30-MH6(AB) 1ST FLR PLN DUCT N
Sheets and Views
Work
090-30-MH6(CD) 1ST FLR PLN DUCT N
091-30-MH7(AB) 2ND FLR PLN DUCT N
092-30-MH7(CD) 2ND FLR PLN DUCT N
093-30-MH8(AB) 1ST FLR PLN PIPING N
094-30-MH8(CD) 1ST FLR PLN PIPING N
095-30-MH9(AB) 2ND FLR PLN PIPING N
096-30-MH9(CD) 2ND FLR PLN PIPING N
097-30-MH10(AB) MECHANICAL ROOF PLAN
098-30-MH10(CD) MECHANICAL ROOF PLAN
099-30-MH11 MECHANICAL CONTROLS
Sheets and Views
Work
100-30-MH12 MECHANICAL AHU SECTIONS
101-30-MH13 MECHANICAL DETAILS
102-30-MH14 MECHANICAL DETAILS
103-30-MH15 MECHANICAL SCHEDULES 1
104-30-MH16 MECHANICAL SCHEDULES 2
105-30-PL1 PLUMB GEN NOTES ABBREV LEGEND
106-30-PL2(AB) DOMESTIC WATER 1ST FLR PLN D
107-30-PL2(CD) DOMESTIC WATER 1ST FLR PLN D
108-30-PL3(AB) DOMESTIC WATER 2ND FLR PLN D

File details come from the government source that posted it. Updated .