614204 - Amelia Co Site Impr - Bid Docs - 2023-01-08 (1).pdf
PDF 40 MB Posted
- Solicitation number
- 56878
- Issued by
- Amelia County, Virginia
About this file
This document is a bid invitation for the Amelia County Elementary School Site Improvements project in Amelia, Virginia. The work generally consists of site work extending the paved portions of the carpool lines and bus loop at the elementary school. Sealed bids will be received until 2:00 p.m. local time on February 8, 2024, and will be publicly opened and read immediately thereafter. A non-mandatory pre-bid conference will be held on January 26, 2024. Bidders must obtain bidding documents electronically from Moseley Architects and will be considered planholders only if they obtain the documents through this process. Only planholders will be notified of addenda.
The bid invitation does not provide details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient commercial information. The document focuses on the project scope, bid submission requirements, and the procurement process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
D A
TE
DRAWN BY
DATE
R
EV
IS
IO
N D
ES
C R
IP
TI
O
N
YO
UR
V
IS
IO
N
AC
HI
EV
ED
T
HR
O
UG
H O
UR
S.
Th es e pl an s an d as so ci at ed d oc um en ts a re th e ex cl us iv e pr op er ty o f T
IM
M O
N S
G R
O U
P a nd m ay n ot b e re pr od uc ed in w ho le o r i n pa rt an d sh al l n ot b e us ed fo r a ny p ur po se w ha ts oe ve r, in cl us iv e, b ut n ot lim ite d to c on st ru ct io n, b id di ng
, a nd
/o r c on st ru ct io n st ak in g w ith ou t t he e xp re ss w rit te n co ns en t o f T
IM
M
O N
S G
R O
U P
B ou ld er s Pa rk w ay , S ui te
R ic hm on d, V A
TE
L
4.
0.
F
AX
.5
.1 w w w .t im m on s.
co m
TH
IS
D
RA
W
IN
G P
RE
PA
RE
D
A T
TH
E
CO
R
PO
R
A
TE
O
FF
IC
E
S :\3
\5
-A m el ia
_B us
_L oo p\ D
W G
\S he et \C
D \5
-C
0- C
O V
R .d w g
| P lo tte d on
/4 /2
2:
P M by
L au rie C of fm an
01/08/2024
59196
A M
EL
IA
E
LE
M
EN
TA
R
Y
SC
H O
O L
SI
TE
IM
PR
O
VE
M
EN
TS
A
M
EL
IA
C
O U
N
TY
TG, LC
TG, LC
SR
01-08-2024
AS SHOWN
/0
8/
B
ID
S E
T
C000
C O
V E
R
CIVIL SITE ENGINEER
TIMMONS GROUP
1001 BOULDERS PARKWAY, SUITE 300
RICHMOND, VIRGINIA 23225
CONTACT: STEVE RAUGH
PHONE: (804) 200-6467
EMAIL: steve.raugh@timmons.com
OWNER
AMELIA CO SCHOOL BOARD
8701 OTTERBURN ROAD
AMELIA COURT HOUSE, VA 23002
CONTACT: BO LYNCH
PHONE: 804-561-2621
EMAIL: blynch@ameliaschools.com
SITE LOCATION INFORMATION
LATITUDE AND LONGITUDE:
37.3306°N, 77.9846°W
FEMA PANEL NUMBER & EFFECTIVE DATE:
51007C0175D UNINCORPORATED AREA
OCTOBER 7, 2021
NAME OF RECEIVING CHANNEL/WATERS:
APPOMATTOX RIVER - SMACKS CREEK
VA CODE HU6: VA28
HUC8: 02080207
APPLICANTS NAME:
ZONING & CASE #:
SCHEMATIC CASE #:
AREA:
GPIN:
DATE OF PLANNING
COMMISSION APPROVAL:
EROSION CONTROL:
SEWER:
WATER:
ROADS &
DRAINAGE:
VDOT:
SHD:
SWCB:
INSPECTOR:
CONTRACTOR:
FOREMAN:
NOTICE TO PROCEED:
DATE STARTED:
DATE COMPLETED:
AMELIA CO SCHOOL BOARD
COUNTY APPROVALS
COUNTY USE
COUNTY CONTRACT NO.
ZONING RR-3 - RURAL RESIDENTIAL
42-64A, 42-64H
16.34 ac., 5.47 ac.
8533 N FIVE FORKS RD
AMELIA COURT HOUSE, VA 23002
SITE
VICINITY MAP
SCALE: 1" = 2,000'
AMELIA COUNTY ELEMENTARY SCHOOL
SITE IMPROVEMENTS
ZONING R-1 - RESIDENTIAL
Drawing List Table Drawing Number Drawing Title
C000 COVER
C010 GENERAL NOTES & DETAILS
C011 GENERAL NOTES & DETAILS
C012 GENERAL NOTES & DETAILS
C013 GENERAL NOTES & DETAILS
C100 OVERALL PROPERTY MAP
C200 EXISTING CONDITIONS PLAN
C300 DEMOLITION & PHASE I E&S CONTROL PLAN
C310 PHASE II EROSION & SEDIMENT CONTROL PLAN
C320 EROSION & SEDIMENT CONTROL NOTES & DETAILS
C321 EROSION & SEDIMENT CONTROL NOTES & DETAILS
C322 EROSION & SEDIMENT CONTROL NOTES & DETAILS
C400 SITE LAYOUT PLAN
C500 GRADING AND SPOT ELEVATION PLAN
C510 STORM SEWER PLAN
C520 STORM SEWER PROFILES
C530 DRAINAGE AREA MAP
C600 PRE DEVELOPED HYDROLOGY
C610 POST DEVELOPED HYDROLOGY
C620 STORMWATER COMPLIANCE PLAN (VRRM)
L100 LANDSCAPE PLAN
L200 LANDSCAPE NOTES & DETAILS
E1 ELECTRICAL SITE PLAN
E2 LIGHTING CUT SHEETS
E3 LIGHTING CUT SHEETS
AutoCAD SHX Text
NAD83
AutoCAD SHX Text %%U
MULTICORELINK:59196-C010-NTDT-C010
MULTICORELINK:59196-C010-NTDT-C010
MULTICORELINK:59196-C010-NTDT-C011
MULTICORELINK:59196-C010-NTDT-C011
MULTICORELINK:59196-C010-NTDT-C012
MULTICORELINK:59196-C010-NTDT-C012
MULTICORELINK:59196-C010-NTDT-C013
MULTICORELINK:59196-C010-NTDT-C013
MULTICORELINK:59196-C100-OVRL-C100
MULTICORELINK:59196-C100-OVRL-C100
MULTICORELINK:59196-C200-EXST-C200
MULTICORELINK:59196-C200-EXST-C200
MULTICORELINK:59196-C300-ERO1-C300
MULTICORELINK:59196-C300-ERO1-C300
MULTICORELINK:59196-C310-ERO2-C310
MULTICORELINK:59196-C310-ERO2-C310
MULTICORELINK:59196-C320-ECND-C320
MULTICORELINK:59196-C320-ECND-C320
MULTICORELINK:59196-C320-ECND-C321
MULTICORELINK:59196-C320-ECND-C321
MULTICORELINK:59196-C320-ECND-C322
MULTICORELINK:59196-C320-ECND-C322
MULTICORELINK:59196-C400-LAYO-C400
MULTICORELINK:59196-C400-LAYO-C400
MULTICORELINK:59196-C500-SPOT-C500
MULTICORELINK:59196-C500-SPOT-C500
MULTICORELINK:59196-C510-DRAIN-C510
MULTICORELINK:59196-C510-DRAIN-C510
MULTICORELINK:59196-C520-STRM-C520
MULTICORELINK:59196-C520-STRM-C520
MULTICORELINK:59196-C530-DAMP-C530
MULTICORELINK:59196-C530-DAMP-C530
MULTICORELINK:59196-C600-HYDR-PRE-C600
MULTICORELINK:59196-C600-HYDR-PRE-C600
MULTICORELINK:59196-C610-HYDR-POST-C610
MULTICORELINK:59196-C610-HYDR-POST-C610
MULTICORELINK:59196-C620-VRRM-C620
MULTICORELINK:59196-C620-VRRM-C620
MULTICORELINK:59196-L100-PLNT-L100 LANDSCAPE PLAN
MULTICORELINK:59196-L100-PLNT-L100 LANDSCAPE PLAN
MULTICORELINK:59196-L200-PLNT-NTDT-L200 LANDSCAPE NOTES & DETAILS
MULTICORELINK:59196-L200-PLNT-NTDT-L200 LANDSCAPE NOTES & DETAILS
MULTICORELINK:59196-LIGHTING-E1
MULTICORELINK:59196-LIGHTING-E1
MULTICORELINK:59196-LIGHTING-E2
MULTICORELINK:59196-LIGHTING-E2
MULTICORELINK:59196-LIGHTING-E3
MULTICORELINK:59196-LIGHTING-E3
VDOT RICHMOND DISTRICT LAND USE
SUBDIVISION AND SITE CONSTRUCTION PLAN GENERAL NOTES
1. ALL MATERIALS AND CONSTRUCTION WITHIN THE PUBLIC RIGHT OF WAY SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION'S ROAD AND BRIDGE SPECIFICATIONS, ROAD AND BRIDGE STANDARDS AND VIRGINIA WORK AREA
PROTECTION MANUAL.
2. LAND USE PERMITS (LUP) SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION PRIOR TO BEGINNING ANY CONSTRUCTION
WITHIN THE EXISTING STATE-MAINTAINED RIGHT-OF-WAY (INCLUDING ACCESS).
3. VDOT REQUIRES NOTIFICATION 48 HOURS PRIOR TO COMMENCING WITH INITIAL CONSTRUCTION ACTIVITIES. PLEASE CONTACT THE APPROPRIATE
PERMIT OFFICE IN WHICH YOUR PROPOSED ACTIVITIES ARE TO OCCUR.
4. APPROVAL OF A DETAILED CONSTRUCTION SEQUENCING AND MAINTENANCE OF TRAFFIC PLAN FOR THE WORK ZONE IS A PREREQUISITE FOR ISSUANCE OF A LAND USE PERMIT. THE PLAN SHALL ACCOMMODATE ACCESS TO AND CONSTRUCTION WITHIN VDOT MAINTAINED RIGHT-OF-WAY.
5. WORK ZONES - REQUESTS FOR THE IMPLEMENTATION OF TEMPORARY LANE AND SHOULDER CLOSURES ON INTERSTATE, LIMITED ACCESS PRIMARY ROUTES, AND ROUTES 58 AND 460 MUST BE ENTERED INTO THE VDOT LANE CLOSURE ADVISORY MANAGEMENT SYSTEM (LCAMS) BY 12:00 PM ON THURSDAY THE WEEK BEFORE THE WORK IS TO TAKE PLACE FOR APPROVAL. CONTACT THE WORK ZONE COORDINATOR AT 804-609-5338 FOR QUESTIONS AND ASSISTANCE. ALL LANE/SHOULDER CLOSURES REQUIRING LCAMS APPROVAL SHALL BE ENTERED INTO VA TRAFFIC.
LANE/SHOULDER CLOSURES ON PRIMARY AND MAJOR SECONDARY ROUTES MUST ALSO BE ENTERED IN VA TRAFFIC. MAJOR SECONDARY ROUTES ARE DEFINED AS THOSE LISTED IN THE RICHMOND DISTRICT RECOMMENDED WORK HOURS DOCUMENT. JUST PRIOR TO THE FIRST CONE GOING DOWN, USERS MUST CONTACT THE TOC AT 804-796-4520 TO ACTIVATE THE WORK ZONE AND WHEN THE LAST CONE HAS BEEN PICKED UP TO
DEACTIVATE THE WORK ZONE.
6. PERMITTEE MUST NOTIFY VIRGINIA DEPARTMENT OF TRANSPORTATION TOC WHEN THERE IS A CRASH IN A WORK ZONE AT 804-796-4520.
7. PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR SHALL CONSULT THE DEVELOPER'S ENGINEERING CONSULTANT AND VERIFY THE APPROVAL OF
THE PLANS BY ALL APPLICABLE FEDERAL, STATE AND LOCAL AGENCIES.
8. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES SHOWN ON PLANS IN AREAS OF CONSTRUCTION PRIOR TO STARTING WORK. CONTACT THE DEVELOPER'S ENGINEERING CONSULTANT IMMEDIATELY IF LOCATION OR ELEVATION IS DIFFERENT FROM THAT SHOWN ON PLAN. IF THERE APPEARS TO BE A CONFLICT, OR UPON DISCOVERY OF ANY UTILITY NOT SHOWN ON THIS PLAN, CALL “MISS UTILITY” AT 811. THE DEVELOPER SHALL BE RESPONSIBLE FOR THE RELOCATION OF ANY UTILITY WITHIN EXISTING AND PROPOSED RIGHT OF WAY
REQUIRED BY THE DEVELOPMENT.
9. THE PERMITTEE OR THEIR AGENT MUST CONTACT THE VDOT CUSTOMER SERVICE CENTER AT 1-800-367-7623 A MINIMUM OF 48 HOURS PRIOR TO INITIATING ANY PLANNED EXCAVATION WITHIN 1,000 FEET OF A SIGNALIZED INTERSECTION AND/OR NEAR VDOT ITS INFRASTRUCTURE.
EXCAVATION MAY PROCEED ONLY AFTER THE VDOT REGIONAL UTILITY LOCATION AGENT HAS NOTIFIED THE PERMITTEE THAT THE UTILITY
MARKING HAS BEEN COMPLETED. ADDITIONAL INFORMATION CAN BE FOUND AT:
HTTP://WWW.VIRGINIADOT.ORG/BUSINESS/RESOURCES/IIM/TE-383_REQUEST_FOR_MARKING_VDOT_UTILITY_LOCATION.PDF “MISS UTILITY” DOES
NOT LOCATE VDOT UTILITIES.
10. THE CONTRACTOR SHALL VERIFY THE ELEVATIONS OF ALL POINTS OF CONNECTION OF PROPOSED WORK TO EXISTING CURBS, SANITARY LINES, WATER LINES, ETC., PRIOR TO CONSTRUCTION.
11. DESIGN CHANGES, SPECIFIED MATERIALS CHANGES AND FIELD CHANGES FROM THE APPROVED PLANS SHALL BE RE-SUBMITTED TO VDOT FOR APPROVAL PRIOR TO PROCEEDING WITH THE WORK. A LETTER OF EXPLANATION SHALL ACCOMPANY THE PROPOSED REVISION ALONG WITH
DRAINAGE CALCULATIONS WHEN APPROPRIATE.
12. VDOT APPROVAL OF CONSTRUCTION PLANS DOES NOT PRECLUDE THE RIGHT TO REQUIRE ADDITIONAL FACILITIES AS DEEMED NECESSARY FOR ACCEPTANCE OF THE ROADS INTO THE VDOT SECONDARY ROAD SYSTEM BASED ON FIELD CONDITIONS OR UNAPPROVED PLAN CHANGES.
13. VDOT APPROVAL OF THESE PLANS WILL EXPIRE FIVE (5) YEARS FROM THE DATE OF APPROVAL FOR SITE PLANS AND SUBDIVISION PLANS IF
CONSTRUCTION HAS NOT STARTED.
14. PRELIMINARY DESIGN OF THE PAVEMENT STRUCTURE FOR ALL SUBDIVISION STREETS SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF THE PAVEMENT DESIGN GUIDE FOR SUBDIVISION AND SECONDARY ROADS IN VIRGINIA. THE COMPLETED DESIGN WORKSHEET APPENDIX IV SHALL BE INCLUDED WITH THE INITIAL PLAN SUBMITTAL FOR EACH PROPOSED PAVEMENT SECTION UTILIZING THE PREDICTED SOIL SUPPORT VALUE SHOWN IN APPENDIX I OF THE PAVEMENT DESIGN GUIDE OR AS REPORTED IN A GEOTECHNICAL ANALYSIS OF THE ON-SITE SOILS.
15. A COPY OF THE COMPLETE CBR REPORT SHALL BE SUBMITTED TO VDOT IN CONJUNCTION WITH FINAL PAVEMENT DESIGNS. ALL PAVEMENT DESIGN RECOMMENDATIONS SHALL BE PERFORMED IN ACCORDANCE WITH THE CURRENT EDITION OF PAVEMENT DESIGN GUIDE FOR SUBDIVISION
AND SECONDARY ROADS IN VIRGINIA.
16. ALL VEGETATION AND ORGANIC MATERIAL SHALL BE REMOVED FROM THE RIGHT OF WAY LIMITS PRIOR TO CONDITIONING OF THE SUBGRADE.
17. UPON DISCOVERY OF SOILS THAT ARE UNSUITABLE FOR FOUNDATIONS, SUBGRADES, OR OTHER ROADWAY CONSTRUCTION PURPOSES, THE DEVELOPER OR HIS DESIGNEE, WHICH MAY BE THE CONTRACTOR, SHALL IMMEDIATELY ENGAGE A GEOTECHNICAL ENGINEER AND NOTIFY VDOT.
THESE AREAS SHALL BE EXCAVATED BELOW PLAN GRADE AS DIRECTED BY THE GEOTECHNICAL ENGINEER, BACKFILLED WITH SUITABLE MATERIAL
AND COMPACTED IN ACCORDANCE WITH CURRENT VDOT SPECIFICATIONS.
18. THE NECESSITY AND LOCATIONS FOR ADDITIONAL VDOT STANDARD UNDERDRAINS SHALL BE DETERMINED AT TIME OF SUBGRADE INSPECTION.
VIDEO INSPECTION OF ACCESSIBLE OUTLET LOCATIONS, MAINLINE LONGITUDINAL CONNECTIONS, AND LONGITUDINAL PIPE FOR ALL PAVEMENT UNDERDRAINS, CROSS DRAINS, EDGEDRAINS AND PREFABRICATED GEOCOMPOSITE PANEL DRAINS SHALL BE CONDUCTED IN ACCORDANCE WITH SECTION 501 OF THE ROAD AND BRIDGE SPECIFICATIONS AND VIRGINIA TEST METHOD 108 - POST INSTALLATION INSPECTION OF UNDERDRAINS, CROSSDRAINS, AND EDGEDRAINS.
19. VDOT SHALL HAVE PERFORMED THE REQUIRED FIELD INSPECTION (PROOF ROLL) PRIOR TO PLACEMENT OF THE AGGREGATE BASE COURSE(S).
CONTACT VDOT FOR SUBGRADE INSPECTION 48 HOURS PRIOR TO SCHEDULING PLACEMENT OF AGGREGATE BASE COURSE(S).
20. THE SCHEDULING OF AGGREGATE BASE INSTALLATION AND SUBSEQUENT PAVING ACTIVITIES SHALL ACCOMMODATE FORECASTED WEATHER
CONDITIONS PER SECTION 315 OF THE ROAD AND BRIDGE SPECIFICATIONS.
21. VDOT SHALL HAVE APPROVED THE AGGREGATE BASE COURSE(S) FOR DEPTH, TEMPLATE AND PERFORMED THE REQUIRED FIELD INSPECTION (PROOF ROLL) PRIOR TO PLACEMENT OF ANY ASPHALT CONCRETE SURFACE COURSE(S). CONTACT VDOT FOR INSPECTION OF THE AGGREGATE
BASE COURSE(S) 48 HOURS PRIOR TO APPLICATION OF THE SURFACE COURSE(S).
22. A LICENSED GEOTECHNICAL ENGINEER OR HIS DESIGNEE SHALL ASCERTAIN CAUSE AND CERTIFY RECOMMENDED METHOD OF REPAIR FOR ALL
PAVEMENT STRUCTURAL FAILURES PRIOR TO STATE ACCEPTANCE.
23. VDOT SHALL BE PROVIDED DOCUMENTATION BY A LICENSED GEOTECHNICAL ENGINEER, CERTIFYING THAT ALL IN-PLACE PAVEMENTS MEET OR EXCEED THE APPROVED PAVEMENT DESIGN THICKNESS PRIOR TO STATE ACCEPTANCE OF THE STREET. CORES ARE TO BE OBTAINED VERIFYING PAVEMENT THICKNESS UNLESS OTHERWISE DIRECTED BY VDOT. THE PERMIT INSPECTOR SHALL BE CONTACTED 24 HOURS PRIOR TO THE CORE
SAMPLES BEING TAKEN.
24. ALL STORM SEWER DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH LATEST VDOT DRAINAGE MANUAL, ROAD AND BRIDGE
STANDARDS, AND IIMS.
25. ALL PRE-CAST UNITS SHALL BE VDOT APPROVED. CERTIFICATION AND VDOT STAMP IS REQUIRED ON ALL UNITS.
26. ALL CONCRETE SHALL BE CLASS A3-AE (AIR ENTRAINED 3,000 PSI) UNLESS OTHERWISE SPECIFIED.
27. ALL ROADSIDE DITCHES SHOWN AS PAVED ON PLANS ARE TO BE PAVED IN ACCORDANCE WITH THE STANDARD TYPICAL SECTION AS SHOWN ON THE PLANS. ANY ADDITIONAL PAVING OF THE DITCHES, OTHER THAN THOSE SHOWN ON THE ROAD PLANS WILL BE DETERMINED PRIOR TO
ACCEPTANCE OF THE ROADS INTO THE VDOT SECONDARY ROAD SYSTEM.
28. ROAD & BRIDGE SPECIFICATIONS SECTION 302, DRAINAGE STRUCTURES ADDRESSES POST INSTALLATION VISUAL/VIDEO CAMERA INSPECTION OF STORM SEWER PIPES AND PIPE CULVERTS. INSPECTION FREQUENCY SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS AND/OR AS NECESSITATED BY THE ENGINEER. VIDEO INSPECTION SHALL BE CONDUCTED IN ACCORDANCE WITH VIRGINIA TEST METHOD (VTM) 123, POST
INSTALLATION INSPECTION OF BURIED STORM SEWER PIPE AND PIPE CULVERTS.
29. A CONSTRUCTION ENTRANCE SHALL BE INSTALLED ON EACH INDIVIDUAL LOT PRIOR TO ANY LOT GRADING OR HOME CONSTRUCTION ACTIVITIES AND SHALL BE ADEQUATELY MAINTAINED UNTIL ALL CONSTRUCTION TRAFFIC AREAS WITHIN THE LOT HAVE BEEN STABILIZED.
30. ALL ENTRANCES SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH CURRENT VDOT STANDARDS. RESIDENTIAL LOT ACCESS SHALL
BE PROVIDED PER THE FOLLOWING CRITERIA:
·· ALL DRIVEWAY ENTRANCES AND ENTRANCE CULVERTS SHALL CONFORM TO PE-1 PRIVATE ENTRANCE STANDARDS UNLESS OTHERWISE
APPROVED BY VDOT. NO ENTRANCE CULVERTS ARE TO BE INSTALLED WITHIN FIVE (5) FEET OF A PROPERTY CORNER.
·· VDOT STANDARD CG-9D ENTRANCES SHALL BE USED WHEN AN ENTRANCE IS REQUIRED IN CURB AND GUTTER NEIGHBORHOODS UNLESS
OTHERWISE APPROVED BY VDOT.
31. DRY GUTTER IS NOT ALLOWED IN VDOT RIGHT OF WAY EXCEPT AS SHOWN ON VDOT'S ENTRANCE STANDARD DETAILS.
32. THE DEVELOPER SHALL FURNISH AND INSTALL STOP SIGNS AND STOP BARS AT STREET INTERSECTIONS AND ALL REGULATORY SIGNAGE PER THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. ALL SIGNS MUST BE INSTALLED ON VDOT STANDARD STP-1 SIGN POSTS.
33. INSTALLATION, MAINTENANCE AND OPERATION OF STREET LIGHTING SHALL BE PROVIDED BY AND AT THE SOLE EXPENSE OF OTHERS. VDOT WILL ALLOW LIGHTING WITHIN THE RIGHT OF WAY BY LAND USE PERMIT (LUP) ONLY. LIGHTING ON CURB SECTIONS SHALL BE PLACED BEHIND THE CURB AND PREFERABLY BEHIND THE SIDEWALK. FOR SHOULDER SECTIONS, THE POLE SHALL BE PLACED A MINIMUM OF 10' FROM EDGE OF PAVEMENT AND BEHIND THE DITCH LINE. ALL LIGHTING PROPOSED WITHIN THE RIGHT OF WAY MUST BE DESIGNED IN ACCORDANCE WITH THE AASHTO GUIDE FOR ROADWAY LIGHTING AND SHALL MEET THE CURRENT ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA (IESNA) STANDARDS.
34. TRAFFIC SIGNALS REQUIRE AN INDIVIDUAL LAND USE PERMIT. THE APPLICANT SHALL BE RESPONSIBLE FOR THE DESIGN COSTS OF ANY TRAFFIC SIGNAL INSTALLATION OR MODIFICATION OF EXISTING SIGNALS. DESIGN PLANS MUST BE PREPARED AND SUBMITTED TO VDOT BY A LICENSED PROFESSIONAL ENGINEER FOR REVIEW AND APPROVAL. THIS INCLUDES THE FOUNDATION DESIGN AND ANY EQUIPMENT ASSOCIATED WITH THE COMPLETED TRAFFIC SIGNAL. ALL EQUIPMENT MUST BE APPROVED BY VDOT. SHOP DRAWINGS MUST BE SUBMITTED FOR REVIEW AND APPROVAL
PRIOR TO FABRICATING ANY SIGNAL STRUCTURAL COMPONENTS.
35. SOIL STABILIZATION IS REQUIRED WITHIN 7 DAYS FOR ALL AREAS WHERE CLEARING, GRADING, EXCAVATION OR OTHER LAND DISTURBING ACTIVITIES HAVE PERMANENTLY CEASED OR WHERE LAND DISTURBANCE ACTIVITIES HAVE BEEN TEMPORARILY SUSPENDED FOR AN ANTICIPATED DURATION OF GREATER THAN 7 DAYS, OR UPON COMPLETION OF GRADING OPERATIONS FOR A SPECIFIED AREA. SOIL STABILIZATION SHALL BEGIN AS SOON AS PRACTICABLE, BUT NOT LATER THAN THE SEVEN DAYS FOLLOWING THE DAY WHEN LAND DISTURBING ACTIVITIES
TEMPORARILY OR PERMANENTLY CEASED.
36. NO STRUCTURE SHALL BE CONSTRUCTED ON STATE MAINTAINED RIGHT OF WAYS, OR ON RIGHT OF WAYS INTENDED TO BE MAINTAINED BY VDOT UNLESS SAID STRUCTURES ARE SHOWN ON CONSTRUCTION PLANS APPROVED BY VDOT OR SUCH STRUCTURES ARE COVERED BY A VDOT LUP (OR BY A LETTER OF INTENT FROM THE RESIDENT ADMINISTRATOR/RESIDENT ENGINEER TO ISSUE SAID PERMIT AT THE TIME OF STATE
ACCEPTANCE).
VDOT CONSTRUCTION STANDARDS
ALL CONSTRUCTION METHODS AND MATERIAL SHALL CONFORM
TO THESE DRAWINGS, PROJECT SPECIFICATIONS, STANDARDS
WITH ALL CURRENT APPLICABLE CODES, AND, UNLESS
OTHERWISE SPECIFIED, WITH THE CURRENT EDITIONS AND
LATEST REVISIONS OF THE FOLLOWING REFERENCE
DOCUMENTS:
· VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT) ROAD
& BRIDGE SPECIFICATIONS
· VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT) ROAD
& BRIDGE STANDARDS
· MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)
· VIRGINIA SUPPLEMENT TO THE MUTCD
· INSTRUCTIONAL AND INFORMATIONAL MEMORANDA (IM)
· VIRGINIA WORK AREA PROTECTION MANUAL
SPECIFIC STANDARDS AND DETAILS FROM THE CURRENT AND
OR REVISED VERSION OF THE 2016 VDOT ROAD AND BRIDGE
STANDARDS INCLUDE:
DI-3C
MH-2
ST-1
GENERAL CONSTRUCTION NOTES
1. THIS PROJECT TO BE CONSTRUCTED IN ACCORDANCE WITH THE LATEST VDOT ROAD
AND BRIDGE SPECIFICATIONS, ROAD AND BRIDGE STANDARDS, WORK AREA
PROTECTION MANUAL, AND AS AMENDED BY CONTRACT PROVISIONS AND THE
COMPLETE PAPER COPY OF THE PLAN ASSEMBLY.
2. THE AMELIA COUNTY ENVIRONMENTAL DEPARTMENT SHALL BE NOTIFIED 24 HOURS IN
ADVANCE OF ANY PLANS TO BEGIN CLEARING AND GRADING OPERATIONS.
3. CONTRACTOR SHALL CALL "MISS UTILITY" 48 HOURS PRIOR TO THE START OF
EXCAVATION. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL
UNDERGROUND UTILITIES SHOWN ON PLANS IN AREA OF CONSTRUCTION PRIOR TO
STARTING WORK. CONTACT THE ENGINEER IMMEDIATELY IF LOCATION OR ELEVATION
IS DIFFERENT FROM THAT SHOWN ON THE PLAN, IF THERE APPEARS TO BE A
CONFLICT AND UPON DISCOVERY OF ANY UTILITY NOT SHOWN ON PLAN, TO MISS THE
UTILITY CALL "MISS UTILITY" OF CENTRAL VIRGINIA: 1-800-552-7001 (TOLL FREE).
4. CONTRACTOR SHALL ACQUIRE ANY AND ALL NECESSARY CONSTRUCTION PERMITS,
AND FURNISH COPIES TO THE OWNER.
5. ALL WORK SHALL BE SUBJECT TO INSPECTION BY DESIGNATED COUNTY OFFICIALS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFICATION OF THE CHIEF
INSPECTOR 48 HOURS PRIOR TO THE START OF WORK.
6. CONSTRUCTION STAKING SHALL BE DONE ONLY BY A LAND SURVEYOR REGISTERED IN
THE COMMONWEALTH OF VIRGINIA.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A LAND DISTURBANCE
PERMIT AND A VDOT LAND USE PERMIT FROM THE COUNTY AND VDOT RESPECTIVELY
PRIOR TO ORDERING MATERIALS OR COMMENCING WORK.
8. VERTICAL DATUM IS BASED ON MEAN SEA LEVEL (USC & GS DATUM). HORIZONTAL
CONTROLS ARE BASED ON VIRGINIA STATE PLANE COORDINATE GRID, SOUTH ZONE,
NORTH AMERICAN DATUM OF 1983 (NAD 83).
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF PROPER TOP
ELEVATIONS BEFORE CONSTRUCTION OF MANHOLES.
10. IN ACCORDANCE WITH HANDICAP ACCESSIBILITY REQUIREMENTS, ALL APPLICABLE
CODES AND REQUIREMENTS FOR ACCESSIBILITY FOR DISABLED PERSONS SHALL BE
STRICTLY COMPLIED WITH.
11. PER ADA REQUIREMENTS, ALL SIDEWALKS AND MARKED CROSSWALKS CONSTRUCTED
MUST NOT EXCEED A 2.0% CROSS SLOPE, AND A 5.0% LONGITUDINAL SLOPE (MAXIMUM
PER ADA REQUIREMENTS). MARKED ACCESSIBLE PARKING SPACES MUST NOT
EXCEED A 2.0% GRADE IN ANY DIRECTION.
12. ALL CURB AND GUTTER SHALL BE CG-6 & CG-2 WITHIN THE VDOT RIGHT-OF-WAY,
UNLESS OTHERWISE NOTED ON PLANS.
13. ALL DIMENSIONS ARE TO FACE OF CURB, UNLESS OTHERWISE NOTED ON PLANS.
14. PERMIT TO TIE TO EXISTING ROAD SHALL BE OBTAINED BY CONTRACTOR FROM VDOT
RESIDENT ENGINEER PRIOR TO CONSTRUCTION OF ENTRANCE.
15. WHERE ANY EXISTING PAVEMENT (SHOULDER OR TRAVEL LANE) IS PROPOSED TO BE
MODIFIED IN ANY WAY, PROPER RECONSTRUCTION AND/OR OVERLAY SHALL BE DONE.
THIS IS TO PROVIDE A SMOOTH SURFACE WITHOUT TRANSITIONAL ROUGHNESS.
16. DEMOLITION OF EXISTING ASPHALT PAVEMENT TO BE IN ACCORDANCE WITH VDOT
SPECIFICATIONS. IN AREAS WHERE FILL IS LESS THAN 3'0", THE PAVEMENT SHALL BE
HAULED OFF-SITE. WHERE FILL IS 3'0" OR GREATER, THE PAVEMENT SHALL BE
PULVERIZED AND LEFT IN PLACE.
17. THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE ADEQUATE AND POSITIVE SITE
DRAINAGE THROUGHOUT CONSTRUCTION. ANY SUBGRADE SOILS WHICH HAVE BEEN
WEAKENED DUE TO INADEQUATE DRAINAGE, SATURATION AND/OR DISTURBANCE BY
CONSTRUCTION SHALL BE UNDER-CUT AND REPLACED WITH COMPACTED
STRUCTURAL FILL AT NO ADDITIONAL COST TO THE OWNER.
18. WHENEVER THE CONTRACTOR'S OPERATIONS AFFECT VEHICULAR OR PEDESTRIAN
TRAFFIC, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION AND
MAINTENANCE OF ANY AND ALL SAFETY CONTROL DEVICES IN ACCORDANCE WITH
THE VDOT WORK AREA PROTECTION MANUAL AND AS DEEMED NECESSARY BY VDOT
AND THE ENGINEER. THE COSTS FOR SUCH ITEMS SHALL BE INCLUDED IN THE
CONTRACTOR'S LUMP SUM BID.
19. ALL SIGNS AND MARKINGS IN CONFLICT WITH ROADWAY CONSTRUCTION SHALL BE
REMOVED AND RESET AS DIRECTED BY THE VDOT RESIDENCY ENGINEER.
20. NO LANDSCAPING OF ANY TYPE SHALL BE PLACED WITHIN A THREE FOOT RADIUS OF
ANY FIRE HYDRANT. LANDSCAPING IN THE AREA OF FIRE HYDRANTS SHALL BE OF THE
TYPE THAT WILL NOT ENCROACH ON THE REQUIRED THREE FOOT CLEAR RADIUS ON
MATURITY OF GROWTH.
GEOTECHNICAL NOTES
1. ALL CONTROLLED FILL ZONES ARE TO BE MONITORED BY A FULL TIME GEOTECHNICAL
ENGINEERING SERVICE FIRM.
2. ENGINEERED FILLS SHALL BE PROPERLY PLACED ACCORDING TO THE
RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER AND THE EARTHWORK
SPECIFICATIONS.
3. ALL SUMMARY REPORTS FROM THE GEOTECHNICAL ENGINEER REPRESENTING THE
PROJECT MUST STATE HIS PROFESSIONAL OPINION ON THE SATISFACTORILY
COMPLETED PHASES OF CONSTRUCTION, SUCH AS; SLOPE CUTS, SUBDRAINAGE
SYSTEMS, PREPARATION OF SUBGRADES AND COMPACTION OF EARTH FILLS.
4. NO FILLS SHALL HAVE ZONES THAT EXCEED TWO (2) FEET IN ELEVATION WITHOUT
CONDUCTING COMPACTION TEST AND OBTAINING RESULTS 95% OR GREATER.
5. ANY BORROW MATERIAL SHALL HAVE A MINIMUM CBR VALUE OF TEN (10).
6. THE GEOTECHNICAL ENGINEER MUST SUBMIT DAILY FIELD REPORTS, ITEMIZING THE
FIELD DENSITY TEST RESULTS. THESE REPORTS SHALL BE ACCOMPANIED WITH A COPY
OF THE SITE PLAN SHEET AND INDICATE THE TEST LOCATIONS & ELEVATIONS. THE
GEOTECHNICAL ENGINEER MUST PROVIDE ENOUGH DESIGNATED TESTING IN ALL FILL
ZONES TO ADEQUATELY EXAMINE & CERTIFY THE INTEGRITY OF THE FILL.
7. THE GEOTECHNICAL ENGINEER MUST SUBMIT A CERTIFIED BUILDING PAD REPORT FOR
EACH FILL PAD LOCATION. THIS REPORT SHALL PROFILE THE FILL MATERIAL PLACEMENT
AND PROVIDE THE COMPACTION TEST RESULTS. ALL REPORTS WILL BE ACCOMPANIED
BY THE SITE PLAN, INDICATING THE TEST LOCATIONS & ELEVATIONS.
8. THESE GEOTECHNICAL NOTES SHALL IN NO WAY LESSEN THE REQUIREMENTS OF THE
EARTHWORK SPECIFICATIONS.
PAVEMENT / TRENCH NOTES
1. TEST SPACING AND METHODS MUST FOLLOW THE APPROVED GUIDELINES SET FORTH
AND/OR AS RECOMMENDED BY THE GEOTECHNICAL ENGINEER.
2. PAVEMENT RESTORATION WIDTH VARIES DEPENDING ON EXISTING PAVEMENT AGE AND
CONDITION AND MAY BE AS WIDE AS 4 TIMES THE TRENCH WIDTH ON BOTH SIDES.
REFER TO VDOT TRENCH CUT RESTORATION GUIDELINES.
3. SELECT FILL PIPE BACKFILL (VDOT #21A) REQUIRED IN RIGHT-OF-WAY COMPACTED TO
95% OF MAXIMUM DENSITY AS SHOWN.
4. ALL OTHER PIPE BACKFILL MATERIAL SHALL BE COMPACTED TO 95% OF MAXIMUM
DENSITY
GENERAL EROSION CONTROL NOTES
1. ALL EROSION CONTROL DEVICES MUST BE INSTALLED AND MAINTAINED IN ACCORDANCE
WITH THE VIRGINIA EROSION AND SEDIMENTATION CONTROL HANDBOOK.
2. ALL EROSION AND SILTATION MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST
STEP IN GRADING.
3. ALL STORM AND SANITARY SEWER LINES NOT IN STREETS ARE TO BE MULCHED AND
SEEDED WITHIN SEVEN DAYS AFTER BACKFILL. NO MORE THAN 500 FEET ARE TO BE
OPEN AT ONE TIME.
4. ALL TEMPORARY EARTH BERMS, DIVERSIONS, AND SILT DAMS ARE TO BE MULCHED AND
SEEDED FOR VEGETATIVE COVER IMMEDIATELY AFTER GRADING, STRAW OR HAY MULCH
IS REQUIRED. THE SAME APPLIES TO STOCKPILES ON SITE AS WELL AS SOIL
(INTENTIONALLY) TRANSPORTED FROM THE PROJECT SITE.
5. ELECTRIC POWER, TELEPHONE AND GAS SUPPLY TRENCHES ARE TO BE COMPACTED,
SEEDED AND MULCHED WITHIN 7 DAYS AFTER BACKFILL.
6. TEMPORARY SEEDING WILL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS WHICH
MAY NOT BE AT FINAL GRADE, BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER
THAN 14 DAYS. FOR TEMPORARY SEEDING USE FIFTY PERCENT OF THE RECOMMENDED
RATES OF FERTILIZER AND LIME, AND FULL AMOUNTS OF SEED AND MULCH REQUIRED
FOR REGULAR SEEDING.
7. DURING CONSTRUCTION, ALL STORM SEWER INLETS WILL BE PROTECTED BY SILT
TRAPS, MAINTAINED AND MODIFIED AS REQUIRED BY CONSTRUCTION PROGRESS.
8. ANY DISTURBANCE AREA NOT PAVED, SODDED, OR BUILT UPON BY NOVEMBER 1ST, IS
TO BE SEEDED ON THAT DATE WITH OATS, ABRUZZI, RYE, OR EQUIVALENT AND MULCHED
WITH HAY OR STRAW MULCH. MODIFY AS APPLICABLE DEPENDING ON PROPOSED TIME
OF CONSTRUCTION.
GENERAL STORM SEWER / STORMWATER NOTES
1. BOOT CONNECTORS MUST BE USED WHERE PLASTIC PIPES ARE CONNECTED TO
CONCRETE STRUCTURES.
2. USE TYPE 'B' NOSE FOR CURB INLET STRUCTURES.
3. HDPE PIPING TO BE N-12 PIPE TYPE S, AASHTO M294 (PIPE SIZES 12" AND GREATER), AND
AASHTO M252 (PIPE SIZES 4" TO 10") OR EQUIVALENT.
4. ALL STORM SEWER PIPES TO HAVE A WATERTIGHT CONNECTION. ALL HDPE PIPE JOINTS
TO BE WATERTIGHT PER ASTM D3212 OR EQUIVALENT.
5. STEPS WILL BE REQUIRED IN ALL STRUCTURES HAVING A DEPTH OF 4'-0" OR GREATER
UNLESS OTHERWISE NOTED.
6. SUMPS IN PLASTIC DRAIN BASINS TO BE FILLED WITH GROUT TO THE INVERT OUT.
7. PLASTIC DRAIN BASIN TOPS TO HAVE H10 LOCKING TOP UNLESS OTHERWISE NOTED.
PLASTIC DRAIN BASINS WITHIN VEHICLE TRAFFIC PAVEMENT AREAS TO HAVE H20
LOADING RATED TOPS (LOCKING).
8. PLASTIC DRAIN BASINS LOCATED IN PAVEMENT AREAS TO HAVE CONCRETE COLLARS.
REFER TO MANUFACTURER'S DETAIL SPECIFICATIONS.
9. CONTRACTOR IS RESPONSIBLE FOR ALL DOCUMENTATION RELATING TO STORMWATER
BMP(s) AS-BUILTS AND CERTIFICATIONS REQUIRED BY THE LOCALITY AND MS-4
OPERATOR.
SURVEY NOTES:
1. OWNER OF RECORD:
AMELIA COUNTY SCHOOL BOARD
MAP ID: 42 64A & 42 64H
DB 162, PG 380
DB 162, PG 420
8533 N. FIVE FORKS ROAD
2. THIS SURVEY IS BASED ON A CURRENT TIMMONS GROUP FIELD SURVEY.
FIELDWORK WAS PERFORMED IN MAY 2023.
3. HORIZONTAL DATUM IS REFERENCED TO NAD83, VIRGINIA SOUTH ZONE
VERTICAL DATUM IS REFERENCED TO NAVD88.
4. THE PROPERTY IS LOCATED WITHIN AN AREA HAVING A ZONE
DESIGNATION "X" BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY
(FEMA) ON FLOOD INSURANCE RATE MAP NO. 51007C0175D DATED
OCTOBER 7, 2021.
5. THIS PLAT WAS PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT.
THEREFORE ALL ENCUMBRANCES MAY NOT BE SHOWN.
6. THIS IS NOT A BOUNDARY SURVEY. PROPERTY LINES SHOWN HEREON
ARE APPROXIMATE.
THIS TOPOGRAPHIC SURVEY WAS COMPLETED UNDER THE DIRECT AND
RESPONSIBLE CHARGE OF DAVID F. PUGH FROM AN ACTUAL GROUND
SURVEY MADE UNDER MY SUPERVISION; THAT THE ORIGINAL DATA WAS
OBTAINED ON THE FOLLOWING DATES: 17-19 & 22-23, 2023. THIS PLAT, MAP
AND DIGITAL GEOSPATIAL DATA INCLUDING METADATA MEETS MINIMUM
ACCURACY STANDARDS UNLESS OTHERWISE NOTED.
HORIZONTAL DATUM: NAD83
VERTICAL DATUM: NAVD88
FIELDWORK COMPLETED MAY 23, 2023
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
D A
TE
DRAWN BY
DATE
R
EV
IS
IO
N D
ES
C R
IP
TI
O
N
YO
UR
V
IS
IO
N
AC
HI
EV
ED
T
HR
O
UG
H O
UR
S.
Th es e pl an s an d as so ci at ed d oc um en ts a re th e ex cl us iv e pr op er ty o f T
IM
M O
N S
G R
O U
P a nd m ay n ot b e re pr od uc ed in w ho le o r i n pa rt an d sh al l n ot b e us ed fo r a ny p ur po se w ha ts oe ve r, in cl us iv e, b ut n ot lim ite d to c on st ru ct io n, b id di ng
, a nd
/o r c on st ru ct io n st ak in g w ith ou t t he e xp re ss w rit te n co ns en t o f T
IM
M
O N
S G
R O
U P
B ou ld er s Pa rk w ay , S ui te
R ic hm on d, V A
TE
L
4.
0.
F
AX
.5
.1 w w w .t im m on s.
co m
TH
IS
D
RA
W
IN
G P
RE
PA
RE
D
A T
TH
E
CO
R
PO
R
A
TE
O
FF
IC
E
S :\3
\5
-A m el ia
_B us
_L oo p\ D
W G
\S he et \C
D \5
-C
0- N
TD
T.
dw g
| P lo tte d on
/4 /2
2:
P M by
L au rie C of fm an
01/08/2024
59196
A M
EL
IA
E
LE
M
EN
TA
R
Y
SC
H O
O L
SI
TE
IM
PR
O
VE
M
EN
TS
A
M
EL
IA
C
O U
N
TY
TG, LC
TG, LC
SR
01-08-2024
AS SHOWN
/0
8/
S E
T
C010
G E
N E
R A
L N
O
TE
S
D E
TA
IL
S
DRIVEWAYS, PARKING AREAS
DENOTES ASPHALT PAVEMENT IN DRIVE ISLES
NO SCALE
2" VDOT SM-9.5A ASPHALTIC CONCRETE
8" VDOT 21B AGGREGATE STONE
COMPACTED SUBGRADE
FLUSH CONCRETE BANDING
(REFER TO LAYOUT PLAN)
5' TRANSITION TO
FLUSH CONCRETE BAND SECTION
(REFER TO LAYOUT PLAN)
PERSPECTIVE VIEW
ELEVATION VIEWCURB TRANSITION DETAIL
NO SCALE
5' CURB TRANSITION
6" HIGH CURB
TRANSITION CURB TO
FLUSH CURB
TOP OF CURB FLUSH CONCRETE
BANDING
NOTES:
1. SAW CUT EXISTING PAVEMENT AND
PROVIDE A SMOOTH TRANSITION IN
GRADE AND APPEARANCE BETWEEN
NEW AND EXISTING PAVEMENT
2. MILL 12" MIN., 1" THICK, OF EXISTING
SURFACE COURSE AND OVERLAY TO
PROVIDE SMOOTH TRANSITION
SAWCUT
EXISTING SURFACE
COURSE PROPOSED SURFACE COURSE
AGGREGATE BASE
EXISTING PAVEMENT PROPOSED PAVEMENT
INTERMEDIATE ASPHALT
BASE ASPHALT
1'-0"
BENCHED PAVEMENT
JOINT WITH ASPHALT
TACK COAT
1'-0"
TIE TO EXISTING PAVEMENT
NO SCALE
4" TYPE
A-3 CONC.
1/4"
1"
CONCRETE SIDEWALK DETAIL
R=1 4"R=1 4"
NO SCALE
DENOTES CONCRETE SIDEWALK ON PLANS
PREPARED SUBGRADE
CONTROL JOINT SPACES
AT WIDTH OF WALK OR
AS SHOWN ON DRAWINGS
EXPANSION JOINT EACH
30' MIN WITH PREMOLDED
EXPANSION FILLER
CONC WALK
MAXIMUM 5% SLOPE IN
DIRECTION OF TRAVEL;
MAXIMUM 2% CROSS SLOPE
4" 21B STONE
1":1'
SLOPE 3/16"
SURFACE OF ROADWAY
6" 1'-6"
6"
1'-1"
4" MIN.
6"
7"
1"
SLOPE 3/16"
6"
1'-6"
6"
4" MIN.
6"
6" MONOLITHIC CONCRETE CURB AND GUTTER
NO SCALE
6" CONCRETE CURB
NO SCALE
CLASS A-3
CONC.
R1/2"
R2"
R1/2"
THE BOTTOM OF THE CURB AND
GUTTER MAY BE CONSTRUCTED
PARALLEL TO THE SLOPE OF THE
SUBBASE COURSES PROVIDED A
MINIMUM DEPTH OF 7" IS
MAINTAINED
R1/2"
R2"
CLASS A-3
CONC.
PAVEMENT SECTIONS
TYPICAL ASPHALT PAVING SECTION
DENOTES ASPHALT PAVEMENT IN BUS LOOP ON PLANS
2.0" VDOT SM-9.5A ASPHALTIC CONCRETE
3" VDOT BM-25.0 ASPHALTIC CONCRETE
8" VDOT 21B AGGREGATE STONE
COMPACTED SUBGRADE
BUS LOOP AND SCHOOL ENTRANCE
NO SCALE
TYPICAL ASPHALT PAVING SECTION
CONTRACTOR TO MATCH EXISTING PAVEMENT SECTION.
PAVEMENT SECTION SHOWN WAS IS FROM THE ORIGINAL
1992 AMELIA ELEMENTARY SCHOOL CONSTRUCTION PLANS.
CONTRACTOR TO MATCH EXISTING PAVEMENT SECTION.
PAVEMENT SECTION SHOWN IS FROM THE ORIGINAL 1992
AMELIA ELEMENTARY SCHOOL CONSTRUCTION PLANS.
AND PARKING AREAS ON PLANS
REFER TO CURB DETAILS
ABOVE FOR ADDITIONAL
CONCRETE/STONE
REQUIREMENTS.
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
D A
TE
DRAWN BY
DATE
R
EV
IS
IO
N D
ES
C R
IP
TI
O
N
YO
UR
V
IS
IO
N
AC
HI
EV
ED
T
HR
O
UG
H O
UR
S.
Th es e pl an s an d as so ci at ed d oc um en ts a re th e ex cl us iv e pr op er ty o f T
IM
M O
N S
G R
O U
P a nd m ay n ot b e re pr od uc ed in w ho le o r i n pa rt an d sh al l n ot b e us ed fo r a ny p ur po se w ha ts oe ve r, in cl us iv e, b ut n ot lim ite d to c on st ru ct io n, b id di ng
, a nd
/o r c on st ru ct io n st ak in g w ith ou t t he e xp re ss w rit te n co ns en t o f T
IM
M
O N
S G
R O
U P
B ou ld er s Pa rk w ay , S ui te
R ic hm on d, V A
TE
L
4.
0.
F
AX
.5
.1 w w w .t im m on s.
co m
TH
IS
D
RA
W
IN
G P
RE
PA
RE
D
A T
TH
E
CO
R
PO
R
A
TE
O
FF
IC
E
S :\3
\5
-A m el ia
_B us
_L oo p\ D
W G
\S he et \C
D \5
-C
0- N
TD
T.
dw g
| P lo tte d on
/4 /2
2:
P M by
L au rie C of fm an
01/08/2024
59196
A M
EL
IA
E
LE
M
EN
TA
R
Y
SC
H O
O L
SI
TE
IM
PR
O
VE
M
EN
TS
A
M
EL
IA
C
O U
N
TY
TG, LC
TG, LC
SR
01-08-2024
AS SHOWN
/0
8/
S E
T
C011
G E
N E
R A
L N
O
TE
S
D E
TA
IL
S rich.satmaria Rectangle rich.satmaria Text Box ALTERNATE No.1
UNDERGROUND DETENTION SYSTEM - BASIS FOR DESIGN
CONTRACTOR TO PROVIDE SHOP DRAWINGS AND SPECIFICATIONS
FOR REVIEW PRIOR TO INSTALLATION OF SYSTEM.
UNDERGROUND DETENTION SYSTEM - BASIS FOR DESIGN
CONTRACTOR TO PROVIDE SHOP DRAWINGS AND SPECIFICATIONS
FOR REVIEW PRIOR TO INSTALLATION OF SYSTEM.
POLYMER COATED CMP
POLYMER COATED CMP
NOTE: CONTRACTOR IS RESPONSIBLE FOR ALL
DOCUMENTATION RELATING TO STORMWATER
BMP(S) AS-BUILTS AND CERTIFICATIONS REQUIRED
BY THE LOCALITY AND MS-4 OPERATOR.
NOTE: CONTRACTOR IS RESPONSIBLE FOR ALL
DOCUMENTATION RELATING TO STORMWATER
BMP(S) AS-BUILTS AND CERTIFICATIONS REQUIRED
BY THE LOCALITY AND MS-4 OPERATOR.
ALTERNATE No.1
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
D A
TE
DRAWN BY
DATE
R
EV
IS
IO
N D
ES
C R
IP
TI
O
N
YO
UR
V
IS
IO
N
AC
HI
EV
ED
T
HR
O
UG
H O
UR
S.
Th es e pl an s an d as so ci at ed d oc um en ts a re th e ex cl us iv e pr op er ty o f T
IM
M O
N S
G R
O U
P a nd m ay n ot b e re pr od uc ed in w ho le o r i n pa rt an d sh al l n ot b e us ed fo r a ny p ur po se w ha ts oe ve r, in cl us iv e, b ut n ot lim ite d to c on st ru ct io n, b id di ng
, a nd
/o r c on st ru ct io n st ak in g w ith ou t t he e xp re ss w rit te n co ns en t o f T
IM
M
O N
S G
R O
U P
B ou ld er s Pa rk w ay , S ui te
R ic hm on d, V A
TE
L
4.
0.
F
AX
.5
.1 w w w .t im m on s.
co m
TH
IS
D
RA
W
IN
G P
RE
PA
RE
D
A T
TH
E
CO
R
PO
R
A
TE
O
FF
IC
E
S :\3
\5
-A m el ia
_B us
_L oo p\ D
W G
\S he et \C
D \5
-C
0- N
TD
T.
dw g
| P lo tte d on
/4 /2
2:
P M by
L au rie C of fm an
01/08/2024
59196
A M
EL
IA
E
LE
M
EN
TA
R
Y
SC
H O
O L
SI
TE
IM
PR
O
VE
M
EN
TS
A
M
EL
IA
C
O U
N
TY
TG, LC
TG, LC
SR
01-08-2024
AS SHOWN
/0
8/
S E
T
C012
G E
N E
R A
L N
O
TE
S
D E
TA
UNDER GROUND DETENTION INSPECTION & MAINTENANCE NARRATIVE
DURING CONSTRUCTION:
1. STORE CMP SYSTEM PER MANUFACTURER'S SPECIFICATIONS.
2. INSTALL PER MANUFACTURES SPECIFICATIONS.
3. ENSURE PROPER COVER OVER SYSTEM AT ALL TIMES PER
MANUFACTURER'S SPECIFICATION.
4. PRIOR TO BRINGING SYSTEM ONLINE, CLEAN OUT ALL SEDIMENT,
TRASH AND DEBRIS FROM BOTTOM OF PIPES AND STRUCTURES.
POST CONSTRUCTION:
1. CONTRACTOR IS RESPONSIBLE FOR ALL DOCUMENTATION
RELATING TO STORMWATER BMP(S) AS-BUILTS AND
CERTIFICATIONS REQUIRED BY THE LOCALITY AND MS-4
OPERATOR.
2. INSPECT SYSTEM ANNUALLY THROUGH THE INSPECTION PORTS.
3. REMOVE ALL MANHOLE COVERS AND USING FLASHLIGHT, INSPECT
ENTIRE SYSTEM THROUGH OUTLET STRUCTURE.
4. FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF
ENTERING A MANHOLE.
5. IF AVERAGE SEDIMENT LEVEL IS 3 INCHES IN DEPTH OR MORE,
CLEAN OUT SEDIMENT.
6. INSPECT PIPES FOR CRACKS OR BREAKS. REPAIR IMMEDIATELY IF
OBSERVED.
7. INSPECT CONTROL STRUCTURE FOR TRASH/DEBRIS AND REMOVE
ANY ACCUMULATION. INSPECT FOR CRACKING AND SPALDING OF
CONCRETE WEIR AND REPAIR AS NECESSARY.
NOTE: CONTRACTOR IS RESPONSIBLE
FOR OBTAINING AS-BUILTS OF THE
UNDERGROUND DETENTION SYSTEM.
NUTRIENT CREDIT APPROVAL LETTERS
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
D A
TE
DRAWN BY
DATE
R
EV
IS
IO
N D
ES
C R
IP
TI
O
N
YO
UR
V
IS
IO
N
AC
HI
EV
ED
T
HR
O
UG
H O
UR
S.
Th es e pl an s an d as so ci at ed d oc um en ts a re th e ex cl us iv e pr op er ty o f T
IM
M O
N S
G R
O U
P a nd m ay n ot b e re pr od uc ed in w ho le o r i n pa rt an d sh al l n ot b e us ed fo r a ny p ur po se w ha ts oe ve r, in cl us iv e, b ut n ot lim ite d to c on st ru ct io n, b id di ng
, a nd
/o r c on st ru ct io n st ak in g w ith ou t t he e xp re ss w rit te n co ns en t o f T
IM
M
O N
S G
R O
U P
B ou ld er s Pa rk w ay , S ui te
R ic hm on d, V A
TE
L
4.
0.
F
AX
.5
.1 w w w .t im m on s.
co m
TH
IS
D
RA
W
IN
G P
RE
PA
RE
D
A T
TH
E
CO
R
PO
R
A
TE
O
FF
IC
E
S :\3
\5
-A m el ia
_B us
_L oo p\ D
W G
\S he et \C
D \5
-C
0- N
TD
T.
dw g
| P lo tte d on
/4 /2
2:
P M by
L au rie C of fm an
01/08/2024
59196
A M
EL
IA
E
LE
M
EN
TA
R
Y
SC
H O
O L
SI
TE
IM
PR
O
VE
M
EN
TS
A
M
EL
IA
C
O U
N
TY
TG, LC
TG, LC
SR
01-08-2024
AS SHOWN
/0
8/
S E
T
C013
G E
N E
R A
L N
O
TE
S
D E
TA
100' FRONT YARD
SETBACK (RR-3)
0'
F R
O N
T
YA
R D
S
ET
BA
C
K (R
R -3
ZONE RR-3: RURAL
RESIDENTIAL
ZONE RR-3: RURAL
RESIDENTIAL
ZONE RR-3: RURAL
RESIDENTIAL
ZONE RR-3:
RURAL
RESIDENTIAL
ZONE R-1:
RESIDENTIAL
ZONE R-1: RESIDENTIAL
ZONE M-2:
INDUSTRIAL
ZONE: R-2:
RESIDENTIAL
ZONE ER-1:
RESIDENTIAL
ZONE B-1: BUSINESS ZONE RR-3: RURAL
RESIDENTIAL
ZONE R-1: RESIDENTIAL
ZONE R-1: RESIDENTIAL
ZONE R-1:
RESIDENTIAL ZONE R-1:
RESIDENTIAL
ZONE B-1:
BUSINESS
ZONE RR-3:
RURAL
RESIDENTIAL
ZONE R-1:
RESIDENTIAL
JANET E. POORE
8633 N FIVE FORKS ROAD
MAP ID: 42 64F
DB 197, PG 325
DB 130, PG 605
ZONED: RURAL RESIDENTIAL
AMELIA COUNTY
VETERANS CENTER,
INC
MAP ID: 42 64D
ZONED: RURAL
RESIDENTIAL
VIRGINIA DIVISION OF
FORESTRY
16520 FIVE FORKS ROAD
MAP ID: 42 64G
DB 197, PG 325
DB 130, PG 605
ZONED: RURAL RESIDENTIAL
DONALD W. ADAMS
8621 N FIVE FORKS ROAD
MAP ID: 42 59
INST. #202201475
ZONED: RURAL RESIDENTIALDONALD W. ADAMS
8621 N FIVE FORKS ROAD
MAP ID: 42 64J
INST. #202201475
ZONED: RURAL RESIDENTIAL
MICHAEL GIVENS
8601 N FIVE FORKS ROAD
MAP ID: 42 64C
DB 152, PG 533
INST. #202201052
ZONED: SINGLE FAMILY
RESIDENTIAL URBAN
AMELIA COUNTY SCHOOL BOARD
8533 N FIVE FORKS ROAD
MAP ID: 42 64h
DB 162, PG 420
ZONED: RESIDENTIAL
5.470 ACRES
AMELIA COUNTY (BALL PARK)
1650 FIVE FORKS ROAD
MAP ID: 42 55
ZONED: RESIDENTIAL
AMELIA COUNTY SCHOOL
BOARD
8533 N FIVE FORKS ROAD
MAP ID: 42 64A
DB 162, PG 380
ZONED: RURAL RESIDENTIAL
AMELIA COUNTY
SCHOOL BOARD
8500 OTTERBURN ROAD
MAP ID: 42 1
ZONED: RESIDENTIAL
WINGO CALVIN W JR ETUX
MAP ID: 42 56
DB 271, PG 3737
ZONED: RESIDENTIAL
FIVE FORKS LC
8530 FIVE FORKS ROAD
MAP ID: 42 56A
DB 253, PG 616
ZONED: RESIDENTIAL
WINGO ROGER E ETUX
8540 N FIVE FORKS ROAD
MAP ID: 42 57B
DB 157, PG 40
ZONED: RESIDENTIAL
WINGO ROGER ERWIN
ETUX
8616 VIRGINIA STREET
MAP ID: 42 57
DB 214, PG 527
ZONED: RESIDENTIAL
MAP ID:
42 58A
AMELIA COUNTY SCHOOL BOARD
8533 N FIVE FORKS ROAD
MAP ID: 42 64A
DB 162, PG 380
ZONED: RURAL RESIDENTIAL
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
D A
TE
DRAWN BY
DATE
R
EV
IS
IO
N D
ES
C R
IP
TI
O
N
YO
UR
V
IS
IO
N
AC
HI
EV
ED
T
HR
O
UG
H O
UR
S.
Th es e pl an s an d as so ci at ed d oc um en ts a re th e ex cl us iv e pr op er ty o f T
IM
M O
N S
G R
O U
P a nd m ay n ot b e re pr od uc ed in w ho le o r i n pa rt an d sh al l n ot b e us ed fo r a ny p ur po se w ha ts oe ve r, in cl us iv e, b ut n ot lim ite d to c on st ru ct io n, b id di ng
, a nd
/o r c on st ru ct io n st ak in g w ith ou t t he e xp re ss w rit te n co ns en t o f T
IM
M
O N
S G
R O
U P
B ou ld er s Pa rk w ay , S ui te
R ic hm on d, V A
TE
L
4.
0.
F
AX
.5
.1 w w w .t im m on s.
co m
TH
IS
D
RA
W
IN
G P
RE
PA
RE
D
A T
TH
E
CO
R
PO
R
A
TE
O
FF
IC
E
S :\3
\5
-A m el ia
_B us
_L oo p\ D
W G
\S he et \C
D \5
-C
0- O
V R
L.
dw g | P lo tte d on
/4
/2
2:
P
M by L au rie
C of fm an
01/08/2024
59196
A M
EL
IA
E
LE
M
EN
TA
R
Y
SC
H O
O L
SI
TE
IM
PR
O
VE
M
EN
TS
A
M
EL
IA
C
O U
N
TY
TG, LC
TG, LC
SR
01-08-2024
AS SHOWN
C100
O V
E R
A
LL
P R
O P
E R
TY
M
A P
NAD 83
SCALE 1"=100'
200'100'
0 37
7 39
9 39
D
AMELIA COUNTY
VETERANS CENTER,
INC
MAP ID: 42 64D
ZONED: RURAL
RESIDENTIAL
VIRGINIA DIVISION OF
FORESTRY
16520 FIVE FORKS ROAD
MAP ID: 42 64G
DB 197, PG 325
DB 130, PG 605
ZONED: RURAL
RESIDENTIAL
FIVE FORKS ROAD
STATE ROUTE 38
VARIABLE WIDTH RIGHT OF WAY
N O
R
TH
F
IV
E
FO
R K
S R
O A
D
ST
A
TE
R O
U
TE
VA
R
IA
BL
E W
ID
TH
R
IG
H T
O F
W
AY
N: 3644470.28 E: 11633044.21
N: 3644016.42 E: 11632699.70
D
D
D
T
T
D
D
S
D
GTI
RIM=396.46'
IN N=384.71'
IN W=384.66'
IN S=384.71'
OUT=384.56'
MHD W/ INLET
RIM=399.91'
OUT=395.51'
MHD W/ INLET
RIM=395.75'
IN N=390.00'
IN S=390.00'
OUT=389.95'
GTI
RIM=395.94'
IN=390.74'
OUT=390.69'
GTI
RIM=395.96'
OUT=391.56'
MHD W/ INLET
RIM=399.55'
OUT=394.96'
MHD W/ INLET
RIM=393.12'
IN=388.07'
OUT=387.97'
MHD
RIM=397.01'
IN=386.22'
OUT=386.09'
MHD W/ INLET
RIM=396.73'
IN S=392.21'
IN N=392.02'
OUT=391.98'
MHD W/ INLET
RIM=396.53'
OUT=392.23'
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
S
S
S
MHS
RIM=397.62'
IN=390.17'
OUT=390.14'
MHS
RIM=400.45'
IN SE=385.45'
IN SW=384.70'
OUT=384.55'
MHS
RIM=399.73'
IN=386.45'
OUT=386.30'
6" PVC
6" P
VC
6" P
VC
6" P
VC
" P
VC
" P
VC
" P
VC
30" R C
P
" R
CP
" R
C P
18" RCP
15" R
CP
" R
CP
" R
C P 15
" R C
P
FRAME
SHED
COVERED
SIDEWALK
COVERED
SIDEWALK
BRICK COLUMNS
0.7' METAL
COLUMNS
(TYP.)
N45°08'27"W 71.29'
N44°08'48"W 91.54'
N32°15'07"W 91.38'
N18°28'23"W 92.23'
N4°
'58 "W
3.
N
°4 7'
"E
4.
N
°3
6'
5.
N
°2 3'
N
°2 9'
.4
4'
R =1
5.
L=
9.
T=
.0
2' D
=4 °2
3'
C
B= N
°1
7'
"E C
=1
.9 6'
N
°1 2'
.8
0'
S58°17'14"E 420.10'
S3 7°
'0
6" W
.9
6'
S3 7°
'0
.7
0'
N58°18'01"W 106.61' N58°18'01"W 420.10'
FLAG
POLES
ELECTRIC
TRANSFORMER
8' BLOCK
WALL
12' TALL
METAL TANK
8' CHAIN
LINK FENCE
FF=398.47'
FF=398.44'
FF=398.47'
FF=398.42'
FF=398.46'
FF=398.49'
FF=398.48'
FF=398.46'
FF=398.45'
FF=398.44'
BRICK
SIGN W/
LANDSCAPE
BORDER
BRICK
SIGN W/
LANDSCAPE
BORDER
AMELIA ELEMENTARY SCHOOL
1 STORY
BRICK & METAL
BUILDING
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONCRETE SIDEW
ALK
CONCRETE SIDEWALK
ROOF DRAIN (TYP.)
4' WOOD FENCE
CENTERLINE
DITCH
CENTERLINE
DITCH
CENTERLINE
DITCH
CENTERLINE
DITCH
WOOD
GATE
COVERED
SIDEWALK
END
PIPE
NOT
FOUND
AMELIA COUNTY SCHOOL BOARD
8533 N FIVE FORKS ROAD
MAP ID: 42 64h
DB 162, PG 420
ZONED: RESIDENTIAL
5.470 ACRES
X X
X X
X X
X X
X
O H U
OH
U
OH
U
O
HU
X
X
X
X
CT
GRAVEL
ASPHALT
ASPHALT
X
X
X
X
X
X
X
X
X
X
65' FRONT YARD SETBACK(R-1)
100' FRONT YARD
SETBACK (RR-3)
' S
ID
E
YA
R
D S
ET
BA
C K
(R -1
' R
EA
R
Y
AR
D S
ET
BA
C K
(R R
-3
0'
F R
O N
T
YA
R D
S
ET
BA
C
K (R
R -3
EX STRM GRATE INLET
PER APPROVED PLAN
30" RCP
(PER PLAN)
D
D
EX STRM INLET PER
APPROVED PLAN
EX STRM MH PER
APPROVED PLAN
EX STRM CURB
INLET PER
APPROVED PLAN
EX STRM MH
(PAVED OVER)
APPROX LOCATION
PER PLAN
24" RCP
(PER PLAN)
27" RCP
(PER PLAN)
30" RCP
(PER PLAN)
27" RCP
(PER PLAN)
27" RCP
(PER PLAN)
27" RCP
(PER PLAN)
D
15" RCP
(PER PLAN)
AMELIA COUNTY SCHOOL BOARD
8533 N FIVE FORKS ROAD
MAP ID: 42 64A
DB 162, PG 380
ZONED: RURAL RESIDENTIAL
FIVE FORKS LC
8530 FIVE FORKS ROAD
MAP ID: 42 56A
DB 253, PG 616
ZONED: RESIDENTIAL
WINGO ROGER E ETUX
8540 N FIVE FORKS ROAD
MAP ID: 42 57B
DB 157, PG 40
ZONED: RESIDENTIAL
WINGO ROGER ERWIN ETUX
8616 VIRGINIA STREET
MAP ID: 42 57
DB 214, PG 527
ZONED: RESIDENTIAL
AMELIA COUNTY SCHOOL BOARD
8533 N FIVE FORKS ROAD
MAP ID: 42 64A
DB 162, PG 380
ZONED: RURAL RESIDENTIAL
(2) 10" HOLLY
(2) 10" HOLLY (2) 15" MAPLE
(2) 24" RED OAK
(2) 24" RED OAK
21" RED OAK
(2) 24" RED OAK
(11) 4" CRAPE
DECIDUOUS
(2) 12" MAPLE
12" MAPLE
15" MAPLE
15" MAPLE
(3) 12" MAPLE
21" RED OAK
15" RED OAK
24" RED OAK
15" TWIN
CONIFEROUS
24" RED OAK
15" TREE
12" TREE
10" DOGWOOD
4" DOGWOOD
(2) 12" TREE
15" TREE
(2) 12" MAPLE
15" MAPLE
(2) 15" TREE
24" RED OAK
48" WHITE OAK
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
D A
TE
DRAWN BY
DATE
R
EV
IS
IO
N D
ES
C R
IP
TI
O
N
YO
UR
V
IS
IO
N
AC
HI
EV
ED
T
HR
O
UG
H O
UR
S.
Th es e pl an s an d as so ci at ed d oc um en ts a re th e ex cl us iv e pr op er ty o f T
IM
M O
N S
G R
O U
P a nd m ay n ot b e re pr od uc ed in w ho le o r i n pa rt an d sh al l n ot b e us ed fo r a ny p ur po se w ha ts oe ve r, in cl us iv e, b ut n ot lim ite d to c on st ru ct io n, b id di ng
, a nd
/o r c on st ru ct io n st ak in g w ith ou t t he e xp re ss w rit te n co ns en t o f T
IM
M
O N
S G
R O
U P
B ou ld er s Pa rk w ay , S ui te
R ic hm on d, V A
TE
L
4.
0.
F
AX
.5
.1 w w w .t im m on s.
co m
TH
IS
D
RA
W
IN
G P
RE
PA
RE
D
A T
TH
E
CO
R
PO
R
A
TE
O
FF
IC
E
S :\3
\5
-A m el ia
_B us
_L oo p\ D
W G
\S he et \C
D \5
-C
0- E
X S
T.
dw g | P lo tte d on
/4
/2
2:
P
M by L au rie
C of fm an
01/08/2024
59196
A M
EL
IA
E
LE
M
EN
TA
R
Y
SC
H O
O L
SI
TE
IM
PR
O
VE
M
EN
TS
A
M
EL
IA
C
O U
N
TY
TG, LC
TG, LC
SR
01-08-2024
AS SHOWN
C200
E X
IS
TI
N G
C O
N D
IT
IO
N S
P
LA
N
NAD 83
SCALE 1"=40'
80'40'
0 37
7 39
9 39
D
AMELIA COUNTY
VETERANS CENTER,
INC
MAP ID: 42 64D
ZONED: RURAL
RESIDENTIAL
VIRGINIA DIVISION OF
FORESTRY
16520 FIVE FORKS ROAD
MAP ID: 42 64G
DB 197, PG 325
DB 130, PG 605
ZONED: RURAL
RESIDENTIAL
FIVE FORKS ROAD
STATE ROUTE 38
VARIABLE WIDTH RIGHT OF WAY
N O
R
TH
F
IV
E
FO
R K
S R
O A
D
ST
A
TE
R O
U
TE
VA
R
IA
BL
E W
ID
TH
R
IG
H T
O F
W
AY
N: 3644470.28 E: 11633044.21
N: 3644016.42 E: 11632699.70
D
D
D
T
T
D
D
S
D
GTI
RIM=396.46'
IN N=384.71'
IN W=384.66'
IN S=384.71'
OUT=384.56'
MHD W/ INLET
RIM=399.91'
OUT=395.51'
MHD W/ INLET
RIM=395.75'
IN N=390.00'
IN S=390.00'
OUT=389.95'
GTI
RIM=395.94'
IN=390.74'
OUT=390.69'
GTI
RIM=395.96'
OUT=391.56'
MHD W/ INLET
RIM=399.55'
OUT=394.96'
MHD W/ INLET
RIM=393.12'
IN=388.07'
OUT=387.97'
MHD
RIM=397.01'
IN=386.22'
OUT=386.09'
MHD W/ INLET
RIM=396.73'
IN S=392.21'
IN N=392.02'
OUT=391.98'
MHD W/ INLET
RIM=396.53'
OUT=392.23'
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
S
S
S
MHS
RIM=397.62'
IN=390.17'
OUT=390.14'
MHS
RIM=400.45'
IN SE=385.45'
IN SW=384.70'
OUT=384.55'
MHS
RIM=399.73'
IN=386.45'
OUT=386.30'
6" PVC
6" P
VC
6" P
VC
6" P
VC
" P
VC
" P
VC
" P
VC
30" R C
P
" R
CP
" R
C P
18" RCP
15" R
CP
" R
CP
" R
C P 15
" R C
P
FRAME
SHED
COVERED
SIDEWALK
COVERED
SIDEWALK
BRICK COLUMNS
0.7' METAL
COLUMNS
(TYP.)
N45°08'27"W 71.29'
N44°08'48"W 91.54'
N32°15'07"W 91.38'
N18°28'23"W 92.23'
N4°
'58 "W
3.
N
°4 7'
4.
N
°3
6'
N
°2 3'
N
°2 9'
.4
4'
R =1
5.
L=
9.
T=
.0
2' D
=4 °2
3'
C
B= N
°1
7'
"E C
=1
.9 6'
N
°1 2'
.8
0'
S58°17'14"E 420.10'
S3 7°
'0
.9
6'
S3 7°
'0
.7
0'
N58°18'01"W 106.61' N58°18'01"W 420.10'
FLAG
POLES
ELECTRIC
TRANSFORMER
8' BLOCK
WALL
12' TALL
METAL TANK
8' CHAIN
LINK FENCE
FF=398.47'
FF=398.44'
FF=398.47'
FF=398.42'
FF=398.46'
FF=398.49'
FF=398.48'
FF=398.46'
FF=398.45'
FF=398.44'
BRICK
SIGN W/
LANDSCAPE
BORDER
BRICK
SIGN W/
LANDSCAPE
BORDER
AMELIA ELEMENTARY SCHOOL
1 STORY
BRICK & METAL
BUILDING
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONCRETE SIDEW
ALK
CONCRETE SIDEWALK
ROOF DRAIN (TYP.)
4' WOOD FENCE
CENTERLINE
DITCH
CENTERLINE
DITCH
CENTERLINE
DITCH
CENTERLINE
DITCH
WOOD
GATE
COVERED
SIDEWALK
END
PIPE
NOT
FOUND
AMELIA COUNTY SCHOOL BOARD
8533 N FIVE FORKS ROAD
MAP ID: 42 64h
DB 162, PG 420
ZONED: RESIDENTIAL
5.470 ACRES
X X
X X
X X
X X
X
O H U
OH
U
OH
U
O
HU
X
X
X
X
CT
GRAVEL
ASPHALT
ASPHALT
X
X
X
X
X
X
X
X
X
X
65' FRONT YARD SETBACK(R-1)
100' FRONT YARD
SETBACK (RR-3)
' S
ID
E
YA
R
D S
ET
BA
C K
(R -1
' R
EA
R
Y
AR
D S
ET
BA
C K
(R R
-3
0'
F R
O N
T
YA
R D
S
ET
BA
C
K (R
R -3
EX STRM GRATE INLET
PER APPROVED PLAN
30" RCP
(PER PLAN)
D
D
EX STRM INLET PER
APPROVED PLAN
EX STRM MH PER
APPROVED PLAN
EX STRM CURB
INLET PER
APPROVED PLAN
EX STRM MH
(PAVED OVER)
APPROX LOCATION
PER PLAN
24" RCP
(PER PLAN)
27" RCP
(PER PLAN)
30" RCP
(PER PLAN)
27" RCP
(PER PLAN)
27" RCP
(PER PLAN)
27" RCP
(PER PLAN)
D
15" RCP
(PER PLAN)
AMELIA COUNTY SCHOOL BOARD
8533 N FIVE FORKS ROAD
MAP ID: 42 64A
DB 162, PG 380
ZONED: RURAL RESIDENTIAL
FIVE FORKS LC
8530 FIVE FORKS ROAD
MAP ID: 42 56A
DB 253, PG 616
ZONED: RESIDENTIAL
WINGO ROGER E ETUX
8540 N FIVE FORKS ROAD
MAP ID: 42 57B
DB 157, PG 40
ZONED: RESIDENTIAL
WINGO ROGER ERWIN ETUX
8616 VIRGINIA STREET
MAP ID: 42 57
DB 214, PG 527
ZONED: RESIDENTIAL
AMELIA COUNTY SCHOOL BOARD
8533 N FIVE FORKS ROAD
MAP ID: 42 64A
DB 162, PG 380
ZONED: RURAL RESIDENTIAL
(2) 10" HOLLY
(2) 10" HOLLY (2) 15" MAPLE
(2) 24" RED OAK
(2) 24" RED OAK
21" RED OAK
(2) 24" RED OAK
(11) 4" CRAPE
DECIDUOUS
(2) 12" MAPLE
12" MAPLE
15" MAPLE
15" MAPLE
(3) 12" MAPLE
21" RED OAK
15" RED OAK
24" RED OAK
15" TWIN
CONIFEROUS
24" RED OAK
15" TREE
12" TREE
10" DOGWOOD
4" DOGWOOD
(2) 12" TREE
15" TREE
(2) 12" MAPLE
15" MAPLE
(2) 15" TREE
24" RED OAK
48" WHITE OAK
TP
TP
SAF
SAF
SAF
SAF
SA
F
S A
F
SA
F
SAF
SAF
SAF
SAF
SAF
SAF
SA
F
SAFSAF
S A
F S
A F
S A
F
SAF
SAF
SAF
S A
F
TP
TP
TP
TP
TP
TP
SAF
SAF
SAF
SAF
SAF
SAF
SA
F
SAF
SAF
SA
F
SA
F
SA
F
SA
F
SA
F
SA
F
SAF
SAF
SAF
SAF
SAF
CE*
IP
IP
IP
TP
TP
SAF
SF
SAF
SAF
SF
TP
TP TP
TP
TPCE*
SAF
SF
SAF
SAF
SF
SF
SAF
SFB
TIE SAFETY
FENCE TO EX
FENCE
TIE SAFETY
FENCE TO EX
FENCE
IP
IP
SAFETY FENCE
REPRESENTS
LIMITS OF WORK
SAFETY FENCE
REPRESENTS
LIMITS OF WORK
SAFETY FENCE
REPRESENTS
LIMITS OF WORK
SAFETY FENCE
REPRESENTS
LIMITS OF WORK
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
STOCKPILE/
CONSTRUCTION
LAYDOWN AREA
STOCKPILE/
CONSTRUCTION
LAYDOWN AREA
TP
TP
TP
DC
DC
TS
TS
TP
ALTERNATE No.1
TO REMAINREMOVE
REMOVE
REMOVE
REMOVE
TO REMAIN
REMOVE
EX TREES
REMOVE
EX SIGNS
REMOVE
EX CURB &
GUTTER
REMOVE EX CURB,
GUTTER & SIDEWALK
SAWCUT AND REMOVE
EX CURB & GUTTER
REMOVE
EX STORM
PIPE &
STRUCTURE
CUT & REMOVE ~ 10' OF EX RCP &
ABANDON REMAINING IN PLACE
(FILL w/CLSM OR ABANDON PER
LOCAL REQUIREMENTS)
REMOVE EX
STORM
STRUCTURE
REMOVE EX STORM
PIPE TO LIMITS
SHOWN
SAW CUT EXISTING
ASPHALT
SAW CUT EXISTING
ASPHALT
SAW CUT EXISTING
ASPHALT
EX CURB TO REMAIN
IN GOOD CONDITION.
DO NOT DISTURB
REMOVE EX STORM
PIPE TO LIMITS
SHOWN
SAWCUT AND REMOVE
EX SIDEWALK
RELOCATE
UTILITY BOX
REMOVE PAVEMENT
FROM EX COVERED MH
TO REMAIN
DEMOLITION NOTES
1. CONTRACTOR REPRESENTS THAT THEY HAVE VISITED THE SITE AND DEMOLITION INCLUDES REMOVAL OF ALL
EXISTING MATERIALS, SHOWN AND UN-SHOWN, REQUIRED TO PERFORM THE WORK.
2. CONTRACTOR RESPONSIBLE FOR HIRING AN INDEPENDENT UTILITY LOCATOR TO FIELD LOCATE ALL EXISTING
UTILITIES PRIOR TO THE START OF CONSTRUCTION.
3. INSTALLATION OF ALL E&S MEASURES IS REQUIRED PRIOR TO BEGINNING DEMOLITION ACTIVITIES. REFER TO
PHASE 1 CONSTRUCTION NARRATIVE ON ADDITIONAL PHASING INFORMATION.
4. ANY EXISTING UTILITIES CUT DURING CONSTRUCTION ACTIVITIES ARE TO BE REPAIRED, COORDINATED, AND
RESTORED TO SERVICE BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER.
5. REMOVE ALL LIFTS OF ASPHALT, CONCRETE, GRAVEL, AND BASE STONE. SAWCUT ALL DEMOLISHED ASPHALT
AND SIDEWALK EDGES.
6. ALL EXISTING UTILITIES INDICATED TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY UNLESS OTHERWISE NOTED. ANY EXISTING UTILITIES TO BE ABANDONED MUST BE DONE IN A MANNER ACCEPTABLE TO
THE LOCAL UTILITY INSPECTOR.
7. ALL EXISTING UTILITIES SHALL MAINTAIN MINIMUM COVER DURING CONSTRUCTION. ALL EXISTING VALVES AND
MANHOLES SHALL BE FLUSHED TO FINISHED GRADE.
8. SOME STORM SEWER, SANITARY SEWER, AND WATERLINE LOCATIONS ARE BASED ON RECORD DRAWINGS.
STORM SEWER, SANITARY SEWER, AND WATERLINE MAY BE INSTALLED IN A DIFFERENT LOCATION.
9. ANY UTILITY SERVICE DISRUPTION TO ADJACENT OWNERS/FACILITIES DUE TO THESE CONSTRUCTION ACTIVITIES MUST BE COORDINATED WITH THE PROVIDERS AND ADJACENT OWNERS PRIOR TO THE WORK.
SITE FEATURE DEMOLITION
DEMOLITION PLAN LEGEND
PAVEMENT / CONCRETE
DEMOLITION
UTILITY DEMOLITION/RELOCATION
SAWCUT
EROSION & SEDIMENT CONTROL GUIDELINES
THE SITE IS TO BE GRADED TO PROPOSED CONTOURS AS SHOWN. NO CRITICAL EROSION CONTROL PROBLEMS ARE ANTICIPATED AS MOST EROSION CONTROL MEASURES ARE TO BE IMPLEMENTED PRIOR TO LAND DISTURBANCE. THE CONTRACTOR SHALL ADHERE TO THE EROSION AND SEDIMENT CONTROL NOTES & DETAILS, AS WELL AS THE FOLLOWING MAINTENANCE & PROCEDURES:
1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN (7) DAYS AFTER ROUGH AND / OR FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN (7) DAYS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN FOURTEEN (14) DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE (1)
YEAR.
2. THE DISPOSAL OF WASTE MATERIALS REMOVED FROM EROSION AND SEDIMENT CONTROL FACILITIES
SHALL BE IN ACCORDANCE WITH THE VIRGINIA EROSION SEDIMENT CONTROL HANDBOOK.
3. PERIMETER EROSION AND SEDIMENT CONTROLS SHALL BE INSTALLED IN ACCORDANCE WITH VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND SHALL BE PLACED PRIOR TO OR AS THE FIRST STEP OF
THE LAND DISTURBING ACTIVITY.
4. EROSION AND SEDIMENT CONTROLS SHALL BE MAINTAINED SO THAT SEDIMENT CARRYING RUNOFF FROM
THE SITE WILL NOT ENTER STORM DRAINAGE FACILITIES.
5. EROSION AND SEDIMENT CONTROLS SHALL BE MAINTAINED UNTIL THE DISTURBED AREA IS STABILIZED.
6. PROPERTIES ADJOINING THE SITE SHALL BE KEPT CLEAN OF MUD OR SILT CARRIED FROM THE SITE BY
VEHICULAR TRAFFIC OR RUNOFF.
7. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES SHALL BE STABILIZED OR PROTECTED WITH
SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE, AS WELL AS EXCESS EXCAVATION
INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE.
8. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED DAILY AND AFTER EACH RUN-OFF
PRODUCING RAINFALL.
9. CONSTRUCTION SEQUENCES ARE FOR REFERENCE ONLY. THE CONTRACTOR MAY MAKE VARIATIONS AS
REQUIRED.
PHASE I EROSION & SEDIMENT CONTROL CONSTRUCTION SEQUENCE
1. A PRE-CONSTRUCTION CONFERENCE WITH THE CONTRACTOR, AND COUNTY EROSION CONTROL
INSPECTOR IS MANDATORY BEFORE ANY WORK IS DONE AT THE SITE. A MINIMUM OF 48 HOURS NOTICE IS
REQUIRED.
2. THE CONTRACTOR MUST VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. MARK EXISTING UTILITIES. NOTIFY THE ENGINEER IF THERE IS A CONFLICT.
*NOTE: ALL UTILITIES MAY NOT BE SHOWN; SOME LOCATIONS ARE APPROXIMATE.
3. AS SHOWN ON THIS PLAN INSTALL:
· PERIMETER SAFETY FENCE;
· PERIMETER SILT FENCE, AND TREE PROTECTION;
· INLET PROTECTION ON EXISTING INLETS;
4. MAKE APPROPRIATE DUST CONTROL ARRANGEMENTS.
5. EXISTING STORM INLETS & PIPES ARE TO REMAIN FREE OF SEDIMENT THROUGHOUT CONSTRUCTION.
6. CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION OF ANY ADDITIONAL EROSION CONTROL
MEASURES NECESSARY TO PREVENT EROSION & SEDIMENTATION AS DETERMINED BY THE EROSION
CONTROL INSPECTOR.
7. BEFORE LAND DISTURBANCE CAN COMMENCE, THE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .