About this file
This is a subcontractors disclosure form for the Forest Preserve District of Kane County, Illinois, related to solicitation SB-FP-10-2526 for soil health analysis services. The form is designed for bidders to identify and list any subcontractors that will perform work on the three-year contractual agreement to conduct soil health analysis on District farmland. The document provides three separate line item spaces for listing subcontractor names and the specific work each subcontractor will perform, with an alternative option for bidders to certify that no subcontractors will be used for the project. Each section requires the bidder's signature, date, and printed name to authenticate the information provided.
The form serves as a transparency mechanism requiring bidders to disclose all subcontracting arrangements prior to contract award. Bidders must certify the accuracy of all information provided regarding subcontractor involvement and work scope assignments. The document does not contain pricing information, set-asides, funding sources, or other financial terms, as it functions solely as a disclosure and certification document within the larger procurement process for soil health analysis services on Kane County farmland.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
To preserve and restore the nature of Kane County
1996 South Kirk Road, Suite 320, Geneva, Illinois 60134
Bill Lenert, President Benjamin Haberthur, Executive Director
(630) 232-5980 Fax: (630) 232-5924 www.kaneforest.com
SUB-CONTRACTORS
The listed Sub-contractors will perform the work indicated herein:
1. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
2. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
3. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
No Sub-Contractors will be used for this project.
I certify that all information above is correct.
Signed:________________________________________________Date:___________________________
Printed Name:__________________________________________
SB-FP-10-2526
http://www.kaneforest.com/
| 1. Sub-Contractor__________________________________________________________________ |
| Work Performed__________________________________________________________________ |
| 2. Sub-Contractor__________________________________________________________________ |
| Work Performed__________________________________________________________________ |
| 3. Sub-Contractor__________________________________________________________________ |
| Work Performed__________________________________________________________________ |
| No Sub-Contractors will be used for this project. |
| I certify that all information above is correct. |
| Signed:________________________________________________Date:___________________________ |
| Printed Name:__________________________________________ |
| 1 SubContractor: |
| Work Performed: |
| 2 SubContractor: |
| Work Performed_2: |
| 3 SubContractor: |
| Work Performed_3: |
| I certify that all information above is correct: Off |