6-SCOPE AND SPECS.pdf

PDF 1 MB Posted

Attached to
26B-029 BIOSOLIDS BUILDING PVC CURTAIN INSTALLATION
Solicitation number
26B-029
Issued by
Marion County, Florida

About this file

This is a Scope of Work and Specifications document for Marion County, Florida, detailing the installation of PVC coated polyester curtains around the biosolids building at the Southwest Regional Water Reclamation Facility. The project involves furnishing and installing new curtains with sliding track assemblies and anchoring systems on all four sides of the biosolids dewatering building. The curtains will be constructed from 18 oz. per square yard PVC coated polyester material in a fire-retardant finish, with the south and east faces being solid curtains and other faces potentially including clear window options. The successful contractor must be fully licensed by the State of Florida and responsible for obtaining all required permits. The contractor shall commence pre-construction activities within thirty calendar days of receiving the Notice to Proceed, achieve substantial completion within thirty days thereafter, and complete final completion within an additional thirty days. All work must comply with Marion County Land Development Code, ADA requirements, and Florida Department of Transportation standards. Regular work hours are Monday through Friday, 7:30 AM to 4:30 PM, with any deviation requiring prior written approval from the Engineer.

The contractor is responsible for all labor, equipment, materials, submittals, daily reports, progress meetings, and mobilization/demobilization costs. Compensation is based on line items defined in the Bid Form and Appendix A, with five percent of each invoice withheld as retainage until final completion. The contractor must provide lien releases from all subcontractors and suppliers with the final invoice. A one-year warranty covering all labor, equipment, and replacement parts is required, commencing upon release of final retainage. Liquidated damages of $250 per calendar day apply for failure to achieve substantial completion by the specified date and an additional $250 per day for failure to achieve final completion. The contractor must maintain daily construction records, submit shop drawings and material specifications for Engineer approval prior to ordering, and comply with all OSHA and ADA regulations. No utilities are provided by the owner; the contractor must supply all necessary services including portable facilities, water, and lighting.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOUTHWEST REGIONAL WRF

BIOSOLIDS BUILDING CURTAINS PART 1 Scope of Work – Page 1 of 7

26B-029 SCOPE OF WORK AND

SPECIFICATIONS

SOUTHWEST REGIONAL WRF

BIOSOLIDS BUILDING CURTAINS

1. SCOPE OF WORK

1.1. DESCRIPTION

Marion County is soliciting fully licensed and qualified firms to submit bids for the SW REGIONAL WRF BIOSOLIDS BUILDING CURTAINS project. The project is located in the southwest quadrant of Marion County, Florida. The successful bidder will be responsible for all permits unless stated otherwise within this document and must be licensed by the State of Florida to perform such work. Successful bidder must submit a copy of such license upon award of bid. All local codes and State of Florida ADA Code will apply. All work must be done by experienced trades.

1.2. GENERAL

1.2.1. The work included in this section is hereby defined as furnishing all labor, equipment and materials, and in performing all operations and procedures necessary for the curtain installation, and any other work in accordance with the specifications itemized below and the following documents:

1.2.1.1. Part 1 – Scope of Work

1.2.1.2. Part 2 - Bid Form

1.2.1.3. Appendix A - Supplemental Specifications

1.2.1.3.1. Exhibit 1 – Biosolids Dewatering Building Curtain Details

1.2.1.3.2. 00800 – Technical Special Provisions

1.2.1.3.3. 13080 – PVC Coated Polyester Curtain Specification

1.2.1.4. Part 3 – Intent and General Information

1.2.1.5. Part 4 – General Conditions

1.2.2. Bidders must identify all subcontractors, and the work they will perform for this project, on the Disclosure Form provided in the solicitation documents. It is the County’s expectation that any portion of the work not identified under a subcontractor will be self-performed by the Bidder.

Written approval must be obtained from the Construction Manager or his designee prior to any changes to subcontractors or their workload/responsibility under this project.

1.2.3. Marion County reserves the right to reject any subcontractor based on past performance, location, or any other grounds that may conflict with the best interests of Marion County Board of County Commissioners.

1.3. SPECIFIC SCOPE OF WORK

1.3.1. The list of activities shall include but not be limited to:

1.3.1.1. Furnish and install new Curtains with sliding track assemblies, and anchoring systems as per Plans and Specifications; See drawings for further details.

BIOSOLIDS BUILDING CURTAINS PART 1 Scope of Work – Page 2 of 7

1.4. GOVERNING SPECIFICATIONS

1.4.1. All improvements shall be made in accordance with the Marion County Land Development Code, as amended and augmented by these specifications.

1.4.2. The CONTRACTOR is directed to the fact that the specifications are provided for reference. It is the CONTRACTOR’S responsibility to verify all field conditions prior to initiating work.

1.5. SUBMITTALS

1.5.1. Prior to ordering the materials, CONTRACTOR shall submit to the ENGINEER the manufacturer’s most current catalogue sheets and performance specifications for associated appurtenances proposed for use on this project. Any material requiring a submittal that is purchased by the CONTRACTOR prior to receiving the ENGINEER’S approval of that material is at the CONTRACTOR’S own risk.

1.5.2. Contractor shall provide one (1) electronic copy in PDF format. Any materials acquired or installed by the CONTRACTOR prior to approval by the ENGINEER, does so at the CONTRACTOR’S sole risk.

1.6. DAILY REPORTS

1.6.1. The Contractor shall submit daily reports of construction activities and total amount of materials installed. The report shall include the following:

1.6.1.1. Manpower, number of workers by craft.

1.6.1.2. Equipment on the project.

1.6.1.3. Major deliveries.

1.6.1.4. Activities work.

1.6.1.5. New problems.

1.6.1.6. Material installed and other pertinent information.

1.6.2. A similar report shall be submitted for/by each subcontractor.

1.6.3. The reports shall be submitted to the Construction Manager and Project Manager the following morning via email of the respective report date. Each report shall be signed by the Contractor’s Superintendent or Project Manager.

1.7. PROGRESS MEETINGS

1.7.1. The Owner will organize and conduct a progress meeting at least once a month to discuss the progress of the Work. The Contractor and any subcontractors the Contractor deems necessary shall attend these meetings.

BIOSOLIDS BUILDING CURTAINS PART 1 Scope of Work – Page 3 of 7

1.8. WORK HOURS

1.8.1. Regular work hours are hereby defined as 7:30 AM to 4:30 PM, Monday through Friday.

Regular work hours do not include Saturday, Sunday, or other Marion County Holidays.

1.8.2. CONTRACTOR shall limit all work to the regular work hours specified above. Any deviation from these regular work hours requires prior written approval from the ENGINEER. If CONTRACTOR is granted permission to work at times other than regular work hours, CONTRACTOR shall be responsible for paying for the OWNER’S, INSPECTORS’ and ENGINEER’S time expended on the project during that time period for the inspections and oversight.

1.9. MOBILIZATION/DEMOBILIZATION

1.9.1. Mobilization shall include moving equipment and materials to the Project Site, providing temporary construction electrical power and water supply, installing sanitary facilities for workers, providing a full time superintendent at the Project Site, providing required submittals, establishing a fire protection and safety plan, providing a detailed Critical Path Method schedule to the ENGINEER for approval, and posting of OSHA, Department of Labor, and all other required notices.

1.9.2. CONTRACTOR shall video all areas where construction will occur noting the condition of existing features in the work areas. CONTRACTOR shall provide a copy to the ENGINEER prior to commencement of work. Video quality shall be sufficient to see details of the existing features.

Any video that is out of focus or otherwise unclear shall be reshot at the CONTRACTOR’S expense prior to any construction activities in the area.

1.9.3. CONTRACTOR shall lay out only the quantity of materials at the work locations that can be installed during that work day. No materials or equipment shall be left at a work location after completion of the workday; such items must be stored during non-work hours at the designated stockpile locations.

1.9.4. Upon completion of the work, CONTRACTOR shall demobilize in a timely manner, properly restore all work sites in accordance with these specifications, and remove from the Project Site all equipment, materials, dirt, debris, and other items generated by the CONTRACTOR during the project. Waste materials shall be disposed of off the Project Site at a duly licensed solid waste disposal facility. The CONTRACTOR shall arrange with the appropriate utility for the proper disconnect and service termination for temporary water and electrical supplies.

1.10. RECORDING

1.10.1. The Contractor shall record construction information:

1.10.1.1. Record and update daily Record information from field notes to the satisfaction of the Engineer.

1.10.1.2. Provide felt tip marking pens, maintaining separate colors for each major system, for recording information.

BIOSOLIDS BUILDING CURTAINS PART 1 Scope of Work – Page 4 of 7

1.10.1.3. Record information concurrently (daily) with construction progress. Work shall not be concealed until required information is recorded.

1.11. PERMITS, LICENSES, AND FEES

1.11.1. CONTRACTOR is responsible for determining the required permits unless otherwise noted and licenses for prosecution of the work and for obtaining them in a timely manner so that the work proceeds in accordance with the project schedule.

1.11.2. CONTRACTOR is responsible for paying all license application and permit fees as applicable and posting all necessary notices required by permits and licenses.

1.12. TRAFFIC

1.12.1. CONTRACTOR’s vehicles (including personal vehicles of its workers) shall obey all posted speed limits and traffic signs while traversing the Project Site.

1.12.2. Under no circumstances shall CONTRACTOR’s vehicles (including personal vehicles of its workers), equipment or materials be parked or located in such a manner that blocks or impairs the flow of vehicular or pedestrian traffic on active roads and driveways.

1.12.3. CONTRACTOR is responsible for maintaining vehicular and pedestrian traffic control as per the latest version of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction.

1.13. PROTECTION OF UTILITIES

1.13.1. During the prosecution of the work, CONTRACTOR shall maintain the maximum practical distance between its work and underground and aboveground (e.g. cables, handholes, terminals, access points, transformers, switch boxes, cable TV pedestals and boxes, etc.) utility services and shall avoid any disturbance of these items and their supporting substrate.

1.13.2. CONTRACTOR shall be responsible at its own cost for repair and/or replacement of utilities damaged by its work.

1.13.3. CONTRACTOR shall keep existing utilities online at all times except as required for scoped work and as approved by COUNTY.

BIOSOLIDS BUILDING CURTAINS PART 1 Scope of Work – Page 5 of 7

1.14. MATERIALS

1.14.1. Refer to the general notes on the specifications, AWWA standards, FAC standards, and the Land Development Code for material and performance specifications.

1.14.2. The OWNER reserves the right to sample and test any material after delivery and to reject all material represented by any sample that fails to comply with specified requirements. All fittings and other ancillary materials shall be subject to inspection and approval by the ENGINEER after delivery. No broken, cracked, imperfectly coated, or otherwise damaged or unsatisfactory material shall be used. When any defect is discovered, the defective portion shall not be installed.

1.15. CLEAN-UP AND WASTE DISPOSAL

1.15.1. During construction, CONTRACTOR shall perform daily cleaning of the work site(s) and adjacent properties and remove waste materials and windblown debris resulting from its construction operations or its worker’s personal activities. No excavations shall be left open overnight without prior approval of the ENGINEER and COUNTY.

1.15.2. CONTRACTOR shall perform complete restoration of each work area within _thirty_ (30) calendar days from completion of major installation work. The CONTRACTOR may be subject to liquidated damages for any work areas not restored within these prescribed times.

1.15.3. CONTRACTOR shall provide on-site container(s) for the collection and storage of waste materials, debris, and rubbish. On-site container(s) shall be located at designated temporary building and material stockpile area(s).

1.15.4. CONTRACTOR shall remove waste materials, debris, and rubbish from on-site container(s) as needed and dispose of it off the Project Site at a duly licensed solid waste disposal facility.

CONTRACTOR shall provide hauling and disposal ticket(s) to ENGINEER and COUNTY prior to project final inspection.

1.15.5. Prior to final completion, CONTRACTOR shall conduct an inspection of all work areas (including the temporary building(s) and material stockpile area(s)) to verify that those areas are clean and free of trash, rubbish, and debris.

1.16. BASIS OF PAYMENT FOR SERVICES

1.16.1. The contractor should submit by the end of each month an invoice in the AIA format broken out in the same line items and sub items that have been defined in the Bid Form and Appendix A of the Contract Documents.

1.16.2. For compensation specifications, see Appendix A – Measurement and Payment.

1.16.3. Five (5) percent of the cost of each invoice will be withheld until final completion of the project.

CONTRACTOR SHALL PROVIDE THE COUNTY WITH FINAL RELEASES OF LIEN

(CERTIFIED ORIGINALS) FROM ALL SUBCONTRACTORS AND SUPPLIERS

WHEN SUBMITTING THEIR FINAL INVOICE. FAILURE TO PROVIDE THE FINAL

RELEASE OF LIEN WILL DELAY PAYMENT OF THE FINAL INVOICE.

BIOSOLIDS BUILDING CURTAINS PART 1 Scope of Work – Page 6 of 7

1.17. WARRANTIES

1.17.1. CONTRACTOR shall provide Marion County with a one (1) year warranty for all portions of the project. The one (1) year warranty shall cover all necessary labor, equipment and replacement parts resulting from faulty or inadequate equipment design, improper assembly or erection, defective workmanship and materials, leakage, breakage or other failure of all equipment and components by the manufacturer.

1.17.2. When not specifically identified in the above language, the warranty shall commence upon release of final retainage.

1.17.3. Marion County shall incur no labor, material or equipment cost during the one (1) year warranty period for the repair of any work completed by the CONTACTOR.

1.18. TIMELINES

1.18.1. All work will commence upon authorization from the County’s Representative. All work will proceed in a timely manner without delays. The Contractor shall commence the work upon the issuance of Notice to Proceed from Procurement Services shall complete pre-construction activities within Thirty (30) calendar days. Following pre-construction activities Contractor shall achieve Substantial Completion of the work no later than Thirty (30) calendar days. An additional Thirty (30) days shall be allowed for Final Completion.

1.18.2. Pre-construction activities shall include shop drawing submittals, equipment and material procurement, and obtaining all required permits.

1.18.3. Contractor shall request a Substantial Completion walkthrough with the Owner, Engineer, and Inspector. A satisfactory inspection is required prior to the Contractor being granted Substantial Completion.

1.18.4. Contractor shall request a Final Completion walkthrough with the Owner, Engineer, and

Inspector. A satisfactory inspection is required prior to the Contractor being granted Final Completion.

BIOSOLIDS BUILDING CURTAINS PART 1 Scope of Work – Page 7 of 7

1.19. LIQUIDATED DAMAGES

1.19.1. Should the Contractor fail to substantially complete work under this contract and make the area available for beneficial use on or before the date stipulated for substantial completion (or such later date as may result from extension of time granted by Owner), he shall pay Owner liquidated damages. The sum of TWO HUNDRED AND FIFTY DOLLARS ($250.00) shall be paid for each consecutive calendar day beyond the contract substantial completion date, which sum has been agreed upon as a reasonable and proper measure of damages which Owner will sustain per diem by failure of contractor to complete work within time as stipulated. This payment shall not be construed as a penalty on the Contractor; it being recognized by Owner and contractor that the injury to the Owner which could result from a failure of Contractor to complete on schedule is uncertain.

1.19.2. For each consecutive calendar day that the work remains incomplete after the date established for Final completion, the Owner will retain from the compensation otherwise to be paid to the Contractor the sum of TWO HUNDRED AND FIFTY DOLLARS ($250.00). This amount is the minimum to complete all remedial work, correct deficient work, clean up the project and other miscellaneous tasks as required to complete all work specified. This amount is in addition to the liquidated damages prescribed above and shall not be construed as a penalty.

1.20. STANDARD AND SAFETY EQUIPMENT

1.20.1. At his expense, CONTRACTOR shall comply with all applicable OSHA, ADA, and FDOT regulations.

1.21. TAXES AND FEES

1.21.1. The Contractor shall pay all applicable sales, consumer, use and other similar taxes required by law. The Contractor is responsible for reviewing the pertinent State statutes involving the sales tax and complying with all requirements.

APPENDIX A - SUPPLEMENTAL SPECIFICATONS

FOR

SOUTHWEST REGIONAL WRF

BIOSOLIDS BUILDING CURTAINS

IN

MARION COUNTY, FLORIDA

PREPARED FOR:

Marion County Utilities 11800 SE US Hwy 441

Belleview, Florida 34420

DATE: September 30, 2025 Prepared By:

925 S.E. 17th Street, Suite A Ocala, FL 34471

Ph 352-861-7799 • Fax 352-861-7709

Project No. 208.88

Chuck A. Pigeon, P.E. NO. 37338

Table of Contents

• Exhibit 1 Biosolids Dewatering Building Curtain Details

• 00800 Technical Special Provisions

• 13080 PVC Coated Polyester Curtains Specifications

TOP VIEW OF BUILDING

'-0

'-0

'-0

'-0

19'-5" 18'-5"

19'-5" 18'-5"

EXISTING ELECTRICAL CONDUIT

EXISTING RECLAIM

WATER MAIN

SANITARY SEWER DRAIN

EXISTING RECLAIM WATER

MAIN

(3) EXISTING 4" FLEXIBLE HOSE

CONNECTIONS

EXISTING FDOT TYPE

"C" INLET

EXISTING CONTROL PANEL

PROPOSED

CURTAIN (TYPICAL

FOUR SIDES)

EXISTING ELECTRICAL

CONDUITS TO REMAIN

VELCRO SEAM VELCRO SEAM

VELCRO SEAM

VELCRO SEAM

EXISTING GUTTER

DOWNSPOUT AND

SPLASHPAD TO REMAIN

TYPICAL EACH COLUMN

CO

N

CR

ET

E

DR

IV

EW

AY

CO

N

CR

ET

E

DR

IV

EW

AY

SCALE: 1"=5'

5'-0" CONCRETE ANCHOR EVERY 5' O.C.

MIN. OR MORE FREQUENT PER

MANUFACTURER REQUIREMENTS

NORTH/SOUTH VIEW

8' -9

1 4" 5'

-0

TOP OF CONCRETE SLAB

RAIN GUTTER

DOWNSPOUT TYP.

37'-113 4"

3.

0"

3' -1

1" 1.

0"

'-8

1 4"

STEEL ROLLER TRACK

BOTTOM OF

ROOF SIDING

CEILING TRACK MOUNT SPACED

PER MANUFACTURER

REQUIREMENT

VELCRO SEAM

LOWER 9' OF CURTAIN

SCALE: 1"=5'

SCALE: 1"=5'

SCALE: 1"=5'

C-BEND

BUILDING

SUPPORT

METAL

SUPPORT

BEAM

TOP OF

ROOF

FRONT

CURTAIN

TYPICAL CORNER DETAIL

CEILING

TRACK MOUNT

EX.

CONCRETE

BASE

VELCRO

STRAP

SIDE

CURTAIN

STEEL

ROLLER

TRACK

SCALE: 1"=5'

EAST/WEST VIEW

TOP OF CONCRETE SLAB

EXISTING BOLLARD (TYP)

5'-0"

8' -9

5'

-0

3' -1

1" 3.

0" 1.

0"

'-8

VARIES SEE PLAN VIEW VARIES SEE PLAN VIEW

STEEL ROLLER TRACK

BOTTOM OF ROOF SIDING

CIELING TRACK MOUNT SPACED

PER MANUFACTURER

REQUIREMENTS

VELCRO SEAM

LOWER 9' OF CURTAIN

CONCRETE ANCHOR EVERY 5' O.C.

MIN. OR MORE FREQUENT PER

MANUFACTURER REQUIREMENTS

SCALE: 1"=5'

SR

CR 484Ju ly

0, T

:\2

M ar io n

C ou nt y\

_O ak R un W

W

TP

B uf fe r\

D W

G \C

-C U

R T-

D

TL

S .d w g

O ct ob er

, 2

T :\2

M ar io n C ou nt y\

_O ak

R un

W W

TP

B uf fe r\ D

W G

\C -C

U R

T- D

TL

S

.d w g

A

B

C

D

E

F

G

H

2 3 4 5 6 7 8 9 10 11 12

1 2 3 4 5 6 7 8 9 10 11 12

EXHIBIT 1

100% PLANS

09/19/2025

B

IO

S O

LI

D

S D

E W

A

TE

R

IN

G B

U

IL

D

IN

G C

U R

TA

IN

D E

TA

IL

S

S O

U

TH

W E

S T

R E

G

IO

N A

L W

R F

B

IO

S O

LI

D

S B

U

IL

D

IN

G C

U R

TA

IN

S

N O

D

A

TE

R E

V

IS

IO

N

B Y

JOB NO:

925 S.E. 17th Street

Suite A

Ocala, Florida 34471

Phone: (352) 861-7799 www.Ardurra.com

2025-1116-00

Utilities 11800 S. U.S. Highway 441

Belleview, FL 34420

Phone: 352-307-6000 Fax: 352-307-6001

After hours: 352-307-6000

NOTES:

1. ALL CONCRETE ANCHORS SHALL BE LOW PROFILE TO THE CONCRETE SURFACE. MANUFACTURER PROVIDED ANCHORING SYSTEM

MAY BE SUBSTITUTED FOR CONCRETE ANCHOR DETAIL PROVIDED BELOW.

2. BOLTS TO BE USED SHALL BE IN ACCORDANCE WITH MANUFACTURER REQUIREMENTS.

3. CURTAIN MATERIAL SHALL BE 18 OZ. PVC COATED VINYL (FIRE RETARDANT).

4. COLOR OF CURTAIN TO BE SELECTED BY THE OWNER. CONTRACTOR TO PROVIDE MANUFACTURER'S COLOR SELECTIONS. BID SHALL

BE BASED ON COLOR SELECTION OF TAN/BEIGE OPTION AVAILABLE FROM MANUFACTURER.

5. SOUTH AND EAST CURTAIN FACES SHALL BE SOLID CURTAIN WITH NO CLEAR WINDOW.

6. DIMENSIONS PROVIDED ARE FOR THE CURTAIN COVERAGE AREA. ADDITIONAL CURTAIN FABRIC OR REDUCTIONS FOR MOUNTING

HARDWARE MAY BE REQUIRED.

7. CONTRACTOR TO FIELD MEASURE DIMENSIONS PRIOR TO ORDERING CURTAINS.

CEILING MOUNT DETAIL

EXISTING METAL OVER HANG

EXISTING SIDE OF ROOFING

INSTALL CEILING ROLLER

TRACK MOUNT (TYP.)

PROJECT

SITE

OWNER:

CONTACTS

CIVIL ENGINEER:

ARDURRA GROUP, INC.

925 SE 17TH ST., SUITE 'A'

OCALA, FL 34471

CONTACT: CHUCK A. PIGEON, P.E.

PHONE: (352) 861-7799

MARION COUNTY BOARD OF COUNTY COMMISSIONERS

11800 SE US HWY 441

BELLEVIEW, FLORIDA 34420

CONTACT: JOSHUA KRAMER

UTILITIES DEPUTY DIRECTOR

PHONE: (352) 307-6000

SOUTHWEST REGIONAL WRF

BIOSOLIDS BUILDING CURTAINS

MARION COUNTY

UTILITIES DIVISION

LOCATION: MARION COUNTY, FLORIDA

SECTION 35 TOWNSHIP 16 SOUTH, RANGE 20 EAST

CONCRETE ANCHOR DETAIL

CURTAIN FABRIC WITH GROMMETS

SPACED PER MANUFACTURER STANDARDS

INDUSTRIAL ROLLER

CURTAIN HOOKS

CURTAIN FABRIC WITH GROMMETS

SPACED PER MANUFACTURER STANDARDS

2-5/16" D-RING 316 SS

1/4"X3" STEEL HEX HEAD CONCRETE ANCHORING

SCREWS TWO PER ANCHOR, TAPCON OR EQUIVALENT

ALIGN CONCRETE ANCHORS WITH CURTAIN DRAPE AT

GROMMET LOCATIONS, SPACED 5' O.C. MINIMUM

SNAP HOOK CARABINER

3" T

YP

IC

AL

NOT TO SCALE NOT TO SCALE

LOCATION MAP

SCALE: 1" = 2000'

SECTION 00800

TECHNICAL SPECIAL PROVISIONS

00800-1

PART 1 - GENERAL

1.01 GENERAL

The Special Provisions of these specifications are intended as modifications or supplements to Information for Bidders and the Technical Specifications, in the intent that any provisions of this section shall govern. If at any time the plans or specifications for this project are unclear, the Contractor shall contact the Engineer immediately. For those situations where details are not included or miscellaneous work arises during the project which is not covered by the specifications for this project, the materials used and construction performed shall be in accordance with Marion County Land Development Code 2013, latest edition.

All improvements shall be made in accordance with the Marion County Land Development Code (LDC) and these Technical Specifications. Discrepancies and inconsistencies between LDC requirements and these Specifications shall be resolved by ENGINEER and the Marion County Utilities Director.

Marion County Land Development Code 2013, can be accessed at the following web site:

https://library.municode.com/fl/marion_county/codes/land_development_code

1.02 INSPECTIONS

The Engineer or an authorized engineer representative will periodically conduct construction inspections. The Contractor shall complete each specific item of work which pertains to the project and notify the Engineer or his representative at least 24 hours in advance of a request for inspection. The Contractor's project superintendent shall be present at all inspections and upon request by the inspector, furnish construction equipment to aid in the inspection.

The following are mandatory inspections, which shall be conducted when the item of work applies to the subject project.

1. Semi-final Inspection - When all construction is completed. The Contractor, Inspector, and Engineer shall prepare a punch list at this time.

2. When punch list items are completed. The Contractor, Inspector, Engineer and Owner’s representative shall conduct an inspection. Any corrections found necessary as a result of this inspection shall be rectified immediately.

3. Final Inspection - Final inspection will be conducted following all corrections made.

1.03 OWNER TESTING/INSPECTION

The Owner reserves the right to enter upon the project at any time for purposes of inspection of the work to obtain samples of materials for testing by its laboratory.

SECTION 00800

TECHNICAL SPECIAL PROVISIONS

00800-2

The results of any such inspections or testing will be discussed with the Engineer if necessary. Owner forces will not intercede between the Contractor and the Engineer.

1.04 UTILITIES PROVIDED BY OWNER

There shall be NO utilities provided by OWNER. Services such as portable toilet facilities, drinking water, site lighting, etc. are not provided. General contractor shall provide all services necessary to perform work.

1.05 DRIVEWAY ACCESS AND PARKING

The Contractor shall maintain access for all residents in the area.

1.06 MATERIALS STORAGE

Any stored materials and equipment shall be the sole responsibility of Contractor.

Contractor shall be responsible to secure equipment laydown and storage areas and obtain written permission from private landowners for equipment storage site(s) if needed.

1.07 SHOP DRAWINGS

Contractor shall be responsible to provide shop drawings and information to the Engineer for review prior to ordering material. Field measurements are required due to the specific locations of items on the building which curtains will be constructed around, on, or near.

1.08 PVC COATED POLYESTER CURTAINS

Curtain color shall be determined by owner and initial bid shall be based on a tan/beige color selection.

END OF SECTION

SECTION 13080

PVC COATED POLYESTER CURTAINS

13080-1 T:\208 Marion County\88_Oak Run WWTP Buffer\Docs\Curtains\13080 PVC Coated Polyester Curtains.doc

Part 1 – GENERAL

1. SCOPE OF WORK

A. The work covered by this specification consists of installing 18 oz. per square yard PVC coated polyester, in the areas shown on the project drawings. All work shall be in strict accordance with the project drawings, these specifications and the Fabricator’s approved shop drawings. All work is subject to the terms and conditions of the contract.

B. Sufficient material shall be furnished to cover all areas as shown on the drawings.

2. MANUFACTURER, FABRICATOR, INSTALLER INFORMATION

A. The following shall be the minimum information submitted at the time of the bid, relating to the PVC Coated Polyester Curtain Manufacturer, proposed Fabricator and Installer: Name, Address, Phone, FAX (Note: Failure to submit this information at the time of bid may disqualify the proposal).

B. Acceptable manufacturers for the PVC Coated Polyester Curtains include the following:

AKON, LLC Fernandina Beach, FL 32034; Amcraft Manufacturing, Inc. Elk Grove Village IL 60007; Steel Guard Safety Products, South Holland Illinois 60473; Goff’s Enterprises Pewaukee, WI 53072; Chase Doors Cincinnati, OH 45246; additional manufacturers may be approved if products meet the specifications.

3. PRODUCTS

A. The PVC coated polyester material shall be 18 oz. per square yard and capable of outdoor use. The membrane shall be manufactured by the calendering process, consisting of first quality ingredients, suitably compounded, of which polyester is the principal resin. The finished compound shall be uniform in color, thickness, size and surface texture.

B. The finished membrane shall consist of two (2) plies of PVC plastisol laminated over one (1) ply of polyester reinforcing scrim.

C. The PVC coating shall fully encapsulate the scrim and shall extend a minimum of 1/8-in.

(3.175 mm) beyond the reinforcing scrim roll edges. Exposed fabric along the longitudinal edges of the roll stock shall not be permitted.

4. SUBMITTALS

A. The Polyester Coated curtain shall be factory fabricated into rolls 100 yards in length and 61 inches in width. The Fabricator shall furnish a proposed curtain panel layout that is to be approved in writing by the Engineer prior to the installation. The drawings shall show the extent, the direction of factory seams and the size of panels, consistent with the requirements of the project drawings. Maximum use of large size panels shall be made to minimize field seaming.

13080-2 T:\208 Marion County\88_Oak Run WWTP Buffer\Docs\Curtains\13080 PVC Coated Polyester Curtains.doc

5. FACTORY FABRICATION

A. The Fabricator shall be an experienced firm customarily engaged in factory-fabricating individual curtains using roll stock into custom panels.

B. Polyester coating of curtains shall be thermal sealed and inspected to have uniform color throughout, except in areas identified on the drawings for the transparent clear window material.

C. Prior to factory seaming, all roll goods shall be inspected. All factory seams shall be made by thermal fusion methods. All factory seams shall have a minimum scrim-to-scrim overlap of one and one half inches (1½-in.) (3.81 cm) when fabricated. Fabricated seams found to have less than the specified minimum overlap shall be repaired by adding an overlap or cap strip that provides the minimum specified overlap or will be rejected. All seams shall be made so that the thermal fusion bond extends fully to the top edge of the sheet so that no loose edges are present on the topside of the sheet.

D. Support brackets shall be grade 304 stainless steel. Brackets shall be 5 feet in length to ensure stability to the hanging polyester coated curtains with a 2:1 factor of safety in regards to load vs distance. Testing for strength of 304 stainless steel should comply with ASTM A240.

6. INSPECTION AND TESTING

A. Inspection

i. All curtains and seams shall be 100% visually inspected during fabrication. No defective seams will be allowed. All indicated design parameters shall be followed and made by the Fabricator before the panels are packaged for shipment.

B. Testing

i. In addition to visual inspection, a 48-in. (1.2 m) sample shall be taken from each factory seam welding unit used in this work at the beginning of every work shift and every four hours of production thereafter. Samples shall be non-destructive, i.e., will not require patching of fabricated panels. Test specimens shall be cut at quarter points from each 48-in. (1.2 m) seam sample (a total of three places) and tested for factory seam strength and peel adhesion.

ii. The shear seam strength shall be tested in accordance with ASTM D2261. The strength of the Polyester coating adhesion shall be tested in accordance with ASTM D2724.

Tensile strength standards shall be in accordance with ASTM D2261.

iii. A log shall be maintained showing the date, time, panel number and test results. Failure of the material and/or seams to meet all the requirements of these specifications may be cause for rejection of the Polyester material and/or seams as appropriate. The Fabricator shall provide the test results to the Owner or Engineer upon request.

13080-3 T:\208 Marion County\88_Oak Run WWTP Buffer\Docs\Curtains\13080 PVC Coated Polyester Curtains.doc

7. CERTIFICATION AND TEST REPORTS

A. Prior to installation of the polyester coated curtain panels, the Fabricator/Installer shall provide the Engineer with the following certification and test reports:

i. Written certification that the factory seams were inspected and tested in accordance with Part 1 Section 6.

ii. A copy of the ANSI/NSF Standard 61 certification shall be provided for all potable grade materials.

8. PACKAGING AND STORAGE

A. Each factory-fabricated panel shall be rolled and/or accordion-folded and placed onto a sturdy wooden pallet designed to be moved by a forklift or similar equipment. Each panel shall be given prominent and unique identifying markings indicating the proper direction of unrolling and/or unfolding to facilitate layout and positioning in the field. The panels shall be packaged in heavy cardboard or wood crates fully enclosed and protected to prevent damage during shipment and each crate is to be prominently marked in the same fashion as the panels within. Until needed, packaged factory-fabricated panels shall be stored in their original unopened crates in a dry area off the ground, and protected from the direct heat of the sun, under an opaque, light colored heat reflective cover in a manner that provides a free-flowing air space between the packaged panel and the covering. Pallets should not be stacked.

B. Steel track shall be delivered in sections of 5 feet maximum to ensure that they are able to fit on a standard pallet size.

Part 2 - INSTALLATION AND FIELD TESTING

1. INSTALLATION

A. The Polyester coated curtains shall be placed on the prepared surfaces in such a manner as to insure minimum handling and in accordance with the approved shop drawings. The brackets shall be secured to all metal structures in accordance with details shown on the plan and shop drawings. Hooks attached to the bracket shall be bolted and securely fastened to the metal bracket. Before the polyester coated curtains are attached, the hooks should be checked to ensure that they have no defects during the installation. The curtains shall be securely fitted inside the drop down hooks. Wind hooks shall be installed at the ground surface as shown in the construction details. The wind hooks shall be placed every five (5) feet. All equipment and materials should be inspected before installation. Damaged equipment and materials shall not be used. Curtains shall be fully tested to move smoothly along the track once the installation has been deemed complete. Velcro shall be tested to ensure a secure fastening for each curtain.

13080-4 T:\208 Marion County\88_Oak Run WWTP Buffer\Docs\Curtains\13080 PVC Coated Polyester Curtains.doc

Part 3 - EXECUTION

1. WARRANTY

A. The Polyester coated curtain Manufacturer shall confirm in writing, that the material to be furnished will be free of defects at the time of sale, and against deterioration due to the effects of ozone, ultraviolet or other normal weathering with a 5 year warranty from the date of completed installation on all sewn seams and heat welds. A limited lifetime warranty shall be provided for all hardware.

B. The Polyester coated curtain Manufacturer shall furnish a sample warranty for review and approval prior to shipment.

END OF SECTION

1.2. GENERAL
1.3. SPECIFIC SCOPE OF WORK
1.4. GOVERNING SPECIFICATIONS
1.5. SUBMITTALS
1.6. DAILY REPORTS
1.7. PROGRESS MEETINGS
1.8. WORK HOURS
1.9. MOBILIZATION/DEMOBILIZATION
1.10. RECORDING
1.11. PERMITS, LICENSES, AND FEES
1.12. TRAFFIC
1.13. PROTECTION OF UTILITIES
1.14. MATERIALS - (NOT APPLICABLE)
1.15. CLEAN-UP AND WASTE DISPOSAL
1.16. BASIS OF PAYMENT FOR SERVICES
1.17. WARRANTIES
1.18. TIMELINES
1.19. LIQUIDATED DAMAGES
1.20. STANDARD AND SAFETY EQUIPMENT
1.21. TAXES AND FEES

File details come from the government source that posted it. Updated .