Bil_of_quantities.xls
XLS spreadsheet 41 KB Posted
- Solicitation number
- 613-10-003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 3_RFP_613_10_003.pdf | ||
| RFP_613_10_003_Amend 2.pdf | ||
| Amend 1_RFP_613_10_003.pdf | ||
| Building_Plans.pdf | ||
| Solicitation_Remodel_USAID_offices.doc | DOC document | |
| Pre-solicitation_construction_final.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INCLUSIVE COSTS
| Remodeling Costs for Mission Buildings | ||||||
| Building | Estimated Renovation Cost | IT Costs | 10% Inflation | 15% VAT | Total Costs | Duration |
| C&R/EG | 17,539 | 3,100 | 2,064 | 3,096 | 25,798 | 1 month |
| DG | 10,956 | 2,850 | 1,381 | 2,071 | 17,258 | 2 weeks |
| Front Office | 5,413 | 250 | 566 | 849 | 7,079 | 1 week |
| HE | 12,448 | 200 | 1,265 | 1,897 | 15,810 | 4 weeks |
| OFDA/FFP | - 0 | 350 | 35 | 53 | 438 | 2 days |
| CONT | 14,631 | 300 | 1,493 | 2,240 | 18,664 | 6 weeks |
| BLDG3 1st flr | 9,922 | 200 | 1,012 | 1,518 | 12,653 | 4 weeks |
| IT | 6,380 | - 0 | 638 | 957 | 7,975 | 3 weeks |
| EXO Building 4 | 100,000 | 700 | 10,070 | 15,105 | 125,875 | 3 months |
| Grand Total | 177,290 | 7,950 | 18,524 | 27,786 | 231,550 |
EG C&R
| COMMUNICATIONS AND RECORDS/ECONOMIC GROWTH | ||||
| Materials for the re-modeling of C&R | ||||
| Item | Size | Unit Cost-$ | Quantity | Total |
| Bison board | 3.66X1.83X0.06 | 40 | ||
| Ceiling boards | 3.66X1.83X0.06 | 10 | ||
| Wooden plank | 75mmX75mm | 80 | ||
| Pine cornice | 76mm | 100 | ||
| Cover strips | 44mmX9mm | 100 | ||
| Wood nails | 75mm | 10 | ||
| Clout/ceiling nails | 40mm | 4 | ||
| Wood glue | 2 litres | 2 | ||
| Crack filler | 2kg | 4 | ||
| Skirting | 80mm | 80 | ||
| Door | Interior flush | 3 | ||
| Lockset | 2 Lever | 3 | ||
| Window frame | C4H | 2 | ||
| Total | ||||
| Total for materials | ||||
| Other Materials | ||||
| Air conditioners | 12000 BTU | 2 | ||
| Double Sockets | 13Amp | 6 | ||
| Single sockets | 13amp | 6 | ||
| Light fixtures | 4 ft Flourescent | 3 | ||
| Carpet-supply and fit | 36 | |||
| Electrical cables | 4 | |||
| Switches | 5 Amp | 3 | ||
| Interior paint | Silk PVA | 2 | ||
| Ceiling white paint | 20L | 2 | ||
| Total | ||||
| Total for other materials | ||||
| Installation Costs | ||||
| Air Conditioners Installation | 2 | |||
| Electrical work and supply of consumables | 3 days | |||
| Construction/carpentry works | 15 days | |||
| Plumbing works and supply of accessories | 4 days | |||
| Grills-supply and fit | 2 | |||
| Total | ||||
| Total | ||||
| Grand Total for EG/C&R Remodeling |
DG
| DG OFFICE (FIRST FLOOR BUILDING 1) | ||||
| Materials for the re-modeling of DG Office | ||||
| Item | Size | Unit Cost-$ | Quantity | Total cost |
| Bison board | 3.66X1.83X0.06 | 20.00 | ||
| Ceiling boards | 3.66X1.83X0.06 | 5.00 | ||
| Wooden plank | 75mmX75mm | 30.00 | ||
| Pine cornice | 76mm | 50.00 | ||
| Cover strips | 44mmX9mm | 50.00 | ||
| Wood nails | 75mm | 5.00 | ||
| Clout/ceiling nails | 40mm | 2.00 | ||
| Wood glue | 2 litres | 1.00 | ||
| Crack filler | 2kg | 3.00 | ||
| Skirting | 80mm | 46.00 | ||
| Door | Interior flush | 1.00 | ||
| Lockset | 2 Lever | 2.00 | ||
| Window frame | C4H | - 0 | ||
| Total | ||||
| Total for Materials | ||||
| Other Materials | ||||
| Air conditioners | 12000 BTU | 3.00 | ||
| Double Sockets | 13Amp | 3.00 | ||
| Single sockets | 13amp | 3.00 | ||
| Light fixtures | 4 ft Flourescent | 3.00 | ||
| Carpet-supply and fit | 27.00 | |||
| Electrical cables | 2.00 | |||
| Switches | 5 Amp | 3.00 | ||
| Interior paint | Silk PVA 20 Litres | 1.00 | ||
| Ceiling white paint | 20L | 1.00 | ||
| Total | ||||
| Total for Other Materials | ||||
| Installation Costs | ||||
| Air Conditioners Installation | 3.00 | |||
| Electrical work and supply of consumables | 1.5 days | |||
| Construction/carpentry works | 7 days | |||
| Plumbing works and supply of accessories | - 0 | |||
| Grills-supply and fit | No grills needed | - 0 | ||
| Total | ||||
| Total for installation costs | ||||
| Grand total | ||||
| TOTAL FOR DG REMODELING |
FRONT OFFICE
| FRONT OFFICE (FIRST FLOOR BUILDING 1) | ||||
| Materials for the re-modeling of the Front Office | ||||
| Item | Size | Unit Cost-$ | Quantity | Total cost |
| Bison board | 3.66X1.83X0.06 | 5.00 | ||
| Ceiling boards | 3.66X1.83X0.06 | 4.00 | ||
| Wooden plank | 75mmX75mm | 10.00 | ||
| Pine cornice | 76mm | 10.00 | ||
| Cover strips | 44mmX9mm | 10.00 | ||
| Wood nails | 75mm | 2.00 | ||
| Clout/ceiling nails | 40mm | 1.00 | ||
| Wood glue | 2 litres | 1.00 | ||
| Crack filler | 2kg | 1.00 | ||
| Skirting | 80mm | 15.00 | ||
| Door | Interior flush | 1.00 | ||
| Lockset | 2 Lever | 1.00 | ||
| Door Frame | Standard Size | 1.00 | ||
| Total | ||||
| Total for Materials | ||||
| Other Materials | ||||
| Air conditioners | 12000 BTU | 1.00 | ||
| Double Sockets | 13Amp | 1.00 | ||
| Single sockets | 13amp | 1.00 | ||
| Light fixtures | 4 ft Flourescent | 1.00 | ||
| Carpet-supply and fit | 15 square meters | 15.00 | ||
| Electrical cables | 1.00 | |||
| Switches | 5 Amp | 1.00 | ||
| Interior paint | Silk PVA 20 Litres | 1.00 | ||
| Ceiling white paint | 20L | 1.00 | ||
| Total | ||||
| Total for other materials | ||||
| Installation Costs | ||||
| Air Conditioners Installation | (need to change B's too) | 2.00 | ||
| Electrical work and supply of consumables | 2 days | |||
| Construction/carpentry works | 5 days | |||
| Door installation demolition works | 2 days | |||
| Grills-supply and fit | No grills needed | - 0 | ||
| Total for Installation costs | ||||
| Total for Installation costs | ||||
| Grand Total | ||||
| TOTAL FOR FRONT OFFICE REMODELING |
HEALTH
| HE OFFICE (GROUND FLOOR BUILDING 2) | ||||
| Materials for the re-modeling of HE Office | ||||
| Item | Size | Unit Cost-$ | Quantity | Total cost |
| Bison board | 3.66X1.83X0.06 | 20.00 | ||
| Ceiling boards | 3.66X1.83X0.06 | 10.00 | ||
| Wooden plank | 75mmX75mm | 40.00 | ||
| Pine cornice | 76mm | 70.00 | ||
| Cover strips | 44mmX9mm | 70.00 | ||
| Wood nails | 75mm | 6.00 | ||
| Clout/ceiling nails | 40mm | 2.00 | ||
| Wood glue | 2 litres | 1.00 | ||
| Crack filler | 2kg | 3.00 | ||
| Skirting | 80mm | 70.00 | ||
| Door | Interior flush | 1.00 | ||
| Lockset | 2 Lever | 2.00 | ||
| Window frame | C4H | - 0 | ||
| Total | ||||
| Other Materials | ||||
| Air conditioners | 12000 BTU | 2.00 | ||
| Double Sockets | 13Amp | 3.00 | ||
| Single sockets | 13amp | 3.00 | ||
| Light fixtures | 4 ft Flourescent | 3.00 | ||
| Carpet-supply and fit | 27.00 | |||
| Electrical cables | 2.00 | |||
| Switches | 5 Amp | 3.00 | ||
| Interior paint | Silk PVA 20 Litres | 2.00 | ||
| Ceiling white paint | 20L | 1.00 | ||
| Total | ||||
| Total for Other Materials | ||||
| Installation Costs | ||||
| Air Conditioners Installation | 2.00 | |||
| Electrical work and supply of consumables | 3 days | |||
| Construction/carpentry works | 15 days | |||
| Plumbing works and supply of accessories | - 0 | |||
| Grills-supply and fit | No grills needed | - 0 | ||
| Total | ||||
| Total for Installation Costs | ||||
| Grand Total for HIV Office | ||||
| TOTAL FOR HE REMODELING |
CONT GROUND FLOOR
| CONTROLLERS' OFFICE (GROUND FLOOR BUILDING 3) | ||||
| Materials for the re-modeling of Controller's Office | ||||
| Item | Size | Unit Cost-$ | Quantity | Total cost |
| Bison board | 3.66X1.83X0.06 | 20.00 | ||
| Ceiling boards | 3.66X1.83X0.06 | 8.00 | ||
| Wooden plank | 75mmX75mm | 40.00 | ||
| Pine cornice | 76mm | 40.00 | ||
| Cover strips | 44mmX9mm | 40.00 | ||
| Wood nails | 75mm | 6.00 | ||
| Clout/ceiling nails | 40mm | 2.00 | ||
| Wood glue | 2 litres | 1.00 | ||
| Crack filler | 2kg | 3.00 | ||
| Skirting | 80mm | 40.00 | ||
| Door | Interior flush | 1.00 | ||
| Lockset | 2 Lever | 2.00 | ||
| Window frame | C4H | - 0 | ||
| Total | ||||
| Total For Materials | ||||
| Other Materials | ||||
| Air conditioners | 12000 BTU | 3.00 | ||
| Double Sockets | 13Amp | 3.00 | ||
| Single sockets | 13amp | 3.00 | ||
| Light fixtures | 4 ft Flourescent | 3.00 | ||
| Carpet-supply and fit | 25 square meters | 25.00 | ||
| Electrical cables | 2.00 | |||
| Switches | 5 Amp | 4.00 | ||
| Interior paint | Silk PVA 20 Litres | 2.00 | ||
| Ceiling white paint | 20L | 1.00 | ||
| Total | ||||
| Total for other materials | ||||
| Installation Costs | ||||
| Air Conditioners Installation | 3.00 | |||
| Electrical work and supply of consumables | 3 days | |||
| Construction/carpentry works | 15 days | |||
| Demolition works | 3 days | |||
| Plumbing works and supply of accessories | - 0 | |||
| Grills-supply and fit | No grills needed | - 0 | ||
| Total | ||||
| Total for Installation Costs | ||||
| Grand total | ||||
| TOTAL FOR CONT GROUND FLOOR |
CONT 1ST FLOOR
| Materials for the re-modeling of Controllers 1st Floor | ||||
| Item | Size | Unit Cost-$ | Quantity | Total cost |
| Bison board | 3.66X1.83X0.06 | 10 | ||
| Ceiling boards | 3.66X1.83X0.06 | 4 | ||
| Wooden plank | 75mmX75mm | 40 | ||
| Pine cornice | 76mm | 10 | ||
| Cover strips | 44mmX9mm | 40 | ||
| Wood nails | 75mm | 5 | ||
| Clout/ceiling nails | 40mm | 2 | ||
| Wood glue | 2 litres | 2 | ||
| Crack filler | 2kg | 2 | ||
| Skirting | 80mm | 30 | ||
| Door | Interior flush | 0 | ||
| Lockset | 2 Lever | 2 | ||
| Window frame | 8 pane size | 1 | ||
| Total | ||||
| Total for materials | ||||
| Other materials | ||||
| Air conditioners | 12000 BTU | 1 | ||
| Double Sockets | 13Amp | 4 | ||
| Single sockets | 13amp | 0 | ||
| Light fixtures | 4 ft Flourescent | 3 | ||
| Carpet-supply and fit | 30 | |||
| Electrical cables | 3 | |||
| Switches | 5 Amp | 1 | ||
| Interior paint | Silk PVA | 1 | ||
| Ceiling white paint | 20L | 1 | ||
| Total | ||||
| Total for Other Materials | ||||
| Installation Costs | ||||
| Air Conditioners Installation and re-positioning | 3 | |||
| Electrical work and supply of consumables | 2 days | |||
| Construction/carpentry works | 1 days | |||
| Plumbing works and supply of accessories | 0 | |||
| Grills-supply and fit | 1 | |||
| Total | ||||
| Total for Installation Costs | ||||
| Grand Total | ||||
| TOTAL FOR CONTROLLERS' FIRST FLOOR |
GSO and Systems
| ESTIMATE FOR OTHER BUILDING WITH NO PLANS | |
| Cost | |
| SYSTEMS | |
| Materials Cost | |
| Materials | |
| Labor | |
| Labour | |
| Total | |
| TOTAL FOR SYSTEMS | |
| GSO ESTIMATE |
File details come from the government source that posted it. Updated .