4-Pendora Park Plan Set.pdf

PDF 13 MB Posted

Attached to
Playground Safety Surface Rebid
Solicitation number
US.216068
Issued by
Berks County, Reese CDP, Pennsylvania

About this file

This is a design engineering plan set for the installation of playground safety surfaces at Pendora Park in the City of Reading, Berks County, Pennsylvania, prepared by Navarro & Wright Consulting Engineers, Inc. The project involves the removal of approximately 3,075 square feet of existing mulch and grass surfacing and 254 linear feet of railroad ties, and the installation of 2,800 square feet of poured-in-place (PIP) rubber safety surface meeting ASTM F-1292 standards and Americans with Disabilities Act accessibility requirements. The project is located at 1801 Forest Street, Reading, PA 19601, on property with an existing playground designed for ages 2-5 and 5-12. Construction is anticipated to occur from summer 2025 through fall 2025, with a ten percent bid surety requirement and sealed bids due via Pennbid by 2:00 PM on Tuesday, February 3, 2025. No pre-bid meeting is scheduled for this project. The design includes concrete curbing, aggregate subbase preparation with six inches minimum thickness, and comprehensive erosion and sedimentation control measures throughout construction.

The project specifications require coordination with six utility companies—Comcast, Pennsylvania Electric Company, City of Reading, Reading Water Authority, UGI Utilities, and Verizon—with all existing utilities to remain in place and protected during construction. The contractor must call PA One Call at 1-800-242-1776 at least three working days prior to commencing work and verify all utility locations before excavation. All disturbed areas must be stabilized with seeding and mulching, with temporary or permanent grass cover applied according to Penn State Agronomy Guide specifications. The site is located within the 100-year floodplain at its southwestern corner, though the playground equipment area is outside this zone. Construction activities must comply with PennDOT Publication 408 standards and City of Reading standards, with the contractor responsible for all traffic control, temporary erosion and sediment control maintenance, and coordination with the City Engineer requiring a minimum of 48 hours notice for municipal inspections. The contract documents include detailed site plans, demolition plans, proposed layout and grading plans, and comprehensive erosion and sedimentation pollution control specifications.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VICINITY MAP

SCALE: 1" = 500'

0 500' 1000'

LOCATION MAP

SCALE: 1" = 2000'

0 2000' 4000'

READING

DESIGN ENGINEERING FOR INSTALLATION OF

PLAYGROUND SAFETY SURFACES

FOR

PENDORA PARK PLAYGROUND

PROPERTY ID: 16531633583523

1801 FOREST STREET, CITY OF READING, BERKS COUNTY, PA. 19601

JUNE 18, 2025

N:\_2025\2503SC046_004_Reading Playgrounds_Pendora\_SC\_CADD\SHEETS\2503SC046_004-C100-COVER.dwg

W ed ne sd ay , J un e

, 2

3:

:2

PM

C100

CONSULTING ENGINEERS, INC.

OWNER / APPLICANT

CITY OF READING

8TH & WASHINGTON STREET

OFFICE 3-12

READING, PA, 19601-3690

TELEPHONE: 610-655-6423

NEIL NEMETH

NEIL. NEMETH@READINGPA.GOV

TAX PARCEL REFERENCE

SOURCES OF TITLE

INSTRUMENT NUMBER: 07070369

DEED DATE: 19300106

PROPERTY ID: 1653163358523

S

8t h

S

TR

E E

T

FOREST STREET

S.

9T H

S

TR

EE

T

MINERAL SPRING ROAD

SITE

SITE

DRAWING INDEX

SHEET NO. SHEET DESCRIPTION

C100 COVER SHEET

C200 EXISTING CONDITIONS OVERALL PLAN

C201 EXISTING CONDITIONS ENLARGEMENT PLAN

C300 DEMOLITION PLAN

C400 PROPOSED LAYOUT PLAN

C500 GRADING PLAN

C600 DETAILS

ESPC -1 ESPC COVER

ESPC- 2 ESPC PLAN

ESPC- 3 ESPC DETAILS

SYSTEM, INC.

1-800-242-1776

PA 1

PENNSYLVANIA LAW REQUIRES

3 WORKING DAYS NOTICE FOR

DAYS IN DESIGN STAGE - STOP CALL

CONSTRUCTION PHASE AND 10 WORKING

CALL BEFORE YOU DIG!

POCS SERIAL NUMBER

20251543749

ACT 287/50

UNDERGROUND UTILITY PROTECTION ACT

NAVARRO & WRIGHT CONSULTING ENGINEERS, INC. HEREBY STATES THAT, PURSUANT TO THE PROVISIONS OF ACT NO, 287 OF 1974, AS AMENDED BY ACT 50 OF 2018, OF THE PENNSYLVANIA LEGISLATURE, IT HAS PERFORMED THE FOLLOWING IN PREPARING THESE DRAWINGS REQUIRING EXCAVATION OR DEMOLITION WORK AT SITES WITHIN THE POLITICAL

SUBDIVISION(S) OR LAND DEVELOPMENT(S) SHOWN ON THE DRAWINGS:

1. PURSUANT TO SECTION 4, CLAUSE (2) OF SAID ACT, NAVARRO & WRIGHT CONSULTING ENGINEERS, INC. REQUESTED FROM EACH USER'S OFFICE DESIGNATED ON SUCH LIST PROVIDED BY THE ONE CALL SYSTEM NOTIFICATION, THE INFORMATION PRESCRIBED BY SECTION 2, CLAUSE (4) OF SAID ACT, NOT LESS THAN (10) NOR MORE THAN (90) DAYS

BEFORE FINAL DESIGN IS TO BE COMPLETED.

2. PURSUANT TO SECTION 4, CLAUSE (3) OF SAID ACT, NAVARRO & WRIGHT CONSULTING ENGINEERS, INC. HAS SHOWN UPON THESE DRAWINGS "THE POSITION AND TYPE OF EACH LINE, AS DERIVED PURSUANT TO THE REQUEST MADE AS REQUIRED BY CLAUSE (2), THE SERIAL NUMBER PROVIDED BY THE ONE CALL SYSTEM, THE TOLL-FREE PHONE NUMBER, AND THE NAME OF THE USER, THE USER'S DESIGNATED OFFICE ADDRESS AND PHONE NUMBER, AS SHOWN ON THE LIST

REFERRED TO IN SECTION 4, CLAUSE (5) OF SAID ACT.

3. PURSUANT TO SECTION 4, CLAUSE (5) OF SAID ACT, NAVARRO & WRIGHT CONSULTING ENGINEERS, INC. HAS MET THEIR OBLIGATIONS OF CLAUSE (2) BY CALLING THE ONE CALL SYSTEM SERVING THE LOCATION WHERE EXCAVATION IS TO BE

PERFORMED.

AND NAVARRO & WRIGHT CONSULTING ENGINEERS, INC. DOES NOT MAKE ANY REPRESENTATION, WARRANTY, ASSURANCE OR GUARANTEE THAT THE INFORMATION RECEIVED PURSUANT TO SAID REQUEST AND AS REFLECTED ON THESE DRAWINGS IS CORRECT OR ACCURATE, BUT NAVARRO & WRIGHT CONSULTING ENGINEERS, INC. IS REFLECTING SAID INFORMATION ON THESE DRAWINGS ONLY DUE TO THE REQUIREMENTS OF SAID ACT 50 EFFECTIVE APRIL 28, 2018.

ONE CALL SYSTEM SERIAL NO. NOTIFICATION BY: NAVARRO & WRIGHT CONSULTING ENGINEERS, INC.

ONE CALL SYSTEM SERIAL NO.: 20251543749

PROJECT CONSULTANT

NAVARRO & WRIGHT

CONSULTING ENGINEERS, INC.

151 RENO AVENUE

NEW CUMBERLAND, PA 17070

TELEPHONE: 717-441-2216 EXT. 1108

JENNIFER FULLENKAMP

JFULLENKAMP@NAVARROWRIGHT.COM

GENERAL NOTES:

1. THE INTENT OF THIS PLAN IS TO REMOVE/REPLACE PLAYGROUND SAFETY SURFACES.

2. EXISTING CONDITIONS AND UTILITY INFORMATION DEPICTED HEREON HAS BEEN ESTABLISHED BY AERIAL MAPPING, FIELD OBSERVATION, GIS DATA, TAX MAP PARCELS AND PA ONE CALL. CONTRACTOR SHALL VERIFY THAT ALL DIMENSIONS ON PLANS ARE ACCURATE WITH FIELD DIMENSIONS BEFORE WORK COMMENCES. IF ANY DISCREPANCIES ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE

ENGINEER.

3. THE CONTRACTOR SHALL IMPLEMENT AND MAINTAIN ALL EROSION AND SEDIMENT CONTROL

MEASURES, TEMPORARY AND PERMANENT, THROUGHOUT THE LIFE OF THE PROJECT.

4. THE CONTRACTOR SHALL CONTACT ONE-CALL AT 1-800-242-1776 NO LESS THAN THREE (3) DAYS PRIOR TO BEGINNING WORK. THE CONTRACTOR SHALL VERIFY ALL UTILITIES PRIOR TO COMMENCING WORK

AND SHALL COMPLY WITH PA ONE CALL 1-800-242-1776.

5. THE CONTRACTOR IS RESPONSIBLE FOR THE PLACEMENT OF ALL TRAFFIC AND PEDESTRIAN CONTROL

SIGNS AS NEEDED.

6. DURING CONSTRUCTION THE CONTRACTOR SHALL PROTECT ALL DRAINAGE STRUCTURES, WALKWAYS

AND ROADWAYS FROM SEDIMENTATION.

7. ALL DISTURBED AREAS AND AREAS WITH EROSION PROBLEMS ARE TO BE DRESSED WITH TOPSOIL, SEEDED AND MULCHED.

8. ALL CONSTRUCTION SHALL BE IN CONFORMANCE WITH PENNDOT PUBLICATION 408 STANDARDS

LATEST EDITION AND THE CITY OF ERIE STANDARDS.

9. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE A MINIMUM OF 48 HOURS NOTICE AND TO COORDINATE WITH THE CITY ENGINEER IN REGARDS TO ALL MUNICIPAL INSPECTION WORK REQUIRED

ON THE PROJECT SITE.

10. THE PROJECT DRAWINGS ARE GENERALLY DIAGRAMMATIC AND DO NOT DEPICT ALL AND ACCURATE

UTILITIES.

11. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ANY AND ALL EXISTING ABOVE AND UNDERGROUND UTILITIES IN THE VICINITY OF THE CONTRACTOR'S WORK. THE

CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF SUPPORT AND PROTECTION DURING

OPERATIONS.

12. THE CONTRACTOR SHALL COOPERATE WITH THE CITY OF READING AND THE UTILITY COMPANIES IN KEEPING RESPECTIVE SERVICES AND FACILITIES IN OPERATION. REPAIR DAMAGED UTILITIES TO THE

SATISFACTION OF THE UTILITY OWNER.

13. THE CONTRACTOR SHALL NOT INTERRUPT EXISTING UTILITIES SERVICING FACILITIES OCCUPIED AND

USED BY OR OTHERS DURING OCCUPIED HOURS EXCEPT WHEN SUCH INTERRUPTIONS HAVE BEEN

AUTHORIZED IN WRITING BY THE OWNER OR PROFESSIONAL. INTERRUPTIONS SHALL OCCUR ONLY

AFTER ACCEPTABLE TEMPORARY UTILITY SERVICE HAS BEEN PROVIDED.

14. THE CONTRACTOR SHALL COMPLY WITH ALL CITY, COUNTY, STATE AND FEDERAL REGULATIONS IN

EFFECT AT THE TIME OF CONSTRUCTION.

15. ALL TURF AND CONCRETE/ASPHALT AREAS ADJACENT TO NEW CURBING AND PIP SURFACING AREAS

SHALL BE FLUSH.

16. THE CONTRACTOR SHALL MAINTAIN AND PROTECT ALL PROPERTY LINE STAKES OR MONUMENTATION

THROUGHOUT THE DURATION OF THE PROJECT CONSTRUCTION.

UTILITY LIST:

COMPANY: COMCAST

ADDRESS: 400 RIVERFRONT DR READING, PA. 19602

CONTACT: JEFF JACOVIDIS

EMAIL: jeff_jacovidis@cable.comcast.com

PHONE: 610-985-0690

COMPANY: PENNSYLVANIA ELECTRIC CO

ADDRESS: 21 S MAIN STREET AKRON, OH. 44308

CONTACT: MELLYSSA ADAMS

EMAIL: madams@firstenergycorp.com

PHONE: 330-604-4073

COMPANY: READING CITY OF

ADDRESS: 503 N 6TH STREET READING, PA. 19601

CONTACT: CARON WASHINGTON

EMAIL: caron.washington@readingpa.gov

PHONE: 610-655-6073

COMPANY: READING WATER AUTHORITY

ADDRESS: 1801 KUTZTOWN RD READING, PA. 19604

CONTACT: EDWARD REICHELT

EMAIL: edward.reichelt@readingareawater.com

PHONE: 610-406-6314

COMPANY: UGI UTILITIES INC

ADDRESS: 225 MORGANTOWN RD READING, PA. 19611

CONTACT: KURT ZIELASKOWSKI

EMAIL: kzielaskowski@ugi.com

PHONE: 610-736-5571

COMPANY: VERIZON BUSINESS FORMERLY MCI

ADDRESS: 7000 WESTON PKWY CARY, NC. 27513

CONTACT: VICTOR WOOD

EMAIL: victor.s.wood@verizon.com

PHONE: 919-414-2782

AutoCAD SHX Text W

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text M

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text B

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text Y

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text V

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text Y

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text P

AutoCAD SHX Text O

AutoCAD SHX Text 1-800-242-1776

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text

PAUL J. NAVARRO

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text V

AutoCAD SHX Text L

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text No.043808-E

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text M

372 37 4370 380

2 394

8 400

38638

38638

LaC

LaCUmD

UnD

TwB

UgB

FOREST STREET

S 1 9th

ST

RE

ET

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH OH

OH

OH

OH

EXISTING 2,758 SF

MULCH/SOIL SURFACEPLAYGROUND AGES 5-12(HALF OF SWING AGES 2-5)

W W

W W

W

W W

W W

W W

W W

W W

W W

W W

W W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

S S S S

S S

S S

S S

SS

S

S S

S S

S S

S S

S S

S

W

G G G G G G

G

G G

G G

G G

G G

G G

G G

G

G G

G

G G

G G

OH OH OH OH OH

W W W W W

S S S S S

G G G G G

LaC

EXISTING CONDITIONS OVERALL PLAN

1 INCH = 100 FEET

GRAPHIC SCALE

500100 100 200

RE

V

IS

IO

N S

D A

TE

DRAWING NUMBER:

BY

JOB NUMBER:

DRAWN BY:

CHECKED BY:

DRAWING DESCRIPTION:

DATE:

SCALE:

2503SC046_004

JJG

ASL

JUNE 18, 2025

N:\_2025\2503SC046_004_Reading Playgrounds_Pendora\_SC\_CADD\SHEETS\2503SC046_004-C200-EXISTING.dwg

W ed ne sd ay , J un e

, 2

3:

:3

PM

D

ES

IG

N

E N

G

IN

EE

RI

N G

F O

R

IN

ST

A

LL

A

TI

O

N O

F

PL

YG

RO

U N

D S

A

FE

TY

SU

RF

A

C

ES

FO

R

PE

N

D O

RA

P

A

RK

P

LA

YG

RO

U N

D

PR

O

PE

RT

Y

ID

: 1

F

O

RR

ES

T

ST

RE

ET

C

IT

Y

O F

RE

A

D

IN

G

BE

RK

S

C O

U N

TY

PE

N

SY

LV

A

N

IA

C O

RP

O

RA

TE

O

FF

IC

E

RE

N

O A

V

EN

U E

N

EW

C U

M

BE

RL

A

N D

, P A

PH

O N

E:

(7

) 4

-2

FA

X:

(7

) 4

-2 w w w .n av ar ro w ri gh t.c om

C O

N S

U L

T

IN

G E

N G

IN

E

E R

S , I

N C

1" = 100'

EXISTING

CONDITIONS

OVERALL

PLAN

C200

FORREST STREET

S

8t h

S

TR

E E

T

S th S

TR

EE

T

HOWARD BLVD.

PROJECT LOCATION

LEGEND

AutoCAD SHX Text

PLAY EQUIPMENT

AutoCAD SHX Text

RAILROAD TIES AROUND PLAY AREA

AutoCAD SHX Text

PLAY EQUIPMENT

AutoCAD SHX Text

RETAINING WALL WITH RAILING 2'+/- HEIGHT

AutoCAD SHX Text

POSSIBLE UNDERGROUND RIVERINE SYSTEM WITHIN A CHANNEL CLASSIFIED AS "R4SBC"

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

CO

AutoCAD SHX Text

LIGHT POLE

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text

STORM DRAIN PIPE WITH INLET

AutoCAD SHX Text

WATER LINE

AutoCAD SHX Text

SANITARY SEWER LINE WITH MANHOLE

AutoCAD SHX Text

RIGHT-OF-WAY LINE

AutoCAD SHX Text

EDGE OF ASPHALT

AutoCAD SHX Text

PROPERTY LINE

AutoCAD SHX Text

OVERHEAD UTILITY

AutoCAD SHX Text S

AutoCAD SHX Text

EM

AutoCAD SHX Text

GM

AutoCAD SHX Text

WM

AutoCAD SHX Text

FH

AutoCAD SHX Text

EXISTING LEGEND

AutoCAD SHX Text

GAS LINE

AutoCAD SHX Text

CONTOUR

AutoCAD SHX Text

SOILS LINE AND SOIL TYPE

AutoCAD SHX Text

WETLANDS

AutoCAD SHX Text

EXISTING MULCH SURFACE

AutoCAD SHX Text

EXISTING TREES

AutoCAD SHX Text

100 YEAR FLOOD

AutoCAD SHX Text W

AutoCAD SHX Text N

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text

PAUL J. NAVARRO

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text V

AutoCAD SHX Text L

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text No.043808-E

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text M

394 396

LaC

UmD

FOREST STREET

S 1 9th

ST

RE

ET

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

EXISTING 2,758 SF

MULCH/SOIL SURFACEPLAYGROUND AGES 5-12(HALF OF SWING AGES 2-5)

OH OH OH OH OH

W W W W W

S S S S S

G G G G G

LaC

EXISTING CONDITIONS ENLARGED PLAN

1 INCH = 10 FEET

GRAPHIC SCALE

5010 10 20

RE

V

IS

IO

N S

D A

TE

DRAWING NUMBER:

BY

JOB NUMBER:

DRAWN BY:

CHECKED BY:

DRAWING DESCRIPTION:

DATE:

SCALE:

2503SC046_004

JJG

ASL

JUNE 18, 2025

N:\_2025\2503SC046_004_Reading Playgrounds_Pendora\_SC\_CADD\SHEETS\2503SC046_004-C201-EXISTING ENLARGED.dwg

W ed ne sd ay , J un e

, 2

3:

:0

PM

D

ES

IG

N

E N

G

IN

EE

RI

N G

F O

R

IN

ST

A

LL

A

TI

O

N O

F

PL

YG

RO

U N

D S

A

FE

TY

SU

RF

A

C

ES

FO

R

PE

N

D O

RA

P

A

RK

P

LA

YG

RO

U N

D

PR

O

PE

RT

Y

ID

: 1

F

O

RR

ES

T

ST

RE

ET

C

IT

Y

O F

RE

A

D

S

C O

U

N

SY

LV

A

N

IA

C O

RP

O

RA

TE

O

FF

IC

E

RE

N

O A

V

EN

U E

N

EW

C U

M

BE

RL

A

N D

, P A

PH

O N

E:

(7

) 4

-2

FA

X:

(7

) 4

-2 w w w .n av ar ro w ri gh t.c om

C O

N S

U L

T

IN

G E

N G

IN

E

E R

S , I

N C

1" = 10'

EXISTING

CONDITIONS

ENLARGED

PLAN

C201

EXISTING CONDITIONS NOTES

1. HORIZONTAL DATUM: NORTH AMERICAN DATUM 1983, 2011 (NAD83)(2011).

2. COORDINATE SYSTEM: PENNSYLVANIA STATE PLANE, SOUTH ZONE.

3. VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88).

4. FEDERAL EMERGENCY MANAGEMENT AGENCY, FLOOD INSURANCE RATE

MAP, PANEL NUMBER #42011C0509G, EFFECTIVE ON 7/3/2012 INDICATES

THE SUBJECT PARCEL OF LAND IS IN A 100 YEAR FLOOD PLAIN IN THE

MOST SOUTHWESTERN CORNER OF THE LOT. THE PORTION OF THE LOT

WITH THE PARK EQUIPMENT IS NOT WITHIN THE 100 YEAR FLOOD ZONE.

5. NAVARRO & WRIGHT CONSULTING ENGINEERS, INC. DOES NOT WARRANT

THAT THE UNDERGROUND UTILITY LOCATIONS ARE COMPLETE OR EXACT.

NAVARRO & WRIGHT CONSULTING ENGINEERS, INC. HAS NOT LOCATED

THE SUBSURFACE UTILITIES. THE ACTUAL LOCATIONS AND CONDITIONS

SHOULD BE VERIFIED BY REPRESENTATIVES OF THE UTILITY OR UTILITIES

IN QUESTION. NAVARRO & WRIGHT CONSULTING ENGINEERS, INC. WILL

ASSUME NO RESPONSIBILITY FOR ACCURACY OR SUFFICIENCY OF THE

DATA RELATED TO EXISTING UTILITIES. UTILITIES SHOWN HEREON WERE

PLOTTED USING SURFACE FEATURES LOCATED.

6. THE NATIONAL WETLAND INVENTORY HAS INDICATED THAT THERE IS A

POSSIBLE UNDERGROUND RIVERINE SYSTEM HABITAT ON SITE. IT IS

CLASSIFIED AS "R4SBC". SEE THE NATIONAL WETLAND INVENTORY FOR

MORE INFORMATION.

AutoCAD SHX Text

PLAY EQUIPMENT

AutoCAD SHX Text

RAILROAD TIES AROUND PLAY AREA

AutoCAD SHX Text

PLAY EQUIPMENT

AutoCAD SHX Text

RETAINING WALL WITH RAILING 2'+/- HEIGHT

AutoCAD SHX Text

CO

AutoCAD SHX Text

LIGHT POLE

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text

STORM DRAIN PIPE WITH INLET

AutoCAD SHX Text

WATER LINE

AutoCAD SHX Text

SANITARY SEWER LINE WITH MANHOLE

AutoCAD SHX Text

RIGHT-OF-WAY LINE

AutoCAD SHX Text

EDGE OF ASPHALT

AutoCAD SHX Text

PROPERTY LINE

AutoCAD SHX Text

OVERHEAD UTILITY

AutoCAD SHX Text S

AutoCAD SHX Text

EM

AutoCAD SHX Text

GM

AutoCAD SHX Text

WM

AutoCAD SHX Text

FH

AutoCAD SHX Text

EXISTING LEGEND

AutoCAD SHX Text

GAS LINE

AutoCAD SHX Text

CONTOUR

AutoCAD SHX Text

SOILS LINE AND SOIL TYPE

AutoCAD SHX Text

WETLANDS

AutoCAD SHX Text

EXISTING MULCH SURFACE

AutoCAD SHX Text

EXISTING TREES

AutoCAD SHX Text

100 YEAR FLOOD

AutoCAD SHX Text W

AutoCAD SHX Text N

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text

PAUL J. NAVARRO

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text V

AutoCAD SHX Text L

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text No.043808-E

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text M

394 396

LaC

UmD

FOREST STREET

S 1 9th

ST

RE

ET

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

1 12

EXISTING RETAINING

WALL AND RAILING

TO REMAIN

3,075 SF OF MULCH/GRASS

TO BE REMOVED

254 LF OF RAILROAD TIES

TO BE REMOVED

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LOD

LODLODLODLOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

OH OH OH OH OH

W W W W W

S S S S S

G G G G G

LaC

DEMOLITION PLAN LEGEND ITEMS:

EXISTING ASPHALT TO REMAIN AND BE PROTECTED.

EXISTING LIGHT POST TO REMAIN AND BE PROTECTED.

EXISTING PLAY EQUIPMENT TO REMAIN AND BE PROTECTED.

EXISTING RETAINING WALL AND RAILING

TO REMAIN AND BE PROTECTED.

SOIL AND MULCH TO BE REMOVED

CONSTRUCTION FENCE

TREE PROTECTION AREA

RAILROAD TIES AND REBAR TO BE REMOVED

LOD LOD LIMIT OF DISTURBANCE

DEMOLITION PLAN

1 INCH = 10 FEET

GRAPHIC SCALE

5010 10 20

RE

V

IS

IO

N S

D A

TE

DRAWING NUMBER:

BY

JOB NUMBER:

DRAWN BY:

CHECKED BY:

DRAWING DESCRIPTION:

DATE:

SCALE:

2503SC046_004

JJG

ASL

JUNE 18, 2025

N:\_2025\2503SC046_004_Reading Playgrounds_Pendora\_SC\_CADD\SHEETS\2503SC046_004-C300-Demolition.dwg

W ed ne sd ay , J un e

, 2

3:

:0

PM

D

ES

IG

N

E N

G

IN

EE

RI

N G

F O

R

IN

ST

A

LL

A

TI

O

N O

F

PL

YG

RO

U N

D S

A

FE

TY

SU

RF

A

C

ES

FO

R

PE

N

D O

RA

P

A

RK

P

LA

YG

RO

U N

D

PR

O

PE

RT

Y

ID

: 1

F

O

RR

ES

T

ST

RE

ET

C

IT

Y

O F

RE

A

D

S

C O

U

N

SY

LV

A

N

IA

C O

RP

O

RA

TE

O

FF

IC

E

RE

N

O A

V

EN

U E

N

EW

C U

M

BE

RL

A

N D

, P A

PH

O N

E:

(7

) 4

-2

FA

X:

(7

) 4

-2 w w w .n av ar ro w ri gh t.c om

C O

N S

U L

T

IN

G E

N G

IN

E

E R

S , I

N C

1" = 10'

DEMOLITION

PLAN

C300

DEMOLITION NOTES

1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ERECT CHAINLINK

CONSTRUCTION FENCING AS SHOWN ON THE PLAN PRIOR TO AND DURING THE

CONSTRUCTION PERIOD.

2. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PLACE ALL E&S ITEMS ON

THE ESPC PLAN PRIOR TO THE START OF CONSTRUCTION AND SHALL MAINTAIN THEM

THROUGHOUT THE LIFE OF THE PROJECTS CONSTRUCTION PERIOD.

3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ANY

AND ALL EXISTING ABOVE AND UNDERGROUND UTILITIES IN THE VICINITY OF THE

CONTRACTOR'S WORK. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF

SUPPORT AND PROTECTION DURING OPERATIONS. ALL UTILITIES ARE TO REMAIN.

4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COOPERATE WITH THE CITY OF

READING AND THE UTILITY COMPANIES IN KEEPING RESPECTIVE SERVICES AND

FACILITIES IN OPERATION. THE CONTRACTOR IS RESPONSIBLE TO REPAIR DAMAGED

UTILITIES TO THE SATISFACTION OF THE UTILITY OWNER.

5. THE CONTRACTOR SHALL NOT INTERRUPT EXISTING UTILITIES SERVICING FACILITIES

OCCUPIED AND USED BY OR OTHERS DURING OCCUPIED HOURS EXCEPT WHEN SUCH

INTERRUPTIONS HAVE BEEN AUTHORIZED IN WRITING BY THE OWNER OR

PROFESSIONAL. INTERRUPTIONS SHALL OCCUR ONLY AFTER ACCEPTABLE TEMPORARY

UTILITY SERVICE HAS BEEN PROVIDED.

6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL AND SHEETING

AND SHORING AS THE NEED REQUIRES.

7. ALL TREES ARE TO BE PROTECTED.

8. ALL EXISTING SIGNAGE SHALL REMAIN AND BE PROTECTED. IT SHALL BE THE

CONTRACTORS RESPONSIBILITY TO REPLACE ANY SIGNAGE THAT GETS DAMAGED

THROUGHOUT THE PERIOD OF CONSTRUCTION AND UNTIL FINAL APPROVAL OF THE

PROJECT. SIGNAGE SHALL BE MADE OF EQUAL OR BETTER MATERIAL AND QUALITY AND

REPLACED IN KIND.

9. ANY SOIL TO BE EXCAVATED SHALL BE DISPOSED OF IMMEDIATELY. SEE ESPC COVER

FOR NOTES ON STOCKPILING AGGREGATE MATERIAL AND ON DISPOSAL OF EXCAVATED

SOIL MATERIAL.

10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT THE EXISTING

PLAY EQUIPMENT STRUCTURES, POSTS, AND FOOTERS WHILE EXCAVATING AND DURING

INSTALL OF THE PIP. ANY DAMAGE DONE TO THE EXISTING PLAY EQUIPMENT DURING

THE CONSTRUCTION PERIOD SHALL BE REPLACED IN KIND AND TO THE APPROVAL OF

THE OWNER AT THE EXPENSE OF THE CONTRACTOR.

11. WHEREVER EXCAVATION NEAR A RETAINING WALL OCCURS, CARE SHOULD BE TAKEN

NOT TO DAMAGE THE WALL OR ITS FOUNDATION. ANY DAMAGE DONE TO THE WALL OR

ITS FOUNDATION WILL BE AT THE EXPENSE OF THE CONTRACTOR TO REPAIR BACK TO

ITS EXISTING STATE AND TO THE SATISFACTION OF THE OWNER.

AutoCAD SHX Text

PLAY EQUIPMENT TO REMAIN

AutoCAD SHX Text

PLAY EQUIPMENT TO REMAIN

AutoCAD SHX Text

CONSTRUCTION ENTRANCE GATE

AutoCAD SHX Text

CO

AutoCAD SHX Text

LIGHT POLE

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text

STORM DRAIN PIPE WITH INLET

AutoCAD SHX Text

WATER LINE

AutoCAD SHX Text

SANITARY SEWER LINE WITH MANHOLE

AutoCAD SHX Text

RIGHT-OF-WAY LINE

AutoCAD SHX Text

EDGE OF ASPHALT

AutoCAD SHX Text

PROPERTY LINE

AutoCAD SHX Text

OVERHEAD UTILITY

AutoCAD SHX Text S

AutoCAD SHX Text

EM

AutoCAD SHX Text

GM

AutoCAD SHX Text

WM

AutoCAD SHX Text

FH

AutoCAD SHX Text

EXISTING LEGEND

AutoCAD SHX Text

GAS LINE

AutoCAD SHX Text

CONTOUR

AutoCAD SHX Text

SOILS LINE AND SOIL TYPE

AutoCAD SHX Text

WETLANDS

AutoCAD SHX Text

EXISTING MULCH SURFACE

AutoCAD SHX Text

EXISTING TREES

AutoCAD SHX Text

100 YEAR FLOOD

AutoCAD SHX Text W

AutoCAD SHX Text N

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text

PAUL J. NAVARRO

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text V

AutoCAD SHX Text L

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text No.043808-E

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text M

394 396

FOREST STREET

S 1

9th

ST

RE

ET

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

29'

60'

33' 36'

2,800 SF

PROPOSED PLAY

SURFACE

R10'

R9'

R7

R5'

R10'

R26'

OH OH OH OH OH

W W W W W

S S S S S

G G G G G

LaC

PROPOSED LEGEND

PROPOSED CONCRETE CURB

PIP SURFACE

ABUTTING PAVEMENT (OPTIONAL)

PROPOSED CONCRETE CURB

ABUTTING TURF

PROPOSED LAYOUT PLAN

1 INCH = 10 FEET

GRAPHIC SCALE

5010 10 20

RE

V

IS

IO

N S

D A

TE

DRAWING NUMBER:

BY

JOB NUMBER:

DRAWN BY:

CHECKED BY:

DRAWING DESCRIPTION:

DATE:

SCALE:

2503SC046_004

JJG

ASL

JUNE 18, 2025

N:\_2025\2503SC046_004_Reading Playgrounds_Pendora\_SC\_CADD\SHEETS\2503SC046_004-C400-PROPOSED.dwg

W ed ne sd ay , J un e

, 2

3:

:3

PM

D

ES

IG

N

E N

G

IN

EE

RI

N G

F O

R

IN

ST

A

LL

A

TI

O

N O

F

PL

YG

RO

U N

D S

A

FE

TY

SU

RF

A

C

ES

FO

R

PE

N

D O

RA

P

A

RK

P

LA

YG

RO

U N

D

PR

O

PE

RT

Y

ID

: 1

F

O

RR

ES

T

ST

RE

ET

C

IT

Y

O F

RE

A

D

S

C O

U

N

SY

LV

A

N

IA

C O

RP

O

RA

TE

O

FF

IC

E

RE

N

O A

V

EN

U E

N

EW

C U

M

BE

RL

A

N D

, P A

PH

O N

E:

(7

) 4

-2

FA

X:

(7

) 4

-2 w w w .n av ar ro w ri gh t.c om

C O

N S

U L

T

IN

G E

N G

IN

E

E R

S , I

N C

1" = 10'

PROPOSED

LAYOUT

PLAN

C400

AutoCAD SHX Text

CO

AutoCAD SHX Text

LIGHT POLE

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text

STORM DRAIN PIPE WITH INLET

AutoCAD SHX Text

WATER LINE

AutoCAD SHX Text

SANITARY SEWER LINE WITH MANHOLE

AutoCAD SHX Text

RIGHT-OF-WAY LINE

AutoCAD SHX Text

EDGE OF ASPHALT

AutoCAD SHX Text

PROPERTY LINE

AutoCAD SHX Text

OVERHEAD UTILITY

AutoCAD SHX Text S

AutoCAD SHX Text

EM

AutoCAD SHX Text

GM

AutoCAD SHX Text

WM

AutoCAD SHX Text

FH

AutoCAD SHX Text

EXISTING LEGEND

AutoCAD SHX Text

GAS LINE

AutoCAD SHX Text

CONTOUR

AutoCAD SHX Text

SOILS LINE AND SOIL TYPE

AutoCAD SHX Text

WETLANDS

AutoCAD SHX Text

EXISTING MULCH SURFACE

AutoCAD SHX Text

EXISTING TREES

AutoCAD SHX Text

100 YEAR FLOOD

AutoCAD SHX Text W

AutoCAD SHX Text N

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text

PAUL J. NAVARRO

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text V

AutoCAD SHX Text L

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text No.043808-E

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text M

394 396

FOREST STREET

S 1

9th

ST

RE

ET

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

MAX GRADE=5%MAX GRADE=5%

CURBING AND PLAY SURFACE

TRANSITION TO BE LEVEL AND

MATCH EXISTING ASPHALT

SURFACE GRADE AND TOP OF

SOIL GRADE WHERE THE CURB

ABUTS THE TURF

396.9

BW- 398.49

BW- 398.18397.04

401.18

401.28

OH OH OH OH OH

W W W W W

S S S S S

G G G G G

LaC

PROPOSED LEGEND

PROPOSED CONCRETE CURB

PIP SURFACE

ABUTTING PAVEMENT (OPTIONAL)

PROPOSED CONCRETE CURB

ABUTTING TURF

GRADING PLAN

1 INCH = 10 FEET

GRAPHIC SCALE

5010 10 20

RE

V

IS

IO

N S

D A

TE

DRAWING NUMBER:

BY

JOB NUMBER:

DRAWN BY:

CHECKED BY:

DRAWING DESCRIPTION:

DATE:

SCALE:

2503SC046_004

JJG

ASL

JUNE 18, 2025

N:\_2025\2503SC046_004_Reading Playgrounds_Pendora\_SC\_CADD\SHEETS\2503SC046_004-C500-GRADING.dwg

W ed ne sd ay , J un e

, 2

3:

:4

PM

D

ES

IG

N

E N

G

IN

EE

RI

N G

F O

R

IN

ST

A

LL

A

TI

O

N O

F

PL

YG

RO

U N

D S

A

FE

TY

SU

RF

A

C

ES

FO

R

PE

N

D O

RA

P

A

RK

P

LA

YG

RO

U N

D

PR

O

PE

RT

Y

ID

: 1

F

O

RR

ES

T

ST

RE

ET

C

IT

Y

O F

RE

A

D

S

C O

U

N

SY

LV

A

N

IA

C O

RP

O

RA

TE

O

FF

IC

E

RE

N

O A

V

EN

U E

N

EW

C U

M

BE

RL

A

N D

, P A

PH

O N

E:

(7

) 4

-2

FA

X:

(7

) 4

-2 w w w .n av ar ro w ri gh t.c om

C O

N S

U L

T

IN

G E

N G

IN

E

E R

S , I

N C

1" = 10'

GRADING

PLAN

C500

GRADING NOTES:

1. THE PROJECT DRAWINGS ARE GENERALLY DIAGRAMMATIC INDICATING THE

PRESENCE OF EXISTING UNDERGROUND UTILITIES. HOWEVER IT IS NOT INTENDED

THAT THE DRAWINGS SHOW EVERY PIPE FITTING OR APPURTENANCE THAT MAY

EXIST AT THE PROJECT SITE. THE ILLUSTRATIONS OF EXISTING UTILITY LINES ON THE

PROJECT DRAWINGS ARE NOT INTENDED TO INDICATE THE EXACT-IN-PLACE

LOCATION OF THE LINES.

2. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ANY

AND ALL EXISTING UNDERGROUND UTILITIES IN THE VICINITY OF THE CONTRACTOR'S

WORK. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF SUPPORT AND

PROTECTION DURING EXCAVATION OPERATIONS WHEN IT IS INDICATED THAT THESE

UTILITIES ARE TO REMAIN IN PLACE.

3. CONSULT THE PROFESSIONAL IMMEDIATELY FOR DIRECTIONS BEFORE PROCEEDING

FURTHER WITH WORK IN AN AREA SHOULD UNCHARTED OR INCORRECTLY CHARTED

EXISTING PIPE OR OTHER UTILITIES BE UNCOVERED. COOPERATE WITH THE

DEPARTMENT OF GENERAL SERVICES AND THE UTILITY COMPANIES IN KEEPING

RESPECTIVE SERVICES AND FACILITIES IN OPERATION. REPAIR DAMAGED UTILITIES

TO THE SATISFACTION OF THE UTILITY OWNER.

4. DO NOT INTERRUPT EXISTING UTILITIES SERVICING FACILITIES OCCUPIED AND USED

BY THE DEPARTMENT OF GENERAL SERVICES OR OTHERS DURING OCCUPIED HOURS

EXCEPT WHEN SUCH INTERRUPTIONS HAVE BEEN AUTHORIZED IN WRITING BY THE

DEPARTMENT OF GENERAL SERVICES OR PROFESSIONAL. INTERRUPTIONS SHALL

OCCUR ONLY AFTER ACCEPTABLE TEMPORARY UTILITY SERVICE HAS BEEN

PROVIDED.

5. ALL GRADES ARE TO BE TAKEN AS CONSTANT BETWEEN ANY TWO ELEVATIONS

SHOWN. CONTOURS ARE CONTROLS ONLY. ALL GRADES SHALL BE SMOOTH AND

CONTINUOUS.

6. THE CONTRACTOR SHALL REFER TO THE SEQUENCE OF CONSTRUCTION AS

DESCRIBED ON THE EROSION AND SEDIMENTATION CONTROL PLAN AND MAINTAIN

ALL EROSION AND SEDIMENTATION CONTROL MEASURES, TEMPORARY AS WELL AS

PERMANENT, THROUGHOUT THE DURATION OF THE PROJECT CONSTRUCTION.

7. ALL PROPOSED SURFACE GRADE TO MATCH EXISTING ASPHALT SURFACE GRADES

AND NOT EXCEED 5% SLOPE IN THE PIP SURFACE AREA..

8. ALL PROPOSED SURFACE GRADE TO HAVE A POSITIVE DRAINAGE TO EXISTING INLET.

AutoCAD SHX Text

CO

AutoCAD SHX Text

LIGHT POLE

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text

STORM DRAIN PIPE WITH INLET

AutoCAD SHX Text

WATER LINE

AutoCAD SHX Text

SANITARY SEWER LINE WITH MANHOLE

AutoCAD SHX Text

RIGHT-OF-WAY LINE

AutoCAD SHX Text

EDGE OF ASPHALT

AutoCAD SHX Text

PROPERTY LINE

AutoCAD SHX Text

OVERHEAD UTILITY

AutoCAD SHX Text S

AutoCAD SHX Text

EM

AutoCAD SHX Text

GM

AutoCAD SHX Text

WM

AutoCAD SHX Text

FH

AutoCAD SHX Text

EXISTING LEGEND

AutoCAD SHX Text

GAS LINE

AutoCAD SHX Text

CONTOUR

AutoCAD SHX Text

SOILS LINE AND SOIL TYPE

AutoCAD SHX Text

WETLANDS

AutoCAD SHX Text

EXISTING MULCH SURFACE

AutoCAD SHX Text

EXISTING TREES

AutoCAD SHX Text

100 YEAR FLOOD

AutoCAD SHX Text W

AutoCAD SHX Text N

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text

PAUL J. NAVARRO

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text V

AutoCAD SHX Text L

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text No.043808-E

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text M

RE

V

IS

IO

N S

D A

TE

DRAWING NUMBER:

BY

JOB NUMBER:

DRAWN BY:

CHECKED BY:

DRAWING DESCRIPTION:

DATE:

SCALE:

2503SC046_004

JJG

ASL

JUNE 18, 2025

N:\_2025\2503SC046_004_Reading Playgrounds_Pendora\_SC\_CADD\SHEETS\2503SC046_004-C600-DETAILS.dwg

W ed ne sd ay , J un e

, 2

3:

:0

PM

D

ES

IG

N

E N

G

IN

EE

RI

N G

F O

R

IN

ST

A

LL

A

TI

O

N O

F

PL

YG

RO

U N

D S

A

FE

TY

SU

RF

A

C

ES

FO

R

PE

N

D O

RA

P

A

RK

P

LA

YG

RO

U N

D

PR

O

PE

RT

Y

ID

: 1

F

O

RR

ES

T

ST

RE

ET

C

IT

Y

O F

RE

A

D

S

C O

U

N

SY

LV

A

N

IA

C O

RP

O

RA

TE

O

FF

IC

E

RE

N

O A

V

EN

U E

N

EW

C U

M

BE

RL

A

N D

, P A

PH

O N

E:

(7

) 4

-2

FA

X:

(7

) 4

-2 w w w .n av ar ro w ri gh t.c om

C O

N S

U L

T

IN

G E

N G

IN

E

E R

S , I

N C

N.T.S.

DETAILS

C600

POURED-IN-PLACE SAFETY SURFACE

WHERE IT ABUTS TURF

NOT TO SCALE

POURED-IN-PLACE SAFETY SURFACE WITH NO CURBING

WHERE IT ABUTS A RETAINING WALL

NOT TO SCALE

POURED-IN-PLACE SAFETY SURFACE WITH PERIMETER CURB SHELF

WHERE IT ABUTS ASPHALT PAVEMENT (OPTIONAL)

NOT TO SCALE

POURED-IN-PLACE SAFETY SURFACE WITH NO CURBING

WHERE IT ABUTS ASPHALT PAVEMENT

NOT TO SCALE

AutoCAD SHX Text W

AutoCAD SHX Text N

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text

PAUL J. NAVARRO

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text V

AutoCAD SHX Text L

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text No.043808-E

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text

AGGREGATE SUBBASE

AutoCAD SHX Text

6" PEN

AutoCAD SHX Text

AMENDED TOPSOIL

AutoCAD SHX Text

6 INCHES (MINIMUM)

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text

1. POURED-IN-PLACE RUBBER SURFACING SHALL MEET THE REQUIREMENTS OF ASTM

AutoCAD SHX Text

F-1292 AND THE REQUIREMENTS OF THE AMERICANS WITH DISABILITIES ACT

AutoCAD SHX Text

PROVISIONS FOR ACCESSIBLE PLAYGROUNDS AND RECREATION AREAS

AutoCAD SHX Text

NEW LAWN

AutoCAD SHX Text

CUSHION COURSE, 3 ½" THICKNESS

AutoCAD SHX Text

WEAR COURSE, ½" THICKNESS COLOR: OWNERS CHOICE

AutoCAD SHX Text

NEW SAFETY SURFACE TO BE FLUSH W/ NEW CURB AND LAWN

AutoCAD SHX Text

COMPACTED SUBSOIL TO 95%

AutoCAD SHX Text 8" WIDE x 12" DEEP CONCRETE CURB

AutoCAD SHX Text

2. POURED-IN-PLACE RUBBER SURFACING SHALL BE INSTALLED AROUND PLAY EQUIPMENT

AutoCAD SHX Text

POSTS ACCORDING TO THE MANUFACTURERS DETAILS.

AutoCAD SHX Text

AGGREGATE SUBBASE

AutoCAD SHX Text

6" PEN

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text

1. POURED-IN-PLACE RUBBER SURFACING SHALL MEET THE REQUIREMENTS OF ASTM

AutoCAD SHX Text

F-1292 AND THE REQUIREMENTS OF THE AMERICANS WITH DISABILITIES ACT

AutoCAD SHX Text

PROVISIONS FOR ACCESSIBLE PLAYGROUNDS AND RECREATION AREAS

AutoCAD SHX Text

SEE NOTE 2

AutoCAD SHX Text

COMPACTED SUBSOIL TO 95%

AutoCAD SHX Text

CUSHION COURSE, 3 ½" THICKNESS

AutoCAD SHX Text

WEAR COURSE, ½" THICKNESS COLOR: OWNERS CHOICE

AutoCAD SHX Text 8" WIDE x 12" DEEP CONCRETE CURB

AutoCAD SHX Text

RETAINING WALL

AutoCAD SHX Text

2. POURED-IN-PLACE SURFACING NEXT TO THE RETAINING WALL SHALL BE INSTALLED

AutoCAD SHX Text

ACCORDING TO THE MANUFACTURERS DETAILS.

AutoCAD SHX Text

AGGREGATE SUBBASE

AutoCAD SHX Text

6" PEN

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text

1. POURED-IN-PLACE RUBBER SURFACING SHALL MEET THE REQUIREMENTS OF ASTM

AutoCAD SHX Text

F-1292 AND THE REQUIREMENTS OF THE AMERICANS WITH DISABILITIES ACT

AutoCAD SHX Text

PROVISIONS FOR ACCESSIBLE PLAYGROUNDS AND RECREATION AREAS

AutoCAD SHX Text

CUSHION COURSE, 3 ½" THICKNESS

AutoCAD SHX Text

WEAR COURSE, ½" THICKNESS COLOR: OWNERS CHOICE

AutoCAD SHX Text

NEW SAFETY SURFACE TO BE FLUSH W/ EXISTING ASPHALT

AutoCAD SHX Text

MEET AND MATCH EXISTING ASPHALT PAVING

AutoCAD SHX Text

COMPACTED SUBSOIL TO 95%

AutoCAD SHX Text

POURED POLYURETHANE BINDER

AutoCAD SHX Text 12" WIDE x 6" DEEP CONCRETE CURB

AutoCAD SHX Text

2. POURED-IN-PLACE RUBBER SURFACING SHALL BE INSTALLED AROUND PLAY EQUIPMENT

AutoCAD SHX Text

POSTS ACCORDING TO THE MANUFACTURERS DETAILS.

AutoCAD SHX Text

AGGREGATE SUBBASE

AutoCAD SHX Text

6" PEN

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text

1. POURED-IN-PLACE RUBBER SURFACING SHALL MEET THE REQUIREMENTS OF ASTM

AutoCAD SHX Text

F-1292 AND THE REQUIREMENTS OF THE AMERICANS WITH DISABILITIES ACT

AutoCAD SHX Text

PROVISIONS FOR ACCESSIBLE PLAYGROUNDS AND RECREATION AREAS

AutoCAD SHX Text

MEET AND MATCH EXISTING ASPHALT PAVING

AutoCAD SHX Text

COMPACTED SUBSOIL TO 95%

AutoCAD SHX Text

2. POURED-IN-PLACE RUBBER SURFACING SHALL BE INSTALLED AROUND PLAY EQUIPMENT

AutoCAD SHX Text

POSTS ACCORDING TO THE MANUFACTURERS DETAILS.

AutoCAD SHX Text

CUSHION COURSE, 3 ½" THICKNESS

AutoCAD SHX Text

WEAR COURSE, ½" THICKNESS COLOR: OWNERS CHOICE

NEW SAFETY SURFACE TO BE FLUSH W/ EXISTING ASPHALT

VICINITY MAP

SCALE: 1" = 500'

0 500' 1000'

LOCATION MAP

SCALE: 1" = 2000'

0 2000' 4000'

READING

EROSION & SEDIMENTATION POLLUTION CONTROL PLAN

FOR

PENDORA PARK PLAYGROUND

PROPERTY ID: 16531633583523

1801 FOREST STREET, CITY OF READING, BERKS COUNTY, PA. 19601

JUNE 18, 2025

N:\_2025\2503SC046_004_Reading Playgrounds_Pendora\_SC\_CADD\SHEETS\2503SC046_004-ESPC- 1 - ESPC COVER.dwg

W ed ne sd ay , J un e

, 2

2:

:1

PM

ESPC- 1

WN CONSULTING ENGINEERS, INC.

OWNER / APPLICANT

CITY OF READING

8TH & WASHINGTON STREET

OFFICE 3-12

READING, PA, 19601-3690

TELEPHONE: 610-655-6423

NEIL NEMETH

NEIL. NEMETH@READINGPA.GOV

TAX PARCEL REFERENCE

SOURCES OF TITLE

INSTRUMENT NUMBER: 07070369

DEED DATE: 19300106

PROPERTY ID: 1653163358523

S th S

TR

EE

T

FOREST STREET

S.

9T H

S

TR

EE

T

MINERAL SPRING ROAD

SITE

SITE

SYSTEM, INC.

1-800-242-1776

PA 1

PENNSYLVANIA LAW REQUIRES

3 WORKING DAYS NOTICE FOR

DAYS IN DESIGN STAGE - STOP CALL

CONSTRUCTION PHASE AND 10 WORKING

CALL BEFORE YOU DIG!

POCS SERIAL NUMBER

20251543749

PROJECT CONSULTANT

NAVARRO & WRIGHT

CONSULTING ENGINEERS, INC.

151 RENO AVENUE

NEW CUMBERLAND, PA 17070

TELEPHONE: 717-441-2216 EXT. 1108

JENNIFER FULLENKAMP

JFULLENKAMP@NAVARROWRIGHT.COM

ESPC COVER

ESPC DETAILS

DRAWING INDEX

ESPC PLAN

ESPC-1

ESPC-2

ESPC-3

FAILURE TO CORRECTLY INSTALL E&S BMPs, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPs MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE DEPARTMENT AS DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION.

PENALTIES

THERMAL IMPACTS ANALYSIS

THE SITE'S THERMAL IMPACT WILL BE THE SAME WITH THE EXISTING AS THE SURFACE IS REMAINING PERVIOUS AND UNDER THE TREE CANOPY. NO ADDITIONAL IMPACTS ARE ANTICIPATED WITH THIS IMPROVEMENT PROJECT FOR THE REMOVAL OF MULCH

AND INSTALL OF NEW RUBBER PLAY SURFACE FOR THE PARK.

RECYCLING OR DISPOSAL OF MATERIALS

MAINTENANCE PROGRAM

1. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENTATION CONTROLS MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST

INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENTATION CONTROL DEVICES AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, RE-GRADING AND

RENETTING, MUST BE PERFORMED IMMEDIATELY.

2. A RUMBLE PAD CONSTRUCTION ENTRANCE SHALL BE PLACED AT THE POINT OF CONSTRUCTION INGRESS AND EGRESS AS NOTED ON THE PLAN. THE STRUCTURE WILL PREVENT TRACKING AND FLOWING OF SEDIMENT ONTO EXISTING STABILIZED AREAS. CLEAN AND RUMBLE PAD CONSTRUCTION ENTRANCE AT THE END OF EVERY DAY AND WHEN IT IS FULL OF SEDIMENT. THE ENTRANCE SHALL

REMAIN FUNCTIONAL FOR THE DURATION OF THE PROJECT.

3. WHERE DUST OR WIND EROSION IS A PROBLEM, THE UNSTABLE SURFACE(S) SHALL BE SPRINKLED WITH WATER OR OTHER SUITABLE

DUST SUPPRESSER.

4. ANY TEMPORARY EROSION CONTROL MEASURE APPLIED TO EXPOSED SOIL SURFACES SHALL REMAIN FUNCTIONAL UNTIL VEGETATIVE

COVER IS SUFFICIENTLY ESTABLISHED.

5. PERMANENT SOIL PROTECTION WILL BE COMPLETED AS EARLY AS PRACTICAL.

6. ANY DEBRIS ACCUMULATED AT FILTER SOCKS AND INLETS SHALL BE REMOVED AND PROPERLY DISPOSED. BARRIERS SHALL BE CHECKED DAILY AND REALIGNED OR RESET AS REQUIRED. REMOVE SEDIMENT WHEN IT REACHES ONE HALF OF SOCK HEIGHT.

7. VEGETATIVE STABILIZATION SHALL BE PERIODICALLY INSPECTED FOR PROPER GROWTH. ANY AREAS NOT RESPONDING SHALL BE PROMPTLY RE-SEEDED. AREAS WHICH SHOW SIGNS OF EROSION PRIOR TO STABILIZATION SHALL BE GRADED, RE-SEEDED AND RE-MULCHED AS SOON AS POSSIBLE. SOD SHALL BE UTILIZED AT AREAS WHERE SEEDING DOES NOT APPEAR TO BE PROPERLY

STABILIZING AN AREA.

SOIL LIMITATIONS & RESOLUTIONS

SEEDING AND MULCH SPECIFICATIONS

EARTHWORK DUE DILIGENCE

SEQUENCE OF CONSTRUCTION

ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE FOLLOWING SEQUENCE. EACH STAGE SHALL BE COMPLETED AND IMMEDIATELY STABILIZED BEFORE ANY FOLLOWING STAGE IS INITIATED. THE ANTICIPATED EARTH

DISTURBANCE DURATION IS FROM SUMMER 2025 TO FALL 2025.

ALL PUMPING OF SEDIMENT LADEN WATER SHALL BE THROUGH A SEDIMENT CONTROL BMP, SUCH AS A PUMPED WATER FILTER

BAG OR EQUIVALENT SEDIMENT REMOVAL FACILITY, OVER UNDISTURBED VEGETATED AREAS.

ALL BEST MANAGEMENT PRACTICES SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS AND LOCATIONS SHOWN ON THE

PLANS.

THE ORDER OF THE FOLLOWING SEQUENCE IS SUBJECT TO CHANGE DUE TO SITE SPECIFIC CONDITIONS AND CONSTRUCTION

METHODS.

1. FIELD MARK THE LIMITS OF DISTURBANCE AS DEPICTED ON THE PLAN. INSTALL CHAINLINK CONSTRUCTION FENCING AROUND AREAS TO BE PROTECTED DURING CONSTRUCTION ACTIVITIES AND A CONSTRUCTION GATE AT THE RUMBLE PAD CONSTRUCTION

ENTRANCE.

2. CONSTRUCTION AREA INGRESS/EGRESS SHALL BE VIA THE TEMPORARY STABILIZED CONSTRUCTION ENTRANCE LOCATED WHERE SHOWN ON THE PLAN. ALL PAVEMENT AREAS SHALL BE KEPT FREE OF SEDIMENT AND DEBRIS DURING ALL CONSTRUCTION

ACTIVITIES.

3. INSTALL AND MAINTAIN TEMPORARY COMPOST FILTER SOCKS WHERE INDICATED ON THE PLAN. INSTALL AND MAINTAIN

TEMPORARY INLET PROTECTION WITHIN ALL EXISTING INLETS AS DEPICTED ON THE PLAN.

4. REMOVE ALL RAILROAD TIES AND GRUB/CLEAR THE MULCH AND TURF AREAS DEPICTED ON THE PLAN. ALL RAILROAD TIES AND SOIL MATERIAL THAT IS BEING EXCAVATED AND REMOVED SHALL BE TAKEN OFF SITE RIGHT AWAY AND DISPOSED OF PROPERLY AS DEPICTED ON THIS ESPC COVER SHEET UNDER DISPOSAL OF MATERIALS SECTION. SOIL SHALL NOT BE STOCKPILED ON SITE.

5. ROUGH GRADE TO THE DESIRED DEPTH OF 10".

6. FINE GRADE THE AREA.

7. PLACE AGGREGATE UP TO A MINIMUM OF 6".

8. INSTALL ALL CURBING.

9. POUR PIP SURFACES WHERE SHOWN, FOLLOWING MANUFACTURERS DETAILS AND REQUIREMENTS FOR AROUND POSTS AND THE

RETAINING WALL. ENSURE THAT ALL PIP SURFACING AND CURBS ARE LEVEL WITH ALL OTHER SURROUNDING SURFACE GRADES.

10. TOPDRESS AND SEED ANY DISTURBED TURF AREAS.

11. ONCE ALL DISTURBED AREAS HAVE BEEN STABILIZED WITH A 70% UNIFORM VEGETATIVE COVER AND/OR PAVEMENT, THE

CONTRACTOR SHALL CONTACT NAVARRO & WRIGHT CONSULTING ENGINEERS, INC. TO COORDINATE FINAL INSPECTION AND REMOVAL OF THE FACILITIES. ALL DISTURBED SOILS RESULTING FROM BMP REMOVAL SHALL BE STABILIZED WITH SEED AND MULCH

IMMEDIATELY.

STABILIZATION SPECIFICATIONS

1. ALL DISTURBED AREAS TO INCLUDE PAVEMENT REPLACEMENT.

2. CONTRACTOR IS TO PRESERVE ALL OPEN LAWN AREA IN THE EXISTING CONDITION. IF CONTRACTOR DISTURBS EXISTING OPEN LAWN AREA, THEN THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING SEEDING

AND MULCHING. SEE SEEDING AND MULCHING NOTES.

SOIL TYPES

STREAM CLASSIFICATION

THE RECEIVING WATER IS SCHUYLKILL RIVER IN READING, PA WAS CLASSIFIED AS A HIGH QUALITY AND

EXCEPTIONAL WATERS.

TOPSOIL SPECIFICATIONS

1. CLEAN FILL AND ENVIRONMENTAL DUE DILIGENCE:

a. IF THE SITE WILL HAVE EXCESS FILL THAT WILL NEED TO BE EXPORTED TO AN OFF-SITE LOCATION, THE RESPONSIBILITY OF CLEAN FILL DETERMINATION AND ENVIRONMENTAL DUE DILIGENCE RESTS WITH THE OWNER.

b. IF ALL CUT AND FILL MATERIALS WILL BE USED ON THE SITE, A CLEAN FILL DETERMINATION IS NOT REQUIRED BY THE OPERATOR UNLESS THERE IS A BELIEF THAT A SPILL OR RELEASE OF A REGULATED SUBSTANCE OCCURRED ON THE

SITE.

2. CLEAN FILL IS DEFINED AS: UNCONTAMINATED, NON-WATER SOLUBLE, NON-DECOMPOSABLE, INERT, SOLID MATERIAL. THE TERM INCLUDES SOIL, ROCK, STONE, DREDGED MATERIAL, USED ASPHALT, AND BRICK, BLOCK OR CONCRETE FROM CONSTRUCTION AND DEMOLITION ACTIVITIES THAT IS SEPARATE FROM OTHER WASTE AND IS RECOGNIZABLE AS SUCH. THE TERM DOES NOT INCLUDE MATERIALS PLACED IN OR ON THE WATERS OF THE COMMONWEALTH UNLESS OTHERWISE AUTHORIZED. (THE TERM "USED ASPHALT" DOES NOT INCLUDE MILLED ASPHALT OR ASPHALT THAT HAS BEEN PROCESSED

FOR RE-USE.)

3. ANY PLACEMENT OF CLEAN FILL THAT HAS BEEN AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE MUST USE FORM FP-001 TO CERTIFY THE ORIGIN OF THE FILL MATERIAL AND THE RESULTS OF THE ANALYTICAL TESTING TO QUALIFY THE MATERIAL AS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE OWNER OF THE PROPERTY RECEIVING THE FILL.

4. ENVIRONMENTAL DUE DILIGENCE:

INVESTIGATIVE TECHNIQUES, INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS, ELECTRONIC DATA BASE SEARCHES, REVIEW OF PROPERTY OWNERSHIP, REVIEW OF PROPERTY USE HISTORY, SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION SCREENS, ANALYTICAL TESTING, ENVIRONMENTAL ASSESSMENTS OR AUDITS. ANALYTICAL TESTING IS NOT A REQUIRED PART OF DUE DILIGENCE UNLESS VISUAL INSPECTION AND/OR REVIEW OF THE PAST LAND USE OF THE PROPERTY INDICATES THAT THE FILL MAY HAVE BEEN SUBJECTED TO A SPILL OR RELEASE OF A REGULATED SUBSTANCE. IF THE FILL MAY HAVE BEEN AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE, IT MUST BE TESTED TO DETERMINE IF IT QUALIFIES AS CLEAN FILL. TESTING SHOULD BE PERFORMED IN ACCORDANCE WITH APPENDIX A

OF THE DEPARTMENT'S POLICY “MANAGEMENT OF CLEAN FILL.”

(1) Erodible Soils - E&S BMPs will be in place and functional prior to earth disturbance. Prompt stabilization practices will be implemented.

(2) Cut Banks Caves -Almost all Pennsylvania soils are susceptible to caving of cut banks. Cut slopes will be stabilized as soon as possible with seed and mulch or erosion control blankets to prevent sliding. Slopes are designed to not exceed 2H:1V.

(3) Corrosive to concrete or steel pipe - Pipes to be used on site shall be either HDPE or coated steel.

(4) High Water Table -Should a high ground water table be encountered during construction, water will be drained away from disturbed areas to a well vegetated area or a placed compost filter sock prior to being discharged off site. Saturated soils the require compaction will be dried prior to being used on site.

(5) Low Strength - Most of Pennsylvania soils (73%) have relatively low strength. Precautions will be taken to prevent slope failures due to improper construction practices. Soils will be evaluated during construction to determine whether additional measures will need to be taken

(6) Piping Tendencies -Piping is the erosion by percolating waters or seepage in layer of subsoil resulting in caving and the formation of tunnels or pipes thorough which the soluble or granular material is removed. Where necessary, anti-seep collars will be used to prevent piping

(7) Poor Topsoil -Soil amendments will be added to site soils to promote vegetative growth.

(8) Potentially Hydric -A wetland delineation has been performed to determine the presence of wetlands

SOILS LIMITATIONS PERTAINING TO EARTHMOVING ACTIVITIES

SOIL NAME

C U

TB

AN

KS

C

AV

E

C O

R R

O

SI

VE

T

O C

O N

C R

ET

E/

ST

EE

L

D R

O U

G H

TY

EA

SI

LY

E

R O

D

IB

LE

FL

O

O D

IN

G

D

EP

TH

T

O S

AT

U

R

AT

ED

Z

O N

E O

R

SE

AS

O

N

AL

H

IG

H W

AT

ER

T

AB

LE

H

YD

R

IC

H

YD

R

IC

IN

C

LU

SI

O

N S

LO

W

S

TR

EN

G

TH

LA

N

D

SL

ID

E

PR

O

N E

SL

O

W P

ER

C

O

LA

TI

O

N

PI

PI

N G

PO

O

R S

O U

R C

E O

F

TO

PS

O

IL

FR

O

ST

A

C

TI

O N

SH

R

IN

K

/ S W

EL

L

PO

TE

N

TI

AL

S

IN

KH

O

LE

S

PO

N

D

IN

G

W

ET

N

ES

S

UmD X

LaC X X X X X X X X

IN ACCORDANCE WITH 25 PA CODE 102.4(b)(5)(x) AND 25 PA CODE 102.8(f)(11), THE FOLLOWING CONSTRUCTION

WASTE MATERIALS MAY BE PRESENT ON THE SITE:

· PAVEMENT MATERIALS

· EXCESS SOIL MATERIAL

ALL BUILDING MATERIALS AND CONSTRUCTION WASTE, INCLUDING MATERIALS WITH AND FROM THE BMPS SHALL BE REMOVED FROM THE SITE AND RECYCLED AND/OR PROPERLY DISPOSED IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS, 25 PA. CODE §260.1 ET SEQ., §271.1 ET SEQ., AND §287.1 ET SEQ. NO BUILDING MATERIAL OR CONSTRUCTION WASTE OR OTHER UNUSED BUILDING MATERIALS, INCLUDING MATERIALS WITH AND FROM THE BMPS SHALL BE BURNED, BURIED, DUMPED OR DISCHARGED AT

THE PROJECT SITE.

ALL RECYCLING AND DISPOSAL OF CONSTRUCTION WASTE, INCLUDING MATERIALS WITH AND FROM THE BMPS SHALL BE IN ACCORDANCE WITH LOCAL AND STATE RULES AND REGULATIONS FOR WASTE MANAGEMENT.

MATERIALS WITH AND FROM THE BMPS, EXCESS SOIL AND ROCK, BUILDING MATERIALS, CONCRETE AND CONCRETE WASH WATER, SANITARY WASTE AND ANY OTHER MATERIALS THAT COULD ADVERSELY IMPACT

SURFACE OR GROUND WATER QUALITY.

PERMANENT GRASS COVER

A. ALL DISTURBED AREAS THAT ARE NOT TO BE PAVED SHALL BE COVERED WITH GRASS IN ORDER TO MINIMIZE EROSION, UNLESS OTHERWISE DIRECTED BY THE OWNER.

B. MULCHING SHALL BE USED TO PROTECT SEEDING AND HELP IN PREVENTING RUNOFF. CLEAN STRAW MULCH SHALL BE REQUIRED IN ALL DISTURBED AREAS AND APPLIED AT A RATE OF 3 TONS/ACRE (EQUIVALENT TO 0.75" TO 1" DEEP). CLEAN

STRAW MULCH SHOULD NOT BE FINELY CHOPPED OR BROKEN DURING APPLICATION.

C. MIXTURES ARE PER THE PENN STATE AGRONOMY GUIDE. THE SEED MIXTURES SHALL CONSIST OF:

SEED TYPE % BY WT. SEEDING RATE SEEDING DATES

1. LAWN MIX (GENERAL LAWNS AND OPEN SPACE AREAS)

KY. BLUEGRASS 30% 8 IBS./1000 SF AUG. 15 TO OCT. 15

CREEP RED FESCUE 55%

PERENNIAL RYEGRASS 15%

D. IN THE ABSENCE OF SOIL TEST RESULTS, FERTILIZER OF 10-20-20, AT AN APPLICATION RATE OF 1000 LB./ACRE SHALL BE USED

WITH PERMANENT SEEDING.

E. IN THE ABSENCE OF SOIL TESTING, LIME RATES OF 4 TONS/ACRE OF AGRICULTURAL GRADE LIME SHALL BE USED WITH

PERMANENT SEEDING

TEMPORARY GRASS COVER

A. IN ORDER TO ESTABLISH A QUICK GRASS COVER OVER DISTURBED AREAS, A TEMPORARY SEED MIXTURE SHALL BE USED.

B. STABILIZATION EFFORTS DURING THE NON-GERMINATING PERIOD, OCT. 15 TO MARCH 15 SHOULD BE MULCHED WITH CLEAN STRAW AT A RATE OF 3 TONS/AC. (EQUIVALENT TO 0.75" TO 1" DEEP). CLEAN STRAW MULCH SHOULD NOT BE FINELY CHOPPED

OR BROKEN DURING APPLICATION.

C. THE MIXES ARE FROM THE PENN STATE AGRONOMY GUIDE AND THE MIX TO BE USED DEPENDS ON THE DATE UTILIZED. THEY

ARE:

SEED TYPE % BY WT. SEEDING RATE SEEDING DATES

ANNUAL RYEGRASS 100% 1 LB./1000 SF MAR 1 TO JUNE 15

40 LB/ACRE AUG 15 TO SEPT 15

WINTER RYE 15% 3.5 LBS/1000 SF AUG 15 TO OCT 15

D. STRAW MULCH SHALL BE REQUIRED IN ALL DISTURBED AREAS AND APPLIED AT 3 TONS/ACRE. FERTILIZER MIX OF 5-5-5 AT AN

APPLICATION RATE OF 1000 LB/ACRE SHALL BE USED WITH TEMPORARY SEEDING.

E. LIME RATES OF 2000 LB/ACRE OF AGRICULTURAL GRADE LIME SHALL BE USED WITH TEMPORARY SEEDING.

1. GRADED AREAS SHOULD BE SCARIFIED OR OTHERWISE LOOSENED TO A DEPTH OF 3 TO 5 INCHES TO PERMIT BONDING OF THE TOPSOIL TO THE SURFACE AREAS AND TO PROVIDE A ROUGHENED SURFACE TO

PREVENT TOPSOIL FROM SLIDING DOWN SLOPE.

2. TOPSOIL SHOULD BE UNIFORMLY DISTRIBUTED ACROSS THE DISTURBED AREA TO A DEPTH OF 4 TO 8 INCHES MINIMUM -2 INCHES ON FILL OUTSLOPES. SPREADING SHOULD BE DONE IN SUCH A MANNER THAT SODDING OR SEEDING CAN PROCEED WITH A MINIMUM OF ADDITIONAL PREPARATION OR TILLAGE.

3. TOPSOIL SHOULD NOT BE PLACED WHILE THE TOPSOIL OR SUBSOIL IS IN A FROZEN OR MUDDY CONDITION, WHEN THE SUBSOIL IS EXCESSIVELY WET, OR IN A CONDITION THAT MAY OTHERWISE BE DETRIMENTAL TO PROPER GRADING AND SEEDBED PREPARATION. COMPACTED SOILS SHOULD BE SCARIFIED 6 TO 12 INCHES

ALONG CONTOUR WHEREVER POSSIBLE PRIOR TO SEEDING.

SOIL TYPES FOUND ON OR NEAR THE PROJECT SITE ARE:

SYMBOL NAME

UmB Urban Land- Duffield Complex, 0-8% Slope

GENERAL E&S CONTROL

1. THE INTENT OF THIS PLAN IS TO PROVIDE EROSION AND SEDIMENTATION CONTROLS DURING CONSTRUCTION OF THE REMOVAL AND

REPLACEMENT OF THE EXISTING PLAY SURFACE AREAS AT THE CITY PARK PROPERTY OF PENDORA PARK IN THE CITY OF READING, PA. IMPROVEMENTS WILL CONSIST OF MULCH REMOVAL / INSTALLATION OF RUBBER POURED IN PLACE SAFETY MATERIAL FOR PLAY

AREAS AROUND THE EXISTING EQUIPMENT.

2. ALL EARTH DISTURBANCES, INCLUDING CUTS AND FILLS SHALL BE DONE IN ACCORDANCE WITH THE E&S PLAN. A COPY OF THE E&S

DRAWINGS MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES.

3. CLEARING, GRUBBING AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPs SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN

INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS E&S PLAN.

4. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED AND FENCED OFF BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN. ALL VEHICLES MUST ENTER AND EXIT THE PROJECT SITE THROUGH THE ROCK CONSTRUCTION ENTRANCE.

5. EACH STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS SHALL NOT EXCEED

35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR FLATTER.

6. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION AND NOTIFY THE LOCAL CONSERVATION DISTRICT AND/OR THE REGIONAL

OFFICE OF THE DEPARTMENT.

7. ALL TEMPORARY STOCKPILED NON-STABILIZED MATERIALS SHALL BE COVERED WITH A TARP, MULCH, OR OTHER SUITABLE

STABILIZATION IN ORDER TO PREVENT WASH-OFF WHEN PRECIPITATION IS IMMINENT.

8. WHERE DUST OR WIND EROSION IS A PROBLEM, THE UNSTABLE SURFACES SHALL BE TREATED WITH WATER OR OTHER SUITABLE

DUST SUPPRESSOR.

9. TEMPORARY SEEDING SHALL BE PLACED IN ACCORDANCE WITH THE TEMPORARY SEEDING SPECIFICATIONS. TEMPORARY SEEDING SHALL BE APPLIED TO THOSE AREAS THAT ARE A POTENTIAL EROSION RISK AND THOSE AREAS WHERE CONSTRUCTION ACTIVITIES

HAVE ENDED.

10. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT CONTROL BMPS MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT CONTROL BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEANOUT, REPAIR, REPLACEMENT, RE-GRADING, RE-SEEDING, RE-MULCHING AND RE-NETTING MUST BE PERFORMED IMMEDIATELY. IF EROSION AND SEDIMENT CONTROL BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED.

11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY EXCESS MATERIAL AND SHALL ENSURE THAT ALL OFF SITE WASTE AND BORROW AREAS RECEIVING EXCESS MATERIAL HAVE AN APPROVED EROSION AND SEDIMENTATION CONTROL PLAN THAT COMPLIES WITH THE CONDITIONS OF CHAPTER 102 AND/OR OTHER FEDERAL, STATE, AND LOCAL REGULATIONS.

12. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT

QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING.

13. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY AN DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.

14. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE, THE CONTRACTOR SHALL STABILIZE THE DISTURBED AREAS. DURING NON-GERMINATING PERIODS, MULCH MUST BE APPLIED AT THE SPECIFIED RATES. DISTURBED AREAS WHICH ARE NOT AT FINISHED GRADE AND WHICH WILL BE RE-DISTURBED WITHIN ONE (1) YEAR MUST BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY VEGETATIVE STABILIZATION SPECIFICATIONS.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .