6001FJ_SQSS_POST.pdf

PDF 102 KB Posted

Attached to
A-10 Trailing Edge Parts (4 NSNs) 5 YR IDIQ
Solicitation number
FA8212-22-R-0024
Issued by

View the file

Other files

File Type Posted
6001FJ_Engineering_Instructions.docx DOCX document
4422FJ_Engineering_Instructions.docx DOCX document
7534FJ_Production_Quality_Requirements.pdf PDF
6001FJ_IUID.pdf PDF
4422FJ_Item_Description.pdf PDF
7534FJ_IUID.pdf PDF
3144FJ_IUID.pdf PDF
3144FJ_Procurement_Statements.pdf PDF
3144FJ_Engineering_Data_List.pdf PDF
4422FJ_Engineering_Data_List.pdf PDF
6001FJ_Engineering_Data_List.pdf PDF
7534FJ_AFMC_Form_260_FA.pdf PDF
7534FJ_Item_Description.pdf PDF
Packaging Requirements.pdf PDF
SOW Pkg Requirements.pdf PDF
3144FJ_Production_Quality_Requirements.pdf PDF
4422FJ_IUID.pdf PDF
7534FJ_Engineering_Data_List.pdf PDF
TDP_Data_Pkg.pdf PDF
Transportation_Funds.pdf PDF
6001FJ_Special_Pkg_Instructions.pdf PDF
4422FJ_Production_Quality_Requirements.pdf PDF
CDRL_A001_FATR.pdf PDF
3144FJ_Item_Description.pdf PDF
4422FJ_AFMC_Form_260_FA.pdf PDF
6001FJ_Procurement_Statements.pdf PDF
6001FJ_Item_Description.pdf PDF
3144FJ_AFMC_Form_260_FA.pdf PDF
3144FJ_SQSS_POST.pdf PDF
Foreign_Disclosure_Review.pdf PDF
4422FJ_SQSS_POST.pdf PDF
4422FJ_Procurement_Statements.pdf PDF
6001FJ_Production_Quality_Requirements.pdf PDF
7534FJ_SQSS_POST.pdf PDF
6001FJ_AFMC_Form_260_FA.pdf PDF
4422FJ_Special_Pkg_Instructions.pdf PDF
7534FJ_Procurement_Statements.pdf PDF
7534FJ_AND_3144FJ_Special_Pkg_Instructions.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MANUFACTURING QUALIFICATION REQUIREMENTS

NSN: 1560011736001FJ

P/N: 160D611512-1 Noun: Trailing Edge Wedge Application: A-10

1 May 2018 Section C 3/4 function evaluation to demonstrate compatibility with the weapon system and to evaluate the manufacturing capability of the offeror. Offerors will be notified whether or not their qualification article passed or failed the required qualification testing within 30 days of submitting a product for qualification testing. Note that successful completion of the qualification testing does not guarantee any contract award. If the offeror is deemed qualified and awarded the contract, a post-contract award first article exhibit may be required to verify production capability.

g. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified: $3,200.

h. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 365 days. This is based on complexity of the Trailing Edge Wedge and other factors.

i. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.

j. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offeror will be listed as an approved source for this item. Approval, however, does not guarantee subsequent contract award.

MANUFACTURING QUALIFICATION REQUIREMENTS

NSN: 1560011736001FJ

P/N: 160D611512-1 Noun: Trailing Edge Wedge Application: A-10

1 May 2018 Section C 4/4

2. SOURCE QUALIFICATION WAIVER REQUIREMENTS

Sources who meet any of the following source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:

a. QWC1: The potential source submits written certification that the articles have recently been supplied to the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc).

b. QWC2: The potential source is qualified on the right-hand article and requests to be qualified on the left-hand article. If the right-and left-hand articles are mirror images of each other, then approval can generally be given.

c. QWC3: A source qualified to provide an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.

d. QWC4: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.

e. QWC5: A source qualified to provide a similar or like item can be qualified to provide the required item. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.

f. QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the manufacturing process.