3144FJ_Engineering_Data_List.pdf
PDF 58 KB Posted
- Attached to
- A-10 Trailing Edge Parts (4 NSNs) 5 YR IDIQ
- Solicitation number
- FA8212-22-R-0024
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENGINEERING DATA LIST
DATE:
07 DEC 2021
REVISION: 8 *HISTORY*
CAGE:
98747
PAGE:
NSN:
1560011263144FJ
DATA TECH:
Hunt, Bertley J
END ITEM:
A-10 AIRCRAFT
ORGANIZATION/OFFICE SYMBOL:
429 SCMS GUMACB/
MANUFACTURER NAME:
OGDEN AIR LOGISTICS CENTER
REFERENCE NUMBER:
160D612512-2
NOUN:
TRAILING EDGE,AIRCR
LINE/
SUB CAGE
ENG DRAWING NUM/ ACCOMP
DOC NUM REV
NR
SHEETS
FURN
CODE
DIST
CODE NOUN REMARKS
L 77751 160D612512 L S D TRAILING EDGE WEDGE
ASSEMBLY OB WING PANEL
Hunt, Bertley J 14 FEB 2022
(-2) WITH PARTS LIST REV L
NAME: DATE:
L 98747 160D612512-2 L X D T.E. WEDGE ASSY (3D MODEL)
L 77751 G-F101 C S D DEBURRING & BLENDING OF
METALS
L 77751 G-F601 F S D RIVET, COMMON,
INSTALLATION
L 77751 G-F603 E S D RIVETS, BLIND INSTALLATION
L 77751 P-M601 A S D CORE, FIBEROUS NYLON,
PHENOLIC COATED
L 77751 S-F501 M S D BONDING, STRUCTURAL
ADHESIVE
L 77751 S-F502 L S D LAMINATES, EPOXY GLASS
L 77751 SP664 M S D FLUSH - FASTENINGS
STRUCTURAL
L 77751 SP900 K S C BOLT, NUT, AND WASHER
INSTALLATION
L 77751 Z-F501 S D INSTALLATION OF BONDED
RUB PADS
L 77751 Z-R701 C S D MARKINGS & IDENTIFICATION
REQUIREMENTS
Hunt, Bertley J 07 DEC 2021
WITH AT-1
NAME: DATE:
L 77751 Z-R901 F S D GENERAL FINISH
SPECIFICATIONS, A-10
L 98747 201308306 S D A-10 GENERAL ENGINEERING
NOTES
Hunt, Bertley J 14 FEB 2022
THE FOLLOWING NOTES APPLY: 2-6 AND 28.
NAME: DATE:
STANDARD ENGINEERING TEXT
Hunt, Bertley J 07 DEC 2021
RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.
NAME: DATE:
C - CLASSIFIED DOCUMENT.
S - FURNISHED WITH SOLICITATION.
M - STABLE BASE DRAWING REQUIRED; FURNISHED WITH
CONTRACT AWARD.
X - DATA SUPPLIED (NOT IN JEDMICS).
R - FURNISHED BY PCO UPON REQUEST.
P - PARTIAL DOCUMENT FURNISHED.
V - VENDOR DRAWING; (NOT PROVIDED).
G - GOV'T DOCUMENT.
O - OTHERS, CONTRACTOR MUST ACQUIRE.
A- DATA NOT AVAILABLE.
FURNISHED METHOD CODE LEGEND:
Page 1 of 1EDL Version 8Generated by PRPS using Jasper Reports on 11 Mar 2022
File details come from the government source that posted it. Updated .