642-16-108 Drawings PART 04 of 06.pdf
PDF 35 MB Posted
- Solicitation number
- 36C24421B0017
About this file
This document provides details on a federal contract solicitation for upgrading patient bedrooms at a Veterans Affairs medical center. Solicitation number 36C24421B0017 calls for offers to upgrade patient bedrooms in building unit B of the Corporal Michael J. Crescenz Veterans Affairs Medical Center in Philadelphia, Pennsylvania. The statement of work involves upgrading existing patient bedrooms to meet current standards. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4. The response due date and award date are not specified.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
RX 16x10
R X x x
RX 12x8 x
RX 8x6
RX 8x6 x x x
RX 8x6
RX 8x6
H
T
T
H
T
T
T
T
T
T
T
T
T T
2 3
JHGFE
R
L P
S U W CC
Y
Z
UP
UP
UP
2/G101 G1012/
RX 16x10
RX 20x10
RX 16x10
RX 14x10
RX 12x10
RX 12x8
RX 20x10
RX 18x10 RX 16x8
RX 12x8
TT
T T T T
T
T
T
T
T
H T
H T x
RX 30x12 x
36x20
36x12
RX 10x8
EX 12x8
EX 8x10
T
T
T
30x10 x
55555
11 7
3 3
8 11
5 5 5 5 5
FD
FD
FD
FD
FD
FD
10x6
1 2
10"Ø x x x x x x x x
RX 22x10
12x6
36x12
8x10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
A R
L
G
D r a w i n g s A c a d B
I D o c u m e n t s M
M
H C
D
S
T
F
L
P
N
U C
T
D
P l o t t e d
B y
B r e n d o n
J
B u r l e y
P
M
BKM# 17022.01
N
Plan North Key Plan
N
True North
07/27/20 212OfDwg.
Unit C
Unit A
Court
C o u r t
(N.I.C.)
(N.I.C.)
(N.I.C.)
N
I C
BURDETTE KOEHLER MURPHY &
ASSOCIATES, INC.
MECHANICAL / ELECTRICAL ENGINEERS
6300 BLAIR HILL LANE, SUITE 400
BALTIMORE, MARYLAND 21209
410.323.0600 - FAX 410.377.2543
KOFFEL ASSOCIATES
FIRE PROTECTION ENGINEERS
8815 CENTRE PARK DRIVE, SUITE 200
COLUMBIA, MARYLAND 21045
410.750.2246 - FAX 410.750.2588
RICKERT ENGINEERING, INC.
STRUCTURAL ENGINEERING
8813 WALTHAM WOODS ROAD, SUITE 301
BALTIMORE, MARYLAND 21234
410.663.5110 - FAX 410.663.5114
BID DOCUMENTS
Sequence
C
Sequence
D
Sequence B
Sequence
A
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
24'16'8'4'
SCALE: 1/8"=1'-0"
30-MH2(CD)
FIRST FLOOR PLAN
DUCTWORK - DEMOLITION
DRAWING NOTES:
GENERAL NOTES:
SCALE: 1/8" = 1'-0"
PART FIRST FLOOR - DUCTWORK - DEMOLITION
1. REMOVE EXISTING SUPPLY DUCTWORK AND ALL ASSOCIATED
APPURTENANCES.
2. REMOVE EXISTING EXHAUST / RETURN DUCTWORK AND ALL
ASSOCIATED APPURTENANCES.
3. REMOVE EXISTING AIR DEVICE (TYPICAL).
4. REMOVE EXISTING THERMOSTAT OR SENSOR AND ALL
ASSOCIATED APPURTENANCES.
5. REMOVE EXISTING RADIANT CEILING PANELS AND ALL
ASSOCIATED APPURTENANCES. CAP HS/HR PIPING AT MAIN.
(TYPICAL).
6. SINGLE DUCT TERMINAL UNIT WITH HYDRONIC HEATING COIL
INSTALLED IN SEQUENCE A AND B.
7. RETURN / EXHAUST DUCTWORK INSTALLED IN SEQUENCES A
AND B.
8. SUPPLY DUCTWORK INSTALLED IN SEQUENCES A AND B.
9. SUPPLY AIR DEVICE INSTALLED IN SEQUENCES A AND B.
10. RETURN / EXHAUST AIR DEVICES INSTALLED IN SEQUENCES A
AND B.
11. CONTRACTOR IS RESPONSIBLE FOR REPLACING AND REPAIRING
ANY DAMAGED OR UNINSTALLED DUCTWORK INSULATION ON
DUCTWORK INSTALLED IN SEQUENCE A AND B.
12. REFER TO SEQUENCES A AND B FOR WORK IN THIS AREA.
13. EXISTING WALL MOUNTED AC UNIT TO REMAIN.
14. PROVIDE 10"Ø TEMPORARY SUPPLY DUCTWORK TO CONNECT EX
8x10 DUCTWORK IN SEQUENCE A AND B. TEMPORARY CONNECT
SHALL BE COMPLETE PRIOR TO DUCTWORK DEMOLITION.
15. PROVIDE 10"Ø TEMPORARY RETURN DUCTWORK TO CONNECT
DUCTWORK IN SEQUENCE A AND B. TEMPORARY CONNECTION
SHALL BE COMPLETE PRIOR TO DUCTWORK DEMOLITION.
16. THERMOSTAT INSTALLED IN SEQUENCES A AND B.
17. REMOVE EXISTING HYDRONIC HEATING COIL AND ALL
ASSOCIATED APPURTENANCES.
SCALE: 1/8" = 1'-0"
PART FIRST FLOOR - DUCTWORK - DEMOLITION
JDS JDT
1. REFER TO 30-MH1 FOR MECHANICAL LEGEND, ABBREVIATIONS
AND GENERAL NOTES.
2. CONTRACTOR SHALL MAKE ALL NEW TO EXISTING CONNECTIONS
FOR DUCTWORK, PIPING, AND CONTROLS TO SUPPORT
SEQUENCED CONSTRUCTION. IT IS ASSUMED THESE
CONNECTIONS WILL OCCUR AT OR NEAR THE PHASED WORK
SHOWN. HVAC SYSTEMS SERVING SEQUENCED AREAS NOT IN
CONTRACT OR DEMOLITION WHICH ARE OCCUPIED SHALL
REMAIN OPERATIONAL.
3. SYSTEMS SHUT DOWNS SHALL BE COORDINATED WITH THE
OWNER AND SHALL BE DONE WITH A 2 WEEKS HOUR ADVANCED
NOTICE.
4. EACH NEW SEQUENCE IS TO BE TESTED AND BALANCED IN
ACCORDANCE WITH SPECIFICATIONS PER THE AIRFLOWS
SCHEDULE AND SHALL BE COORDINATED WITH TESTING AND
BALANCING REQUIREMENTS. AT THE COMPLETION OF THE
PROJECT TESTING AND BALANCING SHALL BE PERFORMED FOR
THE NEW AND EXISTING COMPONENTS OF THE HVAC SYSTEM.
5. REFER TO ARCHITECTURAL DIVISION FOR SEQUENCING
CONSIDERATIONS.
(e) S.Tlt.
RX 18x8
JHGFE
R
L P
S U W CC
Y
Z
DN
DN
DN
(e) S.Tlt.
1B134
I.T.
CLOSET
RX 8x6
RX 10x6
RX 8x6 RX 10x6 x x x
RX 34x12
RX 48x12 x
10x6
RX 8x6 x x
RX 24x12 x
RX 10x6
RX 10x6 x x
RX 24x10
RX 12x8
RX 12x6
RX 10x6
RX 52x14
RX 8x6 RX 8x6
T
T T
T
T
RX 8x10
RX 12x6
RX 12x6 x
RX 8x10
RX 12x4
RX 12x6
RX 12x6
RX 12x6
RX 12x6
RX 12x6
RX 12x6
RX 12x6 x x x
RX 8x10
RX 8x10
RX 8x10 x x x x
RX 12x6
RX 12x6
RX 12x6
RX 24x12
RX 40x12
RX 20x10
RX 10x10
RX 8x6
RX 36x12 x x x x
RX 20x10RX 20x10
RX 8x10
RX 10x10
RX 6x10
Ø
RX 14x10
RX 8x10
RX 8x10
RX 8x10
RX 8x10
RX 8x10
RX 8x10
RX 10x10 x
52x14
EX AC-4
RX 44x12
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
A R
L
G
D r a w i n g s A c a d B c u m e n t s M
M
H A
B
N
D
F
C
T
D
P l o t t e d
B y
B r e n d o n
J
B u r l e y
P
M
BKM# 17022.01
N
Plan North Key Plan
N
True North
07/27/20 212OfDwg.
Unit C
Unit A
Court
C o u r t
(N.I.C.)
(N.I.C.)
(N.I.C.)
N
I C
Sequence B
Sequence
A
BURDETTE KOEHLER MURPHY &
ASSOCIATES, INC.
MECHANICAL / ELECTRICAL ENGINEERS
6300 BLAIR HILL LANE, SUITE 400
BALTIMORE, MARYLAND 21209
410.323.0600 - FAX 410.377.2543
KOFFEL ASSOCIATES
FIRE PROTECTION ENGINEERS
8815 CENTRE PARK DRIVE, SUITE 200
COLUMBIA, MARYLAND 21045
410.750.2246 - FAX 410.750.2588
RICKERT ENGINEERING, INC.
STRUCTURAL ENGINEERING
8813 WALTHAM WOODS ROAD, SUITE 301
BALTIMORE, MARYLAND 21234
410.663.5110 - FAX 410.663.5114
BID DOCUMENTS
Sequence
C
Sequence
D
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
24'16'8'4'
SCALE: 1/8"=1'-0"
30-MH3(AB)
SECOND FLOOR PLAN
DUCTWORK - DEMOLITION
JDS JDT
DRAWING NOTES:
GENERAL NOTES:
SCALE: 1/8" = 1'-0"
PART SECOND FLOOR - DUCTWORK - DEMOLITION
1. REMOVE EXISTING SUPPLY DUCTWORK AND ALL ASSOCIATED
APPURTENANCES IN SEQUENCE B.
2. REMOVE EXISTING EXHAUST / RETURN DUCTWORK AND ALL
ASSOCIATED APPURTENANCES IN SEQUENCE B.
3. REMOVE EXISTING AIR DEVICE AND ALL ASSOCIATED
APPURTENANCES IN SEQUENCE B.
4. REMOVE EXISTING THERMOSTAT AND ALL ASSOCIATED
APPURTENANCES (TYP).
5. REMOVE EXISTING RADIANT CEILING PANEL AND ALL ASSOCIATED
APPURTENANCES, AND CAP HS/HR PIPING AT MAINS.
6. REMOVE EXISTING SINGLE DUCT TERMINAL WITH HYDRONIC HEATING
COIL IN SEQUENCE.
7. REMOVE EXISTING RETURN/EXHAUST DUCTWORK IN SEQUENCE A.
8. REMOVE EXISTING SUPPLY DUCTWORK IN SEQUENCE A.
9. REMOVE EXISTING EXISTING AIR DEVICE IN SEQUENCE A.
10. REMOVE EXISTING RADIANT CEILING PANEL.
11. CONTRACTOR IS RESPONSIBLE TO COORDINATE DEMOLITION UP TO
30-RTU-1 & TO AC-4 WITH BUILDING OWNER AND OCCUPANTS. SEE
30-MH11(AB) FOR DEMOLITION TO UNITS.
12. REMOVE EXISTING DUCTWORK.
13. EXISTING DUCTLESS SPLIT SYSTEM UNIT MOUNTED ON WALL TO
REMAIN.
14. REMOVE EXISTING DUCT MOUNTED HOT WATER HEATING COIL AND
ALL ASSOCIATED APPURTENANCES.
SCALE: 1/8" = 1'-0"
PART SECOND FLOOR - DUCTWORK - DEMOLITION
1. REFER TO 30-MH1 FOR MECHANICAL LEGEND, ABBREVIATIONS
AND GENERAL NOTES.
2. CONTRACTOR SHALL MAKE ALL NEW TO EXISTING CONNECTIONS
FOR DUCTWORK, PIPING, AND CONTROLS TO SUPPORT
SEQUENCED CONSTRUCTION. IT IS ASSUMED THESE
CONNECTIONS WILL OCCUR AT OR NEAR THE PHASED WORK
SHOWN. HVAC SYSTEMS SERVING SEQUENCED AREAS NOT IN
CONTRACT OR DEMOLITION WHICH ARE OCCUPIED SHALL
REMAIN OPERATIONAL.
3. SYSTEMS SHUT DOWNS SHALL BE COORDINATED WITH THE
OWNER AND SHALL BE DONE WITH A 72 HOUR ADVANCED
NOTICE.
4. EACH NEW SEQUENCE IS TO BE TESTED AND BALANCED IN
ACCORDANCE WITH SPECIFICATIONS PER THE AIRFLOWS
SCHEDULED AND SHALL BE COORDINATED WITH TESTING AND
BALANCING REQUIREMENTS. AT THE COMPLETION OF THE
PROJECT TESTING AND BALANCING SHALL BE PERFORMED FOR
THE NEW AND EXISTING COMPONENTS OF THE HVAC SYSTEM.
RX 16x10 x
RX 12x8
RX 12x6
RX 10x6 x x x
RX 8x6
T
T
T
T
T
T
T
T
H
T
T
H x x
RX 12x6
T
T
3 3
2 2
3 3
2 2
1 1
3 3
1 1
2 2
JHGFE
R
L P
S U W CC
Y Z
DN
DN
RX 16x10
10x6
RX 16x10
RX 14x10
RX 12x10
RX 12x8
RX 12x6
RX 18x10 RX 16x8
T T
T T
T
T
T
RX 12x6
H T
H T
30x12 x
36x12 x
10x6 x
FD
36x12
36x20
30x10
RX 20x10
T
T
T
T
5 5 5 5 5
5 5 5 5 5
3 3 3 3 3 3
3 3
8x10
12x8
RX 8x6 x
T
8 6
FD
FD
FD
FD
FD
1 2
10"Ø
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
A R
L
G
D r a w i n g s A c a d B c u m e n t s M
M
H C
D
N
D
F
C
T
D
P l o t t e d
B y
B r e n d o n
J
B u r l e y
P
M
BKM# 17022.01
N
Plan North Key Plan
N
True North
07/27/20 212OfDwg.
Unit C
Unit A
Court
C o u r t
(N.I.C.)
(N.I.C.)
(N.I.C.)
N
I C
BURDETTE KOEHLER MURPHY &
ASSOCIATES, INC.
MECHANICAL / ELECTRICAL ENGINEERS
6300 BLAIR HILL LANE, SUITE 400
BALTIMORE, MARYLAND 21209
410.323.0600 - FAX 410.377.2543
KOFFEL ASSOCIATES
FIRE PROTECTION ENGINEERS
8815 CENTRE PARK DRIVE, SUITE 200
COLUMBIA, MARYLAND 21045
410.750.2246 - FAX 410.750.2588
RICKERT ENGINEERING, INC.
STRUCTURAL ENGINEERING
8813 WALTHAM WOODS ROAD, SUITE 301
BALTIMORE, MARYLAND 21234
410.663.5110 - FAX 410.663.5114
BID DOCUMENTS
Sequence
C
Sequence
D
Sequence B
Sequence
A
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
24'16'8'4'
SCALE: 1/8"=1'-0"
30-MH3(CD)
SECOND FLOOR PLAN
DUCTWORK - DEMOLITION
SCALE: 1/8" = 1'-0"
PART SECOND FLOOR - DUCTWORK - DEMOLITION
SCALE: 1/8" = 1'-0"
PART SECOND FLOOR - DUCTWORK - DEMOLITION
JDS JDT
DRAWING NOTES:
1. REMOVE EXISTING SUPPLY DUCTWORK AND ALL ASSOCIATED
APPURTENANCES (TYP).
2. REMOVE EXISTING EXHAUST/RETURN DUCTWORK AND ALL
ASSOCIATED APPURTENANCES (TYP).
3. REMOVE EXISTING AIR DEVICE (TYP).
4. REMOVE EXISTING THERMOSTAT (TYP).
5. REMOVE EXISTING RADIANT CEILING PANEL AND ALL
ASSOCIATED APPURTENANCES (TYP). CAP HS/HR PIPING AT
MAIN.
6. SINGLE DUCT TERMINAL UNIT WITH HYDRONIC HEATING COIL
INSTALLED IN SEQUENCE A AND B.
7. RETURN/EXHAUST DUCTWORK INSTALLED IN SEQUENCES A
AND B.
8. SUPPLY DUCTWORK TO REMAIN INSTALLED IN SEQUENCES A
AND B.
9. AIR DEVICE INSTALLED IN SEQUENCES A AND B.
10. CONTRACTOR IS RESPONSIBLE TO REPLACE AND REPAIR ANY
DAMAGED OR UNINSTALLED DUCTWORK INSULATION ON
DUCTWORK INSTALLED IN SEQUENCES A AND B.
11. REFER TO SEQUENCES A AND B FOR WORK IN THIS AREA.
12. EXISTING WALL MOUNTED AC UNIT TO REMAIN.
13. PROVIDE 10"Ø TEMPORARY SUPPLY DUCTWORK TO CONNECT
EX 8x10 DUCTWORK IN PHASE 2. TEMPORARY CONNECT
SHALL BE COMPLETE PRIOR TO DUCTWORK DEMOLITION.
14. PROVIDE 10"Ø TEMPORARY RETURN DUCTWORK TO CONNECT
DUCTWORK IN PHASE 2. TEMPORARY CONNECTION SHALL BE
COMPLETE PRIOR TO DUCTWORK DEMOLITION.
15. REMOVE EXISTING DUCT-MOUNTED HYDRONIC HEATING COIL
AND ALL ASSOCIATED APPURTENANCES.
GENERAL NOTES:
1. REFER TO 30-MH1 FOR MECHANICAL LEGEND, ABBREVIATIONS
AND GENERAL NOTES.
2. CONTRACTOR SHALL MAKE ALL NEW TO EXISTING CONNECTIONS
FOR DUCTWORK, PIPING, AND CONTROLS TO SUPPORT PHASED
CONSTRUCTION. IT IS ASSUMED THESE CONNECTIONS WILL
OCCUR AT OR NEAR THE PHASED WORK SHOWN. HVAC SYSTEMS
SERVING PHASE AREAS NOT IN CONTRACT OR DEMOLITION
WHICH ARE OCCUPIED SHALL REMAIN OPERATIONAL.
3. SYSTEMS SHUT DOWNS SHALL BE COORDINATED WITH THE
OWNER AND SHALL BE DONE WITH A 2 WEEK HOUR ADVANCED
NOTICE.
4. EACH NEW PHASE IS TO BE TESTED AND BALANCED IN
ACCORDANCE WITH SPECIFICATIONS PER THE AIRFLOWS
SCHEDULED AND SHALL BE COORDINATED WITH TESTING AND
BALANCING REQUIREMENTS. AT THE COMPLETION OF THE
PROJECT TESTING AND BALANCING SHALL BE PERFORMED FOR
THE NEW AND EXISTING COMPONENTS OF THE HVAC SYSTEM.
5. REFER TO ARCHITECTURAL DIVISION FOR PHASING AND
SEQUENCING CONSIDERATIONS.
1"
1"
1"
1"
JHGFE
R
L P
S U W CC
Y Z
UP
UP
UP
1B134
I.T.
CLOSET
CHWS &
CHWR DN
RX 1"
2"
1 1/4"
1 1/4"
H R
1 1/4"
1"
1"
1"
HS
HR
2"
1 1/4"
RX 1"
C W
S
1"
1 1/4"
3/4"
3/4"
2"
3/4"
3/4"
1"
3/4"
3/4"
1"
3/4"
1"
1"
3/4"
3/4"
1"
3/4"
H R
3/4"
1"
1 1/4"
1 1/4"
1"
1"
3/4"
3/4"
4 4
C W
R
HS
HR
H R
CWS
C W
S
H P
R
H S
C W
R
C W
R
H R
H R
H R
H S
3/4"
3/4"
3/4"
3/4"
3/4"1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
A R
L
G
D r a w i n g s A c a d B c u m e n t s M
M
H A
B
S
T
F
P
I N
G
D
P l o t t e d
B y
B r e n d o n
J
B u r l e y
P
M
BKM# 17022.01
N
Plan North Key Plan
N
True North
07/27/20 212OfDwg.
Unit C
Unit A
Court
C o u r t
(N.I.C.)
(N.I.C.)
(N.I.C.)
N
I C
Sequence B
Sequence
A
BURDETTE KOEHLER MURPHY &
ASSOCIATES, INC.
MECHANICAL / ELECTRICAL ENGINEERS
6300 BLAIR HILL LANE, SUITE 400
BALTIMORE, MARYLAND 21209
410.323.0600 - FAX 410.377.2543
KOFFEL ASSOCIATES
FIRE PROTECTION ENGINEERS
8815 CENTRE PARK DRIVE, SUITE 200
COLUMBIA, MARYLAND 21045
410.750.2246 - FAX 410.750.2588
RICKERT ENGINEERING, INC.
STRUCTURAL ENGINEERING
8813 WALTHAM WOODS ROAD, SUITE 301
BALTIMORE, MARYLAND 21234
410.663.5110 - FAX 410.663.5114
BID DOCUMENTS
Sequence
C
Sequence
D
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
24'16'8'4'
SCALE: 1/8"=1'-0"
30-MH4(AB)
FIRST FLOOR PLAN
HVAC PIPING - DEMOLITION
JDS JDT
DRAWING NOTES:
GENERAL NOTES:
SCALE: 1/8" = 1'-0"
PART FIRST FLOOR - HVAC PIPING - DEMOLITION
1. EXISTING HEATING WATER SUPPLY / HEATING WATER RETURN
PIPING TO REMAIN.
2. EXISTING CHILLED WATER SUPPLY / CHILLED WATER RETURN
PIPING.
3. EXISTING CABINET UNIT HEATER TO REMAIN.
4. REMOVE EXISTING SINGLE DUCT TERMINAL UNIT WITH
HYDRONIC HEATING COIL IN SEQUENCE A.
5. REMOVE EXISTING CHILLED WATER SUPPLY / CHILLED WATER
RETURN PIPING AND ALL ASSOCIATED APPURTENANCES.
6. REMOVE EXISTING HEATING WATER COIL AND ALL ASSOCIATED
APPURTENANCES.
7. REMOVE EXISTING HEATING WATER SUPPLY / HEATING WATER
RETURN PIPING AND ALL ASSOCIATED APPURTENANCES.
8. EXISTING DUCTLESS SPLIT SYSTEM TO REMAIN.
9. EXISTING REFRIGERANT SUCTION / REFRIGERANT LIQUID PIPING
TO REMAIN.
10. REMOVE EXISTING BALANCE VALVE.
11. HEATING WATER COIL. REFER TO SEQUENCES C AND D FOR
REMOVAL INFO.
SCALE: 1/8" = 1'-0"
PART FIRST FLOOR - HVAC PIPING - DEMOLITION
1. REFER TO 30-MH1 FOR MECHANICAL LEGEND, ABBREVIATIONS
AND GENERAL NOTES.
2. CONTRACTOR SHALL MAKE ALL NEW TO EXISTING CONNECTIONS
FOR DUCTWORK, PIPING, AND CONTROLS TO SUPPORT
SEQUENCED CONSTRUCTION. IT IS ASSUMED THESE
CONNECTIONS WILL OCCUR AT OR NEAR THE SEQUENCED
WORK SHOWN. HVAC SYSTEMS SERVING SEQUENCED AREAS
NOT IN CONTRACT OR DEMOLITION WHICH ARE OCCUPIED SHALL
REMAIN OPERATIONAL.
3. SYSTEMS SHUT DOWNS SHALL BE COORDINATED WITH THE
OWNER AND SHALL BE DONE WITH A 72 HOUR ADVANCED
NOTICE.
4. EACH NEW SEQUENCE IS TO BE TESTED AND BALANCED IN
ACCORDANCE WITH SPECIFICATIONS PER THE WATER FLOWS
SCHEDULED AND SHALL BE COORDINATED WITH TESTING AND
BALANCING REQUIREMENTS. AT THE COMPLETION OF THE
PROJECT TESTING AND BALANCING SHALL BE PERFORMED FOR
THE NEW AND EXISTING COMPONENTS OF THE HVAC SYSTEM.
RX 1"
1"
RX 1 1/4"
C W
R
C W
S
H S
H R
H S
H R
C W
R
C W
S
RX 1"
1"
1"
RX 1"
1"
RX 1"
JHGFE
R
L P
S U W CC
Y
Z
UP
UP
UP
2/G101 G1012/
3/4"
1 1/4"
RX 1 1/4"
RX 2"
HS
H S
RX 1"
1"
1"
HR
HS
H S
H R
HR
HS
1" 1 1/4" 1 1/4"
1"
RX 2"
1"
1"
HR
H R
1 1/2"
CWS
CWR
1 1/2"
C W
S
C W
R
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
A R
L
G
D r a w i n g s A c a d B c u m e n t s M
M
H C
D
S
T
F
P
I N
G
D
P l o t t e d
B y
B r e n d o n
J
B u r l e y
P
M
BKM# 17022.01
N
Plan North Key Plan
N
True North
07/27/20 212OfDwg.
Unit C
Unit A
Court
C o u r t
(N.I.C.)
(N.I.C.)
(N.I.C.)
N
I C
BURDETTE KOEHLER MURPHY &
ASSOCIATES, INC.
MECHANICAL / ELECTRICAL ENGINEERS
6300 BLAIR HILL LANE, SUITE 400
BALTIMORE, MARYLAND 21209
410.323.0600 - FAX 410.377.2543
KOFFEL ASSOCIATES
FIRE PROTECTION ENGINEERS
8815 CENTRE PARK DRIVE, SUITE 200
COLUMBIA, MARYLAND 21045
410.750.2246 - FAX 410.750.2588
RICKERT ENGINEERING, INC.
STRUCTURAL ENGINEERING
8813 WALTHAM WOODS ROAD, SUITE 301
BALTIMORE, MARYLAND 21234
410.663.5110 - FAX 410.663.5114
BID DOCUMENTS
Sequence
C
Sequence
D
Sequence B
Sequence
A
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
24'16'8'4'
SCALE: 1/8"=1'-0"
30-MH4(CD)
FIRST FLOOR PLAN
HVAC PIPING - DEMOLITION
JDS JDT
DRAWING NOTES:
SCALE: 1/8" = 1'-0"
PART FIRST FLOOR - HVAC PIPING - DEMOLITION
1. EXISTING HEATING WATER SUPPLY / HEATING WATER RETURN
PIPING TO REMAIN.
2. CWS/CWR PIPING AND HS/HR PIPING SERVING FAN COIL UNITS IN
ADDITION.
3. REMOVE EXISTING HEATING WATER SUPPLY / HEATING WATER
RETURN PIPING AND ALL ASSOCIATED APPURTENANCES TO
RADIANT CEILING PANELS AND HEATING WATER COILS. REFER
TO DRAWING 30-MH2 (CD) FOR RADIANT CEILING PANEL
LOCATIONS. CAP OPEN END AT MAIN.
4. REMOVE EXISTING CHILLED WATER SUPPLY / CHILLED WATER
RETURN PIPING AND ALL ASSOCIATED APPURTENANCES.
REMOVE CHILLED WATER SUPPLY / CHILLED WATER RETURN
PIPING GOING TO RADIANT CEILING PANELS. REFER TO DRAWING
30-MH2 (CD) FOR RADIANT CEILING PANEL LOCATIONS.
5. REMOVE EXISTING HEATING WATER COIL AND ALL ASSOCIATED
APPURTENANCES.
6. REMOVE EXISTING CHILLED WATER PIPING UP TO SECOND
FLOOR.
7. EXISTING WALL MOUNTED AC UNIT TO REMAIN.
8. REMOVE EXISTING BALANCE VALVE.
SCALE: 1/8" = 1'-0"
PART FIRST FLOOR - HVAC PIPING - DEMOLITION
GENERAL NOTES:
1. REFER TO 30-MH1 FOR MECHANICAL LEGEND, ABBREVIATIONS
AND GENERAL NOTES.
2. CONTRACTOR SHALL MAKE ALL NEW TO EXISTING CONNECTIONS
FOR DUCTWORK, PIPING, AND CONTROLS TO SUPPORT
SEQUENCED CONSTRUCTION. IT IS ASSUMED THESE
CONNECTIONS WILL OCCUR AT OR NEAR THE PHASED WORK
SHOWN. HVAC SYSTEMS SERVING PHASE AREAS NOT IN
CONTRACT OR DEMOLITION WHICH ARE OCCUPIED SHALL
REMAIN OPERATIONAL.
3. SYSTEMS SHUT DOWNS SHALL BE COORDINATED WITH THE
OWNER AND SHALL BE DONE WITH A 2 WEEKS ADVANCED
NOTICE.
4. EACH NEW SEQUENCE IS TO BE TESTED AND BALANCED IN
ACCORDANCE WITH SPECIFICATIONS PER THE WATER FLOWS
LISTED AND SHALL BE COORDINATED WITH TESTING AND
BALANCING REQUIREMENTS. AT THE COMPLETION OF THE
PROJECT TESTING AND BALANCING SHALL BE PERFORMED FOR
THE NEW AND EXISTING COMPONENTS OF THE HVAC SYSTEM.
JHGFE
R
L P
S U W CC
Y
Z
DN
DN
DN
(e) S.Tlt.
1B134
I.T.
CLOSET
CWS &
CWR DN
1"
1"
2"
2"1 1/4"
2 1/2"
3"
RX 3/4"
2"
1 1/4"
1"
HR
HS
HS
HR
1"
3/4"
3/4"
1"
H R
1"
3/4"
1"
3/4"
1"
1"
1"
3/4"
1"
RX 3/4"
CWR
CWS
2"
HS HR
CWS
CWR
RX 3/4"
RX 3/4"
CWS
CWR
HS
C W
S
C W
R
H R
C W
R
C W
S
CWS
CWR
CWS
CWR
C W
S
C W
S
C W
R
H S
H R
HS
H R
3/4"
3/4"
3/4"
3 3
RX 3/4"
H S
HR
HS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
A R
L
G
D r a w i n g s A c a d B c u m e n t s M
M
H A
B
N
D
F
P
I N
G
D
P l o t t e d
B y
B r e n d o n
J
B u r l e y
P
M
BKM# 17022.01
N
Plan North Key Plan
N
True North
07/27/20 212OfDwg.
Unit C
Unit A
Court
C o u r t
(N.I.C.)
(N.I.C.)
(N.I.C.)
N
I C
Sequence B
Sequence
A
BURDETTE KOEHLER MURPHY &
ASSOCIATES, INC.
MECHANICAL / ELECTRICAL ENGINEERS
6300 BLAIR HILL LANE, SUITE 400
BALTIMORE, MARYLAND 21209
410.323.0600 - FAX 410.377.2543
KOFFEL ASSOCIATES
FIRE PROTECTION ENGINEERS
8815 CENTRE PARK DRIVE, SUITE 200
COLUMBIA, MARYLAND 21045
410.750.2246 - FAX 410.750.2588
RICKERT ENGINEERING, INC.
STRUCTURAL ENGINEERING
8813 WALTHAM WOODS ROAD, SUITE 301
BALTIMORE, MARYLAND 21234
410.663.5110 - FAX 410.663.5114
BID DOCUMENTS
Sequence
C
Sequence
D
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
24'16'8'4'
SCALE: 1/8"=1'-0"
30-MH5(AB)
SECOND FLOOR PLAN
HVAC PIPING - DEMOLITION
JDS BKM
DRAWING NOTES:
GENERAL NOTES:
SCALE: 1/8" = 1'-0"
PART SECOND FLOOR - HVAC PIPING - DEMOLITION
1. EXISTING HEATING WATER SUPPLY / HEATING WATER
RETURN PIPING TO REMAIN.
2. EXISTING CHILLED WATER SUPPLY / CHILLED WATER
RETURN PIPING TO REMAIN IN SEQUENCES A AND B. REFER
TO SEQUENCES C AND D FOR REMOVAL INFO.
3. REMOVE EXISTING SINGLE DUCT TERMINAL UNIT WITH
HYDRONIC HEATING COIL AND ALL ASSOCIATED
APPURTENEANCES.
4. REMOVE EXISTING CHILLED WATER SUPPLY / CHILLED
WATER RETURN PIPING AND ALL ASSOCIATED
APPURTENANCES.
5. REMOVE EXISTING HEATING WATER COIL AND ALL
ASSOCIATED APPURTENANCES.
6. REMOVE EXISTING HEATING WATER SUPPLY / HEATING
WATER RETURN PIPING AND ALL ASSOCIATED
APPURTENANCES.
7. EXISTING DUCTLESS SPLIT SYSTEM TO REMAIN.
8. EXISTING REFRIGERANT SUCTION / REFRIGERANT LIQUID TO
REMAIN.
9. REMOVE EXISTING BALANCE VALVE.
SCALE: 1/8" = 1'-0"
PART SECOND FLOOR - HVAC PIPING - DEMOLITION
1. REFER TO 30-MH1 FOR MECHANICAL LEGEND, ABBREVIATIONS
AND GENERAL NOTES.
2. CONTRACTOR SHALL MAKE ALL NEW TO EXISTING CONNECTIONS
FOR DUCTWORK, PIPING, AND CONTROLS TO SUPPORT PHASED
CONSTRUCTION. IT IS ASSUMED THESE CONNECTIONS WILL
OCCUR AT OR NEAR THE PHASED WORK SHOWN. HVAC SYSTEMS
SERVING SEQUENCED AREAS NOT IN CONTRACT OR DEMOLITION
WHICH ARE OCCUPIED SHALL REMAIN OPERATIONAL.
3. SYSTEMS SHUT DOWNS SHALL BE COORDINATED WITH THE
OWNER AND SHALL BE DONE WITH A 72 HOUR ADVANCED
NOTICE.
4. EACH NEW SEQUENCE IS TO BE TESTED AND BALANCED IN
ACCORDANCE WITH SPECIFICATIONS PER THE WATER FLOW
SCHEDULED AND SHALL BE COORDINATED WITH TESTING AND
BALANCING REQUIREMENTS. AT THE COMPLETION OF THE
PROJECT TESTING AND BALANCING SHALL BE PERFORMED FOR
THE NEW AND EXISTING COMPONENTS OF THE HVAC SYSTEM.
C W
R
C W
S
H R
H S
H R
C W
S
C W
R
H S
RX 1/4"
RX 1"
RX 1/4"
RX 1/4"
RX 1"
RX 1"
JHGFE
R
L P
S U W CC
Y Z
DN
DN
1 1/4"
2"
1 1/4"
1 1/4"
HR
HS
CWS
CWR
HR
HS
CWR
CWS
RX 1"RX 1"
1" 1"
RX 1"
RX 1"
RX 1 1/4"
RX 1"
RX 1 1/4"
RX 3/4"
2 1/2"
HS
HR
3"
CWR
CWS
RX 3/4"
2"
HS
HR
CWS
CWR
RX
1 1/2"
RX 2"
RX 1"
TO
AHUS
C W
S
C W
R
HS
HR
1"
11/2"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
A R
L
G
D r a w i n g s A c a d B c u m e n t s M
M
H C
D
N
D
F
P
I N
G
D
P l o t t e d
B y
B r e n d o n
J
B u r l e y
P
M
BKM# 17022.01
N
Plan North Key Plan
N
True North
07/27/20 212OfDwg.
Unit C
Unit A
Court
C o u r t
(N.I.C.)
(N.I.C.)
(N.I.C.)
N
I C
BURDETTE KOEHLER MURPHY &
ASSOCIATES, INC.
MECHANICAL / ELECTRICAL ENGINEERS
6300 BLAIR HILL LANE, SUITE 400
BALTIMORE, MARYLAND 21209
410.323.0600 - FAX 410.377.2543
KOFFEL ASSOCIATES
FIRE PROTECTION ENGINEERS
8815 CENTRE PARK DRIVE, SUITE 200
COLUMBIA, MARYLAND 21045
410.750.2246 - FAX 410.750.2588
RICKERT ENGINEERING, INC.
STRUCTURAL ENGINEERING
8813 WALTHAM WOODS ROAD, SUITE 301
BALTIMORE, MARYLAND 21234
410.663.5110 - FAX 410.663.5114
BID DOCUMENTS
Sequence
C
Sequence
D
Sequence B
Sequence
A
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
24'16'8'4'
SCALE: 1/8"=1'-0"
30-MH5(CD)
SECOND FLOOR PLAN
HVAC PIPING - DEMOLITION
SCALE: 1/8" = 1'-0"
PART SECOND FLOOR - HVAC PIPING - DEMOLITION
SCALE: 1/8" = 1'-0"
PART SECOND FLOOR - HVAC PIPING - DEMOLITION
2/30-MH5(CD)
1/30-MH5(CD)
JDS JDT
1. EXISTING HEATING WATER SUPPLY / HEATING WATER RETURN
PIPING TO REMAIN.
2. EXISTING CHILLED WATER SUPPLY / CHILLED WATER RETURN
PIPING SERVING EXISTING AHUS.
3. REMOVE EXISTING HEATING WATER SUPPLY / HEATING WATER
RETURN PIPING AND ALL ASSOCIATED APPURTENANCES TO
RADIANT CEILING PANELS AND HEATING WATER COILS. REFER
TO DRAWING 30-MH2 (CD) FOR RADIANT CEILING PANEL
LOCATIONS. CAP OPEN END AT MAIN.
4. REMOVE EXISTING CHILLED WATER SUPPLY / CHILLED WATER
RETURN PIPING AND ALL ASSOCIATED APPURTENANCES.
REMOVE CHILLED WATER SUPPLY / CHILLED WATER RETURN
PIPING GOING TO RADIANT CEILING PANELS. REFER TO DRAWING
30-MH2 (CD) FOR RADIANT CEILING PANEL LOCATIONS.
5. REMOVE EXISTING HEATING WATER COIL AND ALL ASSOCIATED
APPURTENANCES.
6. REMOVE CHILLED WATER DOWN TO FIRST FLOOR AND CAP END
AT MAIN.
7. EXISTING WALL MOUNTED AC UNIT TO REMAIN.
8. EXISTING HS/HR PIPING AND CWS/CWR PIPING UP FROM FLOOR
BELOW SERVING FCUS IN ADDITION..
9. REMOVE EXISTING FLOOR MOUNTED END SUCTION PUMPS.
10. REMOVE EXISTING BALANCE VALVES.
GENERAL NOTES:
1. REFER TO 30-MH1 FOR MECHANICAL LEGEND, ABBREVIATIONS
AND GENERAL NOTES.
2. CONTRACTOR SHALL MAKE ALL NEW TO EXISTING CONNECTIONS
FOR DUCTWORK, PIPING, AND CONTROLS TO SUPPORT
SEQUENCED CONSTRUCTION. IT IS ASSUMED THESE
CONNECTIONS WILL OCCUR AT OR NEAR THE SEQUENCED
WORK SHOWN. HVAC SYSTEMS SERVING PHASE AREAS NOT IN
CONTRACT OR DEMOLITION WHICH ARE OCCUPIED SHALL
REMAIN OPERATIONAL.
3. SYSTEMS SHUT DOWNS SHALL BE COORDINATED WITH THE
OWNER AND SHALL BE DONE WITH A 2 WEEKS ADVANCED
NOTICE.
4. EACH NEW SEQUENCE IS TO BE TESTED AND BALANCED IN
ACCORDANCE WITH SPECIFICATIONS PER THE WATER FLOWS
SCHEDULED AND SHALL BE COORDINATED WITH TESTING AND
BALANCING REQUIREMENTS. AT THE COMPLETION OF THE
PROJECT TESTING AND BALANCING SHALL BE PERFORMED FOR
THE NEW AND EXISTING COMPONENTS OF THE HVAC SYSTEM.
5. REFER TO ARCHITECTURAL DIVISION FOR SEQUENCING
DRAWING NOTES:
x x
18x10
1B134A
JHGFE
R
L P
S U W CC
Y Z
UP
UP
UP
P-2
P-2
P-2 P-2
P-2 P-2
P-2
P-2
P-2
P-2
1C114
1B104
1B101
1B105
1C110
1B107
1B108
1B109
1B110
1B111
1B112
1B113
1B114
1B115
1B116
36x20
30x10
12x6
16x8
10x6
10x4
16x8
12x6
12x6
12x6
12x6
12x6
12x6
12x6
12x6 x x x x x
8x10
8x10
8x10
8x10
8x10
8x10
8x10 x x x x
1C111
T
T
T
T
T
TT
T
T
T
T
T
44x24 x
44x24
20x10
T
1B118 x
8x10
T
T
12x4
30x10
8x10
1B153
T
12x6
10x6
10x6
10x6
10x6
D
2 2
H
H
H
H
B
A
A
A
H
H
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
B
A
A
EX
14x6
G
E
J
F
F
D
A
G
A
A
H
A
H
A
J
A
A
A
H
H
H
D
A
A
H
H
H
H
H 100
D 80
D 80
D 80
D
D
D
D
D
D
10x6
10x6
10x6
10x6
10x6
T
T
T
H
6x10
A
10x6
10x6
12x6
TT
1B151
1B156
30x12
10x6
8x10
1B148
T x
T
T
A
D
B
A
B
C
C
D
H
D
D
E
A 80 x
36x12
36x12
1B152
20x10
20x10
1B158
18x10
1B133A
1B133
1B134
1B134A
1B145A
1B146
1B151
1B152
1B156
C1-17
1B158
C1-16
1B117
1B116
1B116A
1B115
1B115A
1B114
1B114A
1B113
1B113A
1B112
1B112A
1B111
1B111A
1B110A
1B110
1B109A
1B109
1B108A
1B108
1B107A
1B107
1B106
1B105B
1B105
1B105A
1B118
C1-10A
1B102
1B101
1B103
1B104
1B154
1B153
C1-14
1B149
1B150
1B102
1B102
1B155
A
36x12
E
8x6 x
12 5
12 5
1 5
12 5
12 5 12 5
10x6
12 5 12 5
12 5
12 5
1B134
4"Ø
4"Ø
FD
FD
FD
FD
FD
FD
DF1-1
DF1-2
8x6
H
12x6
36x20
12x6
22x10
10x4
8x10
12x4
10x10
A
A x
A
A
A
1B101
1B150
H
A
10x6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
A R
L
G
D r a w i n g s A c a d B c u m e n t s M
M
H A
B
S
T
F
C
T
N
P l o t t e d
B y
B r e n d o n
J
B u r l e y
P
M
BKM# 17022.01
N
Plan North Key Plan
N
True North
07/27/20 212OfDwg.
Unit C
Unit A
Court
C o u r t
(N.I.C.)
(N.I.C.)
(N.I.C.)
N
I C
Sequence B
Sequence
A
BURDETTE KOEHLER MURPHY &
ASSOCIATES, INC.
MECHANICAL / ELECTRICAL ENGINEERS
6300 BLAIR HILL LANE, SUITE 400
BALTIMORE, MARYLAND 21209
410.323.0600 - FAX 410.377.2543
KOFFEL ASSOCIATES
FIRE PROTECTION ENGINEERS
8815 CENTRE PARK DRIVE, SUITE 200
COLUMBIA, MARYLAND 21045
410.750.2246 - FAX 410.750.2588
RICKERT ENGINEERING, INC.
STRUCTURAL ENGINEERING
8813 WALTHAM WOODS ROAD, SUITE 301
BALTIMORE, MARYLAND 21234
410.663.5110 - FAX 410.663.5114
BID DOCUMENTS
Sequence
C
Sequence
D
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
24'16'8'4'
SCALE: 1/8"=1'-0"
30-MH6(AB)
FIRST FLOOR PLAN
DUCTWORK - NEW WORK
JDS JDT
DRAWING NOTES:
GENERAL NOTES:
SCALE: 1/8" = 1'-0"
PART FIRST FLOOR - DUCTWORK - NEW WORK
1. PROVIDE SUPPLY DUCTWORK IN SEQUENCE A.
2. PROVIDE SINGLE DUCT AIR TERMINAL UNIT WITH HYDRONIC HEATING COIL IN
SEQUENCE A.
3. COORDINATE NEW SUPPLY AIR REGISTER INSTALLATION WITH EXISTING OPENING
IN BULKHEAD. BALANCE TO INDICATED CFM.
4. WALL MOUNTED THERMOSTAT (TYP). CONNECT TO EXISTING TERMINAL UNIT.
5. REFER TO PHASE 1 FOR EXISTING WORK IN THIS AREA.
6. AIR DEVICE MOUNTED IN CEILING (TYP).
7. PROVIDE SUPPLY DUCTWORK IN SEQUENCE B.
8. PROVIDE RETURN/EXHAUST DUCTWORK IN SEQUENCE B.
9. PROVIDE RETURN/EXHAUST DEVICE (TYP).
10. PROVIDE SINGLE DUCT AIR TERMINAL UNIT WITH HYDRONIC HEATING COILS IN
SEQUENCE B.
11. REFER TO SEQUENCES C AND D FOR WORK IN THIS AREA.
12. PROVIDE RETURN/EXHAUST DUCTWORK IN SEQUENCE A.
13. SEQUENCE SWING SPACE.
14. DRYER VENT BOOSTER FAN - 4"Ø - ELECTRIC: 120V/1/60, 100 WATTS.
15. WALL VENTS FOR DRYER EXHAUST MOUNTED IN EXTENSION WALL WITH
BACKDRAFT DAMPER.
16. EXISTING DUCTLESS SPLIT SYSTEM UNIT.
17. AIR DEVICE MOUNTED IN CEILING.
SCALE: 1/8" = 1'-0"
PART FIRST FLOOR - DUCTWORK - NEW WORK
1. REFER TO 30-MH1(P2) FOR MECHANICAL LEGEND, ABBREVIATIONS AND GENERAL
NOTES.
2. CONTRACTOR SHALL MAKE ALL NEW TO EXISTING CONNECTIONS FOR DUCTWORK,
PIPING, AND CONTROLS TO SUPPORT SEQUENCED CONSTRUCTION. IT IS ASSUMED
THESE CONNECTIONS WILL OCCUR AT OR NEAR THE SEQUENCED WORK SHOWN.
HVAC SYSTEMS SERVING PHASE AREAS NOT IN CONTRACT OR DEMOLITION WHICH
ARE OCCUPIED SHALL REMAIN OPERATIONAL.
3. SYSTEMS SHUT DOWNS SHALL BE COORDINATED WITH THE OWNER AND SHALL BE
DONE WITH A 72 HOUR ADVANCED NOTICE.
4. EACH NEW SEQUENCE IS TO BE TESTED AND BALANCED IN ACCORDANCE WITH
SPECIFICATIONS PER THE AIRFLOWS LISTED AND SHALL BE COORDINATED WITH
TESTING AND BALANCING REQUIREMENTS. AT THE COMPLETION OF THE PROJECT
TESTING AND BALANCING SHALL BE PERFORMED FOR THE NEW AND EXISTING
COMPONENTS OF THE HVAC SYSTEM.
5. REFER TO ARCHITECTURAL DIVISION FOR SEQUENCING CONSIDERATIONS.
RESIDENT ROOM
(e)1 BED ROOM
NURSE MANAGER
RESTROOM
RESIDENT ROOM
RESTROOM
MEDICATION
RESTROOM
RESIDENT ROOM
RESTROOM
RESTROOM
RESIDENT ROOM
BARIATRIC RESTROOM
RESIDENT ROOM
1B115
1B117
1B115A
1B116
1B116A
1B118
1B122
1B112
1B111A
1B114
1B114A
1B113A
1B113
1B122A
RESTROOM
RESIDENT ROOM
RESTROOM
BARIATRIC RESIDENT ROOM
RESTROOM
RESIDENT ROOM
BARIATRIC RESIDENT ROOM
BARIATRIC RESTROOM
RESIDENT ROOM
KITCHEN
ACTIVITY
NURSE MANAGER
RESTROOM
CLEAN UTILITY
DINING
1B107A
1B110A
1B111
1B109
1B109A
1B110
1B108A
1B108
1B105
1B104
1B103
1B106
1B105B
1B105A
1B107
(t)SOILED LINEN
FAMILY CONSULTATION
ROOM NAME LIST
1B101
1B102
CORRIDOR
CORRIDORC1-17
C1-16
NEIGHBORHOOD STATION
(e) CORRIDOR
NEIGHBORHOOD STATIONC1-10A
C1-13
C1-14
(e) PRIVATE TOILET
(e) 2 BED ROOM
1B134A
1B134
(e) CONGREGATE BATH1B133
(e) 2 BED ROOM
(e) STANDARD TOILET1B145A
1B146
MEDICATION1B149
ELECTRICAL ROOM1B150
LAUNDRY1B151
SPA BATHING1B152
JAN CLOSET
CLEAN LINEN1B153
1B154
ELEC ROOM1B155
NURSE PRACTITIONER1B156
CLEAN LAUNDRY1B158
I.T. CLOSET1B134
ATC GENERAL NOTES
1. THE ATC WORK SHALL INCLUDE PROVISIONS FOR A COMPLETE AND OPERABLE CONTROL SYSTEM, INCLUDING ALL DEVICES REQUIRED TO ACHIEVE THE SEQUENCES AND FUNCTIONS INDICATED
THROUGHOUT THE CONTRACT DOCUMENTS.
2. THE ATC CONTRACTOR SHALL FURNISH AND INSTALL ALL ELECTRICAL WIRING AND CONDUIT FROM
POWER SOURCE, INCLUDING TERMINATION TO ALL REQUIRED ATC RELATED POWER CONNECTIONS
INCLUDING, BUT NOT LIMITED TO, DDC CONTROLLERS (PROVIDE LOW VOLTAGE CONTROLLER FOR
AIR TERMINAL UNITS INCLUDING TRANSFORMERS AND DISCONNECT SWITCHES AS REQUIRED),
SENSORS, VALVE AND DAMPER ACTUATORS, AIR FLOW MONITORS, ATC PANELS, ETC. THE ATC
CONTRACTOR SHALL OBTAIN A SEPARATE ELECTRICAL PERMIT AS REQUIRED BY THE LOCAL
AUTHORITY. THE ATC CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR ALL POWER
REQUIREMENTS NECESSARY FOR A COMPLETE INSTALLATION FROM THE POWER SOURCE TO ALL
ATC RELATED CONNECTIONS.
3. THE ATC CONTRACTOR SHALL COORDINATE AND VERIFY THAT ALL CONTROLLERS, DEVICES AND
ACCESSORIES ARE PROVIDED AS REQUIRED TO ACCOMPLISH ALL CONTROL FUNCTIONS AND
SEQUENCES INDICATED IN THE CONTRACT DOCUMENTS. WHERE CONTROL RELATED DEVICES ARE
NOT PROVIDED BY AN EQUIPMENT MANUFACTURER, IT SHALL BE THE RESPONSIBILITY OF THE ATC
CONTRACTOR TO PROVIDE THE CONTROL DEVICES REQUIRED TO ACCOMPLISH THE FUNCTIONS AND
SEQUENCES INDICATED.
4. THE ATC CONTRACTOR SHALL PROVIDE ALL CONTROLLERS, DEVICES, POINTS, ETC REQUIRED TO
ACCOMPLISH THE CONTROL SEQUENCES AND FUNCTIONS INDICATED ON THE DRAWINGS AND IN THE
SPECIFICATIONS. ALL POINTS SHALL BE TIED INTO THE BUILDING AUTOMATION SYSTEM (BAS). IN
ADDITION, THE ATC CONTRACTOR SHALL PROVIDE ALL CONTROLLERS, DEVICES, POINTS, ETC
REQUIRED TO CONTROL, OPERATE AND MONITOR ALL EQUIPMENT (IE. AIR HANDLING UNITS, AIR
VOLUME TERMINALS, FANS, VALVES, DAMPERS, ETC.) INDICATED THROUGHOUT THE CONTRACT
DOCUMENTS.
5. PROVIDE EQUIPMENT STATUS FOR ALL MECHANICAL EQUIPMENT. EQUIPMENT FAILURES SHALL BE
ALARMED AT THE BAS.
6. PROVIDE TEMPERATURE SENSORS TIED INTO THE BAS IN SUPPLY DUCTWORK DOWNSTREAM OF ALL
VAV TERMINALS.
7. GENERAL EXHAUST FANS SHALL BE PROVIDED WITH MOTOR OPERATED DAMPERS. UNLESS
OTHERWISE NOTED, DAMPERS SHALL OPEN WHEN FAN IS ENERGIZED AND CLOSED WHEN FAN IS
DE-ENERGIZED.
8. ALL AIR FLOW MONITORS (AFM) SHALL GENERATE AN ALARM CONDITION AT THE BAS WHENEVER
CONDITIONS EXCEED SETPOINT (ADJUSTABLE) BY 10% OR MORE.
9. WATER PRESSURE DROP THROUGH ATC CONTROL VALVES SHALL NOT EXCEED 10 FT. HEAD.
TWO-POSITION ATC VALVES UTILIZED FOR ISOLATION, BY-PASS OR SHUT-OFF PURPOSES SHALL BE
FULL LINE SIZE.
10. PROVIDE A TEMPERATURE SENSOR FOR ALL IT ROOMS AND ELECTRICAL ROOMS. MONITOR
TEMPERATURE AT THE BAS. SHOULD TEMPERATURE RISE ABOVE 90°F SETPOINT (ADJUSTABLE), ALARM AT THE BAS.
11. ALL SETPOINTS INDICATED ON THE SEQUENCES SHALL BE ADJUSTABLE.
12. ALL ATC WIRING SHALL BE INSTALLED IN CONDUIT.
BOX W/REHEAT CONTROL
VARIABLE VOLUME TERMINAL
1. ON A FALL IN TEMPERATURE, SPACE THERMOSTAT SHALL MODULATE
VAV TERMINAL DAMPER TOWARD MINIMUM SETTING.
2. ON A CONTINUED FALL IN TEMPERATURE, SPACE THERMOSTAT
SHALL MODULATE HEATING COIL VALVE TO MAINTAIN SETPOINT.
3. ON A RISE IN TEMPERATURE THE OPPOSITE SHALL OCCUR .
VARIABLE AIR
VOLUME
TERMINAL
DAMPER MOTOR
ROOM
THERMOSTAT
HEATING COIL VALVE
T
DRYER BOOSTER FAN CONTROL
1. PRESSURE SENSING SWITCH LOCATED IN DRYER VENT OUTLET
SHALL ENERGIZE THE DRYER BOOSTER FAN WHEN DRYER IS
ENERGIZED AND OPERATRING. WHEN THE DRYER DE-ENERGIZES,
THE PRESSURE SWITCH WILL DE-ENERGIZE THE DRYER BOOSTER
FAN.
2. PRESSURE SENSING SWITCH SHALL BE FURNISSHED BY THE DRYER
BOOSTER FAN MANUFACTURER. INSTALLATION SHALL BE IN
ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS
AND THE LATEST EDITION OF THE IMC.
DRYER
EA
TERMINATION HOOD
W/BACKDRAFT DAMPER
INLINE DRYER
BOOSTER FAN
PRESSURE SENSING SWITCH BY DRYER
BOOSTER FAN MANUFACTURER
VFD
SPS-1 SPS-2
EXISTING EXHAUST
DUCT
OA
EXISTING
FILTERS
EXISTING
EXHAUST FAN
AFM-3
EXISTING
EXHAUST DUCT
EXISTING
SUPPLY FAN
AFM-2
EXISTING
COIL
VAV AIR HANDLING UNIT CONTROL (WITH RA FAN)
1. GENERAL
1.1. SUPPLY AIR FAN AND EXHAUST AIR FAN OPERATION FOR EACH VENTILATION SYSTEM SHALL BE INTERLOCKED.
SUPPLY AND RETURN FANS SHALL OPERATE CONTINUOUSLY.
1.2. 30-AC-4 AND 30-ERU-2 ARE EXISTING AND OPERATE TOGETHER TO PROVIDE VENTILATION / EXHAUST AIR TO THE
FIRST FLOOR OF EXISTING NHCU ROOMS FOR "UNIT B" AND ARE LOCATED IN THE SECOND FLOOR MECHANICAL
ROOM.
1.3. RTU-1 IS EXISTING AND OPERATES CONTINUOUSLY TO PROVIDE VENTILATION / EXHAUST AIR TO THE SECOND
FLOOR OF THE EXISTING NHCU ROOMS FOR "UNIT B" AND IS LOCATED ON THE ROOF ABOVE THE SECOND FLOOR
MECHANICAL ROOM.
1.4. PROVIDE A HUMIDITY SENSOR IN THE EXHAUST AIR INLET OF 30-ERU-2 FOR CONTROL OF THE EXISTING
HUMIDIFIER LOCATED IN 30-AC-4. INTERLOCK WITH EXISTING HUMIDIFIER TO MAINTAIN A HUMIDITY SET POINT
(ADJUSTABLE). HUMIDITY SETPOINT SHALL BE ADJUSTABLE AND FROM ECMS
2. AIR FLOW / FAN CONTROL
2.1. OCCUPIED:
A. STATIC PRESSURE SENSOR, SPS-2, SHALL MODULATE THE SUPPLY FAN VARIABLE FREQUENCY DRIVE, VFD TO
MAINTAIN THE SUPPLY DUCT STATIC PRESSURE SETPOINT.
1) FAN PRESSURE OPTIMIZATION (STATIC PRESSURE RESET): EVERY 10 MINUTES (ADJUSTABLE) DURING THE
OCCUPIED MODE, THE DAMPER POSITIONS OF EACH VAV TERMINAL ASSOCIATED WITH THE AHU SHALL BE
POLLED. BASED ON FEEDBACK FROM THE VAV DAMPER POSITIONS, THE STATIC PRESSURE SETPOINT SHALL
BE RESET IN +/- 0.1" W.C. INCREMENTS (MAX 0.1" PER 10 MINUTE POLLING CYCLE) BETWEEN A FIXED RANGE
(LOW END SHALL BE MINIMUM 1.0" W.C. - ADJUSTABLE, UPPER END SHALL BE 0.25" W.C. ABOVE THE STATIC
PRESSURE SETPOINT DETERMINED BY THE BALANCE CONTRACTOR). IF THERE ARE NO VAV DAMPER
POSITIONS GREATER THAN 90% OPEN (ADJUSTABLE), THEN THE STATIC PRESSURE SET POINT SHALL BE
LOWERED UNTIL AT LEAST ONE VAV DAMPER IS AT LEAST 90% OPEN (ADJUSTABLE). IF ANY ONE VAV DAMPER
OPENS GREATER THAN 95% OPEN (ADJUSTABLE), THEN THE STATIC PRESSURE SET POINT SHALL BE RAISED
UNTIL THE MAXIMUM VAV DAMPER POSITION IS BELOW 95% OPEN (ADJUSTABLE). IF THE MAX. VAV DAMPER
POSITION IS BETWEEN 90% AND 95% OPEN (ADJUSTABLE), THEN THE STATIC PRESSURE SET POINT SHALL
REMAIN IN STEADY STATE UNTIL THE NEXT TEN MINUTE POLLING CYCLE.
B. AIR FLOW MONITORS LOCATED IN THE SUPPLY AND EXHAUST DUCTWORK SHALL MODULATE THE EXHAUST AIR
FAN VARIABLE FREQUENCY DRIVE, VFD, TO MAINTAIN AN AIR FLOW OFFSET EQUAL TO THE SUPPLY AIR FLOW.
C. HIGH LIMIT STATIC PRESSURE SENSOR, SPS-1 SHALL DE-ENERGIZE AHU FANS WHEN STATIC PRESSURE
REACHES 6.0" (ADJUSTABLE). ALARM AT THE BAS.
EA
EXISTING SUPPLY
DUCT
EXISTING
COIL
EXISTING EXHAUST
DUCT
RH
VFD
(30-AC-4 / 30-ERU-2 AND RTU-1)
OCCUPIED CYCLE:
THE ROOM THERMOSTAT SHALL, ON A RISE IN SPACE TEMPERATURE ABOVE ITS SETPOINT,
MODULATE THE VVB CONTROL DAMPER TO THE OPENED POSITION. ON A DROP IN SPACE
TEMPERATURE, THE REVERSE SHALL OCCUR.
UNOCCUPIED CYCLE:
WHEN THE VAV BOXES RESPECTIVE AIR HANDLING UNIT IS PROGRAMMED TO THE UNOCCUPIED
CYCLE, THE VAV BOX CONTROL DAMPER SHALL CLOSE.
VARIABLE VOLUME BOX CONTROL
M 20 PSIG
BY VAV BOX
MANUFACTURER
DAMPER
ACTUATOR
N.C.
VAV
N.O.
N.C.
C.
T
M
OCCUPIED/UNOCCUPIED
ROOM THERMOSTAT
NOTES:
1. ATC NOTE PROVIDED AT THE REQUEST OF THE VA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
A R
L
G
D r a w i n g s A c a d B c u m e n t s M
M
H
M
E C
H A
N I C
A L
C
O N
T R
O L S
P l o t t e d
B y
B r e n d o n
J
B u r l e y
P
M
BKM# 17022.01
07/27/20 212OfDwg.
BURDETTE KOEHLER MURPHY &
ASSOCIATES, INC.
MECHANICAL / ELECTRICAL ENGINEERS
6300 BLAIR HILL LANE, SUITE 400
BALTIMORE, MARYLAND 21209
410.323.0600 - FAX 410.377.2543
KOFFEL ASSOCIATES
FIRE PROTECTION ENGINEERS
8815 CENTRE PARK DRIVE, SUITE 200
COLUMBIA, MARYLAND 21045
410.750.2246 - FAX 410.750.2588
RICKERT ENGINEERING, INC.
STRUCTURAL ENGINEERING
8813 WALTHAM WOODS ROAD, SUITE 301
BALTIMORE, MARYLAND 21234
410.663.5110 - FAX 410.663.5114
BID DOCUMENTS
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
30-MH11
MECHANICAL CONTROLS
JDS JDT 99
AutoCAD SHX Text
AutoCAD SHX Text
CORPORAL MICHAEL J. CRESCENZ VA MEDICAL CENTER PHILADELPHIA, PA
AutoCAD SHX Text
UPGRADE PATIENT BEDROOMS CLC UNIT B
AutoCAD SHX Text 642-16-108
AutoCAD SHX Text
ARCHITECTURE
AutoCAD SHX Text
PLANNING
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text 2215 Conowingo Rd, Suite 100 Bel Air, Maryland 21015-1436 410.803.0009 fax 410.836.6611
| 055-30-AS43 |
| 056-30-AS44 |
| 057-30-AS45 |
| 058-30-AS46 |
| 059-30-AS47 |
| 060-30-AS48 |
| 061-30-AS49 |
| 062-30-AS50 |
| 063-30-AS51 |
| 064-30-AS52 |
| 065-30-AS53 |
| 066-30-AS54 |
| 067-30-AS55 |
| 068-30-AS56 |
| 069-30-AS57 |
| 070-30-AS58 |
| 071-30-AS59 |
| 072-30-AS60 |
| 073-30-AS61 |
| 074-30-AS62 |
| 075-30-AS63 |
| 076-30-AS64 |
| 077-30-AS65 |
| 078-30-SS1 |
| Sheets and Views |
| 17016 VA Phila CLC-SS1 |
| 079-30-SS2 |
| Sheets and Views |
| 17016 VA Phila CLC-SS2 |
| 080-30-MH1 MECHANICAL LEGEND ABBREVIATIONS AND GENERAL NOTES |
| Sheets and Views |
| Work |
| 081-30-MH2(AB) 1ST FLR PLN DUCT D |
| Sheets and Views |
| Work |
| 082-30-MH2(CD) 1ST FLR PLN DUCT D |
| Sheets and Views |
| Work |
| 083-30-MH3(AB) 2ND FLR PLN DUCT D |
| Sheets and Views |
| Work |
| 084-30-MH3(CD) 2ND FLR PLN DUCT D |
| Sheets and Views |
| Work |
| 085-30-MH4(AB) 1ST FLR PLN PIPING D |
| Sheets and Views |
| Work |
| 086-30-MH4(CD) 1ST FLR PLN PIPING D |
| Sheets and Views |
| Work |
| 087-30-MH5(AB) 2ND FLR PLN PIPING D |
| Sheets and Views |
| Work |
| 088-30-MH5(CD) 2ND FLR PLN PIPING D |
| Sheets and Views |
| Work |
| 089-30-MH6(AB) 1ST FLR PLN DUCT N |
| Sheets and Views |
| Work |
| 090-30-MH6(CD) 1ST FLR PLN DUCT N |
| 091-30-MH7(AB) 2ND FLR PLN DUCT N |
| 092-30-MH7(CD) 2ND FLR PLN DUCT N |
| 093-30-MH8(AB) 1ST FLR PLN PIPING N |
| 094-30-MH8(CD) 1ST FLR PLN PIPING N |
| 095-30-MH9(AB) 2ND FLR PLN PIPING N |
| 096-30-MH9(CD) 2ND FLR PLN PIPING N |
| 097-30-MH10(AB) MECHANICAL ROOF PLAN |
| 098-30-MH10(CD) MECHANICAL ROOF PLAN |
| 099-30-MH11 MECHANICAL CONTROLS |
| Sheets and Views |
| Work |
| 100-30-MH12 MECHANICAL AHU SECTIONS |
| 101-30-MH13 MECHANICAL DETAILS |
| 102-30-MH14 MECHANICAL DETAILS |
| 103-30-MH15 MECHANICAL SCHEDULES 1 |
| 104-30-MH16 MECHANICAL SCHEDULES 2 |
| 105-30-PL1 PLUMB GEN NOTES ABBREV LEGEND |
| 106-30-PL2(AB) DOMESTIC WATER 1ST FLR PLN D |
| 107-30-PL2(CD) DOMESTIC WATER 1ST FLR PLN D |
| 108-30-PL3(AB) DOMESTIC WATER 2ND FLR PLN D |
File details come from the government source that posted it. Updated .