This Work Write-Up (Exhibit 1) is a scope of work document prepared by the City of Jackson Community Development Department for a residential improvement project located at 626 N East Avenue, Jackson, Michigan 49202-3421, for customer Deborah Keena. The project encompasses three primary components: installation of a new 95% efficient forced air, gas-fired furnace with AGA label certification compliant with Michigan Mechanical Code and NWAHA standards; replacement of an air conditioning unit; and installation of a new high-efficiency water heater. The furnace installation requires proper ductwork design with supply and return air provisions, register placement in accordance with building code standards, insulation of exposed ducts, and installation of a new thermostat and filter rack. The water heater installation must comply with manufacturer specifications and applicable codes including the Michigan Plumbing Code, NFPA 70, International Fuel Gas Code, and International Mechanical Code. Both the furnace and water heater installations are designated as permit-required work. The document was prepared on June 30, 2026, by the City of Jackson Community Development Department and requires signatures from both the property owner and contractor to become binding as part of a construction contract.
The project is being rebid as a competitive sealed bid opportunity requiring all participants to maintain SAM.gov registration, possess proper licensing, and obtain all required permits. Awards are made to qualified bidders submitting the lowest compliant bids. The work write-up does not specify explicit pricing information, response deadlines, site visit requirements, or pre-bid meetings within the document itself, as these details are typically contained in the related solicitation documents. Repair and replacement of wiring or plumbing necessary to achieve code compliance are included in the installation scope if not separately bid. The document emphasizes strict adherence to local code requirements and provides specific dimensional and accessibility standards for appliance servicing and installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 626_N_EAST_ST_-_NEW_FURNACE,_A_C_UNIT_&_WATER_HEATER_-_REBID.pdf | ||
| All_Services_Sample_Contract_.docx | DOCX document | |
| Performance_Bond.pdf | ||
| Maintenance_and_Guarantee_Bond.pdf | ||
| Labor_and_Material_Payment_Bond.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Work Write-Up
F19 - FURNACE - REPLACE
* EXHIBIT 1 *
Dated: 6/30/2026
CUSTOMER INFORMATION
Keena, Deborah 626 N East Ave , Jackson, MI 49202-3421
PREPARED BY
sharrison@cityofjackson.org
* NOTE *
THE CUSTOMER AND CONTRACTOR MUST SIGN THE BOTTOM OF EACH PAGE ONLY IF
1) THIS WORK WRITE-UP BECOMES PART OF A CONSTRUCTION CONTRACT
2) THE UNDERSIGNED CUSTOMER AND CONTRACTOR HAVE REVIEWED, APPROVED AND AGREED TO THE WORK AND PRICES DESCRIBED IN THIS WORK WRITE-UP
Location: Unassigned
| General Requirements |
| Quantity |
| Units |
| Total |
1 - F19 - FURNACE and AC- REPLACE (Specification ID:1.19000 )
* PERMIT REQUIRED *
Replace existing furnace with new 95% efficient forced air, gas fired furnace bearing AGA label. Furnace output capacity shall be sufficient to heat the structure according to NWAHA standards. Installations shall comply with the current Michigan Mechanical Code. All habitable rooms, as designated by the Building Inspector, shall be supplied with warm air sufficient to maintain temperatures according to NWAHA standards. All new register installations shall be located in floor or low wall with the exception of bathrooms, which shall be wall mounted. Provide an adequate means of return air for these new supply runs. The use of ceiling diffuser outlets will be allowed only with prior approval. When new supply or returns are required and duct is run through any habitable room, it shall be enclosed in new or existing walls. Any new enclosure shall match existing surfaces. Installation shall include a register in the warm air plenum or trunkline to provide heat to the cellar and a new thermostat. A filter rack with cover shall be installed in the return air duct outside of the furnace cabinet. Whenever possible, insulate new supply and return ducts in unheated attic spaces, ventilated crawl spaces, and other exposed locations to prevent excessive heat loss. Flexible duct shall be used only in attics or crawl spaces. If not bid As a separate part of this contract, the installation shall include repair or replacement of wiring and/or plumbing necessary to comply with local code. If the existing ductwork is not to be replaced, it must be approved by the Mechanical Inspector and:
This to include replacement of the AC unit.
| Plumbing System |
| Quantity |
| Units |
| Total |
2 - WA1 - High Efficiency unit (Specification ID:75.10000 )
EA
* PERMIT REQUIRED *
Disconnect existing unit and remove from property. Installation of a new High efficiency unit.
Water heater shall be installed in accordance with the manufacturer's installation instructions. Electric water heaters shall conform to the requirements of the Michigan plumbing Code and provisions of NFPA 70. Gas-fired water heaters shall conform to the requirements of the International Fuel Gas Code. Elevation of water heater ignition sources and mechanical damage protection requirements for water heaters shall be in accordance with the IMC and the IFG codes.
Appliances shall be provided with access for inspection, service, repair, and replacement without disabling the function of a fire-resistance-rated assembly or removing permanent construction, other appliances or any other piping or ducts not connected to the appliance being inspected, service, repaired or replaced. A level working space at least 30 inches deep and 30 inches wide shall be provided in front of the control side to service an appliance.
Total
Customer
Prepared By: sharrison@cityofjackson.org on 6/30/2026
OWNER ACCEPTS SCOPE OF WORK
I have read the contents of this work write up and received a copy. I fully understand the repairs to be made to my property.
| x_________________________ | __________ | |
| Owner: | Date |
CONTRACTOR ACCEPTS SCOPE OF WORK
I have read the contents of this work write up and agree to perform all work called for in accordance with the bid submitted on __________.
| x_________________________ | __________ | |
| Contractor | Date |
| x____________________________ | __________ | |
| Construction Specialist | Date |
| Prepared By: sharrison@cityofjackson.org on 6/30/2026 |