6-Subcontractors Fillable.pdf

PDF 847 KB Posted

Attached to
SB-FP-10-2526 Soil Health Analysis
Solicitation number
SB-FP-10-2526 Soil Health Analysis
Issued by
Kane County, Illinois

About this file

This is a subcontractors disclosure form for the Forest Preserve District of Kane County, Illinois, related to solicitation SB-FP-10-2526 for soil health analysis services. The form is designed for bidders to identify and list any subcontractors that will perform work on the three-year contractual agreement to conduct soil health analysis on District farmland. The document provides three separate line item spaces for listing subcontractor names and the specific work each subcontractor will perform, with an alternative option for bidders to certify that no subcontractors will be used for the project. Each section requires the bidder's signature, date, and printed name to authenticate the information provided.

The form serves as a transparency mechanism requiring bidders to disclose all subcontracting arrangements prior to contract award. Bidders must certify the accuracy of all information provided regarding subcontractor involvement and work scope assignments. The document does not contain pricing information, set-asides, funding sources, or other financial terms, as it functions solely as a disclosure and certification document within the larger procurement process for soil health analysis services on Kane County farmland.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

To preserve and restore the nature of Kane County

1996 South Kirk Road, Suite 320, Geneva, Illinois 60134

Bill Lenert, President Benjamin Haberthur, Executive Director

(630) 232-5980 Fax: (630) 232-5924 www.kaneforest.com

SUB-CONTRACTORS

The listed Sub-contractors will perform the work indicated herein:

1. Sub-Contractor__________________________________________________________________

Work Performed__________________________________________________________________

2. Sub-Contractor__________________________________________________________________

Work Performed__________________________________________________________________

3. Sub-Contractor__________________________________________________________________

Work Performed__________________________________________________________________

No Sub-Contractors will be used for this project.

I certify that all information above is correct.

Signed:________________________________________________Date:___________________________

Printed Name:__________________________________________

SB-FP-10-2526

http://www.kaneforest.com/

1. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
2. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
3. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
No Sub-Contractors will be used for this project.
I certify that all information above is correct.
Signed:________________________________________________Date:___________________________
Printed Name:__________________________________________
1 SubContractor:
Work Performed:
2 SubContractor:
Work Performed_2:
3 SubContractor:
Work Performed_3:
I certify that all information above is correct: Off
Date:
Printed Name:

File details come from the government source that posted it. Updated .