6-SDB Form, 71-FA-8.2 Dec 2023.docx

DOCX document 56 KB Posted

Attached to
CWU-89-L: Bentley Street Level Renovation Lock Haven Campus
Solicitation number
Not on record
Issued by
Clearfield County, Pennsylvania

About this file

This is a Small Diverse Business (SDB) Solicitation Form for the State System of Higher Education, Commonwealth of Pennsylvania, related to solicitation CWU-89-L for the Bentley Street Level Renovation at Lock Haven Campus. The project involves renovation of 3,810 square feet of interior space at Lock Haven University requiring separate prime contractors in three disciplines: General Construction (including selective demolition, interior glazing and decorative walls, flooring, exterior signage, and painting), HVAC Construction (ceiling diffuser replacement, new mini-split heat pump installation, and sprinkler head resetting), and Electrical Construction (new interior lighting, additional outlets, and IT infrastructure). A mandatory pre-bid conference with site visit is scheduled for November 12, 2026, at 11:00 AM EST at Bentley Dining Hall. Electronic bids are due no later than 1:00 PM EST on December 8, 2026, through PennBid. The General Contractor will serve as the Lead Prime Contractor responsible for coordination among the separate prime contractors.

This form requires the prime bidder to document all SDB solicitations undertaken, including the firms solicited, scope of work, estimated values, dates of solicitation, quotes received, and any commitments made. SDB firms must be registered in the Pennsylvania Department of General Services SDB database. The form mandates that bidders attach written evidence of solicitations and quotes, including negative responses from solicited SDBs. Credit toward the REAA (Resident Employee Advancement Account) is awarded only once per scope of work, with multiple solicitations for identical scopes not counting more than once cumulatively. Non-SDB firms need only be listed if they received solicitations for the same scopes as SDBs, provided lower quotes from non-SDBs are the basis of commitments to those firms.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE SYSTEM OF HIGHER EDUCATION, COMMONWEALTH OF PENNSYLVANIA

SMALL DIVERSE BUSINESS (SDB) SOLICITATION FORM

Bidder Information Company Name:

Address:

Contact Person:

E-mail:

Telephone: ( )

Project Information Contract Number:

Project Name:

Location:

REAA:

Firms Solicited

SDB or Non-SDB

Scope/Materials

Estimated Value

Date Solicited

Quotes

Commitments

Rec'd Y/N

Amount
Attached

Y/N Made Y/N Attached Y/N

Instructions for SDB Solicitation Form

Bidder Information: Self-explanatory. The Contact Person should be the person familiar with the information on the Form. If the prime bidder itself is an SDB, state so on the form. SDBs must be in the PA DGS SDB database. If the prime bidder is an SDB, no proactive solicitation is required.

Project Information: Self-explanatory. The REAA for each contract is specified in the Special Instructions to Bidders.

Firms Solicited: All SDB who were solicited must be listed. List the SDB firm's name and address, along with the name and telephone number of the person contacted at the SDB. Additionally, any Non-SDB Firm who was solicited for the same scopes of work and/or materials for which SDB were solicited, and from whom a written quote was received that is lower than the lowest quote received from an SDB and which is the basis of a commitment to that Non-SDB Firm, must be listed. However, any Non-SDB Firm who was solicited for the same scopes of work and/or materials for which SDB were solicited, and from whom a written quote was not received, or from whom a written quote was received but which is not the basis of a commitment to that Non-SDB Firm, need not be listed. Solicitations for scopes of work and/or materials which did not include any SDB need not be listed.

SDB or Non-SDB: Identify whether the firm is an SDB or not. SDBs must be in the PA DGS SDB database.

Scope/Materials: List the scope of work and/or materials solicited. Use the Technical Specification Division number, if possible and appropriate.

Estimated Value: Identify your (the prime bidder's) estimate of the value of the scope of work and/or materials being solicited. Credit towards the REAA is only given once for each scope of work and/or materials being solicited. Multiple solicitations for the same scope of work and/or materials are encouraged, but multiple solicitations for the same scope of work and/or materials cannot count more than once for the cumulative REAA.

Date Solicited: Identify the date the solicitation was issued. Attach written evidence of that solicitation (letter, fax, or e-mail).

Quotes: Identify whether or not a quote was received from the solicited firm. Identify the dollar value of that bid or quote. Indicate whether written evidence of that quote (letter, fax, or e-mail) is attached. Negative responses from solicited SDB (letter, fax, or e-mail) should also be attached.

Commitments: Identify whether or not your firm made a commitment based on the solicitation. Indicate whether the commitment letter, either to an SDB or to a Non-SDB Firm, is attached.

Use Multiple Sheets and/or Continuation Sheets if Necessary

SDB SOLICITATION FORM CONTINUATION SHEET

Bidder (Company Name):

Project (Contract Number):

Firms Solicited

SDB or Non-SDB

Scope/Materials

Estimated Value

Date Solicited

Quotes

Commitments

Rec'd
Amount
Attached
Made
Attached
Solicitation for Construction 71-FA-8.2SDB Solicitation Form
Solicitation No. CWU-89-LPage 1 of 3

File details come from the government source that posted it. Updated .