Playground Safety Surface Project - City of Reading, Pennsylvania

This procurement document from the City of Reading, Pennsylvania, outlines specifications for a comprehensive playground safety surface renovation project designated as Project No. 2503SC046. The project involves the demolition of existing asphalt paving, site preparation including clearing and grubbing, earthwork and excavation, installation of a concrete slab base with proper drainage and slope requirements, and application of a poured-in-place (PIP) rubberized safety surface system. The specifications detail multiple related work sections including site clearing, earth moving, excavation, dewatering, concrete paving with joints and sealants, and soil preparation for landscaping. Sealed bids were accepted via Pennbid (https://pennbid.bonfirehub.com) with a deadline of 2:00 PM on Tuesday, February 3, 2025. No pre-bid meeting was scheduled for this project. Each proposal must include bid surety equal to ten percent (10%) of the total proposal amount. The contract term is not explicitly specified in the available documentation, though the work encompasses multiple phases of site preparation and safety surface installation.

The pricing terms, funding sources, and specific contract value are not detailed in the provided specifications. The City of Reading reserves the right to reject any or all bids and waive any informality in submitted bids when determined to be in the City's best interest. Bidders must comply with Pennsylvania Department of Transportation (PennDOT) standards and specifications, meet ACI 301 requirements for concrete work, and demonstrate compliance with ASTM standards for playground safety surfaces including ASTM F1292 for impact attenuation and ASTM F1951 for accessibility. All playground surfacing installers must be approved by the safety surfacing manufacturer and possess minimum three years of documented experience in similar installations. The project requires manufacturers' warranties of five years non-pro-rated from the date of substantial completion, with coverage for reduction in impact attenuation and material deterioration beyond normal weathering.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 31 10 00

SITE CLEARING

CITY OF READING PARKS

PROJECT NO. 2503SC046 31 10 00 - 1 SITE CLEARING

PART 1 - GENERAL

1.1 STIPULATIONS

A. The specifications sections " General Conditions to the Construction Contract ", "Special Conditions", and "Division 01 - General Requirements" form a part of this Section by this reference thereto, and shall have the same force and effect as if printed herewith in full.

1.2 SUMMARY

A. Section Includes:

1. Protecting existing vegetation to remain.

2. Removing existing vegetation.

3. Clearing and grubbing.

4. Stripping and removal of topsoil.

5. Removing above- and below-grade site improvements.

6. Disconnecting, capping or sealing, and removing site utilities.

7. Temporary erosion- and sedimentation-control measures.

B. Related Sections:

1. Section 024119 “Selective Demolition" for demolition and removal of existing asphalt pavement.

2. Section 312000 “Earth Moving” for limits of clearing.

3. Section 329113 “Soil Preparation” for limits of prep work for grass.

1.3 DEFINITIONS

A. Subsoil: All soil beneath the topsoil layer of the soil profile, and typified by the lack of organic matter and soil organisms.

B. Surface Soil: Soil that is present at the top layer of the existing soil profile at the Project site. In undisturbed areas, the surface soil is typically topsoil; but in disturbed areas such as urban environments, the surface soil can be subsoil.

C. Topsoil: Top layer of the soil profile consisting of existing native surface topsoil or existing in-place surface soil and is the zone where plant roots grow.

D. Topsoil: Top layer of the soil profile consisting of existing native surface topsoil or existing in-place surface soil and is the zone where plant roots grow. Its appearance is generally friable, pervious, and black or a darker shade of brown, gray, or red than underlying subsoil; reasonably free of subsoil, clay lumps, gravel, and other objects more than 2 inches (50 mm) in diameter;

and free of subsoil and weeds, roots, toxic materials, or other non-soil materials.

E. Plant-Protection Zone: Area surrounding individual trees, groups of trees, shrubs, or other vegetation to be protected during construction, and indicated on Drawings.

PROJECT NO: 2503SC046 31 10 00 - 2 SITE CLEARING

F. Tree-Protection Zone: Area surrounding individual trees or groups of trees to be protected during construction, and defined by a circle concentric with each tree with a radius 1.5 times the diameter of the drip line unless otherwise indicated.

G. Vegetation: Trees, shrubs, groundcovers, grass, and other plants.

1.4 MATERIAL OWNERSHIP

A. Except for materials indicated to be stockpiled or otherwise remain Department's property, cleared materials shall become Contractor's property and shall be removed from Project site.

1.5 INFORMATIONAL SUBMITTALS

A. Existing Conditions: Documentation of existing trees and plantings, adjoining construction, and site improvements that establishes preconstruction conditions that might be misconstrued as damage caused by site clearing.

1. Use sufficiently detailed photographs or videotape.

2. Include plans and notations to indicate specific wounds and damage conditions of each tree or other plants designated to remain.

B. Record Drawings: Identifying and accurately showing locations of capped utilities and other subsurface structural, electrical, and mechanical conditions.

1.6 QUALITY ASSURANCE

A. Pre-installation Conference: Conduct conference at Project site.

1.7 PROJECT CONDITIONS

A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during site-clearing operations.

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Department and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed traffic ways if required by Department or authorities having jurisdiction.

B. Salvable Improvements: Carefully remove items indicated to be salvaged and store on Department's premises where indicated.

C. Utility Locator Service: Notify One Call for area where Project is located before site clearing.

D. Do not commence site clearing operations until temporary erosion- and sedimentation-control and plant-protection measures are in place.

E. The following practices are prohibited within protection zones:

PROJECT NO: 2503SC046 31 10 00 - 3 SITE CLEARING

1. Storage of construction materials, debris, or excavated material.

2. Parking vehicles or equipment.

3. Foot traffic.

4. Erection of sheds or structures.

5. Impoundment of water.

6. Excavation or other digging unless otherwise indicated.

7. Attachment of signs to or wrapping materials around trees or plants unless otherwise indicated.

F. Do not direct vehicle or equipment exhaust towards protection zones.

G. Prohibit heat sources, flames, ignition sources, and smoking within or near protection zones.

H. Soil Stripping, Handling, and Stockpiling: Perform only when the topsoil is dry or slightly moist.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Satisfactory Soil Material: Requirements for satisfactory soil material are specified in Section 312000 "Earth Moving."

1. Obtain approved borrow soil material off-site when satisfactory soil material is not available on-site.

PART 3 - EXECUTION

3.1 PREPARATION

A. Protect and maintain benchmarks and survey control points from disturbance during construction.

B. Locate and clearly identify trees, shrubs, and other vegetation to remain or to be relocated. Wrap a 1-inch (25-mm) blue vinyl tie tape flag around each tree trunk at 54 inches (1372 mm) above the ground.

C. Protect existing site improvements to remain from damage during construction.

1. Restore damaged improvements to their original condition, as acceptable to Department.

3.2 TEMPORARY EROSION AND SEDIMENTATION CONTROL

A. Provide temporary erosion- and sedimentation-control measures to prevent soil erosion and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways, according to erosion- and sedimentation-control Drawings and requirements of authorities having jurisdiction.

PROJECT NO: 2503SC046 31 10 00 - 4 SITE CLEARING

B. Verify that flows of water redirected from construction areas or generated by construction activity do not enter or cross protection zones.

C. Inspect, maintain, and repair erosion- and sedimentation-control measures during construction until permanent vegetation has been established.

D. Remove erosion and sedimentation controls and restore and stabilize areas disturbed during removal.

3.3 TREE AND PLANT PROTECTION

A. General: Protect trees and plants remaining on-site according to plan and planting requirements.

B. Repair or replace trees, shrubs, and other vegetation indicated to remain or be relocated that are damaged by construction operations, in a manner approved by Architect.

3.4 EXISTING UTILITIES

A. Department will arrange for disconnecting and sealing indicated utilities that serve existing structures before site clearing, when requested by Contractor.

1. Verify that utilities have been disconnected and capped before proceeding with site clearing.

B. Interrupting Existing Utilities: Do not interrupt utilities serving facilities occupied by Department or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify Architect not less than two days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without Architect's written permission.

3.5 CLEARING AND GRUBBING

A. Remove obstructions, trees, shrubs, and other vegetation to permit installation of new construction.

1. Do not remove trees, shrubs, and other vegetation indicated to remain or to be relocated.

2. Grind down stumps and remove roots, obstructions, and debris to a depth of 18 inches (450

mm) below exposed subgrade.

3. Use only hand methods for grubbing within protection zones.

4. Chip removed tree branches and dispose of off-site.

B. Fill depressions caused by clearing and grubbing operations with satisfactory soil material unless further excavation or earthwork is indicated.

1. Place fill material in horizontal layers not exceeding a loose depth of 8 inches (200 mm), and compact each layer to a density equal to adjacent original ground.

PROJECT NO: 2503SC046 31 10 00 - 5 SITE CLEARING

3.6 SITE IMPROVEMENTS

A. Remove existing above- and below-grade improvements as indicated and necessary to facilitate new construction.

B. Remove slabs, paving, curbs, gutters, and aggregate base as indicated.

1. Unless existing full-depth joints coincide with line of demolition, neatly saw-cut along line of existing pavement to remain before removing adjacent existing pavement. Saw-cut faces vertically.

2. Paint cut ends of steel reinforcement in concrete to remain with two coats of antirust coating, following coating manufacturer's written instructions. Keep paint off surfaces that will remain exposed.

3.7 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Remove surplus soil material, unsuitable topsoil, obstructions, demolished materials, and waste materials including trash and debris, and legally dispose of them off Department's property.

B. Separate recyclable materials produced during site clearing from other non-recyclable materials.

Store or stockpile without intermixing with other materials and transport them to recycling facilities. Do not interfere with other Project work.

END OF SECTION 31 10 00

SECTION 31 20 00

EARTH MOVING

PROJECT NO. 2503SC046 31 20 00 - 1 EARTH MOVING

A. The specifications sections " General Conditions to the Construction Contract ", "Special Conditions", and "Division 01 - General Requirements" form a part of this Section by this reference thereto, and shall have the same force and effect as if printed herewith in full.

1.2 SUMMARY

A. Section Includes:

1. Preparing subgrades for poured-in-place surfacing and subgrade aggregate.

2. Excavating for poured-in-place surface and aggregate.

3. Base course poured-in-place surface.

1. Section 311000 "Site Clearing" for site stripping, grubbing, and removal of above- and below-grade improvements.

2. Section 312316 “Excavation” for excavation.

3. Section 312319 "Dewatering" for lowering and disposing of ground water during construction.

1.3 DEFINITIONS

A. Backfill: Soil material or controlled low-strength material used to fill an excavation.

1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.

2. Final Backfill: Backfill placed over initial backfill to fill a trench.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

C. Bedding Course: Aggregate layer placed over the excavated subgrade in a trench before laying pipe.

D. Borrow Soil: Satisfactory soil imported from off-site for use as fill or backfill.

E. Drainage Course: Aggregate layer supporting the slab-on-grade that also minimizes upward capillary flow of pore water.

F. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensions indicated.

PROJECT NO. 2503SC046 31 20 00 - 2 EARTH MOVING

1. Authorized Additional Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions as directed by Professional. Authorized additional excavation and replacement material will be paid for according to Contract provisions for changes in the Work.

2. Bulk Excavation: Excavation more than 10 feet (3 m) in width and more than 30 feet (9 m) in length.

3. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions without direction by Professional. Unauthorized excavation, as well as remedial work directed by Professional, shall be without additional compensation.

G. Fill: Soil materials used to raise existing grades.

H. Rock: Rock material in beds, ledges, unstratified masses, conglomerate deposits, and boulders of rock material that exceed 1 cu. yd. (0.76 cu. m) for bulk excavation or 3/4 cu. yd. (0.57 cu. m) for footing, trench, and pit excavation that cannot be removed by rock excavating equipment equivalent to the following in size and performance ratings, without systematic drilling, ram hammering, or ripping:

1. Excavation of Footings, Trenches, and Pits: Late-model, track-mounted hydraulic excavator; equipped with a 42-inch- (1065-mm-) wide, maximum, short-tip-radius rock bucket; rated at not less than 138-hp (103-kW) flywheel power with bucket-curling force of not less than 28,700 lbf (128 kN) and stick-crowd force of not less than 18,400 lbf (82 kN) with extra-long reach boom; measured according to SAE J-1179.

2. Bulk Excavation: Late-model, track-mounted loader; rated at not less than 230-hp (172-kW) flywheel power and developing a minimum of 47,992-lbf (213.3-kN) breakout force with a general-purpose bare bucket; measured according to SAE J-732.

I. Rock: Rock material in beds, ledges, unstratified masses, conglomerate deposits, and boulders of rock material 3/4 cu. yd. (0.57 cu. m) or more in volume that exceed a standard penetration resistance of 100 blows/2 inches (97 blows/50 mm) when tested by a geotechnical testing agency, according to ASTM D 1586.

J. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface.

K. Subbase Course: Aggregate layer placed between the subgrade and base course for hot-mix asphalt pavement, or aggregate layer placed between the subgrade and a cement concrete pavement or a cement concrete or hot-mix asphalt walk.

L. Subgrade: Uppermost surface of an excavation or the top surface of a fill or backfill immediately below subbase, drainage fill, drainage course, or topsoil materials.

M. Utilities: On-site underground pipes, conduits, ducts, and cables, as well as underground services within buildings.

1.4 BASIS OF CONTRACT

A. Excavation for this Project shall be considered unclassified and shall include all types of earth and soil, any pebbles, boulders, and bedrock, municipal trash, rubbish and garbage and all types

PROJECT NO. 2503SC046 31 20 00 - 3 EARTH MOVING

of debris of the construction industry such as wood, stone, concrete, plaster, brick, mortar, steel and iron shapes, pipe, wire, asphaltic materials, paper and glass. Unclassified excavation does not include unforeseen concrete foundations, walls, or slabs. All such materials encountered which are identified by this paragraph as unclassified shall be removed to the required widths and depths to create a finished product as shown and/or noted on the drawings and as written in the specifications. No additional compensation shall be made to the contractor for this unclassified excavation. The materials defined by this paragraph as unclassified will not be considered to be concealed conditions or unknown physical conditions below the surface of the ground for purposes of interpreting the language in the General Conditions to the Construction Contract.

1.5 SUBSURFACE INFORMATION

A. Any available data concerning subsurface materials or conditions based on online data from the National Resources Conservation Web Soil Survey in designing this Project. All exhibits is available for informational/guidance purposes only; it is not to be relied on by prospective Bidders.

1.6 INFORMATIONAL SUBMITTALS

A. Qualification Data: For qualified testing agency.

B. Material Test Reports: For each on-site and borrow soil material proposed for fill and backfill as follows:

1. Classification according to ASTM D 2487.

2. Laboratory compaction curve according to ASTM D 1557.

C. Pre-excavation Photographs or Videotape: Show existing conditions of adjoining construction and site improvements, including finish surfaces that might be misconstrued as damage caused by earth moving operations. Submit before earth moving begins.

1.7 QUALITY ASSURANCE

A. Geotechnical Testing Agency Qualifications: Qualified according to ASTM E 329 and ASTM D 3740 for testing indicated.

B. Pre-excavation Conference: Conduct conference at Project site.

C. Perform Work in accordance with Pennsylvania Department of Transportation (PennDOT) standard.

1.8 PROJECT CONDITIONS

A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during earth moving operations.

PROJECT NO. 2503SC046 31 20 00 - 4 EARTH MOVING

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Department and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed traffic ways if required by Department or authorities having jurisdiction.

B. Utility Locator Service: Notify Pennsylvania "One Call" for area where Project is located before beginning earth moving operations.

C. Do not commence earth moving operations until temporary erosion- and sedimentation-control measures, specified in Section 311000 "Site Clearing," are in place.

D. The following practices are prohibited within protection zones:

1. Storage of construction materials, debris, or excavated material.

2. Parking vehicles or equipment.

3. Foot traffic.

4. Erection of sheds or structures.

5. Impoundment of water.

6. Excavation or other digging unless otherwise indicated.

7. Attachment of signs to or wrapping materials around trees or plants unless otherwise indicated.

E. Do not direct vehicle or equipment exhaust towards protection zones.

F. Prohibit heat sources, flames, ignition sources, and smoking within or near protection zones.

PART 2 - PRODUCTS

2.1 SOIL MATERIALS

A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from excavations.

B. Satisfactory Soils: Soil Classification Groups GW, GP, GM, SW, SP, and SM according to ASTM D 2487 Groups A-1, A-2-4, A-2-5, and A-3 according to AASHTO M 145, or a combination of these groups; free of rock or gravel larger than 3 inches (75 mm) in any dimension, debris, waste, frozen materials, vegetation, and other deleterious matter.

1. Liquid Limit: As required.

2. Plasticity Index: As required.

C. Unsatisfactory Soils: Soil Classification Groups GC, SC, CL, ML, OL, CH, MH, OH, and PT according to ASTM D 2487; Groups A-2-6, A-2-7, A-4, A-5, A-6, and A-7 according to AASHTO M 145, or a combination of these groups.

1. Unsatisfactory soils also include satisfactory soils not maintained within 2 percent of optimum moisture content at time of compaction.

PROJECT NO. 2503SC046 31 20 00 - 5 EARTH MOVING

D. Subbase Material: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 90 percent passing a 1-1/2-inch (37.5-mm) sieve and not more than 12 percent passing a No. 200 (0.075-mm) sieve.

E. Base Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 95 percent passing a 1-1/2-inch (37.5-

mm) sieve and not more than 8 percent passing a No. 200 (0.075-mm) sieve.

F. Engineered Fill: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 90 percent passing a 1-1/2-inch (37.5-mm) sieve and not more than 12 percent passing a No. 200 (0.075-mm) sieve.

G. Bedding Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; except with 100 percent passing a 1-inch (25-

mm) sieve and not more than 8 percent passing a No. 200 (0.075-mm) sieve.

H. Drainage Course: Narrowly graded mixture of washed crushed stone, or crushed or uncrushed gravel; ASTM D 448; coarse-aggregate grading Size 57; with 100 percent passing a 1-1/2-inch (37.5-mm) sieve and 0 to 5 percent passing a No. 8 (2.36-mm) sieve.

I. Filter Material: Narrowly graded mixture of natural or crushed gravel, or crushed stone and natural sand; ASTM D 448; coarse-aggregate grading Size 67; with 100 percent passing a 1-inch (25-mm) sieve and 0 to 5 percent passing a No. 4 (4.75-mm) sieve.

J. Sand: ASTM C 33; fine aggregate.

K. Impervious Fill: Clayey gravel and sand mixture capable of compacting to a dense state.

2.2 PREPARATION

A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earth moving operations.

B. Protect and maintain erosion and sedimentation controls during earth moving operations.

C. Protect subgrades and foundation soils from freezing temperatures and frost. Remove temporary protection before placing subsequent materials.

2.3 DEWATERING

A. Prevent surface water and ground water from entering excavations, from ponding on prepared subgrades, and from flooding Project site and surrounding area.

B. Protect subgrades from softening, undermining, washout, and damage by rain or water accumulation.

1. Reroute surface water runoff away from excavated areas. Do not allow water to accumulate in excavations. Do not use excavated trenches as temporary drainage ditches.

PROJECT NO. 2503SC046 31 20 00 - 6 EARTH MOVING

2.4 EXCAVATION, GENERAL

A. Unclassified Excavation: Excavate to subgrade elevations regardless of the character of surface and subsurface conditions encountered. Unclassified excavated materials may include rock, soil materials, and obstructions. No changes in the Contract Sum or the Contract Time will be authorized for rock excavation or removal of obstructions.

1. Remove rock to lines and grades indicated to permit installation of permanent construction without exceeding the following dimensions:

a. 24 inches (600 mm) outside of concrete forms other than at footings.

b. 12 inches (300 mm) outside of concrete forms at footings.

c. 6 inches (150 mm) outside of minimum required dimensions of concrete cast against grade.

d. Outside dimensions of concrete walls indicated to be cast against rock without forms or exterior waterproofing treatments.

e. 6 inches (150 mm) beneath bottom of concrete slabs-on-grade.

f. 6 inches (150 mm) beneath pipe in trenches, and the greater of 24 inches (600 mm) wider than pipe or 42 inches (1065 mm) wide.

2.5 EXCAVATION FOR STRUCTURES

A. Excavations at Edges of Tree- and Plant-Protection Zones:

1. Excavate by hand to indicated lines, cross sections, elevations, and subgrades. Use narrow-tine spading forks to comb soil and expose roots. Do not break, tear, or chop exposed roots.

Do not use mechanical equipment that rips, tears, or pulls roots.

2. Cut and protect roots according to requirements in Section 015639 "Temporary Tree and Plant Protection."

2.6 EXCAVATION FOR PAVEMENTS

A. Excavate surfaces under pavements to indicated lines, cross sections, elevations, and subgrades.

2.7 SUBGRADE INSPECTION

A. Notify Professional when excavations have reached required subgrade.

B. If Professional determines that unsatisfactory soil is present, continue excavation and replace with compacted backfill or fill material as directed.

C. Proof-roll subgrade below the pavements with a pneumatic-tired and loaded 10-wheel, tandem-axle dump truck weighing not less than 20 tons to identify soft pockets and areas of excess yielding. Do not proof-roll wet or saturated subgrades.

1. Completely proof-roll subgrade in one direction, repeating proof-rolling in direction perpendicular to first direction. Limit vehicle speed to 3 mph (5 km/h).

2. Excavate soft spots, unsatisfactory soils, and areas of excessive pumping or rutting, as determined by Professional, and replace with compacted backfill or fill as directed.

PROJECT NO. 2503SC046 31 20 00 - 7 EARTH MOVING

3. For interior slab areas with limited access provide proof rolling equipment of largest size and weight as possible.

D. Authorized additional excavation and replacement material will be paid for according to Contract provisions for changes in the Work.

E. Reconstruct subgrades damaged by freezing temperatures, frost, rain, accumulated water, or construction activities, as directed by Professional, without additional compensation.

2.8 APPROVAL OF BEARING STRATA

A. The Contractor shall furnish adequate advance notification to the Department and the Professional of times when paving subgrades are to be completed, so that the Construction Stage Geotech Quality Assurance Agent can verify that the bearing quality of the soil has been properly inspected and/or tested by the Contractor. Poured-in-place surface shall follow only after approval by the Construction Stage Geotech Quality Assurance Agent.

B. Should the bearing at the levels indicated be found by the Professional and the Department to be inadequate, they may order the excavation carried down to sound bearing. Such excavation shall be classed as additional work and payment be made on the basis of an agreed price according to the General Conditions. Should suitable bearing be found at a lesser depth than indicated, the Professional and the Department may order the reduction of excavation specified or shown on the drawings, and the Contractor shall allow a credit for excavation thus omitted on the same basis.

2.9 STORAGE OF MATERIALS

A. All soil that is excavated is to be removed from site. Only item to be stockpiled is subbase aggregate if it is required to be removed to reach excavated depth.

1. Stockpile aggregate materials away from edge of excavations. Do not store within drip line of remaining trees.

2.10 COMPACTION OF SOIL

A. Compact soil materials to not less than the following percentages of maximum dry unit weight according to ASTM D 698. Field moisture content should be maintained within two (2) percentage points of the optimum moisture content:

1. Under pavements, scarify and re-compact top 12 inches (300 mm) of existing subgrade at 98 percent.

2. Under turf or unpaved areas, scarify and re-compact top 6 inches (150 mm) below subgrade and compact each layer of backfill or fill soil material at 95 percent.

2.11 GRADING

A. General: Uniformly grade areas to a smooth surface, free of irregular surface changes. Comply with compaction requirements and grade to cross sections, lines, and elevations indicated.

PROJECT NO. 2503SC046 31 20 00 - 8 EARTH MOVING

1. Provide a smooth transition between adjacent existing grades and new grades.

2. Cut out soft spots, fill low spots, and trim high spots to comply with required surface tolerances.

B. Site Rough Grading: Slope grades to direct water away from walls and to prevent ponding. Finish subgrades to required elevations within the following tolerances:

1. Turf or Unpaved Areas: Plus or minus 1 inch (25 mm).

2. Pavements: Plus or minus 1/2 inch (13 mm).

2.12 BASE COURSES UNDER PAVEMENT

A. Place subbase course and base course on subgrades free of mud, frost, snow, or ice.

B. On prepared subgrade, place subbase course and base course under pavements as follows:

1. Install separation geotextile on prepared subgrade according to manufacturer's written instructions, overlapping sides and ends.

2. Place base course material under poured-in-place pavement.

3. Shape base course to required crown elevations and cross-slope grades.

4. Compact base course at optimum moisture content to required grades, lines, cross sections, and thickness to not less than 95 percent of maximum dry unit weight according to

ASTM D 1557.

2.13 QUALITY CONTROL TESTING

A. The Contractor shall perform all necessary Quality Control tests and procedures for the performance of the work, in accordance with Section 014000 and this section, to produce the end results specified. The Contractor’s Quality Control Agent shall maintain clear and orderly records of such tests and procedures and make them available for field review and approval of the Professional and the Department. The Contractor's bid shall include the cost of all Quality Control tests and inspections.

B. The Contractor shall submit its plan for Quality Control testing to the Professional and the Department for review and comments. The Professional shall consult with its Quality Assurance Agent in arriving at its opinion.

C. Quality Control tests shall include tests on fill material, optimum moisture content and maximum density and field density tests of fill layers. The Quality Control Agent shall comment on the suitability of all subgrades, and the subgrades shall be acceptable to the Consulting Geotechnical Engineer.

D. Handwritten copies of field test reports shall be provided to the Contractor. They shall be given to the Contractor and inspector within two (2) hours of completion, but in no event shall the technician leave the site without providing the Contractor and inspector with a copy of the test results. This shall include density, % moisture, plan location, elevation, comments and any other relevant data. Comments shall include any condition that might have an adverse effect on the operations, including weather, drainage, etc.:

PROJECT NO. 2503SC046 31 20 00 - 9 EARTH MOVING

E. The Contractor shall request consultation with the Consulting Geotechnical Engineer on any problems that arise during construction. Copies of the daily in-place soil density tests shall be faxed to the consultant by the Contractor through the testing agency within twenty-four(24) hours of the time the tests are made.

F. The Contractor shall approve each subgrade and each fill layer before proceeding to the next layer. Any area which does not meet density, % moisture or other requirements at any time, shall be suitably reworked and retested by the Contractor at his own expense.

G. The Professional and/or the Department will perform all Quality Assurance Testing and Inspection Services deemed necessary for the assurance of the Professional and/or the Department. This does not relieve the Contractor of his responsibilities. The Department will bear the cost of Quality Assurance tests and inspections.

H. Compaction standards are to be based on Modified Proctor standards, as defined by ASTM D1557

2.14 PROTECTION

A. Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep free of trash and debris.

B. Repair and reestablish grades to specified tolerances where completed or partially completed surfaces become eroded, rutted, settled, or where they lose compaction due to subsequent construction operations or weather conditions.

1. Scarify or remove and replace soil material to depth as directed by Professional; reshape and re-compact.

C. Where settling occurs before Project correction period elapses, remove finished surfacing, backfill with additional soil material, compact, and reconstruct surfacing.

1. Restore appearance, quality, and condition of finished surfacing to match adjacent work, and eliminate evidence of restoration to greatest extent possible.

2.15 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Remove surplus satisfactory soil and waste materials, including unsatisfactory soil, trash, and debris, and legally dispose of them off Department's property.

1. Surplus satisfactory soil from the site shall be considered for reuse on site for project purposes before being shipped off site. The contractor shall plan earth moving and excavation activities in order to avoid unnecessary importing and exporting of soil materials to and from the site.

B. Transport surplus satisfactory soil to designated storage areas on Department's property.

Stockpile or spread soil as directed by Professional.

1. Remove waste materials, including unsatisfactory soil, trash, and debris, and legally dispose of them off Department's property.

PROJECT NO. 2503SC046 31 20 00 - 10 EARTH MOVING

END OF SECTION 31 20 00

SECTION 31 23 16

EXCAVATION

PROJECT NO. 2503SC046 31 23 16- 1 EXCAVATION

A. The specifications sections " General Conditions to the Construction Contract ", "Special Conditions", and "Division 01 - General Requirements" form a part of this Section by this reference thereto, and shall have the same force and effect as if printed herewith in full.

1.2 SUMMARY

A. Section Includes:

1. Excavating for poured-in-place surfacing.

1. Section 311000 – Site Clearing.

2. Section 312000 – Earth Moving.

3. Section 312319 – Dewatering.

1.3 REFERENCES

A. Local utility standards when working within 24 inches of utility lines.

1.4 SUBMITTALS

A. Division 1: Requirements for submittals.

B. Excavation Protection Plan: Describe sheeting, shoring, and bracing materials and installation required to protect excavations and adjacent structures and property; include structural calculations to support plan.

C. Shop Drawings: Indicate soil densification grid for each size and configuration footing requiring soils densification.

1.5 QUALITY ASSURANCE

A. Perform Work in accordance with Pennsylvania Department of Transportation (PennDOT) standards and specifications.

1.6 QUALIFICATIONS

A. Prepare excavation protection plan under direct supervision of Professional Engineer experienced in design of this Work and licensed in State of Pennsylvania.

PART 2 - PRODUCTS

2.1 Not Used.

PART 3 - EXECUTION

3.1 PREPARATION

A. Call Local Utility Line Information service at 1-800-242-1776 not less than three

PROJECT NO. 2503SC046 31 23 16- 2 EXCAVATION

working days before performing Work.

1. Request underground utilities to be located and marked within and surrounding construction areas.

3.2 EXCAVATION

A. Underpin adjacent structures which may be damaged by excavation work.

B. Excavate subsoil to accommodate paving and construction operations.

C. Grade top perimeter of excavation to prevent surface water from draining into excavation.

D. Trim excavation. Remove loose matter.

E. Remove lumped subsoil, boulders, and rock up to 1/3 cu yd measured by volume. Remove larger material as specified in Section 31 23 23 - Fill.

F. Notify Professional of unexpected subsurface conditions.

G. Correct areas over excavated as directed by Professional.

H. Remove excavated soil material off site to the designated disposal location and place excavated aggregate in designated material stockpile location area designated on site.

I. Repair or replace items indicated to remain damaged by excavation.

J. All surfaces affected by the Work shall be restored to their preconstruction conditions as identified on the Contract Drawings.

3.3 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Control Testing Services: Field inspecting, testing, adjusting, and balancing.

B. Section 01 40 10 - Quality Assurance Testing & Inspection Services

C. Request inspection of excavation operations in accordance with applicable code.

D. Request visual inspection of bearing surfaces by inspection agency before installing subsequent work.

3.4 PROTECTION

A. Prevent displacement or loose soil from falling into excavation; maintain soil stability.

B. Protect bottom of excavations and soil adjacent to and beneath playground foundations from freezing.

C. Protect structures, utilities and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earth operations.

END OF SECTION 31 23 16

PROJECT NO. 2503SC046 31 23 19 - 1 DEWATERING

SECTION 31 23 19

DEWATERING

A. The specifications sections " General Conditions to the Construction Contract ", "Special Conditions", and "Division 01 - General Requirements" form a part of this Section by this reference thereto, and shall have the same force and effect as if printed herewith in full.

1.2 SUMMARY

A. Contractor, at his option and cost, may furnish, install, and operate dewatering systems as deemed necessary throughout the course of construction. Contractor shall be responsible for coordinating and establishing the locations of these dewatering facilities and for compliance with the requirements of this Section.

B. All work related to dewatering shall conform to Federal, State and local laws, rules, regulations, requirements, precautions, orders and decrees that apply.

C. Section Includes:

1. Dewatering system.

2. Surface water control system.

3. Monitoring wells.

4. System operation and maintenance.

5. Water disposal.

D. Related Sections:

1. Section 31 10 00 – Site Clearing.

2. Section 31 20 00 – Earth Moving.

3. Section 31 23 16 – Excavation.

1.3 REFERENCES

A. Pennsylvania Department of Transportation (PennDOT) Publication 408.

B. ASTM International:

1. ASTM C33 - Standard Specification for Concrete Aggregates.

1.4 DEFINITIONS

A. Dewatering includes the following:

1. Lowering of ground water table and intercepting horizontal water seepage to prevent ground water from entering excavated area.

2. Reducing piezometric pressure within strata to prevent failure or heaving of excavated area.

3. Disposing of removed water.

PROJECT NO. 2503SC046 31 23 19 - 2 DEWATERING

B. Surface Water Control: Removal of surface water within open excavations.

1.5 SYSTEM DESCRIPTION

A. Responsibility for Condition of Excavation:

1. The failure or refusal of the Engineer to suggest the use of dewatering methods, or a better quality method; shall in no way or extent relieve the Contractor of his responsibility concerning the condition of excavation or of his obligations under the Contract, nor impose liability on the Engineer or the Department; nor shall a delay, whether caused by an action or want of action on the part of the Contractor, or by an act of the Engineer, Department, or their agents, or employees, resulting in the keeping of an excavation open longer than would otherwise have been necessary, relieve the Contractor from the necessity of properly and adequately protecting the excavation from caving or slipping, nor from his obligations under the Contract relating to injury to persons or property, nor entitle him to claims for extra compensation.

B. Furnish standby equipment stored at Project site and ready for immediate use upon failure of dewatering equipment. Provide the following standby equipment, but not less than one of each type:

1. Dewatering Centrifugal Pumps: 50 percent.

2. Dewatering Turbine Pumps: One for every 5 installed pumps.

3. Pump Power Units: 50 percent.

4. Dewatering Jet Eductor Pressure Pumps: 50 percent.

5. Portable Electric Generators: 50 percent.

6. Commercial Electric Power: 100 percent standby electric generating equipment.

1.6 PERFORMANCE REQUIREMENTS

A. Design dewatering systems to:

1. Lower water table within areas of excavation to minimum 2 feet below bottom of excavation to permit Work to be completed on dry and stable subgrade.

2. Relieve hydrostatic pressures in confined water bearing strata below excavation to eliminate risk of uplift or other instability of excavation.

3. Prevent damage to adjacent properties, buildings, structures, utilities, and facilities from construction operations.

4. Prevent loss of fines, quick condition, or softening of foundation subgrade.

5. Maintain stability of sides and bottoms of excavations and trenches.

B. Design surface water control systems to:

1. Collect and remove surface water and seepage entering excavation.

1.7 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit data for each of the following:

PROJECT NO. 2503SC046 31 23 19 - 3 DEWATERING

1. Dewatering Pumps: Indicate sizes, capacities, priming method, engine, and motor characteristics.

2. Pumping equipment for control of surface water within excavation.

1.8 CLOSEOUT SUBMITTALS

A. Section 01 77 00 - Closeout Procedures: Requirements for submittals.

B. Project Record Documents: Record actual locations and depths of capped wells and piping abandoned in place.

1.9 QUALITY ASSURANCE

A. Perform Work in accordance with Pennsylvania Department of Transportation (PennDOT) standards.

1.10 QUALIFICATIONS

A. Installer: Company specializing in performing work of this section with minimum 5 years documented experience and responsible for design, operation, and maintenance of dewatering system.

1. Assume sole responsibility for dewatering and surface water control systems and for loss or damage resulting from partial or complete failure of protective measures and settlement or resultant damage caused by ground water control operations.

1.11 SEQUENCING

A. Section 01 10 00 - Summary: Requirements for sequencing.

B. Sequence work to obtain required permits before start of dewatering operations.

C. Sequence work to install and test monitoring systems minimum 7 days before testing and operating dewatering systems.

D. Sequence work to install and test dewatering and surface water control systems minimum 7 days before starting excavation or trenching.

1.12 COORDINATION

A. Section 01 31 13 – Project Coordination: Requirements for coordination.

PART 2 - PRODUCTS

2.1 DEWATERING EQUIPMENT

A. Select dewatering equipment to meet specified performance requirements.

PROJECT NO. 2503SC046 31 23 19 - 4 DEWATERING

PART 3 - EXECUTION

3.1 EXAMINATION

A. Call Pennsylvania One Call System, Inc. at 1-800-242-1776 not less than three working days before performing Work.

1. Request underground utilities to be located and marked within and surrounding construction areas.

3.2 PREPARATION

A. Protect existing adjacent structures and improvements from damage caused by dewatering operations.

3.3 DEWATERING SYSTEM

A. Install dewatering system in accordance with shop drawings.

B. Locate system components to allow continuous dewatering operations without interfering with installation of permanent Work and existing public rights-of-way, sidewalks, and adjacent buildings, structures, and improvements.

C. Install pumps in accordance with manufacturer's instructions.

3.4 SURFACE WATER CONTROL SYSTEM

A. Provide ditches, berms, and other devices to divert and drain surface water from excavation area as specified.

B. Divert surface water and seepage water within excavation areas in accordance with requirements of agencies having jurisdiction.

C. Control and remove unanticipated water seepage into excavation.

3.5 SYSTEM OPERATION AND MAINTENANCE

A. Operate dewatering system continuously until backfill is minimum 2 feet above normal ground water table elevation.

B. When required, provide 24-hour supervision of dewatering system by personnel skilled in operation, maintenance, and replacement of system components.

C. Conduct daily observation of dewatering system and monitoring system. Make required repairs and perform scheduled maintenance.

D. When dewatering system cannot control water within excavation, notify Engineer and stop excavation work.

1. Supplement or modify dewatering system and provide other remedial measures to control water within excavation.

2. Demonstrate dewatering system operation complies with performance requirements before resuming excavation operations.

PROJECT NO. 2503SC046 31 23 19 - 5 DEWATERING

E. Modify dewatering and surface water control systems when operation causes or threatens to cause damage to new construction, existing site improvements, adjacent property, or adjacent water wells.

3.6 WATER DISPOSAL

A. Discharge water in accordance with requirements set forth by agencies having jurisdiction.

3.7 SYSTEM REMOVAL

A. Remove dewatering and surface water control systems after dewatering operations are discontinued.

B. Repair damage caused by dewatering and surface water control systems or resulting from failure of systems to protect property.

3.8 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Field inspecting, testing, adjusting, and balancing.

B. After dewatering system is installed, perform pumping test to determine when selected pumping rate lowers water level in well below pump intake. Adjust pump speed, discharge volume, or both to ensure proper operation of each pump.

C. Survey existing adjacent buildings, structures, and improvements to detect movement in comparison to original elevations during dewatering operations.

1. Notify Engineer immediately of measured movement.

END OF SECTION 31 23 19

SECTION 32 13 13

CONCRETE PAVING

PROJECT NO. 2503SC046 32 13 13- 1 CONCRETE PAVING

A. The specifications sections " General Conditions to the Construction Contract ", "Special Conditions", and "Division 01 - General Requirements" form a part of this Section by this reference thereto, and shall have the same force and effect as if printed herewith in full.

1.2 SUMMARY

A. Section Includes:

1. Curbs.

B. Related Sections:

1. Section 312316 "Excavation" for cut and compaction applications for concrete.

2. Section 321373 "Concrete Paving Joint Sealants" for joint sealants in expansion and contraction joints within concrete paving and in joints between concrete paving and asphalt paving or adjacent construction.

3. Section 312000 “Earth Moving”.

1.3 DEFINITIONS

A. Cementitious Materials: Portland cement alone or in combination with one or more of blended hydraulic cement, fly ash and other pozzolans, and ground granulated blast-furnace slag.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

B. Samples for Initial Selection: For each type of product, ingredient, or admixture requiring color selection.

C. Samples for Verification: For each type of product or exposed finish, prepared as Samples of size indicated below:

1. Exposed Aggregate: 10-lb (4.5-kg) Sample of each mix.

D. Other Action Submittals:

1. Design Mixtures: For each concrete paving mixture. Include alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.

PROJECT NO. 2503SC046 32 13 13- 2 CONCRETE PAVING

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For qualified Installer of concrete manufacturer and testing agency.

B. Material Certificates: For the following, from manufacturer:

1. Cementitious materials.

2. Admixtures.

3. Curing compounds.

4. Applied finish materials.

5. Bonding agent or epoxy adhesive.

6. Joint fillers.

C. Material Test Reports: For each of the following:

1. Aggregates. Include service-record data indicating absence of deleterious expansion of concrete due to alkali-aggregate reactivity.

D. Field quality-control reports shall be provided by Contractor. All testing to be provided by Contractor.

1.6 QUALITY ASSURANCE

A. Pennsylvania Department of Transportation (PennDOT) standards and Publication 408.

B. Ready-Mix-Concrete Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.

1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete Production Facilities" (Quality Control Manual - Section 3, "Plant Certification Checklist").

C. Testing Agency Qualifications: Qualified according to ASTM C 1077 and ASTM E 329 for testing indicated.

1. Personnel conducting field tests shall be qualified as ACI Concrete Field Testing Technician, Grade 1, according to ACI CP-1 or an equivalent certification program.

D. Concrete Testing Service: Engage a qualified testing agency to perform material evaluation tests and to design concrete mixtures.

E. ACI Publications: Comply with ACI 301 (ACI 301M) unless otherwise indicated.

F. Mockups: Build mockups to verify selections made under sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution.

1. Build mockups of full-thickness sections of concrete paving to demonstrate typical joints;

surface finish, texture, and color; curing; and standard of workmanship.

PROJECT NO. 2503SC046 32 13 13- 3 CONCRETE PAVING

2. Build mockups of concrete paving in the location and of the size indicated or, if not indicated, build mockups where directed by Architect and not less than 96 inches (2400

mm) by 96 inches (2400 mm). Include full-size detectable warning.

3. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Architect specifically approves such deviations in writing.

4. Approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.

G. Pre-installation Conference: Conduct conference at Project site.

1. Review methods and procedures related to concrete paving, including but not limited to, the following:

a. Concrete mixture design.

b. Quality control of concrete materials and concrete paving construction practices.

2. Require representatives of each entity directly concerned with concrete paving to attend, including the following:

a. Contractor's superintendent.

b. Independent testing agency responsible for concrete design mixtures.

c. Ready-mix concrete manufacturer.

d. Concrete paving subcontractor.

1.7 PROJECT CONDITIONS

A. Traffic Control: Maintain access for vehicular and pedestrian traffic as required for other construction activities.

1.8 UNDER STRENGTHED CONCRETE PENALTY

A. If compressive strength of in situ concrete is accepted, either without additional testing or on the basis of testing other than original cylinder compressive strength tests, the Contractor shall compensate the Department for the Contractor’s failure to meet specified strength requirements by paying to the Department one hundred dollars ($100) per cubic yard for each one hundred pounds per square inch (100psi) below the specified compressive strength. The original laboratory cured 28-day cylinder compressive strength test results only shall be used to determine the difference between specified and furnished strengths.

PART 2 - PRODUCTS

2.1 FORMS

A. Form Materials: Plywood, metal, metal-framed plywood, or other approved panel-type materials to provide full-depth, continuous, straight, and smooth exposed surfaces.

PROJECT NO. 2503SC046 32 13 13- 4 CONCRETE PAVING

1. Use flexible or uniformly curved forms for curves with a radius of 100 feet (30.5 m) or less. Do not use notched and bent forms.

B. Form-Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and that will not impair subsequent treatments of concrete surfaces.

2.2 CONCRETE MATERIALS

A. Cementitious Material: Use the following cementitious materials, of same type, brand, and source throughout Project:

1. Portland Cement: ASTM C 150, white portland cement Type I/II, Type III and Type V. Supplement with the following:

a. Fly Ash: ASTM C 618, Class C or Class F.

b. Ground Granulated…