Building_Plans.pdf
PDF 3 MB Posted
- Solicitation number
- 613-10-003
About this file
Building Plans for the remodeling of USAID/Zimbabwe offices
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 3_RFP_613_10_003.pdf | ||
| RFP_613_10_003_Amend 2.pdf | ||
| Amend 1_RFP_613_10_003.pdf | ||
| Bil_of_quantities.xls | XLS spreadsheet | |
| Solicitation_Remodel_USAID_offices.doc | DOC document | |
| Pre-solicitation_construction_final.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SENSITIVE BUT UNCLASSIFIED
USAID
MISSION –
HARARE, ZIMBABWE
OFFICE SPACE PLANNING REPORT & RECOMMENDATIONS
TRELANE PATRICK
FACILITY INFRASTRUCTURE SPECIALIST / SPACE PLANNER
M BUREAU, OVERSEAS MANAGEMENT STAFF (M/OMS)
P:\M.as.oms.pub\Country Files\LAC El Salvador\Space Planning Site VisitZIMBABWE
FEBRUARY 26, 2010
USAID CURRENTLY OCCUPIES SEVERAL RESIDENTIAL HOMES AND
SMALLER UTILITY BUILDINGS ON 2 SEPARATE COMPOUNDS, ACROSS
THE STREET FROM EACHOTHER. DUE TO INCREASED STAFFING LEVELS,
A SPACE ASSESSMENT WAS NECESSARY TO DETERMINE WHERE
ADDITIONAL SPACE COULD BE UTILIZED.
SOME OF THE SPACE ISSUES THE MISSION FACES ARE:
•BUILDINGS ARE UNIQUE & DIFFICULT TO EXPAND
•NOT ENOUGH PARKING SPACES FOR STAFF (INCREASED STAFFING
EXPECTED WILL WORSEN PROBLEM)
•THE EXO OFFICES ARE SPLIT AMONG THE 2 COMPOUNDS
•CURRENT OFFICE FURNITURE IS TOO LARGE AND WASTES SPACE
(DESKS & FILE CABINETS)
•LIMITED SPACE FOR CONSTRUCTION STAGING AND SWING SPACE FOR
STAFF REQUIRED TO RELOCATE DURING CONSTRUCTION
•STORAGE SPACE FOR EXCESS FURNITURE IS LIMITED DUE TO THE
WAREHOUSE BEING AT CAPACITY.
USAID
MISSION HARARE, ZIMBABWE -
SUMMARY
SENSITIVE BUT UNCLASSIFIEDZIMBABWE
BUILDING NO. 1
SUMMARY:
LOCATED ON COMPOUND A, IT CONTAINS THE OFFICE OF THE MISSION
DIRECTOR, THE PROGRAM DEVELOPMENT OFFICE (PDO) AND THE
DEMOCRACY AND GOVERNANCE (DG) OFFICES. CURRENTLY ON THE
FIRST FLOOR, THERE IS A VACANT OFFICE AND AN OFFICE OCCUPIED
BY AN OTI OFFICE STAFF MEMBER, WHO WILL BE RELOCATED TO
BUILDING No. 3.
•7 ADDITIONAL STAFF EXPECTED IN NEAR FUTURE:
PROGRAM DEVELOPMENT OFFICER
PROGRAM DEVELOPMENT ASSISTANT
2 DG ADVISORS
DG DEPUTY DIRECTOR
DG PROGRAM ASSISTANT
DEPUY MISSION DIRECTOR
PROPOSED SOLUTIONS:
•DEMOLISH INTERIOR PARTITIONS AND DIVIDE SPACE INTO SMALLER
PRIVATE OFFICES
•REPLACE SOME OF THE EXISTING, LARGE OFFICE FURNITURE
SMALLER PIECES
BLDG NO. 1 –
DEMOLITION GROUND FLOOR, OPTION A
•NO DEMOLITION
REQUIRED
PROPOSED GROUND FLOOR, OPTION A
•3 DESK POSITIONS
CREATED
•OTI VACATED OFFICE
UTILIZED
DEMOLITION FIRST FLOOR, OPTION A
•INVOLVES
REDUCING THE
SIZE OF THE
SECURITY ROOM
AND RELOCATING
SECURITY
EQUIPMENT
PROPOSED FIRST FLOOR, OPTION A
•4 NEW DESK
SPACES ARE
CREATED IF
CARROLL
WORKSTATIONS
ARE USED
•3 CREATED IF
812.8MM X
1733.5MM DESK IS
USEDIN THAT
LOCATION
•VACANT OFFICES
USED FOR FUTURE
STAFF
•SECURITY ROOM
IS REDUCED IN
SIZE
DEMOLITION GROUND FLOOR, OPTION B
•DEMOLITION AT
PO OFFICE
•REPLACING
LARGE DESKS
WITH 812.8MM X
1733.5MM DESKS
PROPOSED GROUND FLOOR, OPTION B
•4 DESK POSITIONS
CREATED
•BOOKSHELVES AND
LATERAL FILE
CABINETS PROVIDE
FOR SHARED OFFICE
SPACE
DEMOLITION FIRST FLOOR, OPTION B
•DEMOITION LIMITED
TO ONE AREA
•VACANT OFFICES
UTILIZED FOR NEW
STAFF
PROPOSED FIRST FLOOR, OPTION B
•2 DESK POSITIONS
CREATED
•VACANT OFFICES
UTILIZED
•COPY MACHINE AND
SHREDDER
RELOCATED
PROPOSED SCOPE OF WORK ELEMENTS
PROPOSED OPTIONS WILL INCLUDE, BUT MAY NOT BE LIMITED TO THE
FOLLOWING CONSTRUCTION WORK:
•CONSTRUCTION BARRIERS INSTALLED DURING CONSTRUCTION TO
PROTECT EQUIPMENT AND BUILDING INHABITANTS FROM DUST AND
CONSTRUCTION DEBRIS
•STRUCTURAL ANALYSIS TO VERIFY LOAD BEARING WALLS
•DEMOLITION OF EXISTING NON-LOAD BEARING WALLS
•PAINT, PATCH WALLS, CEILINGS AND FLOORS AS NECESSARY
•RELOCATE AND PROVIDE NEW ELECTRICAL AND DATA CONNECTIONS AS
REQUIRED FOR NEW OFFICES AND WORKSTATIONS (LIGHTING, PHONE,
RECEPTACLES, ETC.)
•REPLACE EXISTING THROUGH THE WALL A/C UNIT WITH SMALLER, MORE
MODERN TYPE AND MOUNT NEAR THE CEILING (THESE ARE USED IN SOME
OF THE OFFICES)
BUILDING NO. 2
SUMMARY:
•LOCATED ON COMPOUND B, CONTAINS THE HEALTH AND EDUCATION
(HE) PROGRAM OFFICE, THE FOOD FOR PEACE (FFP) PROGRAM OFFICE
AND THE OFFICE OF DISASTER ASSISTANCE (OFDA)
•4 ADDITIONAL STAFF EXPECTED IN NEAR FUTURE:
•M & E SPECIALIST (HE)
•HEALTH SPECIALIST (HE)
•DLI HEALTH OFFICER (HE)
•OFDA STAFF MEMBER (WILL FILL CURRENT TDY OFFICE)
•SPACE FOR FFP AND OFDA DRIVERS
PROPOSED SOLUTIONS:
•REPLACE AND RECONFIGURE EXISTING LARGE OFFICE FURNITURE
AND REPLACE WITH SMALLER PIECES (SMALLER DESKS, SPACE
SAVING FILE CABINETS, ETC.)
•RECONFIGURE AND REDUCE THE SIZE OF LARGER OFFICES TO ALLOW
FOR MORE SPACE
•MINIMAL
DEMOLITION
BLDG NO. 2 –
DEMOLITION GROUND FLOOR
ZIMBABWE SENSITIVE BUT UNCLASSIFIED
•3 DESK POSITIONS
CREATED
•VACANT OFFICE
PROPOSED GROUND FLOOR
•NO DEMOLITION OR
CONSTRUCTION
INVOLVED
DEMOLITION FIRST FLOOR
•4 DESK POSITIONS
•VACANT OFFICE
PROPOSED FIRST FLOOR OPTION A
•2 DESK POSITIONS
•VACANT OFFICE
PROPOSED FIRST FLOOR OPTION B
•5 DESK POSITIONS
•VACANT OFFICE
PROPOSED FIRST FLOOR OPTION C
PROPOSED OPTIONS WILL INCLUDE, BUT MAY NOT BE LIMITED TO THE
FOLLOWING CONSTRUCTION WORK:
•CONSTRUCTION BARRIERS INSTALLED DURING CONSTRUCTION TO
PROTECT EQUIPMENT AND BUILDING INHABITANTS FROM DUST AND
CONSTRUCTION DEBRIS
•STRUCTURAL ANALYSIS TO VERIFY LOAD BEARING WALLS AND TO
PROVIDE STRUCTURAL SYSTEM FOR NEW DOOE OPENINGS
•DEMOLITION OF EXISTING NON-LOAD BEARING WALLS
•PAINT, PATCH WALLS, CEILINGS AND FLOORS AS NECESSARY
•RELOCATE AND PROVIDE NEW ELECTRICAL AND DATA CONNECTIONS AS
REQUIRED FOR NEW OFFICES AND WORKSTATIONS (LIGHTING, PHONE,
RECEPTACLES, ETC.)
•REPLACE EXISTING THROUGH THE WALL A/C UNIT WITH SMALLER, MORE
MODERN TYPE AND MOUNT NEAR THE CEILING (THESE ARE USED IN SOME
OF THE OFFICES)
BUILDING NO. 3
SUMMARY:
•LOCATED ON COMPOUND A, CONTAINS THE FINANCIAL MANAGEMENT
OFFICE, THE OTI OFFICE AND THE PROCUREMENT & SHIPPING OFFICES
•7 ADDITIONAL STAFF EXPECTED IN NEAR FUTURE:
•OTI DIRECTOR
•OTI DEPUTY DIRECTOR
•EXPEDITER
•3 FINANCIAL MANAGERS
•CONTROLLER
PROPOSED SOLUTIONS:
•REPLACE AND RECONFIGURE EXISTING LARGE OFFICE FURNITURE
AND REPLACE WITH SMALLER PIECES (SMALLER DESKS, SPACE
SAVING FILE CABINETS, ETC.)
•RECONFIGURE LARGER OFFICES TO ALLOW MORE SPACE
•DEMOLITION OF 2
OFFICE SPACES
BLDG NO. 3 –
DEMOLITION GROUND FLOOR
•4 NEW DESK
POSITIONS
PROPOSED GROUND FLOOR
•STRUCTURAL
WORK REQUIRED
TO DEMOLISH
LOAD BEARING
WALLS
DEMOLITION FIRST FLOOR
•3 NEW DESK
POSITIONS
PROPOSED FIRST FLOOR
BUILDING NO. 3 PASCOE AVE –
PROPOSED SCOPE OF WORK
MY PROPOSED OPTION WILL INCLUDE, BUT MAY NOT BE LIMITED TO THE
FOLLOWING CONSTRUCTION WORK:
•CONSTRUCTION BARRIERS INSTALLED DURING CONSTRUCTION TO PROTECT
EQUIPMENT AND BUILDING INHABITANTS FROM DUST AND CONSTRUCTION
DEBRIS
•STRUCTURAL ANALYSIS TO VERIFY LOAD BEARING WALLS AND TO DESIGN NEW
STRUCTURAL SYSTEM TO TRANSFER LOAD
•DEMOLISH EXISTING NON-LOAD BEARING WALLS
•PAINT, PATCH WALLS, CEILINGS AND FLOORS AS NECESSARY
•RELOCATE AND PROVIDE NEW ELECTRICAL AND DATA CONNECTIONS AS
REQUIRED
•REPLACE EXISTING THROUGH THE WALL A/C UNIT WITH SMALLER, MORE
MODERN TYPE AND MOUNT NEAR THE CEILING (THESE ARE USED IN SOME OF
THE OFFICES)
SYSTEMS BUILDING
SUMMARY:
LOCATED ON COMPOUND A, HOUSES THE IT SYSTEMS GROUP, PART
OF THE EXECUTIVE OFFICE. SPACE CONSISTS OF THE MAIN SERVER
ROOM AND AN OPEN OFFICE AREA. CURRENTLY HAS 2 EMPLOYEES
•1 ADDITIONAL IT STAFF MEMBER EXPECTED IN FUTURE
THE OFFICE SPACE IS CURRETNLY LARGE ENOUGH TO ACCOMMODATE
ANOTHER DESK, HOWEVER, THE IT STAFF COULD USE MORE STORAGE
SPACE
PROPOSED SOLUTION:
•NEW CONSTRUCTION PROJECT TO INFILL THE EXISTING PORTICO TO
ALLOW FOR MORE INTERIOR SPACE.
SYSTEMS BUILDING –
EXISTING/DEMOLITION
•INFILL PROJECT
WOULD STAY
WITHIN THE
EXISTING BUILDING
FOOTPRINT AND
NOT CAUSE A
LARGE DISRUPTION
•MINIMAL
STRUCTURE COST
ASSOCITATED
SINCE ROOF
STRUCTURE IS
ALREADY IN PLACE
SYSTEMS BUILDING –
PROPOSED
•ADDITIONAL
STORAGE SPACE
SYSTEMS BLDG –
PROPOSED OPTION WILL INCLUDE, BUT MAY NOT BE LIMITED TO THE
FOLLOWING CONSTRUCTION WORK:
•CONSTRUCTION BARRIERS INSTALLED DURING CONSTRUCTION TO PROTECT
EQUIPMENT AND BUILDING INHABITANTS FROM DUST AND CONSTRUCTION
DEBRIS
•STRUCTURAL ANALYSIS TO VERIFY STRUCTURAL SYSTEM NEEDED FOR DOOR
OPENINGS, DEMOLITION OF EXISTING WALL, ETC.
•DEMOLITION OF EXISTING NON-LOAD BEARING WALLS
•PAINT, PATCH WALLS, CEILINGS AND FLOORS AS NECESSARY
•NEW EXTERIOR WALL CONSTRUCTION
•STRUCTURAL FOOTINGS, SHEATING ANS SHORING OF EXISTING WALLS
COPY AND RECORDS (C&R) BUILDING
SUMMARY:
LOCATED ON COMPOUND B, IT CONTAINS THE COPY AND RECORDS
(C&R) OFFICES, A DIVISION OF THE EXECUTIVE OFFICE TEAM AND PART
OF THE ECONOMIC GROWTH (EG) PROGRAM OFFICE. THE EG OFFICE IS
EXPECTING 5 ADDITIONAL STAFF IN THE FUTURE. THE MISSION HAS A
DESIRE TO MOVE THE C&R TEAM TO COMPOUND A, SO ALL OF THE EXO
TEAM IS IN A CENTRAL LOCATION. THIS WOULD ALLOW THE EG TEAM
TO FULLY OCCUPY THE BUILDING.
•5 ADDITIONAL STAFF EXPECTED IN NEAR FUTURE:
SENIOR EGRONOMIST
EG DIRECTOR
GRANTS MANAGER
ADMINISTRATIVE ASSISTANT
PRIVATE SECTOR POLICY EXPERT
PROPOSED SOLUTIONS:
•DEMOLISH INTERIOR PARTITIONS AND DIVIDE SPACE INTO 5 PRIVATE
OFFICES WITH A LOBBY AND MEETING AREA
(C&R) BUILDING –
EXISTING
ZIMBABWE
PROPOSED OPTION A
•6 DESK POSITIONS
CREATED
•BUILDING COULD
BE USED FOR
SWING SPACE
DURING
CONSTRUCTION
FOR STAFF WHO
NEED PRIVATE
OFFICES
•6 DESK POSITIONS
PROPOSED OPTION B
PROPOSED OPTIONS WILL INCLUDE, BUT MAY NOT BE LIMITED TO THE FOLLOWING
CONSTRUCTION WORK:
•CONSTRUCTION BARRIERS INSTALLED DURING CONSTRUCTION TO PROTECT
EQUIPMENT AND BUILDING INHABITANTS FROM DUST AND CONSTRUCTION DEBRIS
(FOR PHASED APPROACH)
•STRUCTURAL ANALYSIS TO VERIFY LOAD BEARING WALLS; STRUCTURAL WORK
ASSOCIATED WITH NEW WINDOW OPENINGS
•DEMOLISH EXISTING NON-LOAD BEARING WALLS/INTERIOR WALL PARTITIONS
•DEMOLITION ASSOCIATED WITH INSTALLATION OF NEW WINDOWS IN NEW OFFICES
•PAINT, PATCH WALLS, CEILINGS AND FLOORS AS NECESSARY
•RELOCATE AND PROVIDE NEW ELECTRICAL AND DATA CONNECTIONS AS
REQUIRED FOR NEW SPACES (LIGHTING, PHONE, RECEPTACLES, ETC.)
•PLUMBING WORK ASSOCIATED WITH RELOCATING EXISTING TOILET AND
INSTALLING NEW SINK
•PROVIDING NEW AC UNITS FOR EACH NEW SPACE AND PLUMBING/MECHANICAL
WORK ASSOCIATED
EXO BUILDING B
SUMMARY:
LOCATED ON COMPOUND A, IT CONTAINS THE MOTOR POOL OFFICE,
THE FACILITY MANAGEMENT OFFICE, THE GSO OFFICE AND THE
WAREHOUSE SUPERVISOR’S OFFICE. CURRENTLY THE MOTOR POOL
SPACE IS CRAMPED AND THERE IS NO WAITING AREA FOR THE
DRIVERS. THE FACILITY MANAGEMENT OFFICE IS A SMALL SPACE
SHARED BY 2 STAFF MEMBERS ALONG WITH STORAGE OF VARIOUS
PARTS AND EQUIPMENT.SINCE THE REST OF THE EXO STAFF ARE
LOCATED ON COMPOUND A, IT WOULD BE MORE FEASIBLE TO
RELOCATE C & R TO THIS COUMPOUND.
PROPOSED SOLUTION:
•CONSTRUCT A SMALL BUILDING EXTENSION TO EXPAND THE SPACE
TO ACCOMMODATE MISSIONS NEEDS
•6 DESK POSITIONS
EXO BUILDING B –
DEMOLITION PLAN
•C&R RELOCATED
WITH EXTRA
WORKSTATION,
WORK TABLE, AND
BASE CABINETS
WITH ADJUSTABLE
SHELVING FOR
STORAGE
•MOTOR POOL
PROVIDED WITH
COMPUTER
WORKSTATIONS
FOR E-LEARNING,
BOOK CASES,
BASE AND WALL
CABINETS FOR
STORAGE AND
TABLE FOR LUNCH
•TDY SPACE
CREATED IN
CORRIDOR
PROPOSED PLAN
EXO BLDG B –
PROPOSED OPTION WILL INCLUDE, BUT MAY NOT BE LIMITED TO THE
FOLLOWING CONSTRUCTION WORK:
•CONSTRUCTION BARRIERS INSTALLED DURING CONSTRUCTION TO PROTECT
EQUIPMENT AND BUILDING INHABITANTS FROM DUST AND CONSTRUCTION
DEBRIS
•EXCAVATION OF BUILDING SITE FOR FOOTINGS AND SLAB INSTALLATION
•STRUCTURAL DESIGN OF FOOTINGS, EXTERIOR WALL ASSEMBLY, ROOF
SUPPORT, ETC. FOR BUILDING ADDITION
•DEMOLISH OF EXISTING EXTERIOR WALL CONSTRUCTION AND SHORING OF
EXISTING STRUCTURE
•INSTALLATION OF NEW WINDOWSIN NEW EXTERIOR WALL
•PAINT, PATCH WALLS, CEILINGS AND FLOORS AS NECESSARY
•RELOCATE AND PROVIDE NEW ELECTRICAL AND DATA CONNECTIONS AS
REQUIRED FOR NEW SPACES (LIGHTING, PHONE, RECEPTACLES, ETC.)
•PROVIDING NEW AC UNITS FOR EACH NEW SPACE AND
PLUMBING/MECHANICAL WORK ASSOCIATED
•BECAUSE THE c & r WORK ROOM AND
THE MOTOR POOL
OFFICE CAN’T
HAVE WINDOWS
DUE TO BEING
AGAINST THE
PERIMETER WALL,
THE ROOF COULD
BE PITCHED TO
ALLOW
CLERESTORY
WINDOWS TO BE
INSTALLED,
ALLOWING LIGHT
INTO THE SPACES.
PROPOSED BUILDING DESIGN
PROPOSED FURNITURE, EQUIPMENT AND ACCESSORIES
SENSITIVE BUT UNCLASSIFIEDZIMBABWE NOT TO SCALE
TDY CARROLL WORKSTATION
812.8MM X 1733.5MM DESK
CORNER SINK
LATERAL FILE CABINETS
PRIVACY PARTITION
CASEWORK
CONSTRUCTION SWING SPACE –
EXO BLDG A
•THE TRAINING/
CONFERENCE
ROOM COULD
BE USED FOR
SWING SPACE
DURING
CONSTRUCTION.
BY REPLACING
THE EXISTING
THROUGH THE
WALL A/C UNIT
WITH THE
SMALLER, MORE
MODERN TYPE
MOUNTED NEAR
THE CEILING
(USED IN SOME
OF THE
OFFICES), 3
ADDITIONAL
DESKS CAN BE
INCORPORATED.
A COPIER AND
PRINTER ARE
ALSO SHOWN.
ZIMBABWE NOT TO SCALE SENSITIVE BUT UNCLASSIFIED
EXISTING
•REARRANGE GYM
TO SAVE SPACE
•UTILIZE TDY
CARROLL
WORKSTATIONS
•CREATE 5 DESK
SPACES CREATED
CONSTRUCTION SWING SPACE -
THE GYM BUILDING
ZIMBABWE NOT TO SCALE
SWING SPACE -
AS PART OF PREAPRING THE GYM AND CONFERENCE/TRAINING CENTER TO
BECOME SWING SPACE, THE WORK WILL INCLUDE, BUT MAY NOT BE LIMITED TO
THE FOLLOWING:
•PROVIDE NEW ELECTRICAL AND DATA CONNECTIONS AS REQUIRED
•RELOCATING OF ITEMS STORED
•REARRANGING OF GYM EQUIPMENT
•PURCHASE OF NEW OFFICE FURNITURE
1.
MOVE C&R OUT
OF OTHER
BUILDING INTO
THE GYM
2.
OTI MOVES INTO
PERMANENT
OFFICES IN
BLDG 3
3.
EG MOVES
TEMPORARILY
INTO BLDG 1
OFFICE
VACATED BY OTI
SENSITIVE BUT UNCLASSIFIED
CONSTRUCTION PHASING
PHASE 1B –
CONSTRUCTION ON C&R BUILDING –
1 MONTH
PHASE 1A –
1 WEEK
OTI EG WORK AREA
DG NEW HIRE
MOVES INTO
OFFICE
VACATED BY OTI
DG (KEVIN)
MOVES INTO
OTHER VACANT
OFFICE DURING
DG (JOLCY) AND
2 DG NEW
HIRES MOVE
INTO
CONFERENCE
ROOM DURING
4.
WHEN
COMPLETE, DG
(OWTO) AND 2
NEW HIRES
MOVE INTO NEW
OFFICES AND
ADMIN WORK
STATION, DG
DIRECTOR
MOVES INTO
OWTOS OLD
OFFICE
SENSITIVE BUT UNCLASSIFIED
CONSTRUCTION PHASING
PHASE 2A –
FIRST FLOOR BUILDING 1 -
2 WEEKS
DG
Work area
Swing space
EG(JIM) MOVES
BACK INTO NEW
EG BUILDING
(FORMERLY
C&R)
PROGRAM
OFFICER MOVES
INTO AFGHAN
TDY OFFICE
NEW PDO HIRE
MOVES INTO EG
VACATED
OFFICE
4.
NEW
WORKSTATION
AND OFFICE
SETUP, 2 NEW
PO HIRES
PLACED
5.
DEPUTY
MISSION
DIRECTOR
OCCUPIES
OFFICE
VACATED BY PO
SENSITIVE BUT UNCLASSIFIED
CONSTRUCTION PHASING
PHASE 2B –
GROUND FLOOR BUILDING 1 -
2 WEEKS
PO
Work area
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
| Slide Number 22 |
| Slide Number 23 |
| Slide Number 24 |
| Slide Number 25 |
| Slide Number 26 |
| Slide Number 27 |
| Slide Number 28 |
| Slide Number 29 |
| Slide Number 30 |
| Slide Number 31 |
| Slide Number 32 |
| Slide Number 33 |
| Slide Number 34 |
| Slide Number 35 |
| Slide Number 36 |
| Slide Number 37 |
| Slide Number 38 |
| Slide Number 39 |
| Slide Number 40 |
| Slide Number 41 |
| Slide Number 42 |
| Slide Number 43 |
| Slide Number 44 |
| Slide Number 45 |
| Slide Number 46 |
| Slide Number 47 |
File details come from the government source that posted it. Updated .